Professional Documents
Culture Documents
TA CORPORATION LTD
1. FOUNDATION
Reinforced concrete pile
We are currently known as TA Corporation Ltd after turning into a public listed company
(formerly known as Tiong Aik Group of Companies). We have retained our reputation for our
standard of excellence in developing premium homes and further built upon that, offering
you the best.
3. WALLS
a. External Walls
b. Internal Walls
2. SUBSTRUCTURE/SUPERSTRUCTURE
Reinforced concrete structure
4. ROOF
a. Flat Roof/ Terrace
b. Pitch Roof
23
5. CEILING
a. Family Room, Living,
Dining, Bedrooms, Yard,
HS, Car Park
b. All Bathrooms, Wet
Kitchen
23A
25
Recognised for our high quality housing in Singapore, TA Corporation is a significant developer
best known for our hallmark materials, stellar finishes and unwavering workmanship. Our team
of acclaimed consultants from architects to engineers to landscape artists set the gold standard
in providing lifestyle homes for your discerning tastes.
6. WALL FINISHES
Units
a. Family Room, Living,
Dining, Dry Kitchen,
Bedrooms, Balcony,
Roof Terrace
b. Master Bathroom/
Powder Room/
Common Bathrooms
c. Wet Kitchen, WC
(To exposed surface only)
21A
21
19A
19
Common area
a. External walls
Parc Seabreeze
7. FLOOR FINISHES
Units
a. Family Room, Living,
Dining, Dry Kitchen
b. Master Bathroom/
Powder Room/ Common
Bathrooms, Kitchen, WC
c. All Bedrooms
d. Balcony, Roof Terrace, PES
SA
VE
NU
E E
A
ST
Starlight Suites
16. PAINTING
a. External wall: Spray texture coating and/or emulsion paint finish
b. Internal wall: Emulsion paint finish
SIM
e. Internal Staircase
f. Car Park
Common area
a. Walkway, BBQ Area
b. Common staircase
b. Kitchen Appliances
d. Wardrobe
e. Water-heater
Landscape
Pavilion
Pedestrian Entrance
10. IRONMONGERY
Selected quality lockset to main door and other doors.
Reflective Pool
11. RAILING
Units
a. Roof Terrace, Balcony
Eunos Industrial
Estate
NEW
ER
UPP
CHA
NGI
The Cristallo
EW8
BBQ Area
Common Area
a. Escape Staircase
Leoniehill Residences
9. DOORS
a. Basement Entrance Door
b. Main Entrance Door
c. All Bedrooms
d. All Bathrooms
e. Kitchen
f. Yard, Roof Terrace
g. PES
h. WC
i. HS
b. Internal Staircase
c. PES
CC9
RD
:
:
:
:
:
:
:
:
:
Gambir Ridge
15.LIGHTNING PROTECTION
Lightning protection system shall be provided in accordance with SS555.2010.
Tao Nan
Sch
112
Katong
To Changi Airport
8. WINDOWS
Powder coated aluminium frame with glass according to authority requirements.
Note: Color of frames and glass subject to architects selection.
JALAN SAYANG
Coralis
17. WATERPROOFING
Waterproofing to Basement, Bathrooms, Powder Room, Wet Kitchen, Balcony,
Roof Terrace, PES, AC ledge, where applicable
c. Air-conditioning
f. Intercom System
g. Security System
h. Cable Vision
Note:
Marble/ Granite: Marble and granite is a natural material containing veins with
tonality differences. There will be colour differences and marking caused by
their complex mineral composition and incorporated impurities. While such
materials can be pre-selected before installation, this non-conformity cannot
be totally avoided. Granite are pre-polished before laying and care has
been taken for their installation. However, granite being a much harder
material than marble, cannot be re-polished after installation. Hence, some
differences may be felt at the joints. The tonality and pattern of marble,
limestone or granite selected and installed shall be subject to availability.
Timber: Timber is a natural material that does not have total consistency of
colour and grain. Thus it is not possible to achieve a total consistency of colour
and grain in their selection and installation. Timber strip also subject to
thermal expansion and contraction beyond the control of builder and vendor.
Natural timber that is used outdoor will become bleached due to sunlight and
rain. Thus, the cycle of maintenance on staining wall need to be increase as
required. Notwithstanding this note, the vendor shall remain fully responsible
for the performance of its obligations.
Tiles Finishes: Selected tiles sizes and tile surface flatness cannot be perfect and
are subject to acceptable ranged described in Singapore Standards SS483:2000
Sanitary Wares/Fittings: Brand and model of all sanitary wares/fittings
supplied will be provided subject to availability.
Air-conditioning: Air-conditioning system has to be maintained and cleaned
on a regular basis by the Purchaser. This includes the cleaning of filters and
clearing the condensate pipes to ensure that the system be in good working
condition. The purchaser is advised to engage his/her own contractor to service
the air-conditioning system regularly.
Mechanical Ventilation System: Mechanical ventilation fans and ducting are
provided to toilets which are not naturally ventilated. To ensure good working
condition of the system, the exhaust system within internal toilets, where
applicable, is to be maintained by the purchaser on a regular basis.
No tiles behind/below kitchen cabinet, long bath and mirror. Wall surface above
the false ceiling level will be left in its original bare condition.
Layout/location of wardrobe, kitchen cabinets, fan coil units, electrical points,
television points, telecommunication points, audio intercom system, door
swing positions and plaster ceiling board are subject to Architects final decision
and design.
Where the Unit is provided with PES/Open Terrace, the Purchaser shall not
cover up or erect any roof or structure over or enclosing the PES/Open Terrace,
nor shall the Purchaser allow the PES/Open Terrace to be covered up or roofed over.
Television and/or Cable Television (SCV): Purchaser is responsible for paying
annual fee, subscription fees and such other fees to Singapore Cable Vision
Pte Ltd (SCV) or any other relevant authorities. Developer is not responsible
to make arrangements with SCV for the service connection to individual units.
Internet: The purchaser is liable to pay Asymmetrical Digital Subscriber Line
(ADSL) connection, annual fee, subscription fee and such other fees to Internet
Service Provider (ISP). The vendor is not responsible to make arrangements
with any said parties for the service connection for their respective subscription.
Recreational Facilities: All recreational facilities are subject to change/approval
by relevant authorities and/or technical requirement/compliance.
The brand, colour and model of all materials, fittings, equipment, finishes,
installations and appliances supplied shall be provided subject to Architects
selection, market availability.
Web portal of the housing project: The purchaser will have to pay annual fee,
subscription fee or any such fee to the service provider of the web portal of the
housing project as may be appointed by the vendor or the management
corporation with it is formed.
False Ceiling space provision allows for the optimal function and installation
of M&E services. Access panels are allocated for ease of maintenance access to
concealed M&E equipment for regular cleaning purposes. Where removal of
equipment is needed, ceiling works will be required. Location of false ceiling
is subject to the Architects sole discretion and final design.
Glass is manufactured material that is not 100% pure. Invisible nickel sulphide
impurities may cause spontaneous glass breakage, which may occur in all glass
by all manufacturers. The purchaser is recommended to take up home insurance
covering glass breakage to cover this possible event.
Where warranties are given by the manufacturers and/or contractors and/or
suppliers of any of the equipment and/or appliances installed by the Vendor at
the Unit, the Vendor shall assign to the Purchaser such warranties at the time
when possession of the Unit is delivered to the Purchaser.
Electrical Schedule
TYPE/HOUSE NO.
19
19A
21
21A
23
23A
25
LIGHTING POINT
37
38
38
37
37
37
39
45
45
45
43
45
45
47
TELEPHONE POINT
SCV TV POINT
BELL POINT
OVEN POINT
Parkway
Parade
To City
Developer: Tiong Aik Investments Pte Ltd (199501550N) Developers Licence No.: C0963 Tenure of Land: Freehold Lot/Mukim No.: Lots 4680C & 7204X MK 28
BP Approval No.: A1553-00204-2011-BP01 dated 06 August 2012 Expected Date of Vacant Possession: 30 September 2016 Expected Date of Legal Completion:
30 September 2019.
ARTISTS IMPRESSION
SPECIFICATIONS
TA CORPORATION LTD
1. FOUNDATION
Reinforced concrete pile
We are currently known as TA Corporation Ltd after turning into a public listed company
(formerly known as Tiong Aik Group of Companies). We have retained our reputation for our
standard of excellence in developing premium homes and further built upon that, offering
you the best.
3. WALLS
a. External Walls
b. Internal Walls
2. SUBSTRUCTURE/SUPERSTRUCTURE
Reinforced concrete structure
4. ROOF
a. Flat Roof/ Terrace
b. Pitch Roof
23
5. CEILING
a. Family Room, Living,
Dining, Bedrooms, Yard,
HS, Car Park
b. All Bathrooms, Wet
Kitchen
23A
25
Recognised for our high quality housing in Singapore, TA Corporation is a significant developer
best known for our hallmark materials, stellar finishes and unwavering workmanship. Our team
of acclaimed consultants from architects to engineers to landscape artists set the gold standard
in providing lifestyle homes for your discerning tastes.
