Federal Register / Vol. 71, No.

23 / Friday, February 3, 2006 / Notices 5831

Order No. 533 issued May 8, 1991, 56 Copies of the SD outlining the subject All documents (original and eight
FR 23108, May 20, 1991) that all areas to be addressed in the EA were copies) should be filed with: Magalie R.
comments, recommendations, terms and distributed to the parties on the Salas, Secretary, Federal Energy
conditions, and prescriptions Commission’s mailing list. Copies of the Regulatory Commission, 888 First
concerning the application be filed with SD may be viewed on the Web at Street, NE., Washington, DC 20426.
the Commission within 60 days from http://www.ferc.gov using the The Commission’s Rules of Practice
the issuance date of this notice. All ‘‘eLibrary’’ link (see item m above). require all intervenors filing documents
reply comments must be filed with the with the Commission to serve a copy of
Magalie R. Salas,
Commission within 105 days from the that document on each person on the
date of this notice. Secretary.
official service list for the project.
[FR Doc. E6–1444 Filed 2–2–06; 8:45 am] Further, if an intervenor files comments
All filings must (1) bear in all capital
BILLING CODE 6717–01–P or documents with the Commission
letters the title ‘‘PROTEST,’’ ‘‘MOTION
TO INTERVENE,’’ ‘‘NOTICE OF relating to the merits of an issue that
INTENT TO FILE COMPETING may affect the responsibilities of a
DEPARTMENT OF ENERGY particular resource agency, they must
APPLICATION,’’ ‘‘COMPETING
APPLICATION,’’ ‘‘COMMENTS,’’ Federal Energy Regulatory also serve a copy of the document on
‘‘REPLY COMMENTS,’’ Commission that resource agency.
‘‘RECOMMENDATIONS,’’ ‘‘TERMS Scoping comments, motions to
AND CONDITIONS,’’ or Notice of Application Accepted for intervene, protests, comments, terms
‘‘PRESCRIPTIONS;’’ (2) set forth in the Filing, Soliciting Motions To Intervene and conditions, recommendations, and
heading the name of the applicant and and Protests; Ready for Environmental prescriptions may be filed electronically
the project number of the application to Analysis, and Soliciting Comments, via the Internet in lieu of paper. The
which the filing responds; (3) furnish Terms and Conditions, Commission strongly encourages
the name, address, and telephone Recommendations, and Prescriptions; electronic filings. See 18 CFR
number of the person protesting or Paper Scoping and Soliciting Scoping 385.2001(a)(1)(iii) and the instructions
intervening; and (4) otherwise comply Comments on the Commission’s Web site (http://
with the requirements of 18 CFR www.ferc.gov) under the ‘‘e-Filing’’ link.
385.2001 through 385.2005. All January 27, 2006. k. This application has been accepted
comments, recommendations, terms and Take notice that the following for filing, and is now ready for
conditions, or prescriptions must set hydroelectric application has been filed environmental analysis.
forth their evidentiary basis and with the Commission and is available l. The proposed project would be built
otherwise comply with the requirements for public inspection. at the Mill Coulee Canal’s Upper and
of 18 CFR 4.34(b). Agencies may obtain a. Type of Application: Minor Lower Mill Coulee drop structures,
copies of the application directly from License. which are reinforced concrete structures
the applicant. A copy of any protest or b. Project No.: 12599–002.1 290 and 190 feet long, respectively. The
motion to intervene must be served c. Date Filed: November 28, 2005. total drop for the two structures is 101.6
upon each representative of the d. Applicant: Wade Jacobsen. feet. The applicant proposes to
applicant specified in the particular e. Name of Project: Mill Coulee Drops construct: (1) A check structure,
application. A copy of all other filings Hydroelectric Project. consisting of a spillway gate panel
in reference to this application must be f. Location: On the Mill Coulee Canal, anchored to a ballast concrete structure
accompanied by proof of service on all in Cascade County, Montana, about 4 spanning the full width of the canal
persons listed in the service list miles west of Fairfield, Montana. The floor between new concrete abutment
prepared by the Commission in this project would occupy in part lands of walls, upstream from the concrete
proceeding, in accordance with 18 CFR the United States administered by the transition of the Upper Mill Coulee
4.34(b) and 385.2010. Bureau of Reclamation. chute drop; (2) an intake structure to
o. Scoping Process: The Commission g. Filed Pursuant to: Federal Power divert flows from the left side of the
intends to prepare an Environmental Act 16 U.S.C. 791(a)–825(r). canal; (3) a 48-inch-diameter, 1,400-feet-
Assessment (EA) on the project in h. Applicant Contact: Ted Sorenson, long pre-stressed concrete, tape-coated
accordance with the National Sorenson Engineering, 5203 South 11th steel, or polyethylene penstock that
Environmental Policy Act.2 The EA will East, Idaho Falls, ID 83404, (208) 522– would be completely buried; (4) a
consider both site-specific and 8069. powerhouse containing one horizontal
cumulative environmental impacts and i. FERC Contact: Dianne Rodman, Francis turbine and one generator with
reasonable alternatives to the proposed Federal Energy Regulatory Commission, a rated output of 1.05 MW; (5) a draft
action. 888 First Street, NE., Washington, DC tube and 2,650-feet-long tailrace
20426; telephone (202) 502–6077 or by discharging flows into the canal below
Commission staff does not propose to
e-mail at Dianne.rodman@ferc.gov. the Lower Mill Coulee drop structure;
conduct any on-site scoping meetings at
j. Deadline for Filing Scoping (6) a switchyard immediately adjacent
this time. Instead, we will solicit
Comments: 30 days from the issuance to the powerhouse; and (7) a 0.7-mile-
comments, recommendations,
date of this notice; deadline for filing long, 69-kV transmission line extending
information, and alternatives in the
motions to intervene and protests, from the switchyard to interconnect
Scoping Document (SD).3
comments, terms and conditions, with an existing Sun River Electric
2 One EA will be prepared for the Upper Turnbull
recommendations, and prescriptions: 60 Cooperative transmission line. The
hsrobinson on PROD1PC70 with NOTICES

