You are on page 1of 10

SPECIFICATIONS

TA CORPORATION LTD

1. FOUNDATION
Reinforced concrete pile

We are currently known as TA Corporation Ltd after turning into a public listed company
(formerly known as Tiong Aik Group of Companies). We have retained our reputation for our
standard of excellence in developing premium homes and further built upon that, offering
you the best.

3. WALLS
a. External Walls
b. Internal Walls

2. SUBSTRUCTURE/SUPERSTRUCTURE
Reinforced concrete structure

4. ROOF
a. Flat Roof/ Terrace
b. Pitch Roof

23

5. CEILING
a. Family Room, Living,
Dining, Bedrooms, Yard,
HS, Car Park
b. All Bathrooms, Wet
Kitchen

23A
25

Recognised for our high quality housing in Singapore, TA Corporation is a significant developer
best known for our hallmark materials, stellar finishes and unwavering workmanship. Our team
of acclaimed consultants from architects to engineers to landscape artists set the gold standard
in providing lifestyle homes for your discerning tastes.

6. WALL FINISHES
Units
a. Family Room, Living,
Dining, Dry Kitchen,
Bedrooms, Balcony,
Roof Terrace
b. Master Bathroom/
Powder Room/
Common Bathrooms

At TA Corporation, we bring comfort, luxury and elegance to your homes.

c. Wet Kitchen, WC
(To exposed surface only)

21A

21

19A

19

Common area
a. External walls

Parc Seabreeze

7. FLOOR FINISHES
Units
a. Family Room, Living,
Dining, Dry Kitchen
b. Master Bathroom/
Powder Room/ Common
Bathrooms, Kitchen, WC
c. All Bedrooms
d. Balcony, Roof Terrace, PES

SA
VE

NU

E E
A

ST

Starlight Suites

16. PAINTING
a. External wall: Spray texture coating and/or emulsion paint finish
b. Internal wall: Emulsion paint finish

SIM

e. Internal Staircase
f. Car Park
Common area
a. Walkway, BBQ Area
b. Common staircase

20. ADDITIONAL ITEMS


a. Kitchen Cabinets

: Moisture resistance ceiling board with


emulsion paint (up to false ceiling and on
exposed area only)

b. Kitchen Appliances

: Cement and sand plaster and/or skim


coat with emulsion paint finish (up to false
ceiling and on exposed area only)

d. Wardrobe
e. Water-heater

: Natural marble and/or Homogenous


tiles and/or Ceramic tiles to false ceiling
height (up to false ceiling and on exposed
area only)
: Homogenous tiles and/or Ceramic tiles
(up to false ceiling height and exposed
area only) with back painted glass on
designated area
: Cement sand plaster with spray textured
coating and/or emulsion paint finish

: Natural marble with matching skirting


: Natural marble and/or Homogenous
tiles and/or Ceramic tiles
: Timber strip flooring with timber skirting
: Homogenous tiles and/or Ceramic tiles
with matching skirting
: Timber finish
: Concrete finish
: Granite and/or Homogeneous tiles
: Cement sand screed with nosing tiles

Landscape

Pavilion

Pedestrian Entrance

10. IRONMONGERY
Selected quality lockset to main door and other doors.

Reflective Pool

Basement Carpark Entrance

11. RAILING
Units
a. Roof Terrace, Balcony

Eunos Industrial
Estate
NEW

ER
UPP

CHA

NGI

The Cristallo
EW8

: Ceiling board and/or skim coat with


emulsion paint

BBQ Area

Common Area
a. Escape Staircase

Leoniehill Residences

19. RECREATIONAL FACILITIES


a. BBQ Area
b. Reflective Pool
c. Pavilion

9. DOORS
a. Basement Entrance Door
b. Main Entrance Door
c. All Bedrooms
d. All Bathrooms
e. Kitchen
f. Yard, Roof Terrace
g. PES
h. WC
i. HS

b. Internal Staircase
c. PES

CC9

RD

:
:
:
:
:
:
:
:
:

Approved fire rated timber door


Solid core timber flush door
Hollow core timber flush door
Hollow core timber flush door
Sliding frameless glass door
Aluminium framed glass door
Aluminium Frame Vertical Grille
UPVC door
Approved Metal blast door

: Bricks parapet with cement sand plaster


and/or tempered laminated glass with
stainless steel capping
: Stainless steel with glass panel
: Bricks parapet with cement sand plaster
with spray textured paint and/or emulsion
paint
: Galvanized mild steel with paint finish

12. SANITARY WARES AND FITTINGS


Units
a. Master Bathrooms
- 1 vanity top complete with basin, mixer tap and vanity cabinet
- 1 shower cubicle with shower screen with mixer, hand shower and rain shower
- 1 long bathtub with mixer
- 1 water closet
- 1 towel rail
- 1 toilet paper holder
- 1 mirror
b. Common Bathrooms
- 1 vanity top complete with basin, mixer tap and vanity cabinet
- 1 shower cubicle with shower screen with mixer and hand shower
- 1 water closet
- 1 toilet towel rail
- 1 paper holder
- 1 mirror
c. Powder Room
- 1 vanity top complete with basin, mixer tap and vanity cabinet
- 1 water closet
- 1 toilet paper holder
- 1 mirror
d. WC
- 1 wall hung basin with tap
- 1 hand shower
- 1 water closet
- 1 toilet paper holder
e. Yard, PES, Roof Terrace
- 1 bib tap
13. ELECTRICAL INSTALLATION
All electrical wiring to be in concealed conduits and/or in surface trunking/
pipes below false ceiling levels. (Refer to Electrical Schedule for details)
14. TV / TELEPHONE
Ample television points and telephone ready outlets shall be provided in the unit.

Gambir Ridge

15.LIGHTNING PROTECTION
Lightning protection system shall be provided in accordance with SS555.2010.

Tao Nan
Sch

112
Katong

To Changi Airport

18. DRIVEWAY AND CAR PARK


Basement carpark, driveway and ramp: RC slab with floor hardener

: Reinforced concrete with waterproofing


and insulation
: Metal roofing with insulation

8. WINDOWS
Powder coated aluminium frame with glass according to authority requirements.
Note: Color of frames and glass subject to architects selection.

JALAN SAYANG

Coralis

: Reinforced Concrete and/or bricks


: Reinforced Concrete and/or bricks

17. WATERPROOFING
Waterproofing to Basement, Bathrooms, Powder Room, Wet Kitchen, Balcony,
Roof Terrace, PES, AC ledge, where applicable

c. Air-conditioning

f. Intercom System
g. Security System
h. Cable Vision

: Solid surface counter top complete with


high and low level kitchen cabinets with
sink and tap
: (Dry Kitchen) Electrical hob and microwave
(Wet Kitchen) Gas hob, hood and oven
: Split type wall-mounted air-conditioning
system to Family room, living, dining and
all bedrooms
: Built in wardrobe to all bedrooms
: Hot water supply from electric storage water
heater to all bathrooms and kitchen
: Audio Video Intercom system to all units
: Auto swing gate for vehicular access with
wireless remote control and proximity
card access system for pedestrian gate
: Provision of cable outlet only for cable
vision services

Note:
Marble/ Granite: Marble and granite is a natural material containing veins with
tonality differences. There will be colour differences and marking caused by
their complex mineral composition and incorporated impurities. While such
materials can be pre-selected before installation, this non-conformity cannot
be totally avoided. Granite are pre-polished before laying and care has
been taken for their installation. However, granite being a much harder
material than marble, cannot be re-polished after installation. Hence, some
differences may be felt at the joints. The tonality and pattern of marble,
limestone or granite selected and installed shall be subject to availability.
Timber: Timber is a natural material that does not have total consistency of
colour and grain. Thus it is not possible to achieve a total consistency of colour
and grain in their selection and installation. Timber strip also subject to
thermal expansion and contraction beyond the control of builder and vendor.
Natural timber that is used outdoor will become bleached due to sunlight and
rain. Thus, the cycle of maintenance on staining wall need to be increase as
required. Notwithstanding this note, the vendor shall remain fully responsible
for the performance of its obligations.
Tiles Finishes: Selected tiles sizes and tile surface flatness cannot be perfect and
are subject to acceptable ranged described in Singapore Standards SS483:2000
Sanitary Wares/Fittings: Brand and model of all sanitary wares/fittings
supplied will be provided subject to availability.
Air-conditioning: Air-conditioning system has to be maintained and cleaned
on a regular basis by the Purchaser. This includes the cleaning of filters and
clearing the condensate pipes to ensure that the system be in good working
condition. The purchaser is advised to engage his/her own contractor to service
the air-conditioning system regularly.
Mechanical Ventilation System: Mechanical ventilation fans and ducting are
provided to toilets which are not naturally ventilated. To ensure good working
condition of the system, the exhaust system within internal toilets, where
applicable, is to be maintained by the purchaser on a regular basis.
No tiles behind/below kitchen cabinet, long bath and mirror. Wall surface above
the false ceiling level will be left in its original bare condition.
Layout/location of wardrobe, kitchen cabinets, fan coil units, electrical points,
television points, telecommunication points, audio intercom system, door
swing positions and plaster ceiling board are subject to Architects final decision
and design.
Where the Unit is provided with PES/Open Terrace, the Purchaser shall not
cover up or erect any roof or structure over or enclosing the PES/Open Terrace,
nor shall the Purchaser allow the PES/Open Terrace to be covered up or roofed over.
Television and/or Cable Television (SCV): Purchaser is responsible for paying
annual fee, subscription fees and such other fees to Singapore Cable Vision
Pte Ltd (SCV) or any other relevant authorities. Developer is not responsible
to make arrangements with SCV for the service connection to individual units.
Internet: The purchaser is liable to pay Asymmetrical Digital Subscriber Line
(ADSL) connection, annual fee, subscription fee and such other fees to Internet
Service Provider (ISP). The vendor is not responsible to make arrangements
with any said parties for the service connection for their respective subscription.
Recreational Facilities: All recreational facilities are subject to change/approval
by relevant authorities and/or technical requirement/compliance.
The brand, colour and model of all materials, fittings, equipment, finishes,
installations and appliances supplied shall be provided subject to Architects
selection, market availability.
Web portal of the housing project: The purchaser will have to pay annual fee,
subscription fee or any such fee to the service provider of the web portal of the
housing project as may be appointed by the vendor or the management
corporation with it is formed.
False Ceiling space provision allows for the optimal function and installation
of M&E services. Access panels are allocated for ease of maintenance access to
concealed M&E equipment for regular cleaning purposes. Where removal of
equipment is needed, ceiling works will be required. Location of false ceiling
is subject to the Architects sole discretion and final design.
Glass is manufactured material that is not 100% pure. Invisible nickel sulphide
impurities may cause spontaneous glass breakage, which may occur in all glass
by all manufacturers. The purchaser is recommended to take up home insurance
covering glass breakage to cover this possible event.
Where warranties are given by the manufacturers and/or contractors and/or
suppliers of any of the equipment and/or appliances installed by the Vendor at
the Unit, the Vendor shall assign to the Purchaser such warranties at the time
when possession of the Unit is delivered to the Purchaser.
Electrical Schedule
TYPE/HOUSE NO.

