5312 Federal Register / Vol. 71, No.

21 / Wednesday, February 1, 2006 / Notices

A copy of the application may be official service list for the project. reasonable alternatives to the proposed
obtained by agencies directly from the Further, if an intervenor files comments action.
Applicant. If an agency does not file or documents with the Commission Commission staff do not propose to
comments within the time specified for relating to the merits of an issue that conduct any on-site scoping meetings at
filing comments, it will be presumed to may affect the responsibilities of a this time. Instead, we are soliciting
have no comments. One copy of an particular resource agency, they must comments, recommendations, and
agency’s comments must also be sent to also serve a copy of the document on information, on the Scoping Document
the Applicant’s representatives. that resource agency. (SD).
Comments, protests and interventions Scoping comments may be filed Copies of the SD outlining the subject
may be filed electronically via the electronically via the Internet in lieu of areas to be addressed in the EA were
Internet in lieu of paper. See, 18 CFR paper. The Commission strongly distributed to the parties on the
385.2001(a)(1)(iii) and the instructions encourages electronic filings. See 18 Commission’s mailing list. Copies of the
on the Commission’s Web site at CFR 385.2001(a)(1)(iii) and the SD may be viewed on the Web at
http://www.ferc.gov under the ‘‘e- instructions on the Commission’s Web http://www.ferc.gov using the
Filing’’ link. site (http://www.ferc.gov) under the ‘‘eLibrary’’ link. Enter the docket
‘‘eFiling’’ link. number excluding the last three digits in
Magalie R. Salas, k. This application is not ready for the docket number field to access the
Secretary. environmental analysis at this time. document. For assistance, call 1–866–
[FR Doc. E6–1242 Filed 1–31–06; 8:45 am] l. Description of Project: The 208–3676 or for TTY, (202) 502–8659.
BILLING CODE 6717–01–P Alternatives Hydro Power Project would
consist of: (1) The existing 127-foot-long Magalie R. Salas,
by 15.5-foot-high Ring Shop Dam Secretary.
DEPARTMENT OF ENERGY consisting of a concrete 9.5-foot-high [FR Doc. E6–1249 Filed 1–31–06; 8:45 am]
spillway topped with 2.5-foot-high BILLING CODE 6717–01–P
Federal Energy Regulatory flashboards, a waste gate, and two inlet
Commission structures located at the north and south
[Project No. 12608–000] ends of the spillway, (2) an existing 1.3- DEPARTMENT OF ENERGY
acre reservoir enlarged to 2 acres with
Alternatives Unlimited, Inc.; Notice a normal full pond elevation of 285.1 Federal Energy Regulatory
Soliciting Scoping Comments feet above mean sea level, (3) a restored Commission
8-foot-wide head gated intake structure,
January 25, 2006. (4) a new 23-foot by 6-foot metal service Notice of Application Accepted for
Take notice that the following platform (to be enclosed for a future Filing and Soliciting Motions To
hydroelectric application has been filed powerhouse) located at the south side of Intervene, Protests, and Comments
with the Commission and is available the dam containing three generating January 25, 2006.
for public inspection. units with a total installed capacity of Take notice that the following
a. Type of Application: Exemption 45 kilowatts; and (5) appurtenant hydroelectric application has been filed
from Licensing. facilities. The restored project would with the Commission and is available
b. Project No.: P–12608–000. have an average annual generation of for public inspection:
c. Date filed: August 15, 2005. 340 megawatt-hours. a. Type of Application: Preliminary
d. Applicant: Alternatives Unlimited, m. A copy of the application is Permit.
Inc. available for review at the Commission b. Project No.: 12626–000.
e. Name of Project: Alternatives Hydro in the Public Reference Room or may be c. Date filed: November 29, 2005.
Power Project. viewed on the Commission’s Web site at d. Applicant: Northern Illinois
f. Location: On the Mumford River, in http://www.ferc.gov using the Hydropower Corporation.
the Town of Northbridge, Worcester ‘‘eLibrary’’ link. Enter the docket e. Name of Project: Dresden Island
County, Massachusetts. The project number excluding the last three digits in Hydroelectric Project.
would not use federal land. the docket number field to access the f. Location: On the Illinois River, in
g. Filed Pursuant to: Public Utility document. For assistance, contact FERC Grundy, County, Illinois.
Regulatory Policies Act of 1978, 16 Online Support at g. Filed Pursuant to: Federal Power
U.S.C. sections 2705 and 2708. FERCOnlineSupport@ferc.gov or toll- Act, 16 U.S.C. 791(a)—825(r).
h. Applicant Contact: Kathleen D. free at 1–866–208–3676, or for TTY, h. Applicant Contact: Mr. Damon
Hervol. Beals and Thomas, Inc. (202) 502–8659. A copy is also available Zdunich, Northern Illinois Hydropower
Reservoir Corporate Center, 144 for inspection and reproduction at the Corporation, 801 Oakland Avenue,
Turnpike Road (Route 9), Southborough, address in item h above. Joliet, IL 60435, (312) 320–1610,
MA 01772–2104, (508) 366–0560. n. You may also register online at dzdunich@gelbergroup.com. The
i. FERC Contact: Stefanie Harris, (202) http://www.ferc.gov.esubscribenow.htm Dresden Island Lock and Dam is owned
502–6653 or stefanie.harris@ferc.gov. to be notified via email of new filings by the U.S. Army Corps of Engineers.
j. Deadline for filing scoping and issuances related to this or other i. FERC Contact: Patricia W. Gillis at
comments: February 24, 2006. pending projects. For assistance, contact (202) 502–8735.
All documents (original and eight FERC Online Support. j. Deadline for filing comments,
copies) should be filed with: Magalie R. o. Scoping Process: The Commission protests, and motions to intervene: 60
Salas, Secretary, Federal Energy staff intends to prepare a single days from the issuance date of this
Regulatory Commission, 888 First Environmental Assessment (EA) for the notice.
cchase on PROD1PC60 with NOTICES

