You are on page 1of 2

Federal Register / Vol. 71, No.

57 / Friday, March 24, 2006 / Notices 14891

10. Total Annual Hours for Collection: congressional requirements of the report IV. Document Availability
The reporting burden for this survey is on DR in EPAct 2005. This conforms to 20. In addition to publishing the full
estimated at 16,860 hours. the Commission’s plan for efficient text of this document in the Federal
11. Information Collection Costs: The information collection, communication, Register, the Commission provides all
surveyed organizations collect all the and management within the electric interested persons an opportunity to
information requested in FERC–727 and industry. view and/or print the contents of this
FERC–728 as part of their customary
18. Interested persons may obtain document via the Internet through the
and usual business practices. There
information on the reporting Commission’s Home Page (http://
were no comments on the cost of
responding to FERC–727 and FERC– requirements of the survey by www.ferc.gov) and in the Commission’s
728. Therefore, the Commission contacting the following: Federal Energy Public Reference Room during normal
concludes that its calculation of the Regulatory Commission, 888 First business hours (8:30 a.m. to 5 p.m.
average annualized cost for all Street, NE., Washington, DC 20426 Eastern time) at 888 First Street, NE.,
respondents being projected to be (Attention: Michael Miller, Office of the Room 2A, Washington, DC 20426.
$910,440 (16,860 hours × $54 per hour) Executive Director, 202–502–8415, fax: 21. From the Commission’s home
is accurate. 202–273–0873, e-mail: page on the Internet, this information is
12. Title: FERC–727, Demand available in the Commission’s document
Michael.miller@ferc.gov). To submit
Response and Time-Based Rate management system, eLibrary. The full
comments concerning the collection of
Programs Survey and FERC–728, text of this document is available on
information and the associated burden eLibrary in PDF and Microsoft Word
Advanced Metering Infrastructure estimates including suggestions for
Survey. format for viewing, printing, and/or
reducing this burden, please send your downloading. To access this document
13. Action: Proposed Information
comments to the contact listed above in eLibrary, type the docket number
Collection. The respondent shall not be
penalized for failure to respond to this and to the Office of Management and excluding the last three digits of this
collection of information unless the Budget, Room 10202 NEOB, 725 17th document in the docket number field.
collection of information displays a Street, NW., Washington, DC 20503 22. User assistance is available for
valid OMB control number. (Attention: Desk Officer for the Federal eLibrary and the Commission’s Web site
14. Respondents: Business or other for Energy Regulatory Commission), fax: during normal business hours. For
profit, publicly-owned utilities, and 202–395–7285, e-mail: assistance, please contact the
electric cooperatives, RTOs/ISOs. oira_submission@omb.eop.gov). Commission’s Online Support at 1–866–
15. Frequency of Responses: On 19. The ‘‘public protection’’ provision 208–3676 (toll free) or 202–502–6652 (e-
occasion. of the Paperwork Reduction Act 6 mail at FERCOnlineSupport@ferc.gov),
16. Necessity of Information: On requires each agency to display a or the Public Reference Room at (202)
August 8, 2005, Congress enacted EPAct 502–8371, TTY (202) 502–8659. E-Mail
currently valid OMB control number
2005. Section 1252 (e)(3) of the EPAct the Public Reference Room at
and to inform respondents that a
2005 requires the Commission to draft public.referenceroom@ferc.gov.
response is not required unless the
and publish a report, by appropriate
information collection displays a valid Magalie R. Salas,
region, that assesses demand response
resources, including those available OMB control number on each Secretary.
from all consumer classes. Commission information collection. This provision [FR Doc. E6–4230 Filed 3–23–06; 8:45 am]
staff has reviewed public information to has two legal effects: (1) It creates a legal BILLING CODE 6717–01–P
determine the availability of saturation responsibility for the agency; and (2) it
and penetration data on advanced provides an affirmative legal defense for
metering with the regional specificity respondents if the information ENVIRONMENTAL PROTECTION
required by the EPAct 2005. The review collection is imposed on respondents by AGENCY
included an assessment of the EIA–861, the Commission through regulation or
which collects aggregate information on administrative means in order to satisfy [ER–FRL–6673–6]
energy efficiency and load management. a legal authority or responsibility of the
Commission. If the Commission should Environmental Impact Statements and
The EIA–861 does not include any Regulations; Availability of EPA
information on advanced metering. fail to display an OMB control number,
Comments
Moreover, there are no publicly then it is the Commission not the
available saturation and penetration respondent who is in violation of the Availability of EPA comments
data on advanced metering at the level law. ‘‘Display’’ is defined as publishing prepared pursuant to the Environmental
required by the EPAct 2005. The the OMB control number in regulations, Review Process (ERP), under section
Commission is dedicated to establishing guidelines or other issuances in the 309 of the Clean Air Act and Section
clear market rules to govern electric Federal Register (for example, in the 102(2)(c) of the National Environmental
markets. The information collected preamble or regulatory text for the final Policy Act as amended. Requests for
through this survey will assist the rule containing the information copies of EPA comments can be directed
Commission in carrying out its goal of collection).7 Therefore, the Commission to the Office of Federal Activities at
developing robust and efficient energy may not conduct or sponsor, and a 202–564–7167. An explanation of the
markets. person is not required to respond to a ratings assigned to draft environmental
17. Internal Review: Internal review at collection of information unless the impact statements (EISs) was published
the Commission shows that there is information collection displays a valid in FR dated April 1, 2005 (70 FR 16815).
specific, objective support for the OMB control number.
wwhite on PROD1PC61 with NOTICES