19

19A

21

21A

23

23A

25

LIGHTING POINT

37

38

38

37

37

37

39

13A SWITCH SOCKET OUTLET

45

45

45

43

45

45

47

TELEPHONE POINT

SCV TV POINT

BELL POINT

WATER HEATER POINT

COOKER HOOD POINT

COOKER HOB POINT

OVEN POINT

ISOLATOR FOR AIR-CONDITIONING

Another Prestigious Development


By TA Corporation Ltd

Parkway
Parade

East Coast Park

To City

Developer: Tiong Aik Investments Pte Ltd (199501550N) Developers Licence No.: C0963 Tenure of Land: Freehold Lot/Mukim No.: Lots 4680C & 7204X MK 28
BP Approval No.: A1553-00204-2011-BP01 dated 06 August 2012 Expected Date of Vacant Possession: 30 September 2016 Expected Date of Legal Completion:
30 September 2019.

ARTISTS IMPRESSION

ANGLE IN ON LIVING AT ITS FINEST


It's time to take a bold new look at the art of contemporary living, and time to discover how
beauty and functionality can come together in perfect geometry. Terra Villas presents a rare
collection of 7 strata terrace houses, each architectured to redefine luxury living as stunning
design meets exceptional comfort, and soothing greenery finds peace with exciting modernity.
The eye-catching facade exhibits a strong visual play with vertical strip patterns juxtaposed against
full-height windows, which also make for abundant natural light and ventilation. Within the walls
is living space ingeniously configured to provide warmth and comfort, with a soothing ambience
accentuated by exquisite fittings and perfect finishings. A central communal area and lush perimeter
greenery add the final touches, inviting residents to share in the experience of a joyful lifestyle.
Located amidst a prestigious residential enclave in the East, Terra Villas brings it all to you, with
shopping, leisure, entertainment, schools and other amenities in close proximity to add even
more attraction to living with a perfect angle.

SPECIFICATIONS

TA CORPORATION LTD

1. FOUNDATION
Reinforced concrete pile

We are currently known as TA Corporation Ltd after turning into a public listed company
(formerly known as Tiong Aik Group of Companies). We have retained our reputation for our
standard of excellence in developing premium homes and further built upon that, offering
you the best.

3. WALLS
a. External Walls
b. Internal Walls

2. SUBSTRUCTURE/SUPERSTRUCTURE
Reinforced concrete structure

4. ROOF
a. Flat Roof/ Terrace
b. Pitch Roof

23

5. CEILING
a. Family Room, Living,
Dining, Bedrooms, Yard,
HS, Car Park
b. All Bathrooms, Wet
Kitchen

23A
25

Recognised for our high quality housing in Singapore, TA Corporation is a significant developer
best known for our hallmark materials, stellar finishes and unwavering workmanship. Our team
of acclaimed consultants from architects to engineers to landscape artists set the gold standard
in providing lifestyle homes for your discerning tastes.

6. WALL FINISHES
Units
a. Family Room, Living,
Dining, Dry Kitchen,
Bedrooms, Balcony,
Roof Terrace
b. Master Bathroom/
Powder Room/
Common Bathrooms

At TA Corporation, we bring comfort, luxury and elegance to your homes.

c. Wet Kitchen, WC
(To exposed surface only)

21A

21

19A

19

Common area
a. External walls

Parc Seabreeze

7. FLOOR FINISHES
Units
a. Family Room, Living,
Dining, Dry Kitchen
b. Master Bathroom/
Powder Room/ Common
Bathrooms, Kitchen, WC
c. All Bedrooms
d. Balcony, Roof Terrace, PES

SA
VE

NU

E E
A

ST

Starlight Suites

16. PAINTING
a. External wall: Spray texture coating and/or emulsion paint finish
b. Internal wall: Emulsion paint finish

SIM

e. Internal Staircase
f. Car Park
Common area
a. Walkway, BBQ Area
b. Common staircase

20. ADDITIONAL ITEMS


a. Kitchen Cabinets

: Moisture resistance ceiling board with


emulsion paint (up to false ceiling and on
exposed area only)

b. Kitchen Appliances

: Cement and sand plaster and/or skim


coat with emulsion paint finish (up to false
ceiling and on exposed area only)

d. Wardrobe
e. Water-heater

: Natural marble and/or Homogenous


tiles and/or Ceramic tiles to false ceiling
height (up to false ceiling and on exposed
area only)
: Homogenous tiles and/or Ceramic tiles
(up to false ceiling height and exposed
area only) with back painted glass on
designated area
: Cement sand plaster with spray textured
coating and/or emulsion paint finish

: Natural marble with matching skirting


: Natural marble and/or Homogenous
tiles and/or Ceramic tiles
: Timber strip flooring with timber skirting
: Homogenous tiles and/or Ceramic tiles
with matching skirting
: Timber finish
: Concrete finish
: Granite and/or Homogeneous tiles
: Cement sand screed with nosing tiles

Landscape

Pavilion

Pedestrian Entrance

10. IRONMONGERY
Selected quality lockset to main door and other doors.

Reflective Pool

Basement Carpark Entrance

11. RAILING
Units
a. Roof Terrace, Balcony

Eunos Industrial
Estate
NEW

ER
UPP

CHA

NGI

The Cristallo
EW8

: Ceiling board and/or skim coat with


emulsion paint

BBQ Area

Common Area
a. Escape Staircase

Leoniehill Residences

19. RECREATIONAL FACILITIES


a. BBQ Area
b. Reflective Pool
c. Pavilion

9. DOORS
a. Basement Entrance Door
b. Main Entrance Door
c. All Bedrooms
d. All Bathrooms
e. Kitchen
f. Yard, Roof Terrace
g. PES
h. WC
i. HS

b. Internal Staircase
c. PES

CC9

RD

:
:
:
:
:
:
:
:
:

Approved fire rated timber door


Solid core timber flush door
Hollow core timber flush door
Hollow core timber flush door
Sliding frameless glass door
Aluminium framed glass door
Aluminium Frame Vertical Grille
UPVC door
Approved Metal blast door