6. WALL FINISHES
Units
a. Family Room, Living,
Dining, Dry Kitchen,
Bedrooms, Balcony,
Roof Terrace
b. Master Bathroom/
Powder Room/
Common Bathrooms
c. Wet Kitchen, WC
(To exposed surface only)
21A
21
19A
19
Common area
a. External walls
Parc Seabreeze
7. FLOOR FINISHES
Units
a. Family Room, Living,
Dining, Dry Kitchen
b. Master Bathroom/
Powder Room/ Common
Bathrooms, Kitchen, WC
c. All Bedrooms
d. Balcony, Roof Terrace, PES
SA
VE
NU
E E
A
ST
Starlight Suites
16. PAINTING
a. External wall: Spray texture coating and/or emulsion paint finish
b. Internal wall: Emulsion paint finish
SIM
e. Internal Staircase
f. Car Park
Common area
a. Walkway, BBQ Area
b. Common staircase
b. Kitchen Appliances
d. Wardrobe
e. Water-heater
Landscape
Pavilion
Pedestrian Entrance
10. IRONMONGERY
Selected quality lockset to main door and other doors.
Reflective Pool
11. RAILING
Units
a. Roof Terrace, Balcony
Eunos Industrial
Estate
NEW
ER
UPP
CHA
NGI
The Cristallo
EW8
BBQ Area
Common Area
a. Escape Staircase
Leoniehill Residences
9. DOORS
a. Basement Entrance Door
b. Main Entrance Door
c. All Bedrooms
d. All Bathrooms
e. Kitchen
f. Yard, Roof Terrace
g. PES
h. WC
i. HS
b. Internal Staircase
c. PES
CC9
RD
:
:
:
:
:
:
:
:
:
Gambir Ridge
15.LIGHTNING PROTECTION
Lightning protection system shall be provided in accordance with SS555.2010.
Tao Nan
Sch
112
Katong
To Changi Airport
8. WINDOWS
Powder coated aluminium frame with glass according to authority requirements.
Note: Color of frames and glass subject to architects selection.
JALAN SAYANG
Coralis
17. WATERPROOFING
Waterproofing to Basement, Bathrooms, Powder Room, Wet Kitchen, Balcony,
Roof Terrace, PES, AC ledge, where applicable
c. Air-conditioning
f. Intercom System
g. Security System
h. Cable Vision
Note:
Marble/ Granite: Marble and granite is a natural material containing veins with
tonality differences. There will be colour differences and marking caused by
their complex mineral composition and incorporated impurities. While such
materials can be pre-selected before installation, this non-conformity cannot
be totally avoided. Granite are pre-polished before laying and care has
been taken for their installation. However, granite being a much harder
material than marble, cannot be re-polished after installation. Hence, some
differences may be felt at the joints. The tonality and pattern of marble,
limestone or granite selected and installed shall be subject to availability.
Timber: Timber is a natural material that does not have total consistency of
colour and grain. Thus it is not possible to achieve a total consistency of colour
and grain in their selection and installation. Timber strip also subject to
thermal expansion and contraction beyond the control of builder and vendor.
Natural timber that is used outdoor will become bleached due to sunlight and
rain. Thus, the cycle of maintenance on staining wall need to be increase as
required. Notwithstanding this note, the vendor shall remain fully responsible
for the performance of its obligations.
Tiles Finishes: Selected tiles sizes and tile surface flatness cannot be perfect and
are subject to acceptable ranged described in Singapore Standards SS483:2000
Sanitary Wares/Fittings: Brand and model of all sanitary wares/fittings
supplied will be provided subject to availability.
Air-conditioning: Air-conditioning system has to be maintained and cleaned
on a regular basis by the Purchaser. This includes the cleaning of filters and
clearing the condensate pipes to ensure that the system be in good working
condition. The purchaser is advised to engage his/her own contractor to service
the air-conditioning system regularly.
Mechanical Ventilation System: Mechanical ventilation fans and ducting are
provided to toilets which are not naturally ventilated. To ensure good working
condition of the system, the exhaust system within internal toilets, where
applicable, is to be maintained by the purchaser on a regular basis.
No tiles behind/below kitchen cabinet, long bath and mirror. Wall surface above
the false ceiling level will be left in its original bare condition.
Layout/location of wardrobe, kitchen cabinets, fan coil units, electrical points,
television points, telecommunication points, audio intercom system, door
swing positions and plaster ceiling board are subject to Architects final decision
and design.
Where the Unit is provided with PES/Open Terrace, the Purchaser shall not
cover up or erect any roof or structure over or enclosing the PES/Open Terrace,
nor shall the Purchaser allow the PES/Open Terrace to be covered up or roofed over.
Television and/or Cable Television (SCV): Purchaser is responsible for paying
annual fee, subscription fees and such other fees to Singapore Cable Vision
Pte Ltd (SCV) or any other relevant authorities. Developer is not responsible
to make arrangements with SCV for the service connection to individual units.
Internet: The purchaser is liable to pay Asymmetrical Digital Subscriber Line
(ADSL) connection, annual fee, subscription fee and such other fees to Internet
Service Provider (ISP). The vendor is not responsible to make arrangements
with any said parties for the service connection for their respective subscription.
Recreational Facilities: All recreational facilities are subject to change/approval
by relevant authorities and/or technical requirement/compliance.
The brand, colour and model of all materials, fittings, equipment, finishes,
installations and appliances supplied shall be provided subject to Architects
selection, market availability.
Web portal of the housing project: The purchaser will have to pay annual fee,
subscription fee or any such fee to the service provider of the web portal of the
housing project as may be appointed by the vendor or the management
corporation with it is formed.
False Ceiling space provision allows for the optimal function and installation
of M&E services. Access panels are allocated for ease of maintenance access to
concealed M&E equipment for regular cleaning purposes. Where removal of
equipment is needed, ceiling works will be required. Location of false ceiling
is subject to the Architects sole discretion and final design.
Glass is manufactured material that is not 100% pure. Invisible nickel sulphide
impurities may cause spontaneous glass breakage, which may occur in all glass
by all manufacturers. The purchaser is recommended to take up home insurance
covering glass breakage to cover this possible event.
Where warranties are given by the manufacturers and/or contractors and/or
suppliers of any of the equipment and/or appliances installed by the Vendor at
the Unit, the Vendor shall assign to the Purchaser such warranties at the time
when possession of the Unit is delivered to the Purchaser.
Electrical Schedule
TYPE/HOUSE NO.
19
19A
21
21A
23
23A
25
LIGHTING POINT
37
38
38
37
37
37
39
45
45
45
43
45
45
47
TELEPHONE POINT
SCV TV POINT
BELL POINT
OVEN POINT
Parkway
Parade
To City
Developer: Tiong Aik Investments Pte Ltd (199501550N) Developers Licence No.: C0963 Tenure of Land: Freehold Lot/Mukim No.: Lots 4680C & 7204X MK 28
BP Approval No.: A1553-00204-2011-BP01 dated 06 August 2012 Expected Date of Vacant Possession: 30 September 2016 Expected Date of Legal Completion:
30 September 2019.
ARTISTS IMPRESSION
SPECIFICATIONS
TA CORPORATION LTD
1. FOUNDATION
Reinforced concrete pile
We are currently known as TA Corporation Ltd after turning into a public listed company
(formerly known as Tiong Aik Group of Companies). We have retained our reputation for our
standard of excellence in developing premium homes and further built upon that, offering
you the best.
3. WALLS
a. External Walls
b. Internal Walls
2. SUBSTRUCTURE/SUPERSTRUCTURE
Reinforced concrete structure
4. ROOF
a. Flat Roof/ Terrace
b. Pitch Roof
23
5. CEILING
a. Family Room, Living,
Dining, Bedrooms, Yard,
HS, Car Park
b. All Bathrooms, Wet
Kitchen
23A
25
Recognised for our high quality housing in Singapore, TA Corporation is a significant developer
best known for our hallmark materials, stellar finishes and unwavering workmanship. Our team
of acclaimed consultants from architects to engineers to landscape artists set the gold standard
in providing lifestyle homes for your discerning tastes.
6. WALL FINISHES
Units
a. Family Room, Living,
Dining, Dry Kitchen,
Bedrooms, Balcony,
Roof Terrace
b. Master Bathroom/
Powder Room/
Common Bathrooms
c. Wet Kitchen, WC
(To exposed surface only)
21A
21
19A
19
Common area
a. External walls
Parc Seabreeze
7. FLOOR FINISHES
Units
a. Family Room, Living,
Dining, Dry Kitchen
b. Master Bathroom/
Powder Room/ Common
Bathrooms, Kitchen, WC
c. All Bedrooms
d. Balcony, Roof Terrace, PES
SA
VE
NU
E E
A
ST
Starlight Suites
16. PAINTING
a. External wall: Spray texture coating and/or emulsion paint finish
b. Internal wall: Emulsion paint finish
SIM
e. Internal Staircase
f. Car Park
Common area
a. Walkway, BBQ Area
b. Common staircase
b. Kitchen Appliances
d. Wardrobe
e. Water-heater
Landscape
Pavilion
Pedestrian Entrance
10. IRONMONGERY
Selected quality lockset to main door and other doors.
