You are on page 1of 13

Air System Sizing Summary for FF-Boarding Area

Project Name: Airport Terminal Extension


Prepared by: NBTC

09-13-2015
03:44PM

Air System Information


Air System Name ............................ FF-Boarding Area
Equipment Class ............................................ CW AHU
Air System Type ................................................ SZCAV

Number of zones ............................................................. 1


Floor Area ............................................................. 12427.0 m
Location ............................................ Kuwait City, Kuwait

Sizing Calculation Information


Zone and Space Sizing Method:
Zone L/s .......................... Sum of space airflow rates
Space L/s ...................... Individual peak space loads

Calculation Months ......................................... Jan to Dec


Sizing Data ...................................................... Calculated

Central Cooling Coil Sizing Data


Total coil load ..................................................... 3787.9
Sensible coil load ............................................... 2966.5
Coil L/s at Aug 1400 .......................................... 190684
Max block L/s .................................................... 190684
Sum of peak zone L/s ....................................... 190684
Sensible heat ratio ............................................... 0.783
m/kW ....................................................................... 3.3
W/m ..................................................................... 304.8
Water flow @ 6.0 K rise .................................... 151.09

kW
kW
L/s
L/s
L/s

L/s

Load occurs at ................................................... Aug 1400


OA DB / WB ...................................................... 47.6 / 25.4
Entering DB / WB ............................................. 25.2 / 17.8
Leaving DB / WB .............................................. 12.2 / 11.5
Coil ADP ..................................................................... 10.8
Bypass Factor .......................................................... 0.100
Resulting RH ................................................................. 55
Design supply temp. ................................................... 13.0
Zone T-stat Check .................................................... 1 of 1
Max zone temperature deviation .................................. 0.0

C
C
C
C
%
C
OK
K

Central Heating Coil Sizing Data


Max coil load ........................................................ 909.3 kW
Coil L/s at Nov 0400 .......................................... 190684 L/s
Max coil L/s ....................................................... 190684 L/s
Water flow @ 11.1 K drop ...................................... N/A

Load occurs at ................................................... Nov 0400


W/m ........................................................................... 73.2
Ent. DB / Lvg DB .............................................. 11.8 / 15.8 C

Supply Fan Sizing Data


Actual max L/s ................................................... 190684 L/s
Standard L/s ...................................................... 189447 L/s
Actual max L/(s-m) .............................................. 15.34 L/(s-m)

Outdoor Ventilation Air Data

Fan motor BHP ....................................................... 118.03 BHP


Fan motor kW ........................................................... 88.01 kW
Fan static ..................................................................... 300 Pa
L/s/person ................................................................... 5.00 L/s/person

Design airflow L/s ................................................ 56483 L/s


L/(s-m) ................................................................... 4.55 L/(s-m)

Hourly Analysis Program v4.51

Page 1 of 13

Air System Sizing Summary for FF-Office Periphery


Project Name: Airport Terminal Extension
Prepared by: NBTC

09-13-2015
03:44PM

Air System Information


Air System Name ......................... FF-Office Periphery
Equipment Class ............................................ CW AHU
Air System Type ................................................ SZCAV

Number of zones ............................................................. 1


Floor Area ............................................................... 4139.0 m
Location ............................................ Kuwait City, Kuwait

Sizing Calculation Information


Zone and Space Sizing Method:
Zone L/s .......................... Sum of space airflow rates
Space L/s ...................... Individual peak space loads

Calculation Months ......................................... Jan to Dec


Sizing Data ...................................................... Calculated

Central Cooling Coil Sizing Data


Total coil load ....................................................... 377.9
Sensible coil load ................................................. 353.0
Coil L/s at Aug 1300 ............................................ 29999
Max block L/s ...................................................... 29999
Sum of peak zone L/s ......................................... 29999
Sensible heat ratio ............................................... 0.934
m/kW ..................................................................... 11.0
W/m ....................................................................... 91.3
Water flow @ 6.0 K rise ...................................... 15.07

kW
kW
L/s
L/s
L/s

L/s

Load occurs at ................................................... Aug 1300


OA DB / WB ...................................................... 46.5 / 25.1
Entering DB / WB ............................................. 23.0 / 16.5
Leaving DB / WB .............................................. 13.2 / 12.5
Coil ADP ..................................................................... 12.1
Bypass Factor .......................................................... 0.100
Resulting RH ................................................................. 53
Design supply temp. ................................................... 13.0
Zone T-stat Check .................................................... 1 of 1
Max zone temperature deviation .................................. 0.0

C
C
C
C
%
C
OK
K

Central Heating Coil Sizing Data


Max coil load ......................................................... 115.0 kW
Coil L/s at Mar 0500 ............................................ 29999 L/s
Max coil L/s ......................................................... 29999 L/s
Water flow @ 11.1 K drop ...................................... N/A

Load occurs at ................................................... Mar 0500


W/m ........................................................................... 27.8
Ent. DB / Lvg DB .............................................. 13.4 / 16.6 C

Supply Fan Sizing Data


Actual max L/s ..................................................... 29999 L/s
Standard L/s ........................................................ 29805 L/s
Actual max L/(s-m) ................................................ 7.25 L/(s-m)

Outdoor Ventilation Air Data

Fan motor BHP ......................................................... 18.57 BHP


Fan motor kW ........................................................... 13.85 kW
Fan static ..................................................................... 300 Pa
L/s/person ................................................................... 5.03 L/s/person

Design airflow L/s .................................................. 1666 L/s


L/(s-m) ................................................................... 0.40 L/(s-m)

Hourly Analysis Program v4.51

Page 2 of 13

Air System Sizing Summary for GF-Airport Med Centre


Project Name: Airport Terminal Extension
Prepared by: NBTC

09-13-2015
03:44PM

Air System Information


Air System Name ................... GF-Airport Med Centre
Equipment Class ............................................ CW AHU
Air System Type ................................................ SZCAV

Number of zones ............................................................. 1


Floor Area ................................................................. 414.0 m
Location ............................................ Kuwait City, Kuwait

Sizing Calculation Information


Zone and Space Sizing Method:
Zone L/s .......................... Sum of space airflow rates
Space L/s ...................... Individual peak space loads

Calculation Months ......................................... Jan to Dec


Sizing Data ...................................................... Calculated

Central Cooling Coil Sizing Data


Total coil load .......................................................... 33.2
Sensible coil load ................................................... 31.1
Coil L/s at Oct 1500 ............................................... 2679
Max block L/s ........................................................ 2679
Sum of peak zone L/s ........................................... 2679
Sensible heat ratio ............................................... 0.937
m/kW ..................................................................... 12.5
W/m ....................................................................... 80.1
Water flow @ 6.0 K rise ........................................ 1.32

kW
kW
L/s
L/s
L/s

L/s

Load occurs at .................................................... Oct 1500


OA DB / WB ...................................................... 42.3 / 22.5
Entering DB / WB ............................................. 22.9 / 16.5
Leaving DB / WB .............................................. 13.2 / 12.6
Coil ADP ..................................................................... 12.1
Bypass Factor .......................................................... 0.100
Resulting RH ................................................................. 53
Design supply temp. ................................................... 13.0
Zone T-stat Check .................................................... 1 of 1
Max zone temperature deviation .................................. 0.0

C
C
C
C
%
C
OK
K

Central Heating Coil Sizing Data


Max coil load ............................................................ 9.2 kW
Coil L/s at Mar 0800 .............................................. 2679 L/s
Max coil L/s ........................................................... 2679 L/s
Water flow @ 11.1 K drop ...................................... N/A

Load occurs at ................................................... Mar 0800


W/m ........................................................................... 22.3
Ent. DB / Lvg DB .............................................. 13.5 / 16.4 C

Supply Fan Sizing Data


Actual max L/s ....................................................... 2679 L/s
Standard L/s .......................................................... 2661 L/s
Actual max L/(s-m) ................................................ 6.47 L/(s-m)

Outdoor Ventilation Air Data

Fan motor BHP ........................................................... 1.11 BHP


Fan motor kW ............................................................. 0.82 kW
Fan static ..................................................................... 200 Pa
L/s/person ................................................................... 5.03 L/s/person

Design airflow L/s .................................................... 166 L/s


L/(s-m) ................................................................... 0.40 L/(s-m)

Hourly Analysis Program v4.51

Page 3 of 13

Air System Sizing Summary for GF-Baggage Claim


Project Name: Airport Terminal Extension
Prepared by: NBTC

09-13-2015
03:44PM

Air System Information


Air System Name .......................... GF-Baggage Claim
Equipment Class ............................................ CW AHU
Air System Type ................................................ SZCAV

Number of zones ............................................................. 1


Floor Area ............................................................... 8150.0 m
Location ............................................ Kuwait City, Kuwait

Sizing Calculation Information


Zone and Space Sizing Method:
Zone L/s .......................... Sum of space airflow rates
Space L/s ...................... Individual peak space loads

