You are on page 1of 2

Federal Register / Vol. 70, No.

234 / Wednesday, December 7, 2005 / Notices 72825

DEPARTMENT OF ENERGY may be filed electronically via the Submission of a timely notice of intent
Internet in lieu of paper. The allows an interested person to file the
Federal Energy Regulatory Commission strongly encourages competing development application no
Commission electronic filings. See 18 CFR later than 120 days after the specified
385.2001(a)(1)(iii) and the instructions deadline date for the particular
Notice of Application and Applicant- on the Commission’s Web site (http:// application. Applications for
Prepared EA Accepted for Filing, www.ferc.gov) under the ‘‘e-Filing’’ link. preliminary permits will not be
Soliciting Motions To Intervene and k. This application has been accepted accepted in response to this notice.
Protests, and Soliciting Comments, for filing. A notice of intent must specify the
and Final Terms and Conditions, l. The proposed Whitman Lake exact name, business address, and
Recommendations, and Prescriptions Hydroelectric Project will have an telephone number of the prospective
installed generating capacity of 4.6 applicant, and must include an
November 30, 2005.
Megawatts with a maximum hydraulic unequivocal statement of intent to
Take notice that the following capacity of 180 cubic feet per second submit, if such an application may be
hydroelectric application and applicant- (cfs). The proposed project would filed, either a preliminary permit
prepared environmental assessment has consist of the following features: (1) The application or a development
been filed with the Commission and is existing 39-foot-high, 220-foot-long application (specify which type of
available for public inspection. concrete gravity arch dam; (2) 40-foot- application). A notice of intent must be
a. Type of Application: New Major wide Ogee spillway within the dam; (3) served on the applicant(s) named in this
License. a 148 surface acre reservoir (Whitman public notice.
b. Project No.: 11841–002. Lake); (4) a 2,450-foot-long, 45-inch- Anyone may submit comments, a
c. Date filed: August 12, 2004. diameter penstock; (5) a 2,000-foot-long, protest, or a motion to intervene in
d. Applicant: Ketchikan Public 21-inch-diameter pipeline; (6) a accordance with the requirements of
Utilities. horizontal Francis turbine and 3,900 kW Rules of Practice and Procedure, 18 CFR
e. Name of Project: Whitman Lake generator, with a hydraulic capacity of 385.210, .211, .214. In determining the
Hydroelectric Project. 150 cfs; (7) a horizontal or vertical appropriate action to take, the
f. Location: The Whitman Lake Francis turbine and 700 kW generator, Commission will consider all protests or
Hydroelectric Project would be located with a hydraulic capacity of 30 cfs; and other comments filed, but only those
on Whitman Lake in Ketchikan Gateway (8) other appurtenant facilities. who file a motion to intervene in
Borough, Ketchikan, Alaska. The Ketchikan Public Utilities (KPU) accordance with the Commission’s
proposed project would affect estimates that the average annual Rules may become a party to the
approximately 155.8 acres of federal generation will be 16,225 proceeding. Any comments, protests, or
lands (155.0-acres managed by the U.S. megawatthours (MWh). KPU proposes motions to intervene must be received
Forest Service and 0.8-acres managed by to use the project to supplement, as well on or before the specified comment date
