You are on page 1of 72

PORT AUTHORITY OF JAMAICA

ITEM

DESCRIPTION

QUANTITY

UNIT

RATE

CONTRACT SUM

ADDITION

General & Preliminary Items


Listed under this bill are items for which, in opinion of the
Engineer, a separate charge is appropriate and becomes due at
the times stated. The sums are entered against these items
shall be fixed lumps sums not subject to works. All extra costs
requir
Allow for the provision of the following insurances for the works
in accordance with the Condition of Contracts
A

a) Contractors All Risk

Sum

600,000.00

B
C

b) Public Liability
c) Employers Liability

Sum
Sum

Allow for provisons of Performance Bond of 10% for duration of


construction of the works

Sum

100,000.00

Allow for mobilisation of all necessary tools, equipment and


personnel site, inclusive of working platform or pontoon barge
and necessary mooring or anchoring equipment for safe
operation

Sum

550,000.00

Allow for mobilisation of equipment and site personnel

Sum

400,000.00

Programme

Sum

40,000.00

Setting Out

Sum

10,000.00

Allow for all safety and Personal Protective Equipment required


for the workforce including that required for working over water

Sum

250,000.00

Allow Provisional Sum of $50,000.00 for the supply and


installation of signs as per Engineers instructions

PS

50,000.00

Welfare and sanitary facilities, installation of temporary services,


false work, platforms, boat, tenting for protection of works and
removal on completion of contract.

Sum

250,000.00

Allow for modification to property fence and entrance canopy so


as to create access for equipment & make good on completion

Sum

200,000.00

Allow for taking all precaution to avoid any damage whatsoever


to existing infrastructures services.

Sum

80,000.00

Allow for providing samples of material proposed to be used in


the Contract which when requested by the Engineer shall be
furnished without delay.

Sum

50,000.00

TOTAL BILL NO. 1 - FIXED PRELIMINARIES


BQ/2 carried forward

Add#3 -

2,580,000.00

0.00

BILL NO. 1 Cont'd


A

Allow for providing and erecting in approved locations proper


sheds for use of the workmen, storage and protection of
materials (those for cement having floor raised at least 12" from
the ground) and for clearing same away upon completion of
construction.

Sum

Allow for the working, curing and testing of concrete test cubes.

Sum

The Contractor shall enter in the spaces below the clause


numbers of the conditions of Contract or Specification against
which to cover any special risk, liabilities and obligations not
described above and which cannot be included in the rates. The
amoun
TOTAL BILL NO. 1 - FIXED PRELIMINARIES
BQ/2 - brought forward
TOTAL BILL NO. 1 - FIXED PRELIMINARIES
carried to summary

Add#3 -

200,000.00

80,000.00

2,530,000.00
2,860,000.00

0.00

BILL NO. 2
Time Dependent Preliminaries
A

Temporary Services (eg. water, power, phone etc)

10

Week

Lighting, site security and keeping site clean at all times

10

Week

26,750.00

60,000.00

Site Supervsion and management.


List made up of total figure below:

10

Week

135,000.00

500,000.00

Item
Engineer
Supervisor

32,500.00

60,000.00

Amt/Week

TOTAL BILL NO. 2 - TIME DEPENDENT PRELIMINARIES

620,000.00

0.00

REPAIR TO PILE CAPS


BILL NO. 3
Pile Caps
Complete repairs as outlined to Pile Caps and concrete pile muff
protection over water depth between 1m and 6m
Repair to Pile Caps on Grid Lines B, C and E
A

Remove delaminated and spalling concrete to sides of pile cap


to depth of 100mm below reinforcement and clean with potable
water using high pressure water jet equipment during low tide
level

m2

140,000.00

Allow for cleaning of rebars with wet sand blasting, high


pressure potable water jet and mechanical cleaning to White
Metal (SSPC-SP5) (NACE1).
(Corroded portion of rebar
exposed to damaged face of pile caps)

m2

8,500.00

34,000.00

Allow for the replacement of corroded rebar where required with


16mm diameter bars x 1m, bent and welded to existing rebar as
per drawing sheet 2a and as instructed by the Engineer and
coated with epoxy zinc chromate primer to exposed surfaces

30

Kg

3,600.00

108,000.00

Supply and install wrought formwork to soffit and sides of pile


cap. (for minimum concrete thickness of 150mm) inclusive of
supports and bracing and striking on completion

m2

13,000.00

52,000.00

Place design concrete mix containing chloride inhibitors and


super plastisizers having a 28 day cube strength of 30 Mpa

0.6

m3

58,000.00

Allow Provisional Sum of $150,000.00 for supply and installation


of sacrificial anodes ( to be used as directed by the Engineer
and to removed in whole or part if unused)

Allow for the application of repair mortor to surface of repaired


concrete beam to seal and close any cracks which may appear.