Reflective Pool
11. RAILING
Units
a. Roof Terrace, Balcony
Eunos Industrial
Estate
NEW
ER
UPP
CHA
NGI
The Cristallo
EW8
BBQ Area
Common Area
a. Escape Staircase
Leoniehill Residences
9. DOORS
a. Basement Entrance Door
b. Main Entrance Door
c. All Bedrooms
d. All Bathrooms
e. Kitchen
f. Yard, Roof Terrace
g. PES
h. WC
i. HS
b. Internal Staircase
c. PES
CC9
RD
:
:
:
:
:
:
:
:
:
Gambir Ridge
15.LIGHTNING PROTECTION
Lightning protection system shall be provided in accordance with SS555.2010.
Tao Nan
Sch
112
Katong
To Changi Airport
8. WINDOWS
Powder coated aluminium frame with glass according to authority requirements.
Note: Color of frames and glass subject to architects selection.
JALAN SAYANG
Coralis
17. WATERPROOFING
Waterproofing to Basement, Bathrooms, Powder Room, Wet Kitchen, Balcony,
Roof Terrace, PES, AC ledge, where applicable
c. Air-conditioning
f. Intercom System
g. Security System
h. Cable Vision
Note:
Marble/ Granite: Marble and granite is a natural material containing veins with
tonality differences. There will be colour differences and marking caused by
their complex mineral composition and incorporated impurities. While such
materials can be pre-selected before installation, this non-conformity cannot
be totally avoided. Granite are pre-polished before laying and care has
been taken for their installation. However, granite being a much harder
material than marble, cannot be re-polished after installation. Hence, some
differences may be felt at the joints. The tonality and pattern of marble,
limestone or granite selected and installed shall be subject to availability.
Timber: Timber is a natural material that does not have total consistency of
colour and grain. Thus it is not possible to achieve a total consistency of colour
and grain in their selection and installation. Timber strip also subject to
thermal expansion and contraction beyond the control of builder and vendor.
Natural timber that is used outdoor will become bleached due to sunlight and
rain. Thus, the cycle of maintenance on staining wall need to be increase as
required. Notwithstanding this note, the vendor shall remain fully responsible
for the performance of its obligations.
Tiles Finishes: Selected tiles sizes and tile surface flatness cannot be perfect and
are subject to acceptable ranged described in Singapore Standards SS483:2000
Sanitary Wares/Fittings: Brand and model of all sanitary wares/fittings
supplied will be provided subject to availability.
Air-conditioning: Air-conditioning system has to be maintained and cleaned
on a regular basis by the Purchaser. This includes the cleaning of filters and
clearing the condensate pipes to ensure that the system be in good working
condition. The purchaser is advised to engage his/her own contractor to service
the air-conditioning system regularly.
Mechanical Ventilation System: Mechanical ventilation fans and ducting are
provided to toilets which are not naturally ventilated. To ensure good working
condition of the system, the exhaust system within internal toilets, where
applicable, is to be maintained by the purchaser on a regular basis.
No tiles behind/below kitchen cabinet, long bath and mirror. Wall surface above
the false ceiling level will be left in its original bare condition.
Layout/location of wardrobe, kitchen cabinets, fan coil units, electrical points,
television points, telecommunication points, audio intercom system, door
swing positions and plaster ceiling board are subject to Architects final decision
and design.
Where the Unit is provided with PES/Open Terrace, the Purchaser shall not
cover up or erect any roof or structure over or enclosing the PES/Open Terrace,
nor shall the Purchaser allow the PES/Open Terrace to be covered up or roofed over.
Television and/or Cable Television (SCV): Purchaser is responsible for paying
annual fee, subscription fees and such other fees to Singapore Cable Vision
Pte Ltd (SCV) or any other relevant authorities. Developer is not responsible
to make arrangements with SCV for the service connection to individual units.
Internet: The purchaser is liable to pay Asymmetrical Digital Subscriber Line
(ADSL) connection, annual fee, subscription fee and such other fees to Internet
Service Provider (ISP). The vendor is not responsible to make arrangements
with any said parties for the service connection for their respective subscription.
Recreational Facilities: All recreational facilities are subject to change/approval
by relevant authorities and/or technical requirement/compliance.
The brand, colour and model of all materials, fittings, equipment, finishes,
installations and appliances supplied shall be provided subject to Architects
selection, market availability.
Web portal of the housing project: The purchaser will have to pay annual fee,
subscription fee or any such fee to the service provider of the web portal of the
housing project as may be appointed by the vendor or the management
corporation with it is formed.
False Ceiling space provision allows for the optimal function and installation
of M&E services. Access panels are allocated for ease of maintenance access to
concealed M&E equipment for regular cleaning purposes. Where removal of
equipment is needed, ceiling works will be required. Location of false ceiling
is subject to the Architects sole discretion and final design.
Glass is manufactured material that is not 100% pure. Invisible nickel sulphide
impurities may cause spontaneous glass breakage, which may occur in all glass
by all manufacturers. The purchaser is recommended to take up home insurance
covering glass breakage to cover this possible event.
Where warranties are given by the manufacturers and/or contractors and/or
suppliers of any of the equipment and/or appliances installed by the Vendor at
the Unit, the Vendor shall assign to the Purchaser such warranties at the time
when possession of the Unit is delivered to the Purchaser.
Electrical Schedule
TYPE/HOUSE NO.
19
19A
21
21A
23
23A
25
LIGHTING POINT
37
38
38
37
37
37
39
45
45
45
43
45
45
47
TELEPHONE POINT
SCV TV POINT
BELL POINT
OVEN POINT
Parkway
Parade
To City
Developer: Tiong Aik Investments Pte Ltd (199501550N) Developers Licence No.: C0963 Tenure of Land: Freehold Lot/Mukim No.: Lots 4680C & 7204X MK 28
BP Approval No.: A1553-00204-2011-BP01 dated 06 August 2012 Expected Date of Vacant Possession: 30 September 2016 Expected Date of Legal Completion:
30 September 2019.
ARTISTS IMPRESSION
Space
for
Jacuzzi
pes
Trellis
RC LEDGE
balcony
RC LEDGE
Trellis
2400 x 4800
private car park lot
living
roof terrace
master
bath
dining
RC LEDGE
master bedroom
family room
pitched roof
bath 3
dry
kitchen
wc
RC LEDGE
ROOF
ATTIC
bedroom 3
ROOF
bath 1
wc
RC LEDGE
2nd STOREY
3rd STOREY
cabinet
ROOF
3rd STOREY
ATTIC
RC LEDGE
terrace/yard
VOID ABOVE
pes
pes
2nd STOREY
BASEMENT
BASEMENT
wet
kitchen
void
void
powder
room
roof terrace
Space
for
Jacuzzi
dry
kitchen
pes
1st STOREY
1st STOREY
HOUSE NO. 21
2nd STOREY
bedroom 1
bath 3
VOID ABOVE
pes
RC LEDGE
hs
m&e space
terrace/
yard
bath 1
bedroom 1
master
bedroom
bath 4
wet
kitchen
bedroom 1
bath 1
family room
hall
cabinet
bedroom 3
master
bath
DB
hall
hs
pitched roof
store
bedroom 4
powder
room
roof terrace
below
pitched roof
hall
bath 4
hall
mc
powder
room
dining
wet
kitchen
store
master
bath
bedroom 2
mc
dry
kitchen
DB
bedroom 4
m&e space
2400 x 4800
private car park lot
bath 2
pitched roof
pitched roof
roof terrace
master bedroom
hall
2400 x 4800
private car park lot
living
bath 2
bedroom 2
RC LEDGE
balcony
RC LEDGE
RC LEDGE
2400 x 4800
private car park lot
HOUSE NO. 25
Space
for
Jacuzzi
RC LEDGE
HOUSE NO. 19
pes
bedroom 4
dining
m&e
space
Space
for
Jacuzzi
living
bath 4
pes
pes
Trellis
living
living
Trellis
balcony
RC LEDGE
2400 x 4800
private car park lot
RC LEDGE
2400 x 4800
private car park lot
Trellis
ATTIC
1st STOREY
powder
room
dining
bath 2
bedroom 2
master
bath
master
bedroom
bedroom 2
roof terrace
dry
kitchen
DB
dining
mc
mc
master bedroom
store
DB
pitched roof
bath 2
bedroom 4
hs
bath 4
pitched roof
m&e space
bedroom 3
bath 3
bedroom 1
wc
bath 1
RC LEDGE
pes
hs
bath 3
bedroom 1
bedroom 2
m&e space
3rd STOREY
ATTIC
bedroom 3
wc
0
80 lot
x 4 ark
00 p
24 te car
a
v
pri
pes
terrace/yard
balcony
RC LEDGE
RC LEDGE
2nd STOREY
ROOF
3rd STOREY
ATTIC
0
80 lot
x 4 ark
00 p
24 te car
va
pri
family
room
mc
E
OV
ID
VO
VOID ABOVE
ROOF
DB
powder
room
bedroom 3
store
hall
bath 1
cabinet
bath 4
terrace/yard
hall
bath 3
hs
wet
kitchen
wc
bath 2
hall
hall
hall
family room
pitched roof
family room
dry
kitchen
bedroom 4
wet
kitchen
master
bath
RC LEDGE
roof terrace
pitched roof
for
ace i
Sp acuzz
J
2400 x 4800
private car park lot
RC LEDGE
balcony
RC LEDGE
2400 x 4800
private car park lot
AB
terrace/
yard
2nd STOREY
3rd STOREY
BASEMENT
void
void
BASEMENT
1st STOREY
BASEMENT
1st STOREY
HOUSE NO. 23
pes
void
VOID
ABOVE
RC LEDGE
wet
kitchen
RC LEDGE
cabinet
terrace/yard
23
void
wc
pes
dry
kitchen
RC LEDGE
m&e space
bath 3
bedroom 3
bath 1
bedroom 1
dry
kitchen
store
pitched roof
bedroom 4
powder
room
hs
mc
hall
bedroom 3
bath 4
family room
dining
roof terrace
master
bath
living
balcony
master bedroom
bedroom 2
master bedroom
bath 2
RC LEDGE
hs
mc
pes
Trellis
All plans are for visual representation only and are subject to amendments as approved or required by the Building and Construction
Authority and/or the relevant authorities. Floor areas indicated are approximate measurement and subject to final survey.
