You are on page 1of 2

Federal Register / Vol. 71, No.

21 / Wednesday, February 1, 2006 / Notices 5311

application must conform with 18 CFR of the Applicant specified in the modifications would increase the
4.30(b) and 4.36. particular application. generating efficiency by about 7 percent,
p. Notice of Intent: A notice of intent t. Agency Comments: Federal, state, and would enhance the flexibility of the
must specify the exact name, business and local agencies are invited to file plant to meet peak demand.
address, and telephone number of the comments on the described application. l. Locations of Applications: A copy of
prospective applicant, and must include A copy of the application may be the application is available for
an unequivocal statement of intent to obtained by agencies directly from the inspection and reproduction at the
submit, if such an application may be Applicant. If an agency does not file Commission in the Public Reference
filed, either a preliminary permit comments within the time specified for Room, located at 888 First Street, NE.,
application or a development filing comments, it will be presumed to Room 2A, Washington, DC 20426, or by
application (specify which type of have no comments. One copy of an calling (202) 502–8371. This filing may
application). A notice of intent must be agency’s comments must also be sent to also be viewed on the Commission’s
served on the applicant(s) named in this the Applicant’s representatives. Web site at http://www.ferc.gov using
public notice. the ‘‘eLibrary’’ link. Enter the docket
q. Proposed Scope of Studies Under Magalie R. Salas, number excluding the last three digits in
Permit: A preliminary permit, if issued, Secretary. the docket number field to access the
does not authorize construction. The [FR Doc. E6–1240 Filed 1–31–06; 8:45 am] document. You may also register online
term of the proposed preliminary permit BILLING CODE 6717–01–P at http://www.ferc.gov/docs-filing/
would be 36 months. The work esubscription.asp to be notified via e-
proposed under the preliminary permit mail of new filings and issuances
would include economic analysis, DEPARTMENT OF ENERGY related to this or other pending projects.
preparation of preliminary engineering For assistance, call toll-free 1–866–208–
plans, and a study of environmental Federal Energy Regulatory 3676 or e-mail
impacts. Based on the results of these Commission FERCOnlineSupport@ferc.gov. For TTY,
studies, the Applicant would decide call (202) 502–8659. A copy is also
whether to proceed with the preparation Notice of Application for Amendment
available for inspection and
of a development application to of License and Soliciting Comments,
reproduction at the address in item (h)
construct and operate the project. Motions To Intervene, and Protests
above.
r. Comments, Protests, or Motions to January 24, 2006. m. Individuals desiring to be included
Intervene: Anyone may submit Take notice that the following on the Commission’s mailing list should
comments, a protest, or a motion to application has been filed with the so indicate by writing to the Secretary
intervene in accordance with the Commission and is available for public of the Commission.
requirements of Rules of Practice and inspection: n. Comments, Protests, or Motions to
Procedure, 18 CFR 385.210, 385.211, a. Application Type: Application for Intervene: Anyone may submit
385.214. In determining the appropriate Amendment of License. comments, a protest, or a motion to
action to take, the Commission will b. Project No: 2685–021. intervene in accordance with the
consider all protests or other comments c. Date Filed: December 22, 2005. requirements of Rules of Practice and
filed, but only those who file a motion d. Applicant: Power Authority of the Procedure, 18 CFR 385.210, 385.211,
to intervene in accordance with the State of New York. 385.214. In determining the appropriate
Commission’s Rules may become a e. Name of Project: Blenheim Gilboa action to take, the Commission will
party to the proceeding. Any comments, Power Project. consider all protests or other comments
protests, or motions to intervene must f. Location: The project is located on filed, but only those who file a motion
be received on or before the specified the Schoharie Creek in Schoharie to intervene in accordance with the
comment date for the particular County, New York. Commission’s Rules may become a
application. g. Filed Pursuant to: Federal Power party to the proceeding. Any comments,
Comments, protests and interventions Act, 16 U.S.C. 791a–825r. protests, or motions to intervene must
may be filed electronically via the h. Applicant Contacts: Mr. John J. be received on or before the specified
Internet in lieu of paper; See 18 CFR Suloway, Executive Director, Licensing comment date for the particular
385.2001 (a)(1)(iii) and the instructions Division, New York Power Authority, application.
on the Commission’s Web site under ‘‘e- 123 Main Street, 9th Fl., White Plains, o. Filing and Service of Responsive
filing’’ link. The Commission strongly NY 10601, (914) 287–3971. Documents: Any filings must bear in all
encourages electronic filing. i. FERC Contact: Any questions on capital letters the title ‘‘COMMENTS’’,
s. Filing and Service of Responsive this notice should be addressed to Mr. ‘‘RECOMMENDATIONS FOR TERMS
Documents: Any filings must bear in all Hong Tung at (202) 502–8757, or e-mail AND CONDITIONS’’, ‘‘PROTEST’’, OR
capital letters the title ‘‘COMMENTS’’, address: hong.tung@ferc.gov. ‘‘MOTION TO INTERVENE’’, as
‘‘RECOMMENDATIONS FOR TERMS j. Deadline for filing comments and or applicable, and the Project Number of
AND CONDITIONS’’, ‘‘PROTEST’’, OR motions: February 24, 2006. the particular application to which the
‘‘MOTION TO INTERVENE’’, as k. Description of Request: The filing refers. All documents (original
applicable, and the Project Number of licensee proposes to rehabilitate the four and eight copies) should be filed with:
the particular application to which the generating units of its Blenheim-Gilboa Magalie R. Salas, Secretary, Federal
filing refers. Any of the above-named Pumped Storage Project, which would Energy Regulatory Commission, 888
documents must be filed by providing increase its generating capacity and First Street, NE., Washington, DC 20426.
the original and the number of copies efficiency. The rehabilitation of the A copy of any motion to intervene must
provided by the Commission’s existing four pump-turbine runners and also be served upon each representative
cchase on PROD1PC60 with NOTICES