Drop Project and two other projects proposed to be


days from the issuance of this notice. project would use flows as they are
constructed on nearby canals, the Lower Turnbull provided in accordance with the needs
Drop Project No. 12597 and the Mill Coulee Drops 1 The Mill Coulee Drops Project No. 12599 would
of the Greenfield Irrigation District,
Project No. 12599. be located at the sites of the Mill Coulee Lower
3 One SD has been prepared for the Upper Project No. 12536 and the Mill Coulee Upper
which operates the canal. The project
Turnbull Drop Project, the Lower Turnbull Drop Project No. 12537, for which the applicant holds would not impound water and would be
Project, and the Mill Coulee Drops Project. preliminary permits. operated strictly as a run-of-river plant.

VerDate Aug<31>2005 15:00 Feb 02, 2006 Jkt 208001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\03FEN1.SGM 03FEN1
5832 Federal Register / Vol. 71, No. 23 / Friday, February 3, 2006 / Notices

Average annual generation would be Order No. 533 issued May 8, 1991, 56 Copies of the SD outlining the subject
2,500,000 kilowatt-hours. FR 23108, May 20, 1991) that all areas to be addressed in the EA were
m. A copy of the application is comments, recommendations, terms and distributed to the parties on the
available for review at the Commission conditions, and prescriptions Commission’s mailing list. Copies of the
in the Public Reference Room or may be concerning the application be filed with SD may be viewed on the Web at
viewed on the Commission’s Web site at the Commission within 60 days from http://www.ferc.gov using the
http://www.ferc.gov using the the issuance date of this notice. All ‘‘eLibrary’’ link (see item m above).
‘‘eLibrary’’ link. Enter the docket reply comments must be filed with the
number, excluding the last three digits, Magalie R. Salas,
Commission within 105 days from the
in the docket number field to access the date of this notice. Secretary.
document. For assistance, contact FERC [FR Doc. E6–1445 Filed 2–2–06; 8:45 am]
All filings must (1) bear in all capital
Online Support at letters the title ‘‘PROTEST,’’ ‘‘MOTION BILLING CODE 6717–01–P
FERCOnlineSupport@ferc.gov or toll- TO INTERVENE,’’ ‘‘NOTICE OF
free at 1–866–208–3676, or for TTY, INTENT TO FILE COMPETING
(202) 502–8659. A copy is also available DEPARTMENT OF ENERGY
APPLICATION,’’ or ‘‘COMPETING
for inspection and reproduction at the APPLICATION,’’ ‘‘COMMENTS,’’
address in item h above. Federal Energy Regulatory
‘‘REPLY COMMENTS,’’ Commission
Register online at http:// ‘‘RECOMMENDATIONS,’’ ‘‘TERMS
www.ferc.gov/docs-filings/
AND CONDITIONS,’’ or Notice of Application Ready for
esubscription.asp to be notified via e-
‘‘PRESCRIPTIONS;’’ (2) set forth in the Environmental Analysis and Soliciting
mail of new filings and issuances
heading the name of the applicant and Comments, Recommendations, Terms
related to this or other pending projects.
the project number of the application to and Conditions, and Prescriptions
For assistance, contact FERC Online
which the filing responds; (3) furnish
Support. January 26, 2006.
n. Any qualified applicant desiring to the name, address, and telephone
number of the person protesting or Take notice that the following
file a competing application must hydroelectric application has been filed
submit to the Commission on or before intervening; and (4) otherwise comply
with the requirements of 18 CFR with the Commission and is available
the specified deadline date for the for public inspection.
particular application, a competing 385.2001 through 385.2005. All
comments, recommendations, terms and a. Type of Application: Major License.
development application, or a notice of b. Project No.: 11945–001.
intent to file such an application. conditions, or prescriptions must set
forth their evidentiary basis and c. Date Filed: June 30, 2004.
Submission of a timely notice of intent d. Applicant: Symbiotics, LLC.
allows an interested person to file the otherwise comply with the requirements e. Name of Project: Dorena Lake Dam