: Bricks parapet with cement sand plaster


and/or tempered laminated glass with
stainless steel capping
: Stainless steel with glass panel
: Bricks parapet with cement sand plaster
with spray textured paint and/or emulsion
paint
: Galvanized mild steel with paint finish

12. SANITARY WARES AND FITTINGS


Units
a. Master Bathrooms
- 1 vanity top complete with basin, mixer tap and vanity cabinet
- 1 shower cubicle with shower screen with mixer, hand shower and rain shower
- 1 long bathtub with mixer
- 1 water closet
- 1 towel rail
- 1 toilet paper holder
- 1 mirror
b. Common Bathrooms
- 1 vanity top complete with basin, mixer tap and vanity cabinet
- 1 shower cubicle with shower screen with mixer and hand shower
- 1 water closet
- 1 toilet towel rail
- 1 paper holder
- 1 mirror
c. Powder Room
- 1 vanity top complete with basin, mixer tap and vanity cabinet
- 1 water closet
- 1 toilet paper holder
- 1 mirror
d. WC
- 1 wall hung basin with tap
- 1 hand shower
- 1 water closet
- 1 toilet paper holder
e. Yard, PES, Roof Terrace
- 1 bib tap
13. ELECTRICAL INSTALLATION
All electrical wiring to be in concealed conduits and/or in surface trunking/
pipes below false ceiling levels. (Refer to Electrical Schedule for details)
14. TV / TELEPHONE
Ample television points and telephone ready outlets shall be provided in the unit.

Gambir Ridge

15.LIGHTNING PROTECTION
Lightning protection system shall be provided in accordance with SS555.2010.

Tao Nan
Sch

112
Katong

To Changi Airport

18. DRIVEWAY AND CAR PARK


Basement carpark, driveway and ramp: RC slab with floor hardener

: Reinforced concrete with waterproofing


and insulation
: Metal roofing with insulation

8. WINDOWS
Powder coated aluminium frame with glass according to authority requirements.
Note: Color of frames and glass subject to architects selection.

JALAN SAYANG

Coralis

: Reinforced Concrete and/or bricks


: Reinforced Concrete and/or bricks

17. WATERPROOFING
Waterproofing to Basement, Bathrooms, Powder Room, Wet Kitchen, Balcony,
Roof Terrace, PES, AC ledge, where applicable

c. Air-conditioning

f. Intercom System
g. Security System
h. Cable Vision

: Solid surface counter top complete with


high and low level kitchen cabinets with
sink and tap
: (Dry Kitchen) Electrical hob and microwave
(Wet Kitchen) Gas hob, hood and oven
: Split type wall-mounted air-conditioning
system to Family room, living, dining and
all bedrooms
: Built in wardrobe to all bedrooms
: Hot water supply from electric storage water
heater to all bathrooms and kitchen
: Audio Video Intercom system to all units
: Auto swing gate for vehicular access with
wireless remote control and proximity
card access system for pedestrian gate
: Provision of cable outlet only for cable
vision services

Note:
Marble/ Granite: Marble and granite is a natural material containing veins with
tonality differences. There will be colour differences and marking caused by
their complex mineral composition and incorporated impurities. While such
materials can be pre-selected before installation, this non-conformity cannot
be totally avoided. Granite are pre-polished before laying and care has
been taken for their installation. However, granite being a much harder
material than marble, cannot be re-polished after installation. Hence, some
differences may be felt at the joints. The tonality and pattern of marble,
limestone or granite selected and installed shall be subject to availability.
Timber: Timber is a natural material that does not have total consistency of
colour and grain. Thus it is not possible to achieve a total consistency of colour
and grain in their selection and installation. Timber strip also subject to
thermal expansion and contraction beyond the control of builder and vendor.
Natural timber that is used outdoor will become bleached due to sunlight and
rain. Thus, the cycle of maintenance on staining wall need to be increase as
required. Notwithstanding this note, the vendor shall remain fully responsible
for the performance of its obligations.
Tiles Finishes: Selected tiles sizes and tile surface flatness cannot be perfect and
are subject to acceptable ranged described in Singapore Standards SS483:2000
Sanitary Wares/Fittings: Brand and model of all sanitary wares/fittings
supplied will be provided subject to availability.
Air-conditioning: Air-conditioning system has to be maintained and cleaned
on a regular basis by the Purchaser. This includes the cleaning of filters and
clearing the condensate pipes to ensure that the system be in good working
condition. The purchaser is advised to engage his/her own contractor to service
the air-conditioning system regularly.
Mechanical Ventilation System: Mechanical ventilation fans and ducting are
provided to toilets which are not naturally ventilated. To ensure good working
condition of the system, the exhaust system within internal toilets, where
applicable, is to be maintained by the purchaser on a regular basis.
No tiles behind/below kitchen cabinet, long bath and mirror. Wall surface above
the false ceiling level will be left in its original bare condition.
Layout/location of wardrobe, kitchen cabinets, fan coil units, electrical points,
television points, telecommunication points, audio intercom system, door
swing positions and plaster ceiling board are subject to Architects final decision
and design.
Where the Unit is provided with PES/Open Terrace, the Purchaser shall not
cover up or erect any roof or structure over or enclosing the PES/Open Terrace,
nor shall the Purchaser allow the PES/Open Terrace to be covered up or roofed over.
Television and/or Cable Television (SCV): Purchaser is responsible for paying
annual fee, subscription fees and such other fees to Singapore Cable Vision
Pte Ltd (SCV) or any other relevant authorities. Developer is not responsible
to make arrangements with SCV for the service connection to individual units.
Internet: The purchaser is liable to pay Asymmetrical Digital Subscriber Line
(ADSL) connection, annual fee, subscription fee and such other fees to Internet
Service Provider (ISP). The vendor is not responsible to make arrangements
with any said parties for the service connection for their respective subscription.
Recreational Facilities: All recreational facilities are subject to change/approval
by relevant authorities and/or technical requirement/compliance.
The brand, colour and model of all materials, fittings, equipment, finishes,
installations and appliances supplied shall be provided subject to Architects
selection, market availability.
Web portal of the housing project: The purchaser will have to pay annual fee,
subscription fee or any such fee to the service provider of the web portal of the
housing project as may be appointed by the vendor or the management
corporation with it is formed.
False Ceiling space provision allows for the optimal function and installation
of M&E services. Access panels are allocated for ease of maintenance access to
concealed M&E equipment for regular cleaning purposes. Where removal of
equipment is needed, ceiling works will be required. Location of false ceiling
is subject to the Architects sole discretion and final design.
Glass is manufactured material that is not 100% pure. Invisible nickel sulphide
impurities may cause spontaneous glass breakage, which may occur in all glass
by all manufacturers. The purchaser is recommended to take up home insurance
covering glass breakage to cover this possible event.
Where warranties are given by the manufacturers and/or contractors and/or
suppliers of any of the equipment and/or appliances installed by the Vendor at
the Unit, the Vendor shall assign to the Purchaser such warranties at the time
when possession of the Unit is delivered to the Purchaser.
Electrical Schedule
TYPE/HOUSE NO.