regulations to: The Secretary, Federal possibly other components would of the Applicant specified in the
Energy Regulatory Commission, 888 increase the total generating capacity by particular application.
First Street, NE., Washington, DC 20426. 120 MW, and the maximum hydraulic p. Agency Comments: Federal, state,
A copy of any motion to intervene must capacity by about 3.5 to 10.35 percent. and local agencies are invited to file
also be served upon each representative The licensee states the proposed comments on the described application.

VerDate Aug<31>2005 17:49 Jan 31, 2006 Jkt 208001 PO 00000 Frm 00080 Fmt 4703 Sfmt 4703 E:\FR\FM\01FEN1.SGM 01FEN1
5312 Federal Register / Vol. 71, No. 21 / Wednesday, February 1, 2006 / Notices

A copy of the application may be official service list for the project. reasonable alternatives to the proposed
obtained by agencies directly from the Further, if an intervenor files comments action.
Applicant. If an agency does not file or documents with the Commission Commission staff do not propose to
comments within the time specified for relating to the merits of an issue that conduct any on-site scoping meetings at
filing comments, it will be presumed to may affect the responsibilities of a this time. Instead, we are soliciting
have no comments. One copy of an particular resource agency, they must comments, recommendations, and
agency’s comments must also be sent to also serve a copy of the document on information, on the Scoping Document
the Applicant’s representatives. that resource agency. (SD).
Comments, protests and interventions Scoping comments may be filed Copies of the SD outlining the subject
may be filed electronically via the electronically via the Internet in lieu of areas to be addressed in the EA were
Internet in lieu of paper. See, 18 CFR paper. The Commission strongly distributed to the parties on the
385.2001(a)(1)(iii) and the instructions encourages electronic filings. See 18 Commission’s mailing list. Copies of the
on the Commission’s Web site at CFR 385.2001(a)(1)(iii) and the SD may be viewed on the Web at
http://www.ferc.gov under the ‘‘e- instructions on the Commission’s Web http://www.ferc.gov using the
Filing’’ link. site (http://www.ferc.gov) under the ‘‘eLibrary’’ link. Enter the docket
‘‘eFiling’’ link. number excluding the last three digits in
Magalie R. Salas, k. This application is not ready for the docket number field to access the
Secretary. environmental analysis at this time. document. For assistance, call 1–866–
[FR Doc. E6–1242 Filed 1–31–06; 8:45 am] l. Description of Project: The 208–3676 or for TTY, (202) 502–8659.
BILLING CODE 6717–01–P Alternatives Hydro Power Project would
consist of: (1) The existing 127-foot-long Magalie R. Salas,
by 15.5-foot-high Ring Shop Dam Secretary.
DEPARTMENT OF ENERGY consisting of a concrete 9.5-foot-high [FR Doc. E6–1249 Filed 1–31–06; 8:45 am]
spillway topped with 2.5-foot-high BILLING CODE 6717–01–P
Federal Energy Regulatory flashboards, a waste gate, and two inlet
Commission structures located at the north and south
[Project No. 12608–000] ends of the spillway, (2) an existing 1.3- DEPARTMENT OF ENERGY
acre reservoir enlarged to 2 acres with
Alternatives Unlimited, Inc.; Notice a normal full pond elevation of 285.1 Federal Energy Regulatory
Soliciting Scoping Comments feet above mean sea level, (3) a restored Commission
8-foot-wide head gated intake structure,
January 25, 2006. (4) a new 23-foot by 6-foot metal service Notice of Application Accepted for
Take notice that the following platform (to be enclosed for a future Filing and Soliciting Motions To