hall
hall
bedroom 4
DB
family room
g
dinin
pitched roof
living
bedroom 2
wc
bedroom 1
bath 4
hall
terrace/
yard
bath 1
pes
pitched roof
DB
VOID
ABOVE
powder
room
bath 3
m&e space
0
x 480
2400 r park lot
ca
private
r
maste
bath
roof terrace
bath
Trellis
E
EDG
Space
for
Jacuzzi
RC L
0
80 lot
x 4 ark
00 p
24 te car
a
v
pri
pes
or
ce f
Spa cuzzi
Ja
y
alcon
0
80 lot
x 4 ark
00 p
24 te car
va
pri
ROOF
ATTIC
3rd STOREY
2nd STOREY
BASEMENT
1st STOREY
ATTIC
3rd STOREY
All information, specifications and statements herein shall not be treated to form part of an offer or contract. Floor plans are subject
to amendments as may be required by the relevant authorities. Visual representations, illustrations, photographs, art renderings and
other graphic representations and references, not limited to landscape and furniture, are intended to portray only artistic impressions
of the development and cannot be regarded as representations of fact. No part of the materials shall constitute a representation or
warranty. All plans, information and specifications are current at the time of press and are subject to change as may be required and
cannot form part of an offer or contract. The developer reserves the rights to modify any part or parts of the building prior to completion
as directed or approved by the building authority. Floor areas are only approximate measurements and subject to final survey.
EDG
RC L
RC LEDGE
ROOF
25
21A 21 19A 19
wet kitchen
RC LEDGE
pitched roof
23A
2nd STOREY
1st STOREY
BASEMENT
The Sale and Purchase Agreement shall form the entire agreement between the Developer and Purchaser and shall supersede all
statements, representations or promise made prior to the signing of the Sale and Purchase Agreement and shall in no way modified
by any statements, representations or promise made by the Developer or the Marketing Agents.
Space
for
Jacuzzi
pes
Trellis
RC LEDGE
balcony
RC LEDGE
Trellis
2400 x 4800
private car park lot
living
roof terrace
master
bath
dining
RC LEDGE
master bedroom
family room
pitched roof
bath 3
dry
kitchen
wc
RC LEDGE
ROOF
ATTIC
bedroom 3
ROOF
bath 1
wc
RC LEDGE
2nd STOREY
3rd STOREY
cabinet
ROOF
3rd STOREY
ATTIC
RC LEDGE
terrace/yard
VOID ABOVE
pes
pes
2nd STOREY
BASEMENT
BASEMENT
wet
kitchen
void
void
powder
room
roof terrace
Space
for
Jacuzzi
dry
kitchen
pes
1st STOREY
1st STOREY
HOUSE NO. 21
2nd STOREY
bedroom 1
bath 3
VOID ABOVE
pes
RC LEDGE
hs
m&e space
terrace/
yard
bath 1
bedroom 1
master
bedroom
bath 4
wet
kitchen
bedroom 1
bath 1
family room
hall
cabinet
bedroom 3
master
bath
DB
hall
hs
pitched roof
store
bedroom 4
powder
room
roof terrace
below
pitched roof
hall
bath 4
hall
mc
powder
room
dining
wet
kitchen
store
master
bath
bedroom 2
mc
dry
kitchen
DB
bedroom 4
m&e space
2400 x 4800
private car park lot
bath 2
pitched roof
pitched roof
roof terrace
master bedroom
hall
2400 x 4800
private car park lot
living
bath 2
bedroom 2
RC LEDGE
balcony
RC LEDGE
RC LEDGE
2400 x 4800
private car park lot
HOUSE NO. 25
Space
for
Jacuzzi
RC LEDGE
HOUSE NO. 19
pes
bedroom 4
dining
m&e
space
Space
for
Jacuzzi
living
bath 4
pes
pes
Trellis
living
living
Trellis
balcony
RC LEDGE
2400 x 4800
private car park lot
RC LEDGE
2400 x 4800
private car park lot
Trellis
ATTIC
1st STOREY
powder
room
dining
bath 2
bedroom 2
master
bath
master
bedroom
bedroom 2
roof terrace
dry
kitchen
DB
dining
mc
mc
master bedroom
store
DB
pitched roof
bath 2
bedroom 4
hs
bath 4
pitched roof
m&e space
bedroom 3
bath 3
bedroom 1
wc
bath 1
RC LEDGE
pes
hs
bath 3
bedroom 1
bedroom 2
m&e space
3rd STOREY
ATTIC
bedroom 3
wc
0
80 lot
x 4 ark
00 p
24 te car
a
v
pri
pes
terrace/yard
balcony
RC LEDGE
RC LEDGE
2nd STOREY
ROOF
3rd STOREY
ATTIC
0
80 lot
x 4 ark
00 p
24 te car
va
pri
family
room
mc
E
OV
ID
VO
VOID ABOVE
ROOF
DB
powder
room
bedroom 3
store
hall
bath 1
cabinet
bath 4
terrace/yard
hall
bath 3
hs
wet
kitchen
wc
bath 2
hall
hall
hall
family room
pitched roof
family room
dry
kitchen
bedroom 4
wet
kitchen
master
bath
RC LEDGE
roof terrace
pitched roof
for
ace i
Sp acuzz
J
2400 x 4800
private car park lot
RC LEDGE
balcony
RC LEDGE
2400 x 4800
private car park lot
AB
terrace/
yard
2nd STOREY
3rd STOREY
BASEMENT
void
void
BASEMENT
1st STOREY
BASEMENT
1st STOREY
HOUSE NO. 23
pes
void
VOID
ABOVE
RC LEDGE
wet
kitchen
RC LEDGE
cabinet
terrace/yard
23
void
wc
pes
dry
kitchen
RC LEDGE
m&e space
bath 3
bedroom 3
bath 1
bedroom 1
dry
kitchen
store
pitched roof
bedroom 4
powder
room
hs
mc
hall
bedroom 3
bath 4
family room
dining
roof terrace
master
bath
living
balcony
master bedroom
bedroom 2
master bedroom
bath 2
RC LEDGE
hs
mc
pes
Trellis
All plans are for visual representation only and are subject to amendments as approved or required by the Building and Construction
Authority and/or the relevant authorities. Floor areas indicated are approximate measurement and subject to final survey.
hall
hall
bedroom 4
DB
family room
g
dinin
pitched roof
living
bedroom 2
wc
bedroom 1
bath 4
hall
terrace/
yard
bath 1
pes
pitched roof
DB
VOID
ABOVE
powder
room
bath 3
m&e space
0
x 480
2400 r park lot
ca
private
r
maste
bath
roof terrace
bath
Trellis
E
EDG
Space
for
Jacuzzi
RC L
0
80 lot
x 4 ark
00 p
24 te car
a
v
pri
pes
or
ce f
Spa cuzzi
Ja
y
alcon
0
80 lot
x 4 ark
00 p
24 te car
va
pri
ROOF
ATTIC
3rd STOREY
2nd STOREY
BASEMENT
1st STOREY
ATTIC
3rd STOREY
All information, specifications and statements herein shall not be treated to form part of an offer or contract. Floor plans are subject
to amendments as may be required by the relevant authorities. Visual representations, illustrations, photographs, art renderings and
other graphic representations and references, not limited to landscape and furniture, are intended to portray only artistic impressions
of the development and cannot be regarded as representations of fact. No part of the materials shall constitute a representation or
warranty. All plans, information and specifications are current at the time of press and are subject to change as may be required and
cannot form part of an offer or contract. The developer reserves the rights to modify any part or parts of the building prior to completion
as directed or approved by the building authority. Floor areas are only approximate measurements and subject to final survey.