PS

m2

560,000.00

34,800.00

558,000.00

46,400.00

150,000.00

2,000.00

8,000.00

1,100,000.00

Repair to Pile Caps on Grid Lines B, CD, , E, N, P and V


H

Chase cracks to minimum depth fo 30mm by 60mm wide and


repair with approved masonary repair concrete such Phoscrete
supplied by PowerGen Limited (or similar product approved by
the Engineer)

100

11,000.00

Clean during low tide exposed concrete and steel reinforcement


to 2no. Pile Head supporting Pile Cap D appox 0.4 x 0.45m x
2no at splash zone by water blasting with potable water and
apply layers of phoscrete concrete as per manufacturer
instruction to ac

no.

112,000.00

TOTAL BILL NO. 3 - REPAIRS TO PILE CAP


carried to summary

224,000.00

2,270,800.00

604,400.00

REPAIR TO PILE CAPS


BILL NO. 4
Repairs to Deck Support Beams
Repair/Reinstatement of damage to Precast Double Tees on
Grid Lines 5, 6, 7 & 8
A

Allow for temporary support and work access to each Double


Tee sections (approx. 14m length) in water depth varing
between 1m and 6m deep, during beam repairs

no.

235000

Remove 0.5 m2 delaminated and spalling concrete to expose at


least 150mm of tendon on either side of damaged double Tee
beam

no.

31,500.00

Sandblast reinforcement tendons to remove corrosion and apply


zinc chromate primer to exposed tendons

Supply and install wrought fromwork to soffit and side of beam.

1,880,000.00

252,000.00

36

8,500.00

306,000.00

84

m2

13,000.00

1,092,000.00

Place design concrete mix containing chloride inhibitors etc


having a 28 day cube strength of 30 Mpa

m3

58,000.00

174,000.00

Allow for the application of repair mortor to surface of repaired


concrete beam to complete repairs and seal any cracks which
may appear on surface of ccncrete.

42

m2

2,000.00

84,000.00

Allow for the temporary work access platform to complete


repairs to cracks in Double Tee beams in water depths 1m to 6m

no.

50,000.00

400,000.00

Include Provisional Sum of $600,000.00 to be used as


instructed by the Engineer. To be deducted in whole or part if
unused.
To apply Nitobond SBR as bonding agent to deck beams

PS

600,000.00

19,375.00

Alternative (Rate Only)


Apply shot crete or build up concrete having a 28 day cube
strength of 30 Mpa to complete beam repair around
reinforcement tendons inclusive of final surface render finish.

m3

TOTAL BILL NO. 4 - REPAIRS TO DECK SUPPORT BEAMS

4,788,000.00

19,375.00

REPAIR TO PILE CAPS


BILL NO. 5
Painting and Protective Coatings
A

Allow for the installation of protective drop cloth or equivalent


method to facilitate the collection of sand and debris at each
location resulting from the sandblasting of the concrete surface
(measured seperately)

item

100,000.00

Remove existing paint finish to to sides and soffit of


8 no.
pile caps by wet sand blasting or water blasting as required

192

m2

8,500.00

1,632,000.00

Apply approved corrosion inhibiting coating to the previously


prepared and new concrete surfaces of 8no. Pile caps as per
manufacturers instruction

192

m2

7,100.00

1,363,200.00

Repaint exterior surfaces (sides and soffit) of 8no. pile caps with
approved exterior marine grade paint finish, colour to match
existing

192

m2

1,000.00

Allow Provisional Sum of $300,000.00 to be used as instructed


by Engineer. To be removed in whole or part if not used

192,000.00

TOTAL BILL NO. 5 - PAINTING & PROTECTIVE COATINGS


carried to summary

PS

300,000.00

3,587,200.00

3,587,200.00

REPAIR TO DAMAGED T PIER


BILL NO. 6
DEMOLITION AND ALTERATION

The demolition of existing in-situ slab between centre lines 3-4


and A-B . The removal and replacement of two "L" -shaped
beams and repair one pile cap at 3B.

Carefully remove following damaged concrete section of pier


inclusive of all false work and safety measures
A

22'-0" x 12'-0" x 8" section of reinforced concrete slab


supported on 8" thick precast concrete slabs (to be reused)
mounted on damaged reinforced concrete beams (measured
seperately)

25.00

m2

4000

100,000.00

Damaged 18"x16"x22' reinforced concrete beams mounted on


pile caps as supports to precast slab and insitu slab. Insitu slab
to be removed and measured seprately.

13.50

46000

621,000.00

Cart away spoil

SUM

100,000.00

PRE-CAST REINFORCED CONCRETE

This section covers the replacement of 2 No. Pre-cast reinforced


concrete beam and in-situ 200mm concrete slab. Prices should
include for all costs involved in order to fulfill every requirement
of the design specification and any particular site conditio

Reinforced Concrete 4500 PSI in:


D

3.00

Cub. M

240,000.00

720,000.00

10 mm diameter Mild steel rod reinforced

415.00

Kg.

260.00

107,900.00

Precast Reinforced Concrete Beam fixed to top of piles as per

16 mm diameter high tensile rod reinforced

322.00

Kg.

300.00

96,600.00

25 mm diameter high tensile rod reinforced

660.00

Kg.