Calculation Months ......................................... Jan to Dec


Sizing Data ...................................................... Calculated

Central Cooling Coil Sizing Data


Total coil load ..................................................... 3870.3
Sensible coil load ............................................... 3273.4
Coil L/s at Aug 1500 .......................................... 250423
Max block L/s .................................................... 250423
Sum of peak zone L/s ....................................... 250423
Sensible heat ratio ............................................... 0.846
m/kW ....................................................................... 2.1
W/m ..................................................................... 474.9
Water flow @ 6.0 K rise .................................... 154.37

kW
kW
L/s
L/s
L/s

L/s

Load occurs at ................................................... Aug 1500


OA DB / WB ...................................................... 48.0 / 25.5
Entering DB / WB ............................................. 23.8 / 17.1
Leaving DB / WB .............................................. 13.0 / 12.3
Coil ADP ..................................................................... 11.7
Bypass Factor .......................................................... 0.100
Resulting RH ................................................................. 55
Design supply temp. ................................................... 13.0
Zone T-stat Check .................................................... 1 of 1
Max zone temperature deviation .................................. 0.0

C
C
C
C
%
C
OK
K

Central Heating Coil Sizing Data


Max coil load ...................................................... 1619.8 kW
Coil L/s at Nov 0600 .......................................... 250423 L/s
Max coil L/s ....................................................... 250423 L/s
Water flow @ 11.1 K drop ...................................... N/A

Load occurs at ................................................... Nov 0600


W/m ......................................................................... 198.8
Ent. DB / Lvg DB .............................................. 12.6 / 18.0 C

Supply Fan Sizing Data


Actual max L/s ................................................... 250423 L/s
Standard L/s ...................................................... 248799 L/s
Actual max L/(s-m) .............................................. 30.73 L/(s-m)

Outdoor Ventilation Air Data

Fan motor BHP ....................................................... 155.00 BHP


Fan motor kW ......................................................... 115.58 kW
Fan static ..................................................................... 300 Pa
L/s/person ................................................................... 5.00 L/s/person

Design airflow L/s ................................................ 40750 L/s


L/(s-m) ................................................................... 5.00 L/(s-m)

Hourly Analysis Program v4.51

Page 4 of 13

Air System Sizing Summary for GF-BHS


Project Name: Airport Terminal Extension
Prepared by: NBTC

09-13-2015
03:44PM

Air System Information


Air System Name ............................................ GF-BHS
Equipment Class ............................................ CW AHU
Air System Type ................................................ SZCAV

Number of zones ............................................................. 1


Floor Area ............................................................. 10135.0 m
Location ............................................ Kuwait City, Kuwait

Sizing Calculation Information


Zone and Space Sizing Method:
Zone L/s .......................... Sum of space airflow rates
Space L/s ...................... Individual peak space loads

Calculation Months ......................................... Jan to Dec


Sizing Data ...................................................... Calculated

Central Cooling Coil Sizing Data


Total coil load ....................................................... 994.1
Sensible coil load ................................................. 986.4
Coil L/s at Jul 1400 .............................................. 89259
Max block L/s ...................................................... 89259
Sum of peak zone L/s ......................................... 89259
Sensible heat ratio ............................................... 0.992
m/kW ..................................................................... 10.2
W/m ....................................................................... 98.1
Water flow @ 6.0 K rise ...................................... 39.65

kW
kW
L/s
L/s
L/s

L/s

Load occurs at ..................................................... Jul 1400


OA DB / WB ...................................................... 47.6 / 25.4
Entering DB / WB ............................................. 22.6 / 16.3
Leaving DB / WB .............................................. 13.4 / 12.8
Coil ADP ..................................................................... 12.4
Bypass Factor .......................................................... 0.100
Resulting RH ................................................................. 52
Design supply temp. ................................................... 13.0
Zone T-stat Check .................................................... 1 of 1
Max zone temperature deviation .................................. 0.0

C
C
C
C
%
C
OK
K

Central Heating Coil Sizing Data


Max coil load ........................................................ 529.4 kW
Coil L/s at Nov 0400 ............................................ 89259 L/s
Max coil L/s ......................................................... 89259 L/s
Water flow @ 11.1 K drop ...................................... N/A

Load occurs at ................................................... Nov 0400


W/m ........................................................................... 52.2
Ent. DB / Lvg DB .............................................. 13.5 / 18.5 C

Supply Fan Sizing Data


Actual max L/s ..................................................... 89259 L/s
Standard L/s ........................................................ 88680 L/s
Actual max L/(s-m) ................................................ 8.81 L/(s-m)

Outdoor Ventilation Air Data

Fan motor BHP ......................................................... 55.25 BHP