EDG
RC L
RC LEDGE
ROOF
25
21A 21 19A 19
wet kitchen
RC LEDGE
pitched roof
23A
2nd STOREY
1st STOREY
BASEMENT
The Sale and Purchase Agreement shall form the entire agreement between the Developer and Purchaser and shall supersede all
statements, representations or promise made prior to the signing of the Sale and Purchase Agreement and shall in no way modified
by any statements, representations or promise made by the Developer or the Marketing Agents.
Space
for
Jacuzzi
pes
Trellis
RC LEDGE
balcony
RC LEDGE
Trellis
2400 x 4800
private car park lot
living
roof terrace
master
bath
dining
RC LEDGE
master bedroom
family room
pitched roof
bath 3
dry
kitchen
wc
RC LEDGE
ROOF
ATTIC
bedroom 3
ROOF
bath 1
wc
RC LEDGE
2nd STOREY
3rd STOREY
cabinet
ROOF
3rd STOREY
ATTIC
RC LEDGE
terrace/yard
VOID ABOVE
pes
pes
2nd STOREY
BASEMENT
BASEMENT
wet
kitchen
void
void
powder
room
roof terrace
Space
for
Jacuzzi
dry
kitchen
pes
1st STOREY
1st STOREY
HOUSE NO. 21
2nd STOREY
bedroom 1
bath 3
VOID ABOVE
pes
RC LEDGE
hs
m&e space
terrace/
yard
bath 1
bedroom 1
master
bedroom
bath 4
wet
kitchen
bedroom 1
bath 1
family room
hall
cabinet
bedroom 3
master
bath
DB
hall
hs
pitched roof
store
bedroom 4
powder
room
roof terrace
below
pitched roof
hall
bath 4
hall
mc
powder
room
dining
wet
kitchen
store
master
bath
bedroom 2
mc
dry
kitchen
DB
bedroom 4
m&e space
2400 x 4800
private car park lot
bath 2
pitched roof
pitched roof
roof terrace
master bedroom
hall
2400 x 4800
private car park lot
living
bath 2
bedroom 2
RC LEDGE
balcony
RC LEDGE
RC LEDGE
2400 x 4800
private car park lot
HOUSE NO. 25
Space
for
Jacuzzi
RC LEDGE
HOUSE NO. 19
pes
bedroom 4
dining
m&e
space
Space
for
Jacuzzi
living
bath 4
pes
pes
Trellis
living
living
Trellis
balcony
RC LEDGE
2400 x 4800
private car park lot
RC LEDGE
2400 x 4800
private car park lot
Trellis
ATTIC
1st STOREY
powder
room
dining
bath 2
bedroom 2
master
bath
master
bedroom
bedroom 2
roof terrace
dry
kitchen
DB
dining
mc
mc
master bedroom
store
DB
pitched roof
bath 2
bedroom 4
hs
bath 4
pitched roof
m&e space
bedroom 3
bath 3
bedroom 1
wc
bath 1
RC LEDGE
pes
hs
bath 3
bedroom 1
bedroom 2
m&e space
3rd STOREY
ATTIC
bedroom 3
wc
0
80 lot
x 4 ark
00 p
24 te car
a
v
pri
pes
terrace/yard
balcony
RC LEDGE
RC LEDGE
2nd STOREY
ROOF
3rd STOREY
ATTIC
0
80 lot
x 4 ark
00 p
24 te car
va
pri
family
room
mc
E
OV
ID
VO
VOID ABOVE
ROOF
DB
powder
room
bedroom 3
store
hall
bath 1
cabinet
bath 4
terrace/yard
hall
bath 3
hs
wet
kitchen
wc
bath 2
hall
hall
hall
family room
pitched roof
family room
dry
kitchen
bedroom 4
wet
kitchen
master
bath
RC LEDGE
roof terrace
pitched roof
for
ace i
Sp acuzz
J
2400 x 4800
private car park lot
RC LEDGE
balcony
RC LEDGE
2400 x 4800
private car park lot
AB
terrace/
yard
2nd STOREY
3rd STOREY
BASEMENT
void
void
BASEMENT
1st STOREY
BASEMENT
1st STOREY
HOUSE NO. 23
pes
void
VOID
ABOVE
RC LEDGE
wet
kitchen
RC LEDGE
cabinet
terrace/yard
23
void
wc
pes
dry
kitchen
RC LEDGE
m&e space
bath 3
bedroom 3
bath 1
bedroom 1
dry
kitchen
store
pitched roof
bedroom 4
powder
room
hs
mc
hall
bedroom 3
bath 4
family room
dining
roof terrace
master
bath
living
balcony
master bedroom
bedroom 2
master bedroom
bath 2
RC LEDGE
hs
mc
pes
Trellis
All plans are for visual representation only and are subject to amendments as approved or required by the Building and Construction
Authority and/or the relevant authorities. Floor areas indicated are approximate measurement and subject to final survey.
hall
hall
bedroom 4
DB
family room
g
dinin
pitched roof
living
bedroom 2
wc
bedroom 1
bath 4
hall
terrace/
yard
bath 1
pes
pitched roof
DB
VOID
ABOVE
powder
room
bath 3
m&e space
0
x 480
2400 r park lot
ca
private
r
maste
bath
roof terrace
bath
Trellis
E
EDG
Space
for
Jacuzzi
RC L
0
80 lot
x 4 ark
00 p
24 te car
a
v
pri
pes
or
ce f
Spa cuzzi
Ja
y
alcon
0
80 lot
x 4 ark
00 p
24 te car
va
pri
ROOF
ATTIC
3rd STOREY
2nd STOREY
BASEMENT
1st STOREY
ATTIC
3rd STOREY
All information, specifications and statements herein shall not be treated to form part of an offer or contract. Floor plans are subject
to amendments as may be required by the relevant authorities. Visual representations, illustrations, photographs, art renderings and
other graphic representations and references, not limited to landscape and furniture, are intended to portray only artistic impressions
of the development and cannot be regarded as representations of fact. No part of the materials shall constitute a representation or
warranty. All plans, information and specifications are current at the time of press and are subject to change as may be required and
cannot form part of an offer or contract. The developer reserves the rights to modify any part or parts of the building prior to completion
as directed or approved by the building authority. Floor areas are only approximate measurements and subject to final survey.
EDG
RC L
RC LEDGE
ROOF
25
21A 21 19A 19
wet kitchen
RC LEDGE
pitched roof
23A
2nd STOREY
1st STOREY
BASEMENT
The Sale and Purchase Agreement shall form the entire agreement between the Developer and Purchaser and shall supersede all
statements, representations or promise made prior to the signing of the Sale and Purchase Agreement and shall in no way modified
by any statements, representations or promise made by the Developer or the Marketing Agents.
Space
for
Jacuzzi
pes
Trellis
RC LEDGE
balcony
RC LEDGE
Trellis
2400 x 4800
private car park lot
living
roof terrace
master
bath
dining
RC LEDGE
master bedroom
family room
pitched roof
bath 3
dry
kitchen
wc
RC LEDGE
ROOF
ATTIC
bedroom 3
ROOF
bath 1
wc
RC LEDGE
2nd STOREY
3rd STOREY
cabinet
ROOF
3rd STOREY
ATTIC
RC LEDGE
terrace/yard
VOID ABOVE
pes
pes
2nd STOREY
BASEMENT
BASEMENT
wet
kitchen
void
void
powder
room
roof terrace
Space
for
Jacuzzi
dry
kitchen
pes
1st STOREY
1st STOREY
HOUSE NO. 21
2nd STOREY
bedroom 1
bath 3
VOID ABOVE
pes
RC LEDGE
hs
m&e space
terrace/
yard
bath 1
bedroom 1
master
bedroom
bath 4
wet
kitchen
bedroom 1
bath 1
family room
hall
cabinet
bedroom 3
master
bath
DB
hall
hs
pitched roof
store
bedroom 4
powder
room
roof terrace
below
pitched roof
hall
bath 4
hall
mc
powder
room
dining
wet
kitchen
store
master
bath
bedroom 2
mc
dry
kitchen
DB
bedroom 4
m&e space
2400 x 4800
private car park lot
bath 2
pitched roof
pitched roof
roof terrace
master bedroom
hall
2400 x 4800
private car park lot
living
bath 2
bedroom 2
RC LEDGE
balcony
RC LEDGE
RC LEDGE
2400 x 4800
private car park lot
HOUSE NO. 25
Space
for
Jacuzzi
RC LEDGE
HOUSE NO. 19
pes
bedroom 4
dining
m&e
space
Space
for
Jacuzzi
living
bath 4
pes
pes
Trellis
living
living
Trellis
balcony
RC LEDGE
2400 x 4800
private car park lot
RC LEDGE
2400 x 4800
private car park lot
Trellis
ATTIC
1st STOREY
powder
room
dining
bath 2
bedroom 2
master
bath
master
bedroom
bedroom 2
roof terrace
dry
kitchen
DB
dining
mc
mc
master bedroom
store
DB
pitched roof
bath 2
bedroom 4
hs
bath 4
pitched roof
m&e space
bedroom 3
bath 3
bedroom 1
wc
bath 1
RC LEDGE
pes
hs
bath 3
bedroom 1
bedroom 2
m&e space
3rd STOREY
ATTIC
bedroom 3
wc
0
80 lot
x 4 ark
00 p
24 te car
a
v
pri
pes
terrace/yard
balcony
RC LEDGE
RC LEDGE
2nd STOREY
ROOF
3rd STOREY
ATTIC
0
80 lot
x 4 ark
00 p
24 te car
va
pri
family
room
mc
E
OV
ID
VO
VOID ABOVE
ROOF
DB
powder
room
bedroom 3
store
hall
bath 1
cabinet
bath 4
terrace/yard
hall
bath 3
hs
wet
kitchen
wc
bath 2
hall
hall
hall
family room
pitched roof
family room
dry
kitchen
bedroom 4
wet
kitchen
master
bath
RC LEDGE
roof terrace
pitched roof
for
ace i
Sp acuzz
J
2400 x 4800
private car park lot
RC LEDGE
balcony
RC LEDGE
2400 x 4800
private car park lot
AB
terrace/
yard
2nd STOREY
3rd STOREY
BASEMENT
void
void
BASEMENT
1st STOREY
BASEMENT
1st STOREY
HOUSE NO. 23
pes
void
VOID
ABOVE
RC LEDGE
wet
kitchen
RC LEDGE
cabinet
terrace/yard
23
void
wc
pes
dry
kitchen
RC LEDGE
m&e space
bath 3
bedroom 3
bath 1
bedroom 1
dry
kitchen
store
pitched roof
bedroom 4
powder
room
hs
mc
hall
bedroom 3
bath 4
family room
dining
roof terrace
master
bath
living
balcony
master bedroom
bedroom 2
master bedroom
bath 2
RC LEDGE
hs
mc
pes
Trellis
All plans are for visual representation only and are subject to amendments as approved or required by the Building and Construction
Authority and/or the relevant authorities. Floor areas indicated are approximate measurement and subject to final survey.
hall
hall
bedroom 4
DB
family room
g
dinin
pitched roof
living
bedroom 2
wc
bedroom 1
bath 4
hall
terrace/
yard
bath 1
pes
pitched roof
DB
VOID
ABOVE
powder
room
bath 3
m&e space
0
x 480
2400 r park lot
ca
private
r
maste
bath
roof terrace
bath
Trellis
E
EDG
Space
for
Jacuzzi
RC L
0
80 lot
x 4 ark
00 p
24 te car
a
v
pri
pes
or
ce f
Spa cuzzi
Ja
y
alcon
0
80 lot
x 4 ark
00 p
24 te car
va
pri
ROOF
ATTIC
3rd STOREY
2nd STOREY
BASEMENT
1st STOREY
ATTIC
3rd STOREY
All information, specifications and statements herein shall not be treated to form part of an offer or contract. Floor plans are subject
to amendments as may be required by the relevant authorities. Visual representations, illustrations, photographs, art renderings and
other graphic representations and references, not limited to landscape and furniture, are intended to portray only artistic impressions
of the development and cannot be regarded as representations of fact. No part of the materials shall constitute a representation or
warranty. All plans, information and specifications are current at the time of press and are subject to change as may be required and
cannot form part of an offer or contract. The developer reserves the rights to modify any part or parts of the building prior to completion
as directed or approved by the building authority. Floor areas are only approximate measurements and subject to final survey.
EDG
RC L
RC LEDGE
ROOF
25
21A 21 19A 19
wet kitchen
RC LEDGE
pitched roof
23A
2nd STOREY
1st STOREY
BASEMENT
The Sale and Purchase Agreement shall form the entire agreement between the Developer and Purchaser and shall supersede all
statements, representations or promise made prior to the signing of the Sale and Purchase Agreement and shall in no way modified
by any statements, representations or promise made by the Developer or the Marketing Agents.
Space
for
Jacuzzi
pes
Trellis
RC LEDGE
balcony
RC LEDGE
Trellis
2400 x 4800
private car park lot
living
roof terrace
master
bath
dining
RC LEDGE
master bedroom
family room
pitched roof
bath 3
dry
kitchen
wc
RC LEDGE
ROOF
ATTIC
bedroom 3
ROOF
bath 1
wc
RC LEDGE
2nd STOREY
3rd STOREY
cabinet
ROOF
3rd STOREY
ATTIC
RC LEDGE
terrace/yard
VOID ABOVE
pes
pes
2nd STOREY
BASEMENT
BASEMENT
wet
kitchen
void
void
powder
room
roof terrace
Space
for
Jacuzzi
dry
kitchen
pes
1st STOREY
1st STOREY
HOUSE NO. 21
2nd STOREY
bedroom 1
bath 3
VOID ABOVE
pes
RC LEDGE
hs
m&e space
terrace/
yard
bath 1
bedroom 1
master
bedroom
bath 4
wet
kitchen
bedroom 1
bath 1
family room
hall
cabinet
bedroom 3
master
bath
DB
hall
hs
pitched roof
store
bedroom 4
powder
room
roof terrace
below
pitched roof
hall
bath 4
hall
mc
powder
room
dining
wet
kitchen
store
master
bath
bedroom 2
mc
dry
kitchen
DB
bedroom 4
m&e space
2400 x 4800
private car park lot
bath 2
pitched roof
pitched roof
roof terrace
master bedroom
hall
2400 x 4800
private car park lot
living
bath 2
bedroom 2
RC LEDGE
balcony
RC LEDGE
RC LEDGE
2400 x 4800
private car park lot
HOUSE NO. 25
Space
for
Jacuzzi
RC LEDGE
HOUSE NO. 19
pes
bedroom 4
dining
m&e
space
Space
for
Jacuzzi
living
bath 4
pes
pes
Trellis
living
living
Trellis
balcony
RC LEDGE
2400 x 4800
private car park lot
RC LEDGE
2400 x 4800
private car park lot
Trellis
ATTIC
1st STOREY
powder
room
dining
bath 2
bedroom 2
master
bath
master
bedroom
bedroom 2
roof terrace
dry
kitchen
DB
dining
mc
mc
master bedroom
store
DB
pitched roof
bath 2
bedroom 4
hs
bath 4
pitched roof
m&e space
bedroom 3
bath 3
bedroom 1
wc
bath 1
RC LEDGE
pes
hs
bath 3
bedroom 1
bedroom 2
m&e space
3rd STOREY
ATTIC
bedroom 3
wc
0
80 lot
x 4 ark
00 p
24 te car
a
v
pri
pes
terrace/yard
balcony
RC LEDGE
RC LEDGE
2nd STOREY
ROOF
3rd STOREY
ATTIC
0
80 lot
x 4 ark
00 p
24 te car
va
pri
family
room
mc
E
OV
ID
VO
VOID ABOVE
ROOF
DB
powder
room
bedroom 3
store
hall
bath 1
cabinet
bath 4
terrace/yard
hall
bath 3
hs
wet
kitchen
wc
bath 2
hall
hall
hall
family room
pitched roof
family room
dry
kitchen
bedroom 4
wet
kitchen
master
bath
RC LEDGE
roof terrace
pitched roof
for
ace i
Sp acuzz
J
2400 x 4800
private car park lot
RC LEDGE
balcony
RC LEDGE
2400 x 4800
private car park lot
AB
terrace/
yard
2nd STOREY
3rd STOREY
BASEMENT
void
void
BASEMENT
1st STOREY
BASEMENT
1st STOREY
HOUSE NO. 23
pes
void
VOID
ABOVE
RC LEDGE
wet
kitchen
RC LEDGE
cabinet
terrace/yard
23
void
wc
pes
dry
kitchen
RC LEDGE
m&e space
bath 3
bedroom 3
bath 1
bedroom 1
dry
kitchen
store
pitched roof
bedroom 4
powder
room
hs
mc
hall
bedroom 3
bath 4
family room
dining
roof terrace
master
bath
living
balcony
master bedroom
bedroom 2
master bedroom
bath 2
RC LEDGE
hs
mc
pes
Trellis
All plans are for visual representation only and are subject to amendments as approved or required by the Building and Construction
Authority and/or the relevant authorities. Floor areas indicated are approximate measurement and subject to final survey.
hall
hall
bedroom 4
DB
family room
g
dinin
pitched roof
living
bedroom 2
wc
bedroom 1
bath 4
hall
terrace/
yard
bath 1
pes
pitched roof
DB
VOID
ABOVE
powder
room
bath 3
m&e space
0
x 480
2400 r park lot
ca
private
r
maste
bath
roof terrace
bath
Trellis
E
EDG
Space
for
Jacuzzi
RC L
0
80 lot
x 4 ark
00 p
24 te car
a
v
pri
pes
or
ce f
Spa cuzzi
Ja
y
alcon
0
80 lot
x 4 ark
00 p
24 te car
va
pri
ROOF
ATTIC
3rd STOREY
2nd STOREY
BASEMENT
1st STOREY
ATTIC
3rd STOREY
All information, specifications and statements herein shall not be treated to form part of an offer or contract. Floor plans are subject
to amendments as may be required by the relevant authorities. Visual representations, illustrations, photographs, art renderings and
other graphic representations and references, not limited to landscape and furniture, are intended to portray only artistic impressions
of the development and cannot be regarded as representations of fact. No part of the materials shall constitute a representation or
warranty. All plans, information and specifications are current at the time of press and are subject to change as may be required and
cannot form part of an offer or contract. The developer reserves the rights to modify any part or parts of the building prior to completion
as directed or approved by the building authority. Floor areas are only approximate measurements and subject to final survey.