350.00

231,000.00

25 mm diameter high tensile rod reinforced( Dowel)

54.00

Kg

23.00

Sq. M

4,000.00

6.00

Sq. M

3,000.00

drawing
Steel Reinforcement

78,510.00

Formwork and support to:H

Side of beam

Ditto bottom of beam

Include

the

PROVISIONAL

SUM

of

$650,000.00

for

PS

92,000.00
18,000.00
650,000.00

Contingencies to be used as directed by the Engineer and to be


deducted in whole or in part if not required:TOTAL BILL NO. 6 - REPAIR TO DAMAGED T PIER
carried to summary

2,736,500.00

78,510.00

REPAIR TO DAMAGED T PIER


BILL NO. 7
IN-SITU REINFORCED CONCRETE
Reinforced Concrete Pile Cap
A

Pile Cap - Concrete 31 M.Pa

12 mm diameter mild steel rod reinforced

21.00

16 mm diameter high tensile rod reinforced

97.00

Kg.

Sides of pile cap

0.30

2.00

Cub. M

Sq. M

8.00

Cub. M

33,000.00

514.00

Kg.

Kg.

38,000.00

11,400.00

300.00

6,300.00

320.00

31,040.00

13,000.00

26,000.00

In-situ Reinforced Concrete Slab


E

200 mm thick slab laid on Pre-Cast slab (measured seperately)


finished with broom finish.

10 mm diameter mild steel rod reinforced

260.00

264,000.00

133,640.00

Nitobond SBR bonding Agent

TOTAL BILL NO. 7 - IN-SITU REINFORCED CONCRETE


carried to summary

38,125.00

472,380.00

38,125.00

REPAIR TO DAMAGED T PIER


BILL NO. 8
SHORE PROTECTION - BOULDERS
A

To supply material , labour to place boulders 0.9m and 1.2m in


diameter as rock armouring to shoreline in accordance with
specifications (Provisional)

600

Cub. M

5,000.00

Ditto with boulder 0.3m - 0.8m diameter ( Provisional)

40

Cub. M

5,000.00

Carefully reclaim boulders(0.9m and 1.2m in diameter) from


seabed in a depth of water not exceeding 1.5m for repacking in
rock armouring (Provisional)

80

Cub. M

4,000.00

TOTAL BILL NO. 8 - SHORE PROTECTION - BOULDERS


carried to summary

3,000,000.00

200,000.00
320,000.00

3,520,000.00

SUMMARY
PRELIMINARIES

1
2

Bill No.1 - FIXED PRELIMINARIES


Bill No.2 - TIME DEPENDENT PRELIMINARIES

3
4
5

Bill No.3 - REPAIRS TO PILE CAPS


Bill No.4 - REPAIRS TO DECK SUPPORT BEAMS
Bill No.5 - PAINTING & PROTECTIVE COATINGS

6
7
8

Bill No.6 - DEMOLITION AND ALTERATION


Bill No.7 - IN-SITU REINFORCED CONCRETE
Bill No.8 - SHORE PROTECTION - BOULDERS

2,810,000.00
620,000.00

REPAIRS TO PILE CAPS


2,270,800.00
4,788,000.00
3,587,200.00

REPAIR TO DAMAGED T PIER

GRAND TOTAL

PRELIMINARIES
REPAIRS TO PILE CAPS
REPAIR TO DAMAGED T PIER

GRAND TOTAL - TO STANDARD FORM: CONTRACTORS BID

2,736,500.00
472,380.00
3,520,000.00
20,804,880.00

PORT AUTHORITY OF JAMAICA

OMISSION

PROJECTED
COST

2,580,000.00

0.00

2,580,000.00

60,000.00
60,000.00

500,000.00

0.00

620,000.00

108,000.00

34,800.00

150,000.00

292,800.00

2,582,400.00

600,000.00

0.00

600,000.00

3,587,200.00

4,207,375.00

3,587,200.00

650,000.00

650,000.00

0.00

2,165,010.00

510,505.00

3,520,000.00

19772490.00

B
C
D
E
F

G
H

B
C
D
E

REPAIR TO PILE CAPS


BILL NO. 3
Pile Caps
Complete repairs as outlined to Pile Caps and concrete pile muff protection over
water depth between 1m and 6m
Repair to Pile Caps on Grid Lines B, C and E
Remove delaminated and spalling concrete to sides of pile cap to depth of
100mm below reinforcement and clean with potable water using high pressure
water jet equipment during low tide level

m2

Allow for cleaning of rebars with wet sand blasting, high pressure potable water
jet and mechanical cleaning to White Metal (SSPC-SP5) (NACE1).
(Corroded portion of rebar exposed to damaged face of pile caps)

m2

Allow for the replacement of corroded rebar where required with 16mm diameter
bars x 1m, bent and welded to existing rebar as per drawing sheet 2a and as
instructed by the Engineer and coated with epoxy zinc chromate primer to
exposed surfaces

Kg

Supply and install wrought formwork to soffit and sides of pile cap. (for minimum
concrete thickness of 150mm) inclusive of supports and bracing and striking on
completion

m2

Place design concrete mix containing chloride inhibitors and super plastisizers
having a 28 day cube strength of 30 Mpa

m3

Allow Provisional Sum of $150,000.00 for supply and installation of sacrificial


anodes ( to be used as directed by the Engineer and to removed in whole or part
if unused)