the U.S. Bureau of Land Management). as displace, other generation resources for the particular application.
g. Filed Pursuant to: Federal Power owned and operated by KPU. With the The Commission directs, pursuant to
Act 16 U.S.C. 791(a)–825(r). construction and operation of the section 4.34(b) of the Regulations (see
h. Applicant Contact: Mr. Don project, KPU hopes to minimize its use Order No. 533 issued May 8, 1991, 56
Thompson, WESCORP, 3035 Island and dependency on fossil fuel FR 23108, May 20, 1991) that all
Crest Way, Suite 200, Mercer Island, generation. comments, recommendations, terms and
WA 98040; Telephone: (206) 275–1000. m. A copy of the application is conditions and prescriptions concerning
i. FERC Contact: Kenneth Hogan at available for review at the Commission the application and APEA be filed with
(202) 502–8434; e-mail: in the Public Reference Room or may be the Commission within 60 days from
kenneth.hogan@ferc.gov. viewed on the Commission’s Web site at the issuance date of this notice. All
j. Deadline for filing motions to http://www.ferc.gov using the reply comments must be filed with the
intervene and protests, comments, and ‘‘eLibrary’’ link. Enter the docket Commission within 105 days from the
final terms and conditions, number excluding the last three digits in date of this notice.
recommendations, and prescriptions: 60 the docket number field to access the Anyone may obtain an extension of
days from the issuance of this notice. document. For assistance, contact FERC time for these deadlines from the
All documents (original and eight Online Support at Commission only upon a showing of
copies) should be filed with: Magalie R. FERCOnlineSupport@ferc.gov or toll- good cause or extraordinary
Salas, Secretary, Federal Energy free at 1–866–208–3676, or for TTY, circumstances in accordance with 18
Regulatory Commission, 888 First (202) 502–8659. A copy is also available CFR 385.2008.
Street, NE., Washington, DC 20426. for inspection and reproduction at the All filings must: (1) Bear in all capital
The Commission’s Rules of Practice address in item h above. letters the title ‘‘PROTEST’’, ‘‘MOTION
require all intervenors filing documents Register online at http:// TO INTERVENE’’, ‘‘NOTICE OF
with the Commission to serve a copy of www.ferc.gov/docs-filing/ INTENT TO FILE COMPETING
that document on each person on the esubscription.asp to be notified via APPLICATION,’’ ‘‘COMPETING
official service list for the project. email of new filings and issuances APPLICATION,’’ ‘‘COMMENTS,’’
Further, if an intervenor files comments related to this or other pending projects. ‘‘REPLY COMMENTS,’’
or documents with the Commission For assistance, contact FERC Online ‘‘RECOMMENDATIONS,’’ ‘‘TERMS
relating to the merits of an issue that Support. AND CONDITIONS,’’ or
may affect the responsibilities of a n. Any qualified applicant desiring to ‘‘PRESCRIPTIONS;’’ (2) set forth in the
particular resource agency, they must file a competing application must heading the name of the applicant and
also serve a copy of the document on submit to the Commission, on or before the project number of the application to
that resource agency. the specified deadline date for the which the filing responds; (3) furnish
Motions to intervene, protests, particular application, a competing the name, address, and telephone
comments, terms and conditions, development application, or a notice of number of the person protesting or
recommendations, and prescriptions intent to file such an application. intervening; and (4) otherwise comply