EDG
RC L
RC LEDGE
ROOF
25
21A 21 19A 19
wet kitchen
RC LEDGE
pitched roof
23A
2nd STOREY
1st STOREY
BASEMENT
The Sale and Purchase Agreement shall form the entire agreement between the Developer and Purchaser and shall supersede all
statements, representations or promise made prior to the signing of the Sale and Purchase Agreement and shall in no way modified
by any statements, representations or promise made by the Developer or the Marketing Agents.
SPECIFICATIONS
TA CORPORATION LTD
1. FOUNDATION
Reinforced concrete pile
We are currently known as TA Corporation Ltd after turning into a public listed company
(formerly known as Tiong Aik Group of Companies). We have retained our reputation for our
standard of excellence in developing premium homes and further built upon that, offering
you the best.
3. WALLS
a. External Walls
b. Internal Walls
2. SUBSTRUCTURE/SUPERSTRUCTURE
Reinforced concrete structure
4. ROOF
a. Flat Roof/ Terrace
b. Pitch Roof
23
5. CEILING
a. Family Room, Living,
Dining, Bedrooms, Yard,
HS, Car Park
b. All Bathrooms, Wet
Kitchen
23A
25
Recognised for our high quality housing in Singapore, TA Corporation is a significant developer
best known for our hallmark materials, stellar finishes and unwavering workmanship. Our team
of acclaimed consultants from architects to engineers to landscape artists set the gold standard
in providing lifestyle homes for your discerning tastes.
6. WALL FINISHES
Units
a. Family Room, Living,
Dining, Dry Kitchen,
Bedrooms, Balcony,
Roof Terrace
b. Master Bathroom/
Powder Room/
Common Bathrooms
c. Wet Kitchen, WC
(To exposed surface only)
21A
21
19A
19
Common area
a. External walls
Parc Seabreeze
7. FLOOR FINISHES
Units
a. Family Room, Living,
Dining, Dry Kitchen
b. Master Bathroom/
Powder Room/ Common
Bathrooms, Kitchen, WC
c. All Bedrooms
d. Balcony, Roof Terrace, PES
SA
VE
NU
E E
A
ST
Starlight Suites
16. PAINTING
a. External wall: Spray texture coating and/or emulsion paint finish
b. Internal wall: Emulsion paint finish
SIM
e. Internal Staircase
f. Car Park
Common area
a. Walkway, BBQ Area
b. Common staircase
b. Kitchen Appliances
d. Wardrobe
e. Water-heater
Landscape
Pavilion
Pedestrian Entrance
10. IRONMONGERY
Selected quality lockset to main door and other doors.
Reflective Pool
11. RAILING
Units
a. Roof Terrace, Balcony
Eunos Industrial
Estate
NEW
ER
UPP
CHA
NGI
The Cristallo
EW8
BBQ Area
Common Area
a. Escape Staircase
Leoniehill Residences
9. DOORS
a. Basement Entrance Door
b. Main Entrance Door
c. All Bedrooms
d. All Bathrooms
e. Kitchen
f. Yard, Roof Terrace
g. PES
h. WC
i. HS
b. Internal Staircase
c. PES
CC9
RD
:
:
:
:
:
:
:
:
:
Gambir Ridge
15.LIGHTNING PROTECTION
Lightning protection system shall be provided in accordance with SS555.2010.
Tao Nan
Sch
112
Katong
To Changi Airport
8. WINDOWS
Powder coated aluminium frame with glass according to authority requirements.
Note: Color of frames and glass subject to architects selection.
JALAN SAYANG
Coralis
17. WATERPROOFING
Waterproofing to Basement, Bathrooms, Powder Room, Wet Kitchen, Balcony,
Roof Terrace, PES, AC ledge, where applicable
c. Air-conditioning
f. Intercom System
g. Security System
h. Cable Vision
Note:
Marble/ Granite: Marble and granite is a natural material containing veins with
tonality differences. There will be colour differences and marking caused by
their complex mineral composition and incorporated impurities. While such
materials can be pre-selected before installation, this non-conformity cannot
be totally avoided. Granite are pre-polished before laying and care has
been taken for their installation. However, granite being a much harder
material than marble, cannot be re-polished after installation. Hence, some
differences may be felt at the joints. The tonality and pattern of marble,
limestone or granite selected and installed shall be subject to availability.
Timber: Timber is a natural material that does not have total consistency of
colour and grain. Thus it is not possible to achieve a total consistency of colour
and grain in their selection and installation. Timber strip also subject to
thermal expansion and contraction beyond the control of builder and vendor.
Natural timber that is used outdoor will become bleached due to sunlight and
rain. Thus, the cycle of maintenance on staining wall need to be increase as
required. Notwithstanding this note, the vendor shall remain fully responsible
for the performance of its obligations.
Tiles Finishes: Selected tiles sizes and tile surface flatness cannot be perfect and
are subject to acceptable ranged described in Singapore Standards SS483:2000
Sanitary Wares/Fittings: Brand and model of all sanitary wares/fittings
supplied will be provided subject to availability.
Air-conditioning: Air-conditioning system has to be maintained and cleaned
on a regular basis by the Purchaser. This includes the cleaning of filters and
clearing the condensate pipes to ensure that the system be in good working
condition. The purchaser is advised to engage his/her own contractor to service
the air-conditioning system regularly.
Mechanical Ventilation System: Mechanical ventilation fans and ducting are
provided to toilets which are not naturally ventilated. To ensure good working
condition of the system, the exhaust system within internal toilets, where
applicable, is to be maintained by the purchaser on a regular basis.
No tiles behind/below kitchen cabinet, long bath and mirror. Wall surface above
the false ceiling level will be left in its original bare condition.
Layout/location of wardrobe, kitchen cabinets, fan coil units, electrical points,
television points, telecommunication points, audio intercom system, door
swing positions and plaster ceiling board are subject to Architects final decision
and design.
Where the Unit is provided with PES/Open Terrace, the Purchaser shall not
cover up or erect any roof or structure over or enclosing the PES/Open Terrace,
nor shall the Purchaser allow the PES/Open Terrace to be covered up or roofed over.
Television and/or Cable Television (SCV): Purchaser is responsible for paying
annual fee, subscription fees and such other fees to Singapore Cable Vision
Pte Ltd (SCV) or any other relevant authorities. Developer is not responsible
to make arrangements with SCV for the service connection to individual units.
Internet: The purchaser is liable to pay Asymmetrical Digital Subscriber Line
(ADSL) connection, annual fee, subscription fee and such other fees to Internet
Service Provider (ISP). The vendor is not responsible to make arrangements
with any said parties for the service connection for their respective subscription.
Recreational Facilities: All recreational facilities are subject to change/approval
by relevant authorities and/or technical requirement/compliance.
The brand, colour and model of all materials, fittings, equipment, finishes,
installations and appliances supplied shall be provided subject to Architects
selection, market availability.
Web portal of the housing project: The purchaser will have to pay annual fee,
subscription fee or any such fee to the service provider of the web portal of the
housing project as may be appointed by the vendor or the management
corporation with it is formed.
False Ceiling space provision allows for the optimal function and installation
of M&E services. Access panels are allocated for ease of maintenance access to
concealed M&E equipment for regular cleaning purposes. Where removal of
equipment is needed, ceiling works will be required. Location of false ceiling
is subject to the Architects sole discretion and final design.
Glass is manufactured material that is not 100% pure. Invisible nickel sulphide
impurities may cause spontaneous glass breakage, which may occur in all glass
by all manufacturers. The purchaser is recommended to take up home insurance
covering glass breakage to cover this possible event.