PS

Allow for the application of repair mortor to surface of repaired concrete beam to
seal and close any cracks which may appear.

m2

Repair to Pile Caps on Grid Lines B, CD, , E, N, P and V


Chase cracks to minimum depth fo 30mm by 60mm wide and repair with
approved masonary repair concrete such Phoscrete supplied by PowerGen
Limited (or similar product approved by the Engineer)

Clean during low tide exposed concrete and steel reinforcement to 2no. Pile
Head supporting Pile Cap D appox 0.4 x 0.45m x 2no at splash zone by water
blasting with potable water and apply layers of phoscrete concrete as per
manufacturer instruction to ac
TOTAL BILL NO. 3 - REPAIRS TO PILE CAP
summary

no.

carried to

REPAIR TO PILE CAPS


BILL NO. 4
Repairs to Deck Support Beams
Repair/Reinstatement of damage to Precast Double Tees on Grid Lines 5, 6, 7 &
8
Allow for temporary support and work access to each Double Tee sections
(approx. 14m length) in water depth varing between 1m and 6m deep, during
beam repairs

no.

Remove 0.5 m2 delaminated and spalling concrete to expose at least 150mm of


tendon on either side of damaged double Tee beam

no.

Sandblast reinforcement tendons to remove corrosion and apply zinc chromate


primer to exposed tendons

m2

Supply and install wrought fromwork to soffit and side of beam.

m2

Place design concrete mix containing chloride inhibitors etc having a 28 day
cube strength of 30 Mpa

m3

Allow for the application of repair mortor to surface of repaired concrete beam to
complete repairs and seal any cracks which may appear on surface of ccncrete.

m2

Allow for the temporary work access platform to complete repairs to cracks in
Double Tee beams in water depths 1m to 6m

no.

Include Provisional Sum of $600,000.00 to be used as instructed by the


Engineer. To be deducted in whole or part if unused.

PS

Alternative (Rate Only)


Apply shot crete or build up concrete having a 28 day cube strength of 30 Mpa
to complete beam repair around reinforcement tendons inclusive of final surface
render finish.
TOTAL BILL NO. 4 - REPAIRS TO DECK SUPPORT BEAMS

m3

REPAIR TO PILE CAPS


BILL NO. 5
Painting and Protective Coatings
Allow for the installation of protective drop cloth or equivalent method to facilitate
the collection of sand and debris at each location resulting from the sandblasting
of the concrete surface (measured seperately)
Remove existing paint finish to to sides and soffit of
sand blasting or water blasting as required

8 no. pile caps by wet

item

m2

Apply approved corrosion inhibiting coating to the previously prepared and new
concrete surfaces of 8no. Pile caps as per manufacturers instruction

m2

Repaint exterior surfaces (sides and soffit) of 8no. pile caps with approved
exterior marine grade paint finish, colour to match existing

m2

Allow Provisional Sum of $300,000.00 to be used as instructed by Engineer. To


be removed in whole or part if not used

PS

TOTAL BILL NO. 5 - PAINTING & PROTECTIVE COATINGS


summary

carried to

REPAIR TO DAMAGED T PIER


BILL NO. 6
DEMOLITION AND ALTERATION

The demolition of existing in-situ slab between centre lines 3-4 and A-B . The
removal and replacement of two "L" -shaped beams and repair one pile cap at
3B.
Carefully remove following damaged concrete section of pier inclusive of all
false work and safety measures
22'-0" x 12'-0" x 8" section of reinforced concrete slab supported on 8" thick
precast concrete slabs (to be reused) mounted on damaged reinforced concrete
beams (measured seperately)

m2

Damaged 18"x16"x22' reinforced concrete beams mounted on pile caps as


supports to precast slab and insitu slab. Insitu slab to be removed and
measured seprately.

Cart away spoil


PRE-CAST REINFORCED CONCRETE

SUM

This section covers the replacement of 2 No. Pre-cast reinforced concrete beam
and in-situ 200mm concrete slab. Prices should include for all costs involved in
order to fulfill every requirement of the design specification and any particular
site conditio
Reinforced Concrete 4500 PSI in:
Precast Reinforced Concrete Beam fixed to top of piles as per drawing

Cub. M

Steel Reinforcement

10 mm diameter Mild steel rod reinforced

Kg.

16 mm diameter high tensile rod reinforced

Kg.

25 mm diameter high tensile rod reinforced

Kg.

Formwork and support to:-

Side of beam

Sq. M

Ditto bottom of beam

Sq. M

Include the PROVISIONAL SUM of $650,000.00 for Contingencies to be used


as directed by the Engineer and to be deducted in whole or in part if not
required:-

TOTAL BILL NO. 6 - REPAIR TO DAMAGED T PIER


summary

carried to

PS

REPAIR TO DAMAGED T PIER

BILL NO. 7

IN-SITU REINFORCED CONCRETE

Reinforced Concrete Pile Cap

Pile Cap - Concrete 431 M.Pa

Cub. M

12 mm diameter mild steel rod reinforced

Kg.