Fan motor kW ........................................................... 41.20 kW
Fan static ..................................................................... 300 Pa
L/s/person ................................................................... 5.02 L/s/person

Design airflow L/s .................................................... 507 L/s


L/(s-m) ................................................................... 0.05 L/(s-m)

Hourly Analysis Program v4.51

Page 5 of 13

Air System Sizing Summary for GF-Boarding Area


Project Name: Airport Terminal Extension
Prepared by: NBTC

09-13-2015
03:44PM

Air System Information


Air System Name ........................... GF-Boarding Area
Equipment Class ............................................ CW AHU
Air System Type ................................................ SZCAV

Number of zones ............................................................. 1


Floor Area ............................................................... 7561.0 m
Location ............................................ Kuwait City, Kuwait

Sizing Calculation Information


Zone and Space Sizing Method:
Zone L/s .......................... Sum of space airflow rates
Space L/s ...................... Individual peak space loads

Calculation Months ......................................... Jan to Dec


Sizing Data ...................................................... Calculated

Central Cooling Coil Sizing Data


Total coil load ..................................................... 1330.0
Sensible coil load ............................................... 1039.6
Coil L/s at Jul 1500 .............................................. 66210
Max block L/s ...................................................... 66210
Sum of peak zone L/s ......................................... 66210
Sensible heat ratio ............................................... 0.782
m/kW ....................................................................... 5.7
W/m ..................................................................... 175.9
Water flow @ 6.0 K rise ...................................... 53.05

kW
kW
L/s
L/s
L/s

L/s

Load occurs at ..................................................... Jul 1500


OA DB / WB ...................................................... 48.0 / 25.5
Entering DB / WB ............................................. 25.2 / 17.7
Leaving DB / WB .............................................. 12.1 / 11.4
Coil ADP ..................................................................... 10.6
Bypass Factor .......................................................... 0.100
Resulting RH ................................................................. 55
Design supply temp. ................................................... 13.0
Zone T-stat Check .................................................... 1 of 1
Max zone temperature deviation .................................. 0.0

C
C
C
C
%
C
OK
K

Central Heating Coil Sizing Data


Max coil load ........................................................ 234.9 kW
Coil L/s at Mar 1000 ............................................ 66210 L/s
Max coil L/s ......................................................... 66210 L/s
Water flow @ 11.1 K drop ...................................... N/A

Load occurs at ................................................... Mar 1000


W/m ........................................................................... 31.1
Ent. DB / Lvg DB .............................................. 12.0 / 15.0 C

Supply Fan Sizing Data


Actual max L/s ..................................................... 66210 L/s
Standard L/s ........................................................ 65780 L/s
Actual max L/(s-m) ................................................ 8.76 L/(s-m)

Outdoor Ventilation Air Data

Fan motor BHP ......................................................... 40.98 BHP


Fan motor kW ........................................................... 30.56 kW
Fan static ..................................................................... 300 Pa
L/s/person ................................................................... 5.00 L/s/person

Design airflow L/s ................................................ 19900 L/s


L/(s-m) ................................................................... 2.63 L/(s-m)

Hourly Analysis Program v4.51

Page 6 of 13

Air System Sizing Summary for GF-Check in Hall


Project Name: Airport Terminal Extension
Prepared by: NBTC

09-13-2015
03:44PM

Air System Information


Air System Name ............................. GF-Check in Hall
Equipment Class ............................................ CW AHU
Air System Type ................................................ SZCAV

Number of zones ............................................................. 1


Floor Area ............................................................... 3015.0 m
Location ............................................ Kuwait City, Kuwait

Sizing Calculation Information


Zone and Space Sizing Method:
Zone L/s .......................... Sum of space airflow rates
Space L/s ...................... Individual peak space loads

Calculation Months ......................................... Jan to Dec


Sizing Data ...................................................... Calculated

Central Cooling Coil Sizing Data


Total coil load ..................................................... 1947.4
Sensible coil load ............................................... 1632.5
Coil L/s at Aug 1400 ............................................ 92001
Max block L/s ...................................................... 92001
Sum of peak zone L/s ......................................... 92001
Sensible heat ratio ............................................... 0.838
m/kW ....................................................................... 1.5
W/m ..................................................................... 645.9
Water flow @ 6.0 K rise ...................................... 77.67

kW
kW
L/s
L/s
L/s

L/s

Load occurs at ................................................... Aug 1400


OA DB / WB ...................................................... 47.6 / 25.4
Entering DB / WB ............................................. 26.5 / 17.6
Leaving DB / WB .............................................. 11.7 / 10.9
Coil ADP ..................................................................... 10.1
Bypass Factor .......................................................... 0.100
Resulting RH ................................................................. 50
Design supply temp. ................................................... 13.0
Zone T-stat Check .................................................... 1 of 1
Max zone temperature deviation .................................. 0.0

