Professional Documents
Culture Documents
VerDate Aug<31>2005 15:53 Mar 07, 2006 Jkt 208001 PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 E:\FR\FM\08MRN1.SGM 08MRN1
Federal Register / Vol. 71, No. 45 / Wednesday, March 8, 2006 / Notices 11613
to transfer the license for the Enterprise agency’s comments must also be sent to site under the ‘‘e-Filing’’ link. The
Mill Project from the Enterprise Mill, the Applicants’ representatives. Commission strongly encourages
LLC to Melaver/Enterprise Mill, LLC. electronic filings.
Magalie R. Salas, The Commission’s Rules of Practice
k. This filing is available for review at Secretary. and Procedure require all intervenors
the Commission in the Public Reference [FR Doc. E6–3204 Filed 3–7–06; 8:45 am] filing documents with the Commission
Room or may be viewed on the BILLING CODE 6717–01–P to serve a copy of that document on
Commission’s Web site at http:// each person in the official service list
www.ferc.gov using the ‘‘eLibrary’’ link. for the project. Further, if an intervenor
Enter the docket number (P–2935) in the DEPARTMENT OF ENERGY files comments or documents with the
docket number field to access the Commission relating to the merits of an
document. For assistance, call toll-free Federal Energy Regulatory issue that may affect the responsibilities
1–866–208–3676 or e-mail Commission of a particular resource agency, they
FERCOnlineSupport@ferc.gov. For TTY, must also serve a copy of the document
Notice of Application Accepted for
call (202) 502–8659. A copy is also Filing and Soliciting Comments, on that resource agency.
available for inspection and l. Description of Project: The proposed
Motions To Intervene, Protests,
reproduction at the addresses in item g small conduit hydroelectric project
Recommendations, and Terms and
above. would consist of a proposed 1-megawatt
Conditions generating unit in the 36-inch diameter
l. Individuals desiring to be included pipe at the Briones Pumping Plant. The
March 1, 2006.
on the Commission’s mailing list should average annual energy production
Take notice that the following
so indicate by writing to the Secretary would be 1,364 megawatt-hours.
hydroelectric application has been filed
of the Commission. m. This filing is available for review
with the Commission and is available
m. Comments, Protests, or Motions to for public inspection: and reproduction at the Commission in
Intervene: Anyone may submit a. Type of Application: Conduit the Public Reference Room, Room 2A,
comments, a protest, or a motion to Exemption. 888 First Street, NE., Washington, DC
intervene in accordance with the b. Project No.: 12649–000. 20426. The filing may also be viewed on
requirements of Rules of Practice and c. Date filed: January 30, 2006. the Web at http://www.ferc.gov using
Procedure, 18 CFR 385.210, 385.211, d. Applicant: East Bay Municipal the ‘‘eLibrary’’ link. Enter the docket
385.214. In determining the appropriate Utility District. number, P–12644, in the docket number
e. Name of Project: Briones Energy field to access the document. For
action to take, the Commission will
Recovery Project. assistance, call toll-free 1–866–208–
consider all protests or other comments
f. Location: The Briones Energy 3676 or e-mail
filed, but only those who file a motion FERCOnlineSupport@ferc.gov. For TTY,
Recovery Project would be located in
to intervene in accordance with the the existing pipeline, which supplies call (202) 502–8659. A copy is also
Commission’s Rules may become a the Orinda Water Treatment Plant in available for review and reproduction at
party to the proceeding. Any comments, Contra Costa County, California. the address in item h above.
protests, or motions to intervene must g. Filed Pursuant to: Federal Power n. Development Application: Any
be received on or before the specified Act 16 U.S.C. 791a–825r. qualified applicant desiring to file a
comment date for the particular h. Applicant Contact: Mr. Dennis competing application must submit to
application. Diemer, East Bay Municipal Utility the Commission, on or before the
n. Filing and Service of Responsive District, 375 Eleventh Street, Oakland, specified deadline date for the
Documents: Any filings must bear in all CA 94607, (866) 403–2683. particular application, a competing
capital letters the title ‘‘COMMENTS’’, i. FERC Contact: Robert Bell, (202) development application, or a notice of
‘‘PROTEST’’, or ‘‘MOTION TO 502–6062. intent to file such an application.
j. Status of Environmental Analysis: Submission of a timely notice of intent
INTERVENE’’, as applicable, and the
This application is ready for allows an interested person to file the
Project Number of the particular
environmental analysis at this time, and competing development application no
application to which the filing refers. the Commission is requesting later than 120 days after the specified
Any of the above-named documents comments, reply comments, deadline date for the particular
must be filed by providing the original recommendations, terms and application. Applications for
and eight copies to: The Secretary, conditions, and prescriptions. preliminary permits will not be
Federal Energy Regulatory Commission, k. Deadline for filing responsive accepted in response to this notice.
888 First Street, NE., Washington, DC documents: The Commission directs, o. Notice of Intent: A notice of intent
20426. A copy of any motion to pursuant to section 4.34(b) of the must specify the exact name, business
intervene must also be served upon each Regulations (see Order No. 533 issued address, and telephone number of the
representative of the Applicants May 8, 1991, 56 FR 23108, May 20, prospective applicant, and must include
specified in the particular application. 1991) that all comments, motions to an unequivocal statement of intent to
o. Agency Comments: Federal, state, intervene, protests, recommendations, submit a competing development
and local agencies are invited to file terms and conditions, and prescriptions application. A notice of intent must be
comments on the described application. concerning the application be filed with served on the applicant(s) named in this
A copy of the application may be the Commission by April 30, 2006. All public notice.
reply comments must be filed with the p. Protests or Motions to Intervene:
obtained by agencies directly from the
Commission by May 15, 2006. Anyone may submit a protest or a
erjones on PROD1PC68 with NOTICES
Applicants. If an agency does not file Comments, protests, and motion to intervene in accordance with
comments within the time specified for interventions may be filed electronically the requirements of Rules of Practice
filing comments, it will be presumed to via the Internet in lieu of paper: See 18 and Procedure, 18 CFR 385.210,
have no comments. One copy of an CFR 385.2001(a)(1)(iii) and the 385.211, and 385.214. In determining
instructions on the Commission’s Web the appropriate action to take, the
VerDate Aug<31>2005 15:53 Mar 07, 2006 Jkt 208001 PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 E:\FR\FM\08MRN1.SGM 08MRN1