16 mm diameter high tensile rod reinforced

Kg.

Sides of pile cap

Sq. M

In-situ Reinforced Concrete Slab

200 mm thick slab laid on Pre-Cast slab (measured seperately) finished with
broom finish.

Cub. M

10 mm diameter mild steel rod reinforced

TOTAL BILL NO. 7 - IN-SITU REINFORCED CONCRETE


summary

REPAIR TO DAMAGED T PIER

BILL NO. 8

SHORE PROTECTION - BOULDERS

Kg.

carried to

To supply material , labour to place boulders 0.9m and 1.2m in diameter as rock
armouring to shoreline in accordance with specifications (Provisional)

Cub. M

Ditto with boulder 0.3m - 0.8m diameter ( Provisional)

Cub. M

Carefully reclaim boulders(0.9m and 1.2m in diameter) from seabed in a depth


of water not exceeding 1.5m for repacking in rock armouring (Provisional)

Cub. M

TOTAL BILL NO. 8 - SHORE PROTECTION - BOULDERS


summary

carried to

SUMMARY

PRELIMINARIES

Bill No.1 - FIXED PRELIMINARIES

Bill No.2 - TIME DEPENDENT PRELIMINARIES

REPAIRS TO PILE CAPS

Bill No.3 - REPAIRS TO PILE CAPS

Bill No.4 - REPAIRS TO DECK SUPPORT BEAMS

Bill No.5 - PAINTING & PROTECTIVE COATINGS

REPAIR TO DAMAGED T PIER

Bill No.6 - DEMOLITION AND ALTERATION

Bill No.7 - IN-SITU REINFORCED CONCRETE

Bill No.8 - SHORE PROTECTION - BOULDERS

GRAND TOTAL

PRELIMINARIES

REPAIRS TO PILE CAPS

REPAIR TO DAMAGED T PIER

GRAND TOTAL - TO STANDARD FORM: CONTRACTORS BID

D&S

20,500.00

82,000.00

130,600.00

560,000.00

48600.00

15,900.00

63,600.00

18,500.00

34,000.00

(45100.00)

16,000.00

480,000.00

18,750.00

108,000.00

(461250.00)

15,000.00

60,000.00

58,000.00

52,000.00

(2000.00)

48,000.00

28,800.00

25,500.00

34,800.00

(3300.00)

150,000.00

150,000.00

150,000.00

0.00

15,500.00

62,000.00

136,840.00

8,000.00

3,500.00

350,000.00

155,000.00

1,100,000.00

74840.00

(195000.00)

120,000.00

240,000.00

125,040.00

224,000.00

(114960.00)

1,516,400.00

818,230.00

2,270,800.00

(698170.00)

100000

800,000.00

494,560.00

1,880,000.00

(305440.00)

15,500.00

124,000.00

386,600.00

252,000.00

262600.00

10,900.00

392,400.00

189,540.00

306,000.00

(202860.00)

15,000.00

1,260,000.00

1,218,000.00

1,092,000.00

(42000.00)

48,000.00

144,000.00

127,500.00

174,000.00

(16500.00)

15,500.00

651,000.00

1,436,820.00

84,000.00

785820.00

60,000.00

480,000.00

494,560.00

400,000.00

14560.00

600,000.00

600,000.00

600,000.00

4,451,400.00

750,000.00

5,697,580.00

750000.00

4,788,000.00

1246180.00

350,000.00

550,000.00

100,000.00

200000.00

8,900.00

1,708,800.00

630,720.00

1,632,000.00 (1078080.00)

3,500.00

672,000.00

680,064.00

1,363,200.00

2,500.00

480,000.00

893,760.00

192,000.00

300,000.00

300,000.00

300,000.00

3,510,800.00

3,054,544.00

3,587,200.00

(456256.00)

80,000.00

1,850,000.00

100,000.00

1770000.00

53,000.00

587,250.00

621,000.00

534250.00

10,000.00

245,000.00

100,000.00

235000.00

8064.00
413760.00

31,250.00

93,750.00

165,000.00

720,000.00

71250.00

82.00

34,030.00

134,875.00

107,900.00

100845.00

82.00

26,404.00

123,970.00

96,600.00

97566.00

82.00

54,120.00

254,100.00

231,000.00

199980.00

300.00

6,900.00

241,500.00

92,000.00

234600.00

300.00

1,800.00

87,000.00

18,000.00

85200.00

650,000.00

650,000.00

650,000.00

1,010,004.00

4,338,695.00

2,736,500.00

3328691.00

26,500.00

7,950.00

16,500.00

11,400.00

8550.00

82.00

1,722.00

6,825.00

6,300.00

5103.00

82.00

7,954.00

37,345.00

31,040.00

29391.00

3,300.00

6,600.00

21,000.00

26,000.00

14400.00

26,500.00

212,000.00

440,000.00

264,000.00

228000.00

82.00

42,148.00

167,050.00

133,640.00

124902.00

278,374.00

688,720.00

472,380.00

410346.00

4,000.00

2,400,000.00

6,900,000.00

3,000,000.00

4500000.00

3,800.00

152,000.00

460,000.00

200,000.00

308000.00

1,500.00

120,000.00

600,000.00

320,000.00

480000.00

2,672,000.00

7,960,000.00

3,520,000.00

5288000.00

3,900,000.00 15,056,100.00

2,810,000.00

11156100.00

1,942,500.00

6,306,300.00

620,000.00

4363800.00

1,516,400.00

818,230.00

2,270,800.00

(698170.00)