C
C
C
C
%
C
OK
K

Central Heating Coil Sizing Data


Max coil load ........................................................ 760.9 kW
Coil L/s at Dec 0600 ............................................ 92001 L/s
Max coil L/s ......................................................... 92001 L/s
Water flow @ 11.1 K drop ...................................... N/A

Load occurs at ................................................... Dec 0600


W/m ......................................................................... 252.4
Ent. DB / Lvg DB .............................................. 11.2 / 18.0 C

Supply Fan Sizing Data


Actual max L/s ..................................................... 92001 L/s
Standard L/s ........................................................ 91404 L/s
Actual max L/(s-m) .............................................. 30.51 L/(s-m)

Outdoor Ventilation Air Data

Fan motor BHP ......................................................... 56.94 BHP


Fan motor kW ........................................................... 42.46 kW
Fan static ..................................................................... 300 Pa
L/s/person ................................................................... 5.00 L/s/person

Design airflow L/s ................................................ 15075 L/s


L/(s-m) ................................................................... 5.00 L/(s-m)

Hourly Analysis Program v4.51

Page 7 of 13

Air System Sizing Summary for GF-Concession


Project Name: Airport Terminal Extension
Prepared by: NBTC

09-13-2015
03:44PM

Air System Information


Air System Name ............................... GF-Concession
Equipment Class ............................................ CW AHU
Air System Type ................................................ SZCAV

Number of zones ............................................................. 1


Floor Area ............................................................... 4374.0 m
Location ............................................ Kuwait City, Kuwait

Sizing Calculation Information


Zone and Space Sizing Method:
Zone L/s .......................... Sum of space airflow rates
Space L/s ...................... Individual peak space loads

Calculation Months ......................................... Jan to Dec


Sizing Data ...................................................... Calculated

Central Cooling Coil Sizing Data


Total coil load ..................................................... 1572.6
Sensible coil load ............................................... 1206.8
Coil L/s at Aug 1500 ............................................ 45845
Max block L/s ...................................................... 45845
Sum of peak zone L/s ......................................... 45845
Sensible heat ratio ............................................... 0.767
m/kW ....................................................................... 2.8
W/m ..................................................................... 359.5
Water flow @ 6.0 K rise ...................................... 62.73

kW
kW
L/s
L/s
L/s

L/s

Load occurs at ................................................... Aug 1500


OA DB / WB ...................................................... 48.0 / 25.5
Entering DB / WB ............................................. 32.2 / 19.9
Leaving DB / WB ................................................ 10.2 / 9.3
Coil ADP ....................................................................... 7.8
Bypass Factor .......................................................... 0.100
Resulting RH ................................................................. 50
Design supply temp. ................................................... 13.0
Zone T-stat Check .................................................... 1 of 1
Max zone temperature deviation .................................. 0.0

C
C
C
C
%
C
OK
K

Central Heating Coil Sizing Data


Max coil load ........................................................ 375.5 kW
Coil L/s at Des Htg .............................................. 45845 L/s
Max coil L/s ......................................................... 45845 L/s
Water flow @ 11.1 K drop ...................................... N/A

Load occurs at ..................................................... Des Htg


W/m ........................................................................... 85.9
Ent. DB / Lvg DB .............................................. 15.1 / 21.9 C

Supply Fan Sizing Data


Actual max L/s ..................................................... 45845 L/s
Standard L/s ........................................................ 45548 L/s
Actual max L/(s-m) .............................................. 10.48 L/(s-m)

Outdoor Ventilation Air Data

Fan motor BHP ......................................................... 18.92 BHP


Fan motor kW ........................................................... 14.11 kW
Fan static ..................................................................... 200 Pa
L/s/person ................................................................... 5.00 L/s/person

Design airflow L/s ................................................ 17497 L/s


L/(s-m) ................................................................... 4.00 L/(s-m)

Hourly Analysis Program v4.51

Page 8 of 13

Air System Sizing Summary for GF-Immigration Hall


Project Name: Airport Terminal Extension
Prepared by: NBTC

09-13-2015
03:44PM

Air System Information


Air System Name ........................ GF-Immigration Hall
Equipment Class ............................................ CW AHU
Air System Type ................................................ SZCAV

Number of zones ............................................................. 1


Floor Area ............................................................... 7561.0 m
Location ............................................ Kuwait City, Kuwait

Sizing Calculation Information


Zone and Space Sizing Method:
Zone L/s .......................... Sum of space airflow rates
Space L/s ...................... Individual peak space loads

Calculation Months ......................................... Jan to Dec


Sizing Data ...................................................... Calculated

Central Cooling Coil Sizing Data


Total coil load ..................................................... 1657.4
Sensible coil load ............................................... 1306.8
Coil L/s at Jul 1500 .............................................. 57188
Max block L/s ...................................................... 57188
Sum of peak zone L/s ......................................... 57188
Sensible heat ratio ............................................... 0.788
m/kW ....................................................................... 4.6
W/m ..................................................................... 219.2
Water flow @ 6.0 K rise ...................................... 66.11

kW
kW
L/s
L/s
L/s

L/s

Load occurs at ..................................................... Jul 1500


OA DB / WB ...................................................... 48.0 / 25.5
Entering DB / WB ............................................. 30.0 / 19.1
Leaving DB / WB .............................................. 10.9 / 10.0
Coil ADP ....................................................................... 8.8
Bypass Factor .......................................................... 0.100
Resulting RH ................................................................. 50
Design supply temp. ................................................... 13.0
Zone T-stat Check .................................................... 1 of 1
Max zone temperature deviation .................................. 0.0

C
C
C
C
%
C
OK
K

Central Heating Coil Sizing Data


Max coil load ........................................................ 342.0 kW
Coil L/s at Des Htg .............................................. 57188 L/s
Max coil L/s ......................................................... 57188 L/s
Water flow @ 11.1 K drop ...................................... N/A

Load occurs at ..................................................... Des Htg


W/m ........................................................................... 45.2
Ent. DB / Lvg DB .............................................. 16.4 / 21.4 C

Supply Fan Sizing Data


Actual max L/s ..................................................... 57188 L/s
Standard L/s ........................................................ 56817 L/s
Actual max L/(s-m) ................................................ 7.56 L/(s-m)

Outdoor Ventilation Air Data

Fan motor BHP ......................................................... 35.40 BHP


Fan motor kW ........................................................... 26.40 kW
Fan static ..................................................................... 300 Pa
L/s/person ................................................................... 5.00 L/s/person

Design airflow L/s ................................................ 16824 L/s


L/(s-m) ................................................................... 2.23 L/(s-m)

Hourly Analysis Program v4.51

Page 9 of 13

Air System Sizing Summary for GF-IT Room


Project Name: Airport Terminal Extension
Prepared by: NBTC

09-13-2015
03:44PM

Air System Information


Air System Name ...................................... GF-IT Room
Equipment Class ............................................ CW AHU
Air System Type ................................................ SZCAV

Number of zones ............................................................. 1


Floor Area ................................................................. 271.0 m
Location ............................................ Kuwait City, Kuwait

Sizing Calculation Information


Zone and Space Sizing Method:
Zone L/s .......................... Sum of space airflow rates
Space L/s ...................... Individual peak space loads

Calculation Months ......................................... Jan to Dec


Sizing Data ...................................................... Calculated

Central Cooling Coil Sizing Data


Total coil load .......................................................... 53.8
Sensible coil load ................................................... 50.3
Coil L/s at Jul 1500 ................................................ 3808
Max block L/s ........................................................ 3808
Sum of peak zone L/s ........................................... 3808
Sensible heat ratio ............................................... 0.933
m/kW ....................................................................... 5.0
W/m ..................................................................... 198.7
Water flow @ 6.0 K rise ........................................ 2.15

kW
kW
L/s
L/s
L/s

L/s

Load occurs at ..................................................... Jul 1500


OA DB / WB ...................................................... 48.0 / 25.5
Entering DB / WB ............................................. 20.0 / 13.4
Leaving DB / WB .................................................. 9.0 / 8.4
Coil ADP ....................................................................... 7.8
Bypass Factor .......................................................... 0.100
Resulting RH ................................................................. 50
Design supply temp. ................................................... 13.0
Zone T-stat Check .................................................... 1 of 1
Max zone temperature deviation .................................. 0.0

C
C
C
C
%
C
OK
K

Central Heating Coil Sizing Data


Max coil load .......................................................... 24.7 kW
Coil L/s at Feb 0800 .............................................. 3808 L/s
Max coil L/s ........................................................... 3808 L/s
Water flow @ 11.1 K drop ...................................... N/A