Where warranties are given by the manufacturers and/or contractors and/or
suppliers of any of the equipment and/or appliances installed by the Vendor at
the Unit, the Vendor shall assign to the Purchaser such warranties at the time
when possession of the Unit is delivered to the Purchaser.
Electrical Schedule
TYPE/HOUSE NO.
19
19A
21
21A
23
23A
25
LIGHTING POINT
37
38
38
37
37
37
39
45
45
45
43
45
45
47
TELEPHONE POINT
SCV TV POINT
BELL POINT
OVEN POINT
Parkway
Parade
To City
Developer: Tiong Aik Investments Pte Ltd (199501550N) Developers Licence No.: C0963 Tenure of Land: Freehold Lot/Mukim No.: Lots 4680C & 7204X MK 28
BP Approval No.: A1553-00204-2011-BP01 dated 06 August 2012 Expected Date of Vacant Possession: 30 September 2016 Expected Date of Legal Completion:
30 September 2019.
ARTISTS IMPRESSION
SPECIFICATIONS
TA CORPORATION LTD
1. FOUNDATION
Reinforced concrete pile
We are currently known as TA Corporation Ltd after turning into a public listed company
(formerly known as Tiong Aik Group of Companies). We have retained our reputation for our
standard of excellence in developing premium homes and further built upon that, offering
you the best.
3. WALLS
a. External Walls
b. Internal Walls
2. SUBSTRUCTURE/SUPERSTRUCTURE
Reinforced concrete structure
4. ROOF
a. Flat Roof/ Terrace
b. Pitch Roof
23
5. CEILING
a. Family Room, Living,
Dining, Bedrooms, Yard,
HS, Car Park
b. All Bathrooms, Wet
Kitchen
23A
25
Recognised for our high quality housing in Singapore, TA Corporation is a significant developer
best known for our hallmark materials, stellar finishes and unwavering workmanship. Our team
of acclaimed consultants from architects to engineers to landscape artists set the gold standard
in providing lifestyle homes for your discerning tastes.
6. WALL FINISHES
Units
a. Family Room, Living,
Dining, Dry Kitchen,
Bedrooms, Balcony,
Roof Terrace
b. Master Bathroom/
Powder Room/
Common Bathrooms
c. Wet Kitchen, WC
(To exposed surface only)
21A
21
19A
19
Common area
a. External walls
Parc Seabreeze
7. FLOOR FINISHES
Units
a. Family Room, Living,
Dining, Dry Kitchen
b. Master Bathroom/
Powder Room/ Common
Bathrooms, Kitchen, WC
c. All Bedrooms
d. Balcony, Roof Terrace, PES
SA
VE
NU
E E
A
ST
Starlight Suites
16. PAINTING
a. External wall: Spray texture coating and/or emulsion paint finish
b. Internal wall: Emulsion paint finish
SIM
e. Internal Staircase
f. Car Park
Common area
a. Walkway, BBQ Area
b. Common staircase
b. Kitchen Appliances
d. Wardrobe
e. Water-heater
Landscape
Pavilion
Pedestrian Entrance
10. IRONMONGERY
Selected quality lockset to main door and other doors.
Reflective Pool
11. RAILING
Units
a. Roof Terrace, Balcony
Eunos Industrial
Estate
NEW
ER
UPP
CHA
NGI
The Cristallo
EW8
BBQ Area
Common Area
a. Escape Staircase
Leoniehill Residences
9. DOORS
a. Basement Entrance Door
b. Main Entrance Door
c. All Bedrooms
d. All Bathrooms
e. Kitchen
f. Yard, Roof Terrace
g. PES
h. WC
i. HS
b. Internal Staircase
c. PES
CC9
RD
:
:
:
:
:
:
:
:
:
Gambir Ridge
15.LIGHTNING PROTECTION
Lightning protection system shall be provided in accordance with SS555.2010.
Tao Nan
Sch
112
Katong
To Changi Airport
8. WINDOWS
Powder coated aluminium frame with glass according to authority requirements.
Note: Color of frames and glass subject to architects selection.
JALAN SAYANG
Coralis
17. WATERPROOFING
Waterproofing to Basement, Bathrooms, Powder Room, Wet Kitchen, Balcony,
Roof Terrace, PES, AC ledge, where applicable
c. Air-conditioning
f. Intercom System
g. Security System
h. Cable Vision
Note:
Marble/ Granite: Marble and granite is a natural material containing veins with
tonality differences. There will be colour differences and marking caused by
their complex mineral composition and incorporated impurities. While such
materials can be pre-selected before installation, this non-conformity cannot
be totally avoided. Granite are pre-polished before laying and care has
been taken for their installation. However, granite being a much harder
material than marble, cannot be re-polished after installation. Hence, some
differences may be felt at the joints. The tonality and pattern of marble,
limestone or granite selected and installed shall be subject to availability.
Timber: Timber is a natural material that does not have total consistency of
colour and grain. Thus it is not possible to achieve a total consistency of colour
and grain in their selection and installation. Timber strip also subject to
thermal expansion and contraction beyond the control of builder and vendor.
Natural timber that is used outdoor will become bleached due to sunlight and
rain. Thus, the cycle of maintenance on staining wall need to be increase as
required. Notwithstanding this note, the vendor shall remain fully responsible
for the performance of its obligations.
Tiles Finishes: Selected tiles sizes and tile surface flatness cannot be perfect and
are subject to acceptable ranged described in Singapore Standards SS483:2000
Sanitary Wares/Fittings: Brand and model of all sanitary wares/fittings
supplied will be provided subject to availability.
Air-conditioning: Air-conditioning system has to be maintained and cleaned
on a regular basis by the Purchaser. This includes the cleaning of filters and
clearing the condensate pipes to ensure that the system be in good working
condition. The purchaser is advised to engage his/her own contractor to service
the air-conditioning system regularly.
Mechanical Ventilation System: Mechanical ventilation fans and ducting are
provided to toilets which are not naturally ventilated. To ensure good working
condition of the system, the exhaust system within internal toilets, where
applicable, is to be maintained by the purchaser on a regular basis.
No tiles behind/below kitchen cabinet, long bath and mirror. Wall surface above
the false ceiling level will be left in its original bare condition.
Layout/location of wardrobe, kitchen cabinets, fan coil units, electrical points,
television points, telecommunication points, audio intercom system, door
swing positions and plaster ceiling board are subject to Architects final decision
and design.
Where the Unit is provided with PES/Open Terrace, the Purchaser shall not
cover up or erect any roof or structure over or enclosing the PES/Open Terrace,
nor shall the Purchaser allow the PES/Open Terrace to be covered up or roofed over.
Television and/or Cable Television (SCV): Purchaser is responsible for paying
annual fee, subscription fees and such other fees to Singapore Cable Vision
Pte Ltd (SCV) or any other relevant authorities. Developer is not responsible
to make arrangements with SCV for the service connection to individual units.
Internet: The purchaser is liable to pay Asymmetrical Digital Subscriber Line
(ADSL) connection, annual fee, subscription fee and such other fees to Internet
Service Provider (ISP). The vendor is not responsible to make arrangements
with any said parties for the service connection for their respective subscription.
Recreational Facilities: All recreational facilities are subject to change/approval
by relevant authorities and/or technical requirement/compliance.
The brand, colour and model of all materials, fittings, equipment, finishes,
installations and appliances supplied shall be provided subject to Architects
selection, market availability.
Web portal of the housing project: The purchaser will have to pay annual fee,
subscription fee or any such fee to the service provider of the web portal of the
housing project as may be appointed by the vendor or the management
corporation with it is formed.
False Ceiling space provision allows for the optimal function and installation
of M&E services. Access panels are allocated for ease of maintenance access to
concealed M&E equipment for regular cleaning purposes. Where removal of
equipment is needed, ceiling works will be required. Location of false ceiling
is subject to the Architects sole discretion and final design.
Glass is manufactured material that is not 100% pure. Invisible nickel sulphide
impurities may cause spontaneous glass breakage, which may occur in all glass
by all manufacturers. The purchaser is recommended to take up home insurance
covering glass breakage to cover this possible event.
Where warranties are given by the manufacturers and/or contractors and/or
suppliers of any of the equipment and/or appliances installed by the Vendor at
the Unit, the Vendor shall assign to the Purchaser such warranties at the time
when possession of the Unit is delivered to the Purchaser.
Electrical Schedule
TYPE/HOUSE NO.
19
19A
21
21A
23
23A
25
LIGHTING POINT
37
38
38
37
37
37
39
45
45
45
43
45
45
47
TELEPHONE POINT
SCV TV POINT
BELL POINT
OVEN POINT
Parkway
Parade
To City
Developer: Tiong Aik Investments Pte Ltd (199501550N) Developers Licence No.: C0963 Tenure of Land: Freehold Lot/Mukim No.: Lots 4680C & 7204X MK 28
BP Approval No.: A1553-00204-2011-BP01 dated 06 August 2012 Expected Date of Vacant Possession: 30 September 2016 Expected Date of Legal Completion:
30 September 2019.
ARTISTS IMPRESSION