4,451,400.00

5,697,580.00

4,788,000.00

1246180.00

3,510,800.00

3,054,544.00

3,587,200.00

(456256.00)

1,010,004.00

4,338,695.00

2,736,500.00

3328691.00

278,374.00

688,720.00

472,380.00

410346.00

2,672,000.00

7,960,000.00

3,520,000.00

5288000.00

19,281,478.00 43,920,169.00

20,804,880.00

24638691.00

5,842,500.00 21,362,400.00

3,430,000.00

15519900.00

9,570,354.00

10,646,000.00

91754.00

3,960,378.00 12,987,415.00

6,728,880.00

9027037.00

19,281,478.00 43,920,169.00

20,804,880.00

24638691.00

9,478,600.00

P&S

478000.00

(29600.00)

(372000.00)

(8000.00)

6000.00

0.00

(54000.00)

750000.00

(16000.00)

754400.00

1080000.00

128000.00
(86400.00)
(168000.00)
30000.00
(567000.00)

(80000.00)

336600.00

(250000.00)

(76800.00)
691200.00
(288000.00)

76400.00

20000.00

568000.00

90000.00

626250.00

73870.00

70196.00

176880.00

85100.00

16200.00

1726496.00

3450.00

4578.00

23086.00

19400.00

52000.00

91492.00

194006.00

600000.00

48000.00

200000.00

848000.00

(1090000.00)

(1322500.00)

754400.00

336600.00

76400.00

1726496.00

194006.00

848000.00

1523402.00

(2412500.00)

1167400.00

2768502.00

1523402.00

SELECTED RATES- T-PIER REPAIRS


unit

Engineer's Est

Diving & Salvage

Pavement &
Structures

22'-0" x 12'-0" x 8" section of reinforced concrete slab supported on 8" thick precast concrete slabs (to be
reused) mounted on damaged reinforced concrete beams (measured seperately)

3200

74,000.0

4,000.0

Damaged 18"x16"x22' reinforced concrete beams mounted on pile caps as supports to precast slab and
insitu slab. Insitu slab to be removed and measured seprately.

3926

43,500.0

46,000.0

10 mm diameter Mild steel rod reinforced

kg

220

325.0

260.0

16 mm diameter high tensile rod reinforced

kg

220

385.0

300.0

25 mm diameter high tensile rod reinforced

kg

220

385.0

350.0

Side of beam

Sq. M

3000

10,500.0

4,000.0

Bottom of beam

Sq. M

3000

14,500.0

3,000.0

26500

55,000.0

33,000.0

unit

Engineer's Est

Diving & Salvage

Pavement &
Structures

22'-0" x 12'-0" x 8" section of reinforced concrete slab supported on 8" thick precast concrete slabs (to be
reused) mounted on damaged reinforced concrete beams (measured seperately)

3200

2212.5%

25.0%

Damaged 18"x16"x22' reinforced concrete beams mounted on pile caps as supports to precast slab and
insitu slab. Insitu slab to be removed and measured seprately.

3926

1008.0%

1071.7%

10 mm diameter Mild steel rod reinforced

kg

220

47.7%

18.2%

16 mm diameter high tensile rod reinforced

kg

220

75.0%

36.4%

25 mm diameter high tensile rod reinforced

kg

220

75.0%

59.1%

Side of beam

Sq. M

3000

250.0%

33.3%

Bottom of beam

Sq. M

3000

383.3%

0.0%

26500

107.5%

24.5%

unit

Engineer's Est

Diving & Salvage

Pavement &
Structures

22'-0" x 12'-0" x 8" section of reinforced concrete slab supported on 8" thick precast concrete slabs (to be
reused) mounted on damaged reinforced concrete beams (measured seperately)

80,000.00

$1,850,000.0

$100,000.0

Damaged 18"x16"x22' reinforced concrete beams mounted on pile caps as supports to precast slab and
insitu slab. Insitu slab to be removed and measured seprately.

53,000.00

$5,872.5

$621,000.00

10 mm diameter Mild steel rod reinforced

kg

91,300.00

$134,875.0

$107,900.0

16 mm diameter high tensile rod reinforced

kg

70,840.00

$123,970.0

$96,000.0

kg

145,200.00

$254,100.0

$231,000.0

Side of beam

Sq. M

69,000.00

$241,500.0

$92,000.0

Bottom of beam

Sq. M

18,000.00

$87,000.0

$18,000.0

256,000.00

$440,000.0

$264,000.0

Description

Formwork and support

200 mm thick slab laid on Pre-Cast slab (measured seperately) finished with broom finish.