Street, NE., Washington, DC 20426. Alternatives Hydro Power Project in The Commission’s Rules of Practice
The Commission’s Rules of Practice accordance with the National and Procedure require all intervenors
require all intervenors filing documents Environmental Policy Act. The EA will filing documents with the Commission
with the Commission to serve a copy of consider both site-specific and to serve a copy of that document on
that document on each person on the cumulative environmental impacts and each person in the official service list

VerDate Aug<31>2005 17:49 Jan 31, 2006 Jkt 208001 PO 00000 Frm 00081 Fmt 4703 Sfmt 4703 E:\FR\FM\01FEN1.SGM 01FEN1
Federal Register / Vol. 71, No. 21 / Wednesday, February 1, 2006 / Notices 5313

for the project. Further, if an intervenor application allows an interested person regulations to: The Secretary, Federal
files comments or documents with the to file the competing application no Energy Regulatory Commission, 888
Commission relating to the merits of an later than 120 days after the specified First Street, NE., Washington, DC 20426.
issue that may affect the responsibilities comment date for the particular A copy of any motion to intervene must
of a particular resource agency, they application. A competing license also be served upon each representative
must also serve a copy of the document application must conform with 18 CFR of the Applicant specified in the
on that resource agency. 4.30(b) and 4.36. particular application.
k. Description of Project: The p. Notice of Intent: A notice of intent t. Agency Comments: Federal, state,
proposed project using the Dresden must specify the exact name, business and local agencies are invited to file
Island Lock and Dam would consist of: address, and telephone number of the comments on the described application.
(1) A proposed powerhouse having a prospective applicant, and must include A copy of the application may be
total installed capacity of 18-megawatts, an unequivocal statement of intent to obtained by agencies directly from the
(2) a proposed 3-phase 34-kilovolt 3⁄4 submit, if such an application may be Applicant. If an agency does not file
mile overhead transmission line, and (3) filed, either a preliminary permit comments within the time specified for
appurtenant facilities. The proposed application or a development filing comments, it will be presumed to
project would have an average annual application (specify which type of have no comments. One copy of an
generation of 73,400,000 kilowatt-hours, application). A notice of intent must be agency’s comments must also be sent to
which would be sold to a local utility. served on the applicant(s) named in this the Applicant’s representatives.
l. Locations of Applications: A copy of public notice.
the application is available for q. Proposed Scope of Studies under Magalie R. Salas,
inspection and reproduction at the Permit: A preliminary permit, if issued, Secretary.
Commission in the Public Reference does not authorize construction. The [FR Doc. E6–1250 Filed 1–31–06; 8:45 am]
Room, located at 888 First Street, NE., term of the proposed preliminary permit BILLING CODE 6717–01–P
Room 2A, Washington, DC 20426, or by would be 36 months. The work
calling (202) 502–8371. This filing may proposed under the preliminary permit
also be viewed on the Commission’s would include economic analysis, DEPARTMENT OF ENERGY
Web site at http://www.ferc.gov using preparation of preliminary engineering
the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental Federal Energy Regulatory
number excluding the last three digits in impacts. Based on the results of these Commission
the docket number field to access the studies, the Applicant would decide
document. For assistance, call toll-free whether to proceed with the preparation Notice of Application To Amend
1–866–208–3676 or e-mail of a development application to Recreation Plan and Soliciting
FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project. Comments, Motions To Intervene, and
call (202) 502–8659. A copy is also r. Comments, Protests, or Motions to Protests
available for inspection and Intervene: Anyone may submit January 25, 2006.
reproduction at the address in item h. comments, a protest, or a motion to Take notice that the following
above. intervene in accordance with the application has been filed with the
m. Individuals desiring to be included requirements of Rules of Practice and Commission and is available for public
on the Commission’s mailing list should Procedure, 18 CFR 385.210, 385.211, inspection:
so indicate by writing to the Secretary 385.214. In determining the appropriate a. Application Type: Amendment of
of the Commission. action to take, the Commission will License.
n. Competing Preliminary Permit: consider all protests or other comments b. Project No: 2157–166.
Anyone desiring to file a competing filed, but only those who file a motion c. Date Filed: December 15, 2005.
application for preliminary permit for a to intervene in accordance with the d. Applicant: Public Utility District
proposed project must submit the Commission’s Rules may become a No. 1 of Snohomish County,
competing application itself, or a notice party to the proceeding. Any comments, Washington and the City of Everett.
of intent to file such an application, to protests, or motions to intervene must e. Name of Project: Henry M. Jackson
the Commission on or before the be received on or before the specified Project.
specified comment date for the comment date for the particular f. Location: The project is located on
particular application (see 18 CFR 4.36). application. Sulton River, in Snohomish County,
Submission of a timely notice of intent Comments, protests and interventions Washington. This project occupies
allows an interested person to file the may be filed electronically via the about 1,939 acres of federal lands
competing preliminary permit Internet in lieu of paper; See 18 CFR administered by the U.S. Forest Service.
application no later than 30 days after 385.2001(a)(1)(iii) and the instructions g. Filed Pursuant to: Federal Power
the specified comment date for the on the Commission’s web site under ‘‘e- Act, 16 U.S.C. 791(a) 825(r) and 799 and
particular application. A competing filing’’ link. The Commission strongly 801.
preliminary permit application must encourages electronic filing. h. Applicant Contact: Mr. Clare
conform with 18 CFR 4.30(b) and 4.36. s. Filing and Service of Responsive Olivers, Public Utility District No. 1 of
o. Competing Development Documents: Any filings must bear in all Snohomish County, 2320 California
Application: Any qualified development capital letters the title ‘‘COMMENTS’’, Street, P.O. Box 1107, Everett, WA
applicant desiring to file a competing ‘‘RECOMMENDATIONS FOR TERMS 98206, (425) 783–8606.
development application must submit to AND CONDITIONS’’, ‘‘PROTEST’’, or i. FERC Contacts: Any questions on
the Commission, on or before a ‘‘MOTION TO INTERVENE’’, as this notice should be addressed to Mr.
specified comment date for the applicable, and the Project Number of Jon Cofrancesco at (202) 502–8951, or e-
cchase on PROD1PC60 with NOTICES

particular application, either a the particular application to which the mail address: jon.cofrancesco@ferc.gov.
competing development application or a filing refers. Any of the above-named j. Deadline for filing comments and or
notice of intent to file such an documents must be filed by providing motions: February 14, 2006.
application. Submission of a timely the original and the number of copies All documents (original and eight
notice of intent to file a development provided by the Commission’s copies) should be filed with: Ms.

VerDate Aug<31>2005 17:49 Jan 31, 2006 Jkt 208001 PO 00000 Frm 00082 Fmt 4703 Sfmt 4703 E:\FR\FM\01FEN1.SGM 01FEN1

You might also like