VerDate Aug<31>2005 13:01 Dec 06, 2005 Jkt 208001 PO 00000 Frm 00048 Fmt 4703 Sfmt 4703 E:\FR\FM\07DEN1.SGM 07DEN1
72826 Federal Register / Vol. 70, No. 234 / Wednesday, December 7, 2005 / Notices

with the requirements of 18 CFR DEPARTMENT OF ENERGY For additional information, please
385.2001 through 385.2005. All contact Michelle Reaux of FERC’s Office
comments, recommendations, terms and Federal Energy Regulatory of Market Oversight & Investigations at
conditions or prescriptions must set Commission (202) 502–6497 or by e-mail at
forth their evidentiary basis and [Docket No. RM01–8–000; Docket No. ER02– eqr@ferc.gov.
otherwise comply with the requirements 2001–000] Magalie R. Salas,
of 18 CFR 4.34(b). Agencies may obtain Secretary.
copies of the application directly from Revised Public Utility Filing
Requirements; Electric Quarterly [FR Doc. E5–6941 Filed 12–6–05; 8:45 am]
the applicant. A copy of any protest or BILLING CODE 6717–01–P
motion to intervene must be served Reports; Notice of Electric Quarterly
upon each representative of the Reports Users Group Meeting
applicant specified in the particular November 29, 2005. DEPARTMENT OF ENERGY
application. A copy of all other filings On April 25, 2002, the Commission
in reference to this application must be issued Order No. 2001,1 a final rule Federal Energy Regulatory
accompanied by proof of service on all which requires public utilities to file Commission
persons listed in the service list Electric Quarterly Reports. Order 2001–
Notice of Membership of Performance
prepared by the Commission in this C, issued December 18, 2002, instructs
Review Board for Senior Executives
proceeding, in accordance with 18 CFR all public utilities to file these reports
(PRB)
4.34(b) and 385.2010. using Electric Quarterly Report
Submission Software. This notice November 28, 2005.
Magalie R. Salas, announces a meeting for the EQR Users The Federal Energy Regulatory
Secretary. Group to be held Wednesday, December Commission hereby provides notice of
[FR Doc. E5–6956 Filed 12–6–05; 8:45 am] 14, 2005, via teleconference. The the membership of its Performance
BILLING CODE 6717–01–P meeting will run from 1 p.m. to 5 p.m. Review Board (PRB) for the
e.s.t. Commission’s Senior Executive Service
During the teleconference, (SES) members. The function of this
DEPARTMENT OF ENERGY Commission staff and EQR users will board is to make recommendations
discuss the technical compliance relating to the performance of senior
Federal Energy Regulatory screening process for EQR filings. The executives in the Commission. This
Commission call will include a discussion of the action is undertaken in accordance with
overall process as well as a review of Title 5, U.S.C., section 4314(c)(4). The
[Docket No. RP05–691–000] specific screens. A detailed agenda will Commission’s PRB will add the
be provided on http://www.ferc.gov following member: Susan J. Court.
CenterPoint Energy-Mississippi River prior to the meeting.
All interested parties are invited to Magalie R. Salas,
Transmission Corporation; Notice of
call in. Documents to be discussed at Secretary.
Postponement of Technical
Conference the meeting will be posted on the EQR [FR Doc. E5–6929 Filed 12–6–05; 8:45 am]
Users Group and Workshops page on BILLING CODE 6717–01–P
November 30, 2005. FERC.gov at http://www.ferc.gov/docs-
Take notice that the technical filing/eqr/groups-workshops.asp. The
workshop will only be available via ENVIRONMENTAL PROTECTION
conference scheduled for Tuesday,
teleconference. AGENCY
December 6, 2005, has been postponed Those interested in participating are
until Tuesday, January 24, 2006, at 10 asked to do so by registering on the [Petition IV–2002–1; FRL–8005–7]
a.m. (e.s.t.), in a room to be designated FERC Web site at https://www.ferc.gov/
at the offices of the Federal Energy Clean Air Act Operating Permit
whats-new/registration/eqr-1129-
Regulatory Commission, 888 First Program; Petition for Objection to
form.asp. There is no registration fee.
Street, NE., Washington, DC 20426. Interested parties wishing to file State Operating Permit for Oglethorpe
comments may do so under the above- Power Company—Wansley Combined
Magalie R. Salas, Cycle Energy Facility; Roopville (Heard
captioned Docket Numbers. Those
Secretary. filings will be available for review at the County), GA
[FR Doc. E5–6958 Filed 12–6–05; 8:45 am] Commission or may be viewed on the AGENCY: Environmental Protection
BILLING CODE 6717–01–P Commission’s Web site at http:// Agency (EPA).
www.ferc.gov, using the ‘‘eLibrary’’ link. ACTION: Notice of amended final order
Enter the docket number excluding denying petition to object to a state
the last three digits in the docket operating permit in response to remand.
number field to access the document.
For assistance, contact FERC Online SUMMARY: This Amended Order
Support at Responding to Remand corrects certain
FERCOnlineSupport@ferc.gov or via errors that were found in the Order
phone at (866) 208–3676 (toll-free). For Responding to Remand that was issued
TTY, contact (202) 502–8659. on September 15, 2005. The September
15th Order, which is superseded by this
1 Revised Public Utility Filing Requirements, Order, is being amended to correct
Order No. 2001, 67 FR 31043, FERC Stats. & Regs. certain clerical errors and to address a
¶ 31,127 (April 25, 2002); reh’g denied, Order No.
2001–A, 100 FERC ¶ 61,074, reconsideration and
factual error in note 13 of that order
clarification denied, Order No. 2001–B, 100 FERC regarding whether Oglethorpe Power
¶ 61,342 (2002). Company (Oglethorpe) had any

VerDate Aug<31>2005 13:01 Dec 06, 2005 Jkt 208001 PO 00000 Frm 00049 Fmt 4703 Sfmt 4703 E:\FR\FM\07DEN1.SGM 07DEN1

You might also like