PERCENTAGE DIFFERENCE BETWEEN THE TENDERED RATES AND THE ENG.'S ESTIMATE

Description

Formwork and support

200 mm thick slab laid on Pre-Cast slab (measured seperately) finished with broom finish.

TENDERED AMOUNT COMPARED WITH THE ENG.'S ESTIMATE FOR SELECTED ITEMS.
Description

25 mm diameter high tensile rod reinforced


Formwork and support

200 mm thick slab laid on Pre-Cast slab (measured seperately) finished with broom finish.

SELECTED TASKS- %DIFF. BETWEEN ENG.'S EST. AND BID AMOUNT


unit

Engineer's
Est

Diving &
Salvage

Pavement &
Structures

20,500.00

32,650.00

140,000.00

15,900.00

4,625.00

8,500.00

kg

16,000.00

625.00

3,600.00

15,000.00

14,500.00

13,000.00

Place design concrete mix containing chloride inhibitors and super plastisizers having a 28
day cube strength of 30 Mpa

48,000.00

42,500.00

58,000.00

Allow for the application of repair mortor to surface of repaired concrete beam to seal and
close any cracks which may appear.

15,500.00

34,210.00

2,000.00

Chase cracks to minimum depth fo 30mm by 60mm wide and repair with approved masonary
repair concrete such Phoscrete supplied by PowerGen Limited (or similar product approved
by the Engineer)

3,500.00

1,550.00

11,000.00

no

120,000.00

62,520.00

112,000.00

Allow for temporary support and work access to each Double Tee sections (approx. 14m
length) in water depth varing between 1m and 6m deep, during beam repairs

no

100,000.00

61,820.00

235,000.00

Remove 0.5 m2 delaminated and spalling concrete to expose at least 150mm of tendon on
either side of damaged double Tee beam

no

15,500.00

48,325.00

31,500.00

Sandblast reinforcement tendons to remove corrosion and apply zinc chromate primer to
exposed tendons

10,900.00

5,265.00

8,500.00

Supply and install wrought fromwork to soffit and side of beam.

15,000.00

14,500.00

13,000.00

Place design concrete mix containing chloride inhibitors etc having a 28 day cube strength of
30 Mpa

48,000.00

42,500.00

58,000.00

Allow for the application of repair mortor to surface of repaired concrete beam to complete
repairs and seal any cracks which may appear on surface of ccncrete.

15,500.00

34,210.00

2,000.00

Allow for the temporary work access platform to complete repairs to cracks in Double Tee
beams in water depths 1m to 6m

no

60,000.00

61,820.00

50,000.00

Item

350,000.00

550,000.00

100,000.00

8,900.00

3,285.00

8,500.00

Apply approved corrosion inhibiting coating to the previously prepared and new concrete
surfaces of 8no. Pile caps as per manufacturers instruction

3,500.00

3,542.00

7,100.00

Repaint exterior surfaces (sides and soffit) of 8no. pile caps with approved exterior marine
grade paint finish, colour to match existing

2,500.00

4,655.00

1,000.00

Description
Remove delaminated and spalling concrete to sides of pile cap to depth of 100mm below
reinforcement and clean with potable water using high pressure water jet equipment during
low tide level
Allow for cleaning of rebars with wet sand blasting, high pressure potable water jet and
mechanical cleaning to White Metal (SSPC-SP5) (NACE1).
(Corroded portion of rebar
exposed to damaged face of pile caps)
Allow for the replacement of corroded rebar where required with 16mm diameter bars x 1m,
bent and welded to existing rebar as per drawing sheet 2a and as instructed by the Engineer
and coated with epoxy zinc chromate primer to exposed surfaces
Supply and install wrought formwork to soffit and sides of pile cap. (for minimum concrete
thickness of 150mm) inclusive of supports and bracing and striking on completion

Clean during low tide exposed concrete and steel reinforcement to 2no. Pile Head supporting
Pile Cap D appox 0.4 x 0.45m x 2no at splash zone by water blasting with potable water and
apply layers of phoscrete concrete as per manufacturer instruction to ac

Allow for the installation of protective drop cloth or equivalent method to facilitate the collection
of sand and debris at each location resulting from the sandblasting of the concrete surface
Remove existing paint finish to to sides and soffit of
or water blasting as required

8 no. pile caps by wet sand blasting

Description

unit
m

Engineer's
Est

Diving &
Salvage

% DIFF. BETWEEN ENGINEER'S EST. &


BID SUM
82,000.00
59.27%

Remove
and
spalling
concrete
to sides
of pile high
cap topressure
depth of potable
100mm
Allow
fordelaminated
cleaning of
rebars
with
wet sand
blasting,
below jet
reinforcement
and clean
with to
potable
high pressure
water jet
water
and mechanical
cleaning
White water
Metal using
(SSPC-SP5)
(NACE1).
equipment during
low
level
(Corroded
portion
of tide
rebar
exposed to damaged face of pile caps)

63,600.00

-70.91%

Allow for the replacement of corroded rebar where required with 16mm
diameter bars x 1m, bent and welded to existing rebar as per drawing sheet 2a
and as instructed by the Engineer and coated with epoxy zinc chromate primer
to exposed surfaces

kg

480,000.00

-96.09%

Place
design concrete mix containing chloride inhibitors and super
plastisizers having a 28 day cube strength of 30 Mpa

28,800.00

-11.46%

Allow for the application of repair mortor to surface of repaired concrete beam
to seal and close any cracks which may appear.