19

19A

21

21A

23

23A

25

LIGHTING POINT

37

38

38

37

37

37

39

13A SWITCH SOCKET OUTLET

45

45

45

43

45

45

47

TELEPHONE POINT

SCV TV POINT

BELL POINT

WATER HEATER POINT

COOKER HOOD POINT

COOKER HOB POINT

OVEN POINT

ISOLATOR FOR AIR-CONDITIONING

Another Prestigious Development


By TA Corporation Ltd

Parkway
Parade

East Coast Park

To City

Developer: Tiong Aik Investments Pte Ltd (199501550N) Developers Licence No.: C0963 Tenure of Land: Freehold Lot/Mukim No.: Lots 4680C & 7204X MK 28
BP Approval No.: A1553-00204-2011-BP01 dated 06 August 2012 Expected Date of Vacant Possession: 30 September 2016 Expected Date of Legal Completion:
30 September 2019.

ARTISTS IMPRESSION

ANGLE IN ON LIVING AT ITS FINEST


It's time to take a bold new look at the art of contemporary living, and time to discover how
beauty and functionality can come together in perfect geometry. Terra Villas presents a rare
collection of 7 strata terrace houses, each architectured to redefine luxury living as stunning
design meets exceptional comfort, and soothing greenery finds peace with exciting modernity.
The eye-catching facade exhibits a strong visual play with vertical strip patterns juxtaposed against
full-height windows, which also make for abundant natural light and ventilation. Within the walls
is living space ingeniously configured to provide warmth and comfort, with a soothing ambience
accentuated by exquisite fittings and perfect finishings. A central communal area and lush perimeter
greenery add the final touches, inviting residents to share in the experience of a joyful lifestyle.
Located amidst a prestigious residential enclave in the East, Terra Villas brings it all to you, with
shopping, leisure, entertainment, schools and other amenities in close proximity to add even
more attraction to living with a perfect angle.

SPECIFICATIONS

TA CORPORATION LTD

1. FOUNDATION
Reinforced concrete pile

We are currently known as TA Corporation Ltd after turning into a public listed company
(formerly known as Tiong Aik Group of Companies). We have retained our reputation for our
standard of excellence in developing premium homes and further built upon that, offering
you the best.

3. WALLS
a. External Walls
b. Internal Walls

2. SUBSTRUCTURE/SUPERSTRUCTURE
Reinforced concrete structure

4. ROOF
a. Flat Roof/ Terrace
b. Pitch Roof

23

5. CEILING
a. Family Room, Living,
Dining, Bedrooms, Yard,
HS, Car Park
b. All Bathrooms, Wet
Kitchen

23A
25

Recognised for our high quality housing in Singapore, TA Corporation is a significant developer
best known for our hallmark materials, stellar finishes and unwavering workmanship. Our team
of acclaimed consultants from architects to engineers to landscape artists set the gold standard
in providing lifestyle homes for your discerning tastes.

6. WALL FINISHES
Units
a. Family Room, Living,
Dining, Dry Kitchen,
Bedrooms, Balcony,
Roof Terrace
b. Master Bathroom/
Powder Room/
Common Bathrooms

At TA Corporation, we bring comfort, luxury and elegance to your homes.

c. Wet Kitchen, WC
(To exposed surface only)

21A

21

19A

19

Common area
a. External walls

Parc Seabreeze

7. FLOOR FINISHES
Units
a. Family Room, Living,
Dining, Dry Kitchen
b. Master Bathroom/
Powder Room/ Common
Bathrooms, Kitchen, WC
c. All Bedrooms
d. Balcony, Roof Terrace, PES

SA
VE

NU

E E
A

ST

Starlight Suites

16. PAINTING
a. External wall: Spray texture coating and/or emulsion paint finish
b. Internal wall: Emulsion paint finish

SIM

e. Internal Staircase
f. Car Park
Common area
a. Walkway, BBQ Area
b. Common staircase

20. ADDITIONAL ITEMS


a. Kitchen Cabinets

: Moisture resistance ceiling board with


emulsion paint (up to false ceiling and on
exposed area only)

b. Kitchen Appliances

: Cement and sand plaster and/or skim


coat with emulsion paint finish (up to false
ceiling and on exposed area only)

d. Wardrobe
e. Water-heater

: Natural marble and/or Homogenous


tiles and/or Ceramic tiles to false ceiling
height (up to false ceiling and on exposed
area only)
: Homogenous tiles and/or Ceramic tiles
(up to false ceiling height and exposed
area only) with back painted glass on
designated area
: Cement sand plaster with spray textured
coating and/or emulsion paint finish