competing development application no of 18 CFR 4.34(b). Agencies may obtain Hydroelectric Project.
later than 120 days after the specified copies of the application directly from f. Location: On the Row River, near
deadline date for the particular the applicant. A copy of any protest or the Town of Cottage Grove, Lane
application. Applications for motion to intervene must be served County, Oregon. The project would
preliminary permits will not be upon each representative of the occupy less than 1 acre of Federal lands
accepted in response to this notice. applicant specified in the particular administered by the U.S. Army Corps of
A notice of intent must specify the application. A copy of all other filings Engineers.
exact name, business address, and in reference to this application must be g. Filed Pursuant to: Federal Power
telephone number of the prospective accompanied by proof of service on all Act 16 U.S.C. 791(a)–825(r).
applicant, and must include an persons listed in the service list h. Applicant Contact: Brent L. Smith,
unequivocal statement of intent to prepared by the Commission in this Symbiotics, LLC, P.O. Box 535, Rigby,
submit, if such an application may be proceeding, in accordance with 18 CFR Idaho 83442; telephone (208) 745–0834
filed, either a preliminary permit 4.34(b) and 385.2010. or by e-mail at
application or a development o. Scoping Process: The Commission bsmith@nwpwrservices.com.
application (specify which type of intends to prepare an Environmental i. FERC Contact: Dianne Rodman;
application). A notice of intent must be Assessment (EA) on the project in telephone (202) 502–6077 or by e-mail
served on the applicant(s) named in this accordance with the National at dianne.rodman@ferc.gov.
public notice. Environmental Policy Act.2 The EA will j. Deadline for filing comments,
Anyone may submit comments, a consider both site-specific and recommendations, terms and
protest, or a motion to intervene in cumulative environmental impacts and conditions, and prescriptions is 60 days
accordance with the requirements of reasonable alternatives to the proposed from the issuance of this notice; reply
Rules of Practice and Procedure, 18 CFR action. comments are due 105 days from the
385.210, 385.211, and 385.214. In Commission staff does not propose to issuance date of this notice.
determining the appropriate action to conduct any on-site scoping meetings at All documents (original and eight
take, the Commission will consider all this time. Instead, we will solicit copies) should be filed with: Magalie R.
protests or other comments filed, but comments, recommendations, Salas, Secretary, Federal Energy
only those who file a motion to information, and alternatives in the Regulatory Commission, 888 First
intervene in accordance with the Scoping Document (SD).3 Street, NE., Washington, DC 20426.
Commission’s Rules may become a The Commission’s Rules of Practice
party to the proceeding. Any comments, 2 One EA will be prepared for the Mill Coulee require all intervenors filing documents
hsrobinson on PROD1PC70 with NOTICES

protests, or motions to intervene must Drops Project and two other projects proposed to be with the Commission to serve a copy of
be received on or before the specified constructed on nearby canals, the Lower Turnbull that document on each person on the
Drop Project No. 12597 and the Upper Turnbull official service list for the project.
comment date for the particular Drop Project No. 12598.
application. 3 One SD has been prepared for the Mill Coulee Further, if an intervenor files comments
The Commission directs, pursuant to Drops Project, the Lower Turnbull Drop Project, and or documents with the Commission
section 4.34(b) of the Regulations (see the Upper Turnbull Drop Project. relating to the merits of an issue that

VerDate Aug<31>2005 15:00 Feb 02, 2006 Jkt 208001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\03FEN1.SGM 03FEN1

You might also like