62,000.00

120.71%

Chase cracks to minimum depth fo 30mm by 60mm wide and repair with
approved masonary repair concrete such Phoscrete supplied by PowerGen
Limited (or similar product approved by the Engineer)

350,000.00

-55.71%

Clean during low tide exposed concrete and steel reinforcement to 2no. Pile
Head supporting Pile Cap D appox 0.4 x 0.45m x 2no at splash zone by water
blasting with potable water and apply layers of phoscrete concrete as per
manufacturer instruction to ac

no

240,000.00

-47.90%

Allow for temporary support and work access to each Double Tee sections
(approx. 14m length) in water depth varing between 1m and 6m deep, during
beam repairs

no

800,000.00

-38.18%

Remove 0.5 m2 delaminated and spalling concrete to expose at least 150mm of


tendon on either side of damaged double Tee beam

no

124,000.00

211.77%

Sandblast reinforcement tendons to remove corrosion and apply


chromate primer to exposed tendons

392,400.00

-51.70%

Item

350,000.00

57.14%

1,708,800.00

-63.09%

480,000.00

86.20%

zinc

Allow for the installation of protective drop cloth or equivalent method to


facilitate the collection of sand and debris at each location resulting from the
sandblasting of the concrete surface
Remove existing paint finish to to sides and soffit of
wet sand blasting or water blasting as required

8 no. pile caps by

Repaint exterior surfaces (sides and soffit) of 8no. pile caps with approved
exterior marine grade paint finish, colour to match existing

PORT AUTHORITY OF JAMAICA

ITEM

DESCRIPTION

QUANTITY

UNIT

RATE

EST. SUM

General & Preliminary Items


General & Preliminary Items

$2,000,000.00

REPAIR TO STEM OF DECK BEAMS


STEM OF BEAMS
Allow for temporary support and work access to each
Double Tee sections (approx. 14m length) in water depth
varing between 1m and 6m deep, during beam repairs

Remove delaminated and spalling concrete to a depth ( > 10


MM) so as to expose reinforcement and clean with potable
water .

40

M2

14,000.00

$560,000.00

Allow for cleaning of rebars with wire brush to remove all


corrosion and wash with potable water.
(Corroded
portion of rebar exposed to damaged face of stem)

20

1,800.00

$36,000.00

Place design concrete mix containing chloride inhibitors


having a 28 day cube strength of 30 Mpa

0.8

58,000.00

$46,400.00

Chase cracks to minimum depth fo 10mm e and repair with


approved masonary repair concrete such Phoscrete
supplied by PowerGen Limited (or similar product approved
by the Engineer)

21

6,000.00

$126,000.00

Allow for removing concrete from defective area (0.07 sq. m)


of beam stem, clean rebars with wire brush to remove all
corrosion and treat with zinc chromate. place design
concrete mix containing chloride inhibitors having a 28 days
strength no less than 30 MPa (Corroded portion of rebar
exposed to damaged face of stem). apply Nitobond SBR as
per manufacturer's specification.

56

M2

21000

$1,176,000.00

REPAIR TO SOFFIT OF BEAMS


Repairs to Deck Soffit of Beams
A

Allow for temporary support and work access to each


Double Tee sections (approx. 14m length) in water depth
varing between 1m and 6m deep, during Soffit repairs

20

no.

235000

$4,700,000.00

Remove 0.2 m2 delaminated and spalling concrete to a


minimum depth of 10 mm so as to expose rebars of the
soffit of deck beam.

29

no.

18,200.00

$527,800.00

Wire brush rebars to remove corrosion, wash with potable


water and coat with zinc chromete

m2

4,500.00

$36,000.00

To apply Nitobond SBR as bonding agent to deck beams

m2

6,000.00

$36,000.00

Place design concrete mix containing chloride inhibitors etc


having a 28 day cube strength of 30 Mpa

0.1

m3

58,000.00

$5,800.00

REPAIR TO PILE CAPS


H

Chase cracks to minimum depth fo 30mm by 60mm wide


and repair with approved masonary repair concrete such
Phoscrete supplied by PowerGen Limited (or similar
product approved by the Engineer)

10

11,000.00

$1,100,000.00

Clean during low tide exposed concrete and steel


reinforcement to 30no. Pile Head supporting Pile Cap appox
0.4 x 0.45m x 30 no at splash zone by water blasting with
potable water and apply layers of phoscrete concrete as per
manufacturer instruction to ac

30

m3

112,000.00

$3,360,000.00

Repaint exterior surfaces (sides and soffit) of 8no. pile caps


with approved exterior marine grade paint finish, colour to
match existing

30

M2

1,000.00

$30,000.00

$13,710,000.00

You might also like