Load occurs at ................................................... Feb 0800


W/m ........................................................................... 91.3
Ent. DB / Lvg DB ................................................ 8.9 / 14.3 C

Supply Fan Sizing Data


Actual max L/s ....................................................... 3808 L/s
Standard L/s .......................................................... 3783 L/s
Actual max L/(s-m) .............................................. 14.05 L/(s-m)

Outdoor Ventilation Air Data

Fan motor BHP ........................................................... 1.57 BHP


Fan motor kW ............................................................. 1.17 kW
Fan static ..................................................................... 200 Pa
L/s/person ................................................................. 10.00 L/s/person

Design airflow L/s .................................................... 180 L/s


L/(s-m) ................................................................... 0.66 L/(s-m)

Hourly Analysis Program v4.51

Page 10 of 13

Air System Sizing Summary for GF-Office


Project Name: Airport Terminal Extension
Prepared by: NBTC

09-13-2015
03:44PM

Air System Information


Air System Name .......................................... GF-Office
Equipment Class ............................................ CW AHU
Air System Type ................................................ SZCAV

Number of zones ............................................................. 1


Floor Area ............................................................... 6420.0 m
Location ............................................ Kuwait City, Kuwait

Sizing Calculation Information


Zone and Space Sizing Method:
Zone L/s .......................... Sum of space airflow rates
Space L/s ...................... Individual peak space loads

Calculation Months ......................................... Jan to Dec


Sizing Data ...................................................... Calculated

Central Cooling Coil Sizing Data


Total coil load ....................................................... 561.5
Sensible coil load ................................................. 508.7
Coil L/s at Aug 1500 ............................................ 35469
Max block L/s ...................................................... 35469
Sum of peak zone L/s ......................................... 35469
Sensible heat ratio ............................................... 0.906
m/kW ..................................................................... 11.4
W/m ....................................................................... 87.5
Water flow @ 6.0 K rise ...................................... 22.40

kW
kW
L/s
L/s
L/s

L/s

Load occurs at ................................................... Aug 1500


OA DB / WB ...................................................... 48.0 / 25.5
Entering DB / WB ............................................. 24.4 / 16.8
Leaving DB / WB .............................................. 12.5 / 11.8
Coil ADP ..................................................................... 11.2
Bypass Factor .......................................................... 0.100
Resulting RH ................................................................. 50
Design supply temp. ................................................... 13.0
Zone T-stat Check .................................................... 1 of 1
Max zone temperature deviation .................................. 0.0

C
C
C
C
%
C
OK
K

Central Heating Coil Sizing Data


Max coil load ........................................................ 168.2 kW
Coil L/s at Dec 0600 ............................................ 35469 L/s
Max coil L/s ......................................................... 35469 L/s
Water flow @ 11.1 K drop ...................................... N/A

Load occurs at ................................................... Dec 0600


W/m ........................................................................... 26.2
Ent. DB / Lvg DB .............................................. 12.1 / 16.1 C

Supply Fan Sizing Data


Actual max L/s ..................................................... 35469 L/s
Standard L/s ........................................................ 35239 L/s
Actual max L/(s-m) ................................................ 5.52 L/(s-m)

Outdoor Ventilation Air Data

Fan motor BHP ......................................................... 18.29 BHP


Fan motor kW ........................................................... 13.64 kW
Fan static ..................................................................... 250 Pa
L/s/person ................................................................... 5.00 L/s/person

Design airflow L/s .................................................. 2568 L/s


L/(s-m) ................................................................... 0.40 L/(s-m)

Hourly Analysis Program v4.51

Page 11 of 13

Air System Sizing Summary for GF-Prayer Room


Project Name: Airport Terminal Extension
Prepared by: NBTC

09-13-2015
03:44PM

Air System Information


Air System Name ............................. GF-Prayer Room
Equipment Class ............................................ CW AHU
Air System Type ................................................ SZCAV

Number of zones ............................................................. 1


Floor Area ................................................................. 413.0 m
Location ............................................ Kuwait City, Kuwait

Sizing Calculation Information


Zone and Space Sizing Method:
Zone L/s .......................... Sum of space airflow rates
Space L/s ...................... Individual peak space loads