: Natural marble with matching skirting


: Natural marble and/or Homogenous
tiles and/or Ceramic tiles
: Timber strip flooring with timber skirting
: Homogenous tiles and/or Ceramic tiles
with matching skirting
: Timber finish
: Concrete finish
: Granite and/or Homogeneous tiles
: Cement sand screed with nosing tiles

Landscape

Pavilion

Pedestrian Entrance

10. IRONMONGERY
Selected quality lockset to main door and other doors.

Reflective Pool

Basement Carpark Entrance

11. RAILING
Units
a. Roof Terrace, Balcony

Eunos Industrial
Estate
NEW

ER
UPP

CHA

NGI

The Cristallo
EW8

: Ceiling board and/or skim coat with


emulsion paint

BBQ Area

Common Area
a. Escape Staircase

Leoniehill Residences

19. RECREATIONAL FACILITIES


a. BBQ Area
b. Reflective Pool
c. Pavilion

9. DOORS
a. Basement Entrance Door
b. Main Entrance Door
c. All Bedrooms
d. All Bathrooms
e. Kitchen
f. Yard, Roof Terrace
g. PES
h. WC
i. HS

b. Internal Staircase
c. PES

CC9

RD

:
:
:
:
:
:
:
:
:

Approved fire rated timber door


Solid core timber flush door
Hollow core timber flush door
Hollow core timber flush door
Sliding frameless glass door
Aluminium framed glass door
Aluminium Frame Vertical Grille
UPVC door
Approved Metal blast door

: Bricks parapet with cement sand plaster


and/or tempered laminated glass with
stainless steel capping
: Stainless steel with glass panel
: Bricks parapet with cement sand plaster
with spray textured paint and/or emulsion
paint
: Galvanized mild steel with paint finish

12. SANITARY WARES AND FITTINGS


Units
a. Master Bathrooms
- 1 vanity top complete with basin, mixer tap and vanity cabinet
- 1 shower cubicle with shower screen with mixer, hand shower and rain shower
- 1 long bathtub with mixer
- 1 water closet
- 1 towel rail
- 1 toilet paper holder
- 1 mirror
b. Common Bathrooms
- 1 vanity top complete with basin, mixer tap and vanity cabinet
- 1 shower cubicle with shower screen with mixer and hand shower
- 1 water closet
- 1 toilet towel rail
- 1 paper holder
- 1 mirror
c. Powder Room
- 1 vanity top complete with basin, mixer tap and vanity cabinet
- 1 water closet
- 1 toilet paper holder
- 1 mirror
d. WC
- 1 wall hung basin with tap
- 1 hand shower
- 1 water closet
- 1 toilet paper holder
e. Yard, PES, Roof Terrace
- 1 bib tap
13. ELECTRICAL INSTALLATION
All electrical wiring to be in concealed conduits and/or in surface trunking/
pipes below false ceiling levels. (Refer to Electrical Schedule for details)
14. TV / TELEPHONE
Ample television points and telephone ready outlets shall be provided in the unit.

Gambir Ridge

15.LIGHTNING PROTECTION
Lightning protection system shall be provided in accordance with SS555.2010.

Tao Nan
Sch

112
Katong

To Changi Airport

18. DRIVEWAY AND CAR PARK


Basement carpark, driveway and ramp: RC slab with floor hardener

: Reinforced concrete with waterproofing


and insulation
: Metal roofing with insulation

8. WINDOWS
Powder coated aluminium frame with glass according to authority requirements.
Note: Color of frames and glass subject to architects selection.

JALAN SAYANG

Coralis

: Reinforced Concrete and/or bricks


: Reinforced Concrete and/or bricks

17. WATERPROOFING
Waterproofing to Basement, Bathrooms, Powder Room, Wet Kitchen, Balcony,
Roof Terrace, PES, AC ledge, where applicable

c. Air-conditioning

f. Intercom System
g. Security System
h. Cable Vision

: Solid surface counter top complete with


high and low level kitchen cabinets with
sink and tap
: (Dry Kitchen) Electrical hob and microwave
(Wet Kitchen) Gas hob, hood and oven
: Split type wall-mounted air-conditioning
system to Family room, living, dining and
all bedrooms
: Built in wardrobe to all bedrooms
: Hot water supply from electric storage water
heater to all bathrooms and kitchen
: Audio Video Intercom system to all units
: Auto swing gate for vehicular access with
wireless remote control and proximity
card access system for pedestrian gate
: Provision of cable outlet only for cable
vision services