hydroelectric application has been filed powerhouse) located at the south side of Intervene, Protests, and Comments
with the Commission and is available the dam containing three generating January 25, 2006.
for public inspection. units with a total installed capacity of Take notice that the following
a. Type of Application: Exemption 45 kilowatts; and (5) appurtenant hydroelectric application has been filed
from Licensing. facilities. The restored project would with the Commission and is available
b. Project No.: P–12608–000. have an average annual generation of for public inspection:
c. Date filed: August 15, 2005. 340 megawatt-hours. a. Type of Application: Preliminary
d. Applicant: Alternatives Unlimited, m. A copy of the application is Permit.
Inc. available for review at the Commission b. Project No.: 12626–000.
e. Name of Project: Alternatives Hydro in the Public Reference Room or may be c. Date filed: November 29, 2005.
Power Project. viewed on the Commission’s Web site at d. Applicant: Northern Illinois
f. Location: On the Mumford River, in http://www.ferc.gov using the Hydropower Corporation.
the Town of Northbridge, Worcester ‘‘eLibrary’’ link. Enter the docket e. Name of Project: Dresden Island
County, Massachusetts. The project number excluding the last three digits in Hydroelectric Project.
would not use federal land. the docket number field to access the f. Location: On the Illinois River, in
g. Filed Pursuant to: Public Utility document. For assistance, contact FERC Grundy, County, Illinois.
Regulatory Policies Act of 1978, 16 Online Support at g. Filed Pursuant to: Federal Power
U.S.C. sections 2705 and 2708. FERCOnlineSupport@ferc.gov or toll- Act, 16 U.S.C. 791(a)—825(r).
h. Applicant Contact: Kathleen D. free at 1–866–208–3676, or for TTY, h. Applicant Contact: Mr. Damon
Hervol. Beals and Thomas, Inc. (202) 502–8659. A copy is also available Zdunich, Northern Illinois Hydropower
Reservoir Corporate Center, 144 for inspection and reproduction at the Corporation, 801 Oakland Avenue,
Turnpike Road (Route 9), Southborough, address in item h above. Joliet, IL 60435, (312) 320–1610,
MA 01772–2104, (508) 366–0560. n. You may also register online at dzdunich@gelbergroup.com. The
i. FERC Contact: Stefanie Harris, (202) http://www.ferc.gov.esubscribenow.htm Dresden Island Lock and Dam is owned
502–6653 or stefanie.harris@ferc.gov. to be notified via email of new filings by the U.S. Army Corps of Engineers.
j. Deadline for filing scoping and issuances related to this or other i. FERC Contact: Patricia W. Gillis at
comments: February 24, 2006. pending projects. For assistance, contact (202) 502–8735.
All documents (original and eight FERC Online Support. j. Deadline for filing comments,
copies) should be filed with: Magalie R. o. Scoping Process: The Commission protests, and motions to intervene: 60
Salas, Secretary, Federal Energy staff intends to prepare a single days from the issuance date of this
Regulatory Commission, 888 First Environmental Assessment (EA) for the notice.
cchase on PROD1PC60 with NOTICES

Street, NE., Washington, DC 20426. Alternatives Hydro Power Project in The Commission’s Rules of Practice
The Commission’s Rules of Practice accordance with the National and Procedure require all intervenors
require all intervenors filing documents Environmental Policy Act. The EA will filing documents with the Commission
with the Commission to serve a copy of consider both site-specific and to serve a copy of that document on
that document on each person on the cumulative environmental impacts and each person in the official service list

VerDate Aug<31>2005 17:49 Jan 31, 2006 Jkt 208001 PO 00000 Frm 00081 Fmt 4703 Sfmt 4703 E:\FR\FM\01FEN1.SGM 01FEN1