CONTRACT AGREEMENT
Clause
1
2
3
3.1
3.2
4
5
6
7
8
Page
Preamble
Words and Expressions
Contract Documents
Covenants for Performance of the Works
1
2
2
4
4
4
4
5
5
5
5
7
The Contractor
The Employer
Contract Price
Effective Date of the Contract
Commencement Date
Time for Completion
Duration of the Contract
Annex 1: Power of Attorney
Table of Contents
17-Sep-07
Rev 0
NISCO
TARA
TARH
Contract Agreement
Page 2 of 7
&T h l i l
who are legally authorized to sign this Contract by virtue of Power of Attorney attached
hereto as Annex 1, on the other part.
Consortium members shall be individually, jointly, and severally liable to the Employer for
fulfillment of all Contractors obligations under this Contract.
WHEREAS:
(A) concerning provincial steel plans of Iranian Government, the Employer intends to establish
a new steel complex at Baft, Iran;
(B) the Contractor has agreed to construct a direct reduction plant and raw material receiving
and handling plant at Baft Steel Complex as specified in the Employers Requirements;
(C) the Contractor has thoroughly visited and inspected the Site and has acquired complete
knowledge and sufficient information about the Site and is thoroughly familiar with battery
limits, environmental conditions, available manpower and their level of expertise and any
other matter which in any way affects the design and execution of Contract and its related
costs;
Contract No.:
17-Sep-07
Rev 0
NISCO
TARA
TARH
Contract Agreement
Page 3 of 7
&T h l i l
(D) the Contractor has visited various local (Iranian) manufacturing workshops and has
concluded that with their organization, manpower, facilities and equipment, the local
manufacture of equipment destined for Local Supply is feasible both from quality and
delivery time schedule points of view;
(E) the Contractor is the owner of the offered process (if any) and/or entitled to grant licence
on behalf of process owner for design, construction and operation of the Plant;
(F) Contractor has thoroughly studied and examined the Contract Documents and fully
informed themselves as to all the condition and matters which can in any way affect the
Works and the cost thereof;
(G) the Contractor has sufficient experience, capability, skills, competence, and know-how in
design, engineering, supply, construction, erection, and commissioning and operation of
similar plants of the size and complexity as required by the Employer;
This Preamble is an integral part of this Contract Agreement.
2. Contract Documents
The documents comprising the Contract shall be:
a) this Contract Agreement and its related Annex
b) the Particular Conditions and its related Annexes
c) the General Conditions
d) the Employers Requirements and its related Annexes consisting of:
(i)
Contract No.:
17-Sep-07
Rev 0
NISCO
Baft Steel Complex
TARA
TARH
Contract Agreement
Page 4 of 7
&T h l i l
4. Contract Price
The total Contract Price is the sum of Euro .. .. (
..............)
as Foreign Portion and IRR ...... (
..................)
as Iranian Portion of the Contract Price including IRR ...... (
.............................)
as estimated price of adjustable portion of civil construction works. The Contract Price, except
for civil construction works prices, is fix, firm and not subject to any escalation of any nature
throughout the Contract duration. The breakdown of the Contract Price is according to the
Schedule of Prices and Price Break Down (Document B).
Contract No.:
17-Sep-07
Rev 0
NISCO
TARA
TARH
Contract Agreement
Page 5 of 7
&T h l i l
6. Commencement Date
The Commencement Date shall be seven (7) days after Effective Date of the Contract. The
Contractor shall affect the delivery of the supplies and implementation of all services to be
rendered under this Contract in accordance with the Time Schedule. The Commencement Date is
the reference date for the Time Schedule.
Contract No.:
17-Sep-07
Rev 0
NISCO
TARA
TARH
Contract Agreement
Page 6 of 7
&T h l i l
IN WITNESS whereof each of the Parties has caused this Contract Agreement to be executed in
more than one copy each of which is deemed to be an original as of the day and year first above
written.
SIGNED by:
SIGNED by:
in the presence of
in the presence of
Witness:
Witness:
Name:
Title:
Contract No.:
17-Sep-07
Rev 0
NISCO
Baft Steel Complex
TARA
TARH
Contract Agreement
Page 7 of 7
&T h l i l
Annex 1
Power of Attorney
Contract No.:
17-Sep-07
Rev 0