Note:
Marble/ Granite: Marble and granite is a natural material containing veins with
tonality differences. There will be colour differences and marking caused by
their complex mineral composition and incorporated impurities. While such
materials can be pre-selected before installation, this non-conformity cannot
be totally avoided. Granite are pre-polished before laying and care has
been taken for their installation. However, granite being a much harder
material than marble, cannot be re-polished after installation. Hence, some
differences may be felt at the joints. The tonality and pattern of marble,
limestone or granite selected and installed shall be subject to availability.
Timber: Timber is a natural material that does not have total consistency of
colour and grain. Thus it is not possible to achieve a total consistency of colour
and grain in their selection and installation. Timber strip also subject to
thermal expansion and contraction beyond the control of builder and vendor.
Natural timber that is used outdoor will become bleached due to sunlight and
rain. Thus, the cycle of maintenance on staining wall need to be increase as
required. Notwithstanding this note, the vendor shall remain fully responsible
for the performance of its obligations.
Tiles Finishes: Selected tiles sizes and tile surface flatness cannot be perfect and
are subject to acceptable ranged described in Singapore Standards SS483:2000
Sanitary Wares/Fittings: Brand and model of all sanitary wares/fittings
supplied will be provided subject to availability.
Air-conditioning: Air-conditioning system has to be maintained and cleaned
on a regular basis by the Purchaser. This includes the cleaning of filters and
clearing the condensate pipes to ensure that the system be in good working
condition. The purchaser is advised to engage his/her own contractor to service
the air-conditioning system regularly.
Mechanical Ventilation System: Mechanical ventilation fans and ducting are
provided to toilets which are not naturally ventilated. To ensure good working
condition of the system, the exhaust system within internal toilets, where
applicable, is to be maintained by the purchaser on a regular basis.
No tiles behind/below kitchen cabinet, long bath and mirror. Wall surface above
the false ceiling level will be left in its original bare condition.
Layout/location of wardrobe, kitchen cabinets, fan coil units, electrical points,
television points, telecommunication points, audio intercom system, door
swing positions and plaster ceiling board are subject to Architects final decision
and design.
Where the Unit is provided with PES/Open Terrace, the Purchaser shall not
cover up or erect any roof or structure over or enclosing the PES/Open Terrace,
nor shall the Purchaser allow the PES/Open Terrace to be covered up or roofed over.
Television and/or Cable Television (SCV): Purchaser is responsible for paying
annual fee, subscription fees and such other fees to Singapore Cable Vision
Pte Ltd (SCV) or any other relevant authorities. Developer is not responsible
to make arrangements with SCV for the service connection to individual units.
Internet: The purchaser is liable to pay Asymmetrical Digital Subscriber Line
(ADSL) connection, annual fee, subscription fee and such other fees to Internet
Service Provider (ISP). The vendor is not responsible to make arrangements
with any said parties for the service connection for their respective subscription.
Recreational Facilities: All recreational facilities are subject to change/approval
by relevant authorities and/or technical requirement/compliance.
The brand, colour and model of all materials, fittings, equipment, finishes,
installations and appliances supplied shall be provided subject to Architects
selection, market availability.
Web portal of the housing project: The purchaser will have to pay annual fee,
subscription fee or any such fee to the service provider of the web portal of the
housing project as may be appointed by the vendor or the management
corporation with it is formed.
False Ceiling space provision allows for the optimal function and installation
of M&E services. Access panels are allocated for ease of maintenance access to
concealed M&E equipment for regular cleaning purposes. Where removal of
equipment is needed, ceiling works will be required. Location of false ceiling
is subject to the Architects sole discretion and final design.
Glass is manufactured material that is not 100% pure. Invisible nickel sulphide
impurities may cause spontaneous glass breakage, which may occur in all glass
by all manufacturers. The purchaser is recommended to take up home insurance
covering glass breakage to cover this possible event.
Where warranties are given by the manufacturers and/or contractors and/or
suppliers of any of the equipment and/or appliances installed by the Vendor at
the Unit, the Vendor shall assign to the Purchaser such warranties at the time
when possession of the Unit is delivered to the Purchaser.
Electrical Schedule
TYPE/HOUSE NO.

19

19A

21

21A

23

23A

25

LIGHTING POINT

37

38

38

37

37

37

39

13A SWITCH SOCKET OUTLET

45

45

45

43

45

45

47

TELEPHONE POINT

SCV TV POINT

BELL POINT

WATER HEATER POINT

COOKER HOOD POINT

COOKER HOB POINT

OVEN POINT

ISOLATOR FOR AIR-CONDITIONING

Another Prestigious Development


By TA Corporation Ltd

Parkway
Parade

East Coast Park

To City

Developer: Tiong Aik Investments Pte Ltd (199501550N) Developers Licence No.: C0963 Tenure of Land: Freehold Lot/Mukim No.: Lots 4680C & 7204X MK 28
BP Approval No.: A1553-00204-2011-BP01 dated 06 August 2012 Expected Date of Vacant Possession: 30 September 2016 Expected Date of Legal Completion:
30 September 2019.

ARTISTS IMPRESSION

ANGLE IN ON LIVING AT ITS FINEST


It's time to take a bold new look at the art of contemporary living, and time to discover how
beauty and functionality can come together in perfect geometry. Terra Villas presents a rare
collection of 7 strata terrace houses, each architectured to redefine luxury living as stunning
design meets exceptional comfort, and soothing greenery finds peace with exciting modernity.
The eye-catching facade exhibits a strong visual play with vertical strip patterns juxtaposed against
full-height windows, which also make for abundant natural light and ventilation. Within the walls
is living space ingeniously configured to provide warmth and comfort, with a soothing ambience
accentuated by exquisite fittings and perfect finishings. A central communal area and lush perimeter
greenery add the final touches, inviting residents to share in the experience of a joyful lifestyle.
Located amidst a prestigious residential enclave in the East, Terra Villas brings it all to you, with
shopping, leisure, entertainment, schools and other amenities in close proximity to add even
more attraction to living with a perfect angle.

STRATA AREA = 378 SQM / 4,069 SQFT

HOUSE NO. 19A

Space
for
Jacuzzi

(Inclusive of void, RC ledge and metal roof)

STRATA AREA = 384 SQM / 4,133 SQFT


pes

pes

Trellis

RC LEDGE

balcony

RC LEDGE

Trellis
2400 x 4800
private car park lot

living
roof terrace

master
bath

dining

RC LEDGE

master bedroom

family room

pitched roof

bath 3

dry
kitchen

wc
RC LEDGE

ROOF

ATTIC

bedroom 3

ROOF

bath 1
wc
RC LEDGE

2nd STOREY

3rd STOREY

cabinet

ROOF

3rd STOREY

ATTIC

RC LEDGE

terrace/yard
VOID ABOVE

pes

pes

2nd STOREY

BASEMENT

BASEMENT

wet
kitchen

void

void

powder
room

roof terrace

STRATA AREA = 399 SQM / 4,295 SQFT

HOUSE NO. 21A

Space
for
Jacuzzi

(Inclusive of void, RC ledge and metal roof)