burden estimates associated with the Draft EISs


information requirements. The 6 44 U.S.C. 3512 (2000); 5 CFR 1320.5(b) (2005);
EIS No. 20050510, ERP No. D–FHW–
Commission will review the data 5 CFR 1320.6(a) (2005). D40334–VA, I–81 Corridor
resulting from the survey to ensure that 7 See 1 CFR 21.35 (2005); 5 CFR 1320.3(f)(3) Improvement Study in Virginia,
the survey results meet the (2005). Transportation Improvements from

VerDate Aug<31>2005 18:26 Mar 23, 2006 Jkt 208001 PO 00000 Frm 00060 Fmt 4703 Sfmt 4703 E:\FR\FM\24MRN1.SGM 24MRN1
14892 Federal Register / Vol. 71, No. 57 / Friday, March 24, 2006 / Notices

the Tennessee Border to the West Alternative (LEDPA) based on Section EIS No. 20060086, Draft EIS, BLM, WY,
Virginia Border, (Tier 1), Several 404(b)(1) Guidelines. EPA also Pit 14 Coal Lease-by-Application
Counties, VA and WV. recommends including additional Project, Black Butte Coal Mine,
Summary: EPA expressed compensatory mitigation for Surface Mining Operations, Federal
environmental concerns about the unavoidable impacts to old growth Coal Lease Application WYW160394,
proposed project arising from the habitat areas. Sweetwater County, WY, Comment
reliability of projecting traffic data to the EIS No. 20050417, ERP No. FS–COE– Period Ends: 05/22/2006, Contact:
year 2035, and the lack of data in the D35057–MD, Poplar Island Teri Deakins 307–352–0211.
Tier 1 document to support the Environmental Restoration Project, EIS No. 20060087, Final EIS, AFS, IL,
intended Tier 1 decisions. Rating EC2. Habitat Restoration and Dredged Shawnee National Forest Trails
EIS No. 20050511, ERP No. D–DOE– Material Capacity, Chesapeake Bay, Designation Project, Phase 1,
D09800–PA, Gilberton Coal-to-Clean Talbot County, MD. Designation, Construction and
Fuels and Power Project, Construction Summary: EPA’s comments on the Maintenance for Trail System within
and Operation a New Demonstration Draft EIS were adequately addressed; we Four Watershed: Eagle Creek, Big
Plant, Schuylkill County, PA. have no objections to the proposed Grand Pierre Creek, Lusk Creek and
Summary: EPA expressed action. Upper Bay Creek, Hidden Springs
environmental concerns about the Dated: March 21, 2006. Ranger District, Gallatin, Hardin,
uncertainty and lack of information Robert W. Hargrove, Johnson, Pope and Saline Counties,
related to cumulative impacts of the IL, Wait Period Ends: 04/24/2006,
Director, NEPA Compliance Division, Office
various emissions associated with the of Federal Activities. Contact: Matthew Lechner 618–253–
facility, fugitive dust associated with 7114.
[FR Doc. E6–4300 Filed 3–23–06; 8:45 am]
construction activities, and a need for BILLING CODE 6560–50–P This document is available on the
greater emphasis on public outreach and Internet at: http://www.fs.fed.us/r9/
community involvement efforts. Rating forests/shawnee/projects/projects/eis/
EC2. ENVIRONMENTAL PROTECTION 2005/trails/final/trails-FEIS.pdf.
EIS No. 20060010, ERP No. D–IBR– AGENCY EIS No. 20060088, Draft EIS, FTA, CO,
G31003–NM, Long-Term [ER–FRL–6673–5] Denver Union Station (DUS) Project,
Miscellaneous Purposes Contract Transportation Improvement,
Abstract, To Use Carlsbad Project Environmental Impacts Statements; Multimodal Transportation Center for
Water for Purposes Other than Notice of Availability the Metro Denver Region, Funding
Irrigation, Eddy County, NM. and NPDES Permit, City and County
Responsible Agency: Office of Federal
Summary: EPA does not object to the Denver, CO, Comment Period Ends:
Activities, General Information (202)
proposed action. Rating LO. 05/08/2006, Contact: David
564–7167 or http://www.epa.gov/
EIS No. 20060023, ERP No. D–IBR– Beckhouse 720–963–3306.
compliance/nepa/.
G39046–00, Upper Rio Grande Basin EIS No. 20060089, Draft Supplement,
Weekly receipt of Environmental Impact
Water Operations Review, To Develop AFS, ID, West Gold Creek Project,
Statements
an Integrated Plan for Water Filed 3/13/2006 through 3/17/2006 Updated Information, Forest
Operations at the Existing Facilities, Pursuant to 40 CFR 1506.9. Management Activities Plan,
NM, CO and TX. Implementation, Idaho Panhandle
EIS No. 20060083, Draft EIS, AFS, AZ,
Summary: EPA does not object to the National Forests, Sandpoints Ranger
Jacob Ryan Vegetation Management
selected alternative. Rating LO. District, Bonner County, ID, Comment
Project, Implementation, Kaibab
EIS No. 20060028, ERP No. D–DOD– Period Ends: 05/08/2006, Contact: A.J.
National Forest, North Kaibab Ranger
G11046–NM, Programmatic—Defense Helgenberg 208–265–6643.
District, Coconino County, AZ,
Threat Reduction Agency (DTRA) Comment Period Ends: 05/08/2006, This document is available on the
Activities on White Sands Missile Contact: Jonathan M. Beck 928–643– Internet at: http://www.fs.fed.us/ipnf/
Range (WSMR), Implementation, NM. 8143. eco/manage/nepa/sptnepa/wgold/
Summary: EPA does not object to the wg_dseis_ document.pdf.
This document is available on the
selected alternative. Rating LO. Internet at: http://www.fs.fed.us/r3/kai/ EIS No. 20060090, Draft EIS, AFS, WI,
projects/jacob_ryan/deis/index.html. Fishbone Project Area, Vegetation and
Final EISs Road Management, Implementation,
EIS No. 20060084, Draft EIS, DOA, CA,
EIS No. 20060040, ERP No. F–FHW– Commercial Park Stock Permit Washburn Ranger District,
L40203–AK, Juneau Access Reissuance for the Sierra National Chequamegon-Nicolet National
Transportation Project, Improvements Forest and Trail Management Plan for Forest, Bayfield County, WI,
in the Lynn Canal/Taiya Inlet the Dinkey Lakes Wilderness, Comment Period Ends: 05/08/2006,
Corridor between Juneau and Haines/ Application Reissuance Special-Use- Contact: Cristi Corey-Luse 715–373–
Skagway, Special-Use-Permit and Permit, Mariposa, Madera and Fresno 2667 Ext. 235.
COE Section 10 and 404 Permits, Counties, CA, Comment Period Ends: EIS No. 20060091, Draft EIS, AFS, CA,
Tongass National Forest, Klondike 05/15/2006, Contact: Kim Sorini- Phoenix Project Area, Treat Poor
Gold Rush National Historic Park, Wilson 559–855–5355, Ext. 3328. Forest Health, High Fire Hazard
Haines States Forest, City and EIS No. 20060085, Draft EIS, NRS, MO, Condition, Develop a Network of
Borough of Juneau, Haines Borough, East Locust Creek Watershed Revised Defensible Fuel Profile Zones
Cities Haines and Skagway, AK. Plan, Installation of Multiple-Purpose (DFPZs), and Restore Aspen Stand,
wwhite on PROD1PC61 with NOTICES

Summary: EPA has environmental Reservoir, Flood Prevention and Sierraville Ranger District, Tahoe
concerns about the new preferred Watershed Protection, Sullivan and National Forest, Sierra and Nevada
Alternative 2B due to uncertainty about Putnam Counties, MO, Comment Counties, CA, Comment Period Ends:
whether it represents the Least Period Ends: 05/08/2006, Contact: Sue 5/8/2006, Contact: Jeff Leach 530–
Environmentally Damaging Practicable Teson 573–876–0912. 994–3401.

VerDate Aug<31>2005 18:26 Mar 23, 2006 Jkt 208001 PO 00000 Frm 00061 Fmt 4703 Sfmt 4703 E:\FR\FM\24MRN1.SGM 24MRN1

You might also like