Calculation Months ......................................... Jan to Dec


Sizing Data ...................................................... Calculated

Central Cooling Coil Sizing Data


Total coil load ....................................................... 224.6
Sensible coil load ................................................. 172.8
Coil L/s at Jul 1600 ................................................ 4046
Max block L/s ........................................................ 4046
Sum of peak zone L/s ........................................... 4046
Sensible heat ratio ............................................... 0.770
m/kW ....................................................................... 1.8
W/m ..................................................................... 543.7
Water flow @ 6.0 K rise ........................................ 8.96

kW
kW
L/s
L/s
L/s

L/s

Load occurs at ..................................................... Jul 1600


OA DB / WB ...................................................... 47.6 / 25.4
Entering DB / WB ............................................. 47.1 / 25.3
Leaving DB / WB ................................................ 11.5 / 9.9
Coil ADP ....................................................................... 7.6
Bypass Factor .......................................................... 0.100
Resulting RH ................................................................. 50
Design supply temp. ................................................... 13.0
Zone T-stat Check .................................................... 1 of 1
Max zone temperature deviation .................................. 0.0

C
C
C
C
%
C
OK
K

Central Heating Coil Sizing Data


Max coil load .......................................................... 84.1 kW
Coil L/s at Des Htg ................................................ 4046 L/s
Max coil L/s ........................................................... 4046 L/s
Water flow @ 11.1 K drop ...................................... N/A

Load occurs at ..................................................... Des Htg


W/m ......................................................................... 203.5
Ent. DB / Lvg DB ................................................ 4.9 / 22.2 C

Supply Fan Sizing Data


Actual max L/s ....................................................... 4046 L/s
Standard L/s .......................................................... 4020 L/s
Actual max L/(s-m) ................................................ 9.80 L/(s-m)

Outdoor Ventilation Air Data

Fan motor BHP ........................................................... 1.67 BHP


Fan motor kW ............................................................. 1.24 kW
Fan static ..................................................................... 200 Pa
L/s/person ................................................................... 7.99 L/s/person

Design airflow L/s .................................................. 3965 L/s


L/(s-m) ................................................................... 9.60 L/(s-m)

Hourly Analysis Program v4.51

Page 12 of 13

Air System Sizing Summary for GF-Technical Rooms


Project Name: Airport Terminal Extension
Prepared by: NBTC

09-13-2015
03:44PM

Air System Information


Air System Name ...................... GF-Technical Rooms
Equipment Class ............................................ CW AHU
Air System Type ................................................ SZCAV

Number of zones ............................................................. 1


Floor Area ............................................................... 1978.0 m
Location ............................................ Kuwait City, Kuwait

Sizing Calculation Information


Zone and Space Sizing Method:
Zone L/s .......................... Sum of space airflow rates
Space L/s ...................... Individual peak space loads

Calculation Months ......................................... Jan to Dec


Sizing Data ...................................................... Calculated

Central Cooling Coil Sizing Data


Total coil load .......................................................... 77.8
Sensible coil load ................................................... 77.8
Coil L/s at Jul 1700 ................................................ 6757
Max block L/s ........................................................ 6757
Sum of peak zone L/s ........................................... 6757
Sensible heat ratio ............................................... 1.000
m/kW ..................................................................... 25.4
W/m ....................................................................... 39.4
Water flow @ 6.0 K rise ........................................ 3.10

kW
kW
L/s
L/s
L/s

L/s

Load occurs at ..................................................... Jul 1700


OA DB / WB ...................................................... 46.7 / 25.2
Entering DB / WB ............................................... 23.6 / 7.6
Leaving DB / WB ................................................ 14.0 / 2.6
Coil ADP ..................................................................... 12.9
Bypass Factor .......................................................... 0.100
Resulting RH ................................................................... 0
Design supply temp. ................................................... 13.0
Zone T-stat Check .................................................... 1 of 1
Max zone temperature deviation .................................. 0.0

C
C
C
C
%
C
OK
K

Central Heating Coil Sizing Data


Max coil load ............................................................ 8.0 kW
Coil L/s at Des Htg ................................................ 6757 L/s
Max coil L/s ........................................................... 6757 L/s
Water flow @ 11.1 K drop ...................................... N/A

Load occurs at ..................................................... Des Htg


W/m ............................................................................. 4.1
Ent. DB / Lvg DB .............................................. 21.7 / 22.7 C

Supply Fan Sizing Data


Actual max L/s ....................................................... 6757 L/s
Standard L/s .......................................................... 6714 L/s
Actual max L/(s-m) ................................................ 3.42 L/(s-m)

Outdoor Ventilation Air Data

Fan motor BHP ........................................................... 2.79 BHP


Fan motor kW ............................................................. 2.08 kW
Fan static ..................................................................... 200 Pa
L/s/person ................................................................... 0.00 L/s/person

Design airflow L/s ........................................................ 0 L/s


L/(s-m) ................................................................... 0.00 L/(s-m)

Hourly Analysis Program v4.51

Page 13 of 13