dry
kitchen
pes

1st STOREY

1st STOREY

HOUSE NO. 21

2nd STOREY

bedroom 1

bath 3

VOID ABOVE

pes

RC LEDGE

hs

m&e space

terrace/
yard

bath 1

bedroom 1

master
bedroom

bath 4
wet
kitchen

bedroom 1

bath 1

family room

hall

cabinet

bedroom 3

master
bath

DB

hall
hs

pitched roof

store

bedroom 4

powder
room

roof terrace
below

pitched roof

hall

bath 4

hall

mc

powder
room

dining

wet
kitchen

store

master
bath

bedroom 2

mc

dry
kitchen
DB

bedroom 4

m&e space

2400 x 4800
private car park lot

bath 2

pitched roof

pitched roof

(Inclusive of void, RC ledge and metal roof)

roof terrace

master bedroom

hall

2400 x 4800
private car park lot

living

bath 2
bedroom 2

STRATA AREA = 403 SQM / 4,338 SQFT

RC LEDGE

balcony

RC LEDGE

roof terrace below

RC LEDGE

roof terrace below

2400 x 4800
private car park lot

HOUSE NO. 25

Space
for
Jacuzzi

(Inclusive of void, RC ledge and metal roof)

RC LEDGE

HOUSE NO. 19

pes

bedroom 4

dining

m&e
space

STRATA AREA = 371 SQM / 3,993 SQFT

Space
for
Jacuzzi

(Inclusive of void, RC ledge and metal roof)

living

bath 4

pes

pes
Trellis
living

living
Trellis

balcony

RC LEDGE

2400 x 4800
private car park lot

RC LEDGE

2400 x 4800
private car park lot

Trellis

roof terrace below

ATTIC

1st STOREY

roof terrace below

powder
room

dining

bath 2
bedroom 2

master
bath

master
bedroom

bedroom 2

roof terrace

dry
kitchen

DB

dining

mc

mc

master bedroom
store

DB

pitched roof

bath 2

bedroom 4

hs

bath 4

pitched roof

m&e space
bedroom 3
bath 3

bedroom 1

wc

bath 1

RC LEDGE

pes

hs
bath 3

bedroom 1

bedroom 2

m&e space

3rd STOREY

ATTIC

bedroom 3

wc

0
80 lot
x 4 ark
00 p
24 te car
a
v
pri

pes

terrace/yard

balcony
RC LEDGE

RC LEDGE

2nd STOREY

ROOF

3rd STOREY

ATTIC

0
80 lot
x 4 ark
00 p
24 te car
va
pri

family
room

mc

E
OV

ID
VO

VOID ABOVE

ROOF

DB

powder
room

bedroom 3

store

hall

bath 1

cabinet

bath 4

terrace/yard

hall

bath 3

hs
wet
kitchen

wc
bath 2

hall

hall

hall

family room

pitched roof

family room
dry
kitchen

bedroom 4

wet
kitchen

master
bath

RC LEDGE

roof terrace

pitched roof

for
ace i
Sp acuzz
J

2400 x 4800
private car park lot

RC LEDGE

balcony

RC LEDGE

2400 x 4800
private car park lot

AB

terrace/
yard

2nd STOREY

3rd STOREY

BASEMENT

void
void

BASEMENT
1st STOREY

BASEMENT

1st STOREY

HOUSE NO. 23

HOUSE NO. 23A

STRATA AREA = 377 SQM / 4,058 SQFT


(Inclusive of void, RC ledge and metal roof)

pes
void
VOID
ABOVE

RC LEDGE

wet
kitchen

RC LEDGE

cabinet

terrace/yard

STRATA AREA = 381 SQM / 4,101 SQFT

23

(Inclusive of void, RC ledge and metal roof)

void

wc

pes

dry
kitchen

RC LEDGE

m&e space

bath 3

bedroom 3

bath 1
bedroom 1

dry
kitchen
store

pitched roof

bedroom 4

powder
room

hs
mc

hall

bedroom 3

bath 4

family room
dining

roof terrace below

roof terrace

master
bath

living

roof terrace below


0
x 480
2400 r park lot
ca
private

balcony

master bedroom

bedroom 2

master bedroom

bath 2

RC LEDGE

hs
mc

pes
Trellis

All plans are for visual representation only and are subject to amendments as approved or required by the Building and Construction
Authority and/or the relevant authorities. Floor areas indicated are approximate measurement and subject to final survey.

hall

hall
bedroom 4

DB

family room

g
dinin

pitched roof

living

bedroom 2

wc

bedroom 1

bath 4

hall

terrace/
yard

bath 1

pes

pitched roof

DB

VOID
ABOVE

powder
room

bath 3

m&e space

0
x 480
2400 r park lot
ca
private

r
maste
bath

roof terrace

bath

Trellis
E

EDG

Space
for
Jacuzzi

RC L

0
80 lot
x 4 ark
00 p
24 te car
a
v
pri

pes

or
ce f
Spa cuzzi
Ja

y
alcon

0
80 lot
x 4 ark
00 p
24 te car
va
pri

ROOF
ATTIC

3rd STOREY

2nd STOREY

BASEMENT
1st STOREY

ATTIC

3rd STOREY

All information, specifications and statements herein shall not be treated to form part of an offer or contract. Floor plans are subject
to amendments as may be required by the relevant authorities. Visual representations, illustrations, photographs, art renderings and
other graphic representations and references, not limited to landscape and furniture, are intended to portray only artistic impressions
of the development and cannot be regarded as representations of fact. No part of the materials shall constitute a representation or
warranty. All plans, information and specifications are current at the time of press and are subject to change as may be required and
cannot form part of an offer or contract. The developer reserves the rights to modify any part or parts of the building prior to completion
as directed or approved by the building authority. Floor areas are only approximate measurements and subject to final survey.

EDG

RC L

RC LEDGE

ROOF

25

21A 21 19A 19

wet kitchen
RC LEDGE

pitched