PQR No.
WPS No.
Welding Process
:
:
:
Joints (QW-402)
Joint Design
Root Spacing
Backing
Backing Material ( Type)
Weld layer / Sequence
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
Position ( QW-405)
Groove Position
Fillet
:
:
Weld Progression(Uphill/Downhill) :
Other
:
Preheat ( QW-406)
Preheat Temperature
Others
:
:
Interpass Temperature :
Interpass Temperature Maintenance :
Thickness Limits :
Rate of Cooling :
Other
:
PQR/JCFF/
WPS/JCFF/
Date
Date
Rev. No. : 0
Type
to
to
to
:
:
:
:
:
:
:
Other :
Polarity
:
Voltage :
Heat Input :
Tungsten Electrode Size :
Bead - String/ weave :
Orifice/Cup/Nozzle size :
Method of cleaning :
Closed to out chamber :
PQR No.
WPS No.
Manual or Automatic
Tube to Work - Distance
:
:
:
:
PQR/JCFF/
WPS/JCFF/
Rev. No. : 0
Date
:
Date
:
Filler metal delivery :
PQR No.
WPS No.
:
:
PQR/JCFF/
WPS/JCFF/
Date
Date
Rev. No. : 0
:
:
Width
Thickness
Area
Ultimate
Unit stress
Notch type
Test Temperature
Resu
Impact value
in J
Ni
Mo
Mn
Si
Average
Averag
Cr
Macro Test :
Other Tests:
Hardness Survey QW 462.5 ( e )
Report No:
Weld Metal
HAZ 1
Base Metal
Welder Name
Test conducted by
:
:
ID No.:
Stamp No. :
Laboratory Test report No. :
We certifiy that the statement in this record are true and correct and that the test welds were prepared, welded and tested in
accordance with the requirements of Section IX of ASME Boiler & Pressure Vessel code.
Approved By
For Tyco Flow Control FZE.
Type of Failure
& Location
Result
Fe
PQR No.
WPS No.
Welding Process
:
:
:
Joints (QW-402)
Joint Design
Root Spacing
Backing
Backing Material ( Type)
Weld layer / Sequence
:
:
:
:
:
:
:
:
:
PQR/JCFF/
WPS/JCFF/
Rev. No. : 0
Type
Date
Date
:
:
to
to
Maximum pass thickness :
Other :
:
:
:
:
:
:
Position ( QW-405)
Groove Position
Fillet
:
:
Weld Progression(Uphill/Downhill) :
Other
:
Preheat ( QW-406)
Preheat Temperature
Others
:
:
Interpass Temperature :
Interpass Temperature Maintenance :
Thickness Limits :
Rate of Cooling :
Other
:
:
:
Polarity
:
Voltage :
Heat Input :
Tungsten Electrode Size :
Technique(QW 410)
Travel Speed
Oscillation
:
:
PQR No.
WPS No.
Multi pass/Single Pass
Multiple/Single Electrode
Manual or Automatic
Tube to Work - Distance
:
:
:
:
:
:
Hardness Requirement
Other Test
Welder Name
Test conducted by
PQR/JCFF/
WPS/JCFF/
Rev. No. : 0
Date
:
Date
:
Method of cleaning :
Closed to out chamber :
Filler metal delivery :
:
:
:
:
ID No.:
Stamp No. :
Laboratory Test report No. :
We certifiy that the statement in this record are true and correct and that the test welds were prepared, welded and tested in
accordance with the requirements of Section IX of ASME Boiler & Pressure Vessel code.
Approved By
For Tyco Flow Control FZE.
Welder's Name
ID No.
Base Metal/UNS
Process
Direct / Remote visual control
:
:
:
:
:
Actual variable
used in qualification
Variables (QW-350)
Backing ( QW-402)
ASME P. No.(QW-403)
:
:
Thickness
Plate / Pipe thickness
Groove
Fillet
Pipe Diameter groove
Pipe Diameter Fillet
:
:
:
:
:
:
Filler Metal
AWS Specn. SFA (QW-404)
Electrode Classification
F.No.
Product form
:
:
:
:
:
:
:
:
:
:
:
:
Guided Bend Tests (QW-160)
Type & Fig. No
Result
Specimen No.
Other Tests
:
:
:
:
:
:
:
:
:
:
We certify that the statement in this record are correct and that the test coupon were prepared, welded and
tested in accordance with the requirements of Section IX of ASME Boiler and Pressure Vessel Code.
Test conducted at
For JCF Fluid Flow FZE
ssel Code
WPS No.
Date
Thickness
Type
Qualified Range
Witnessed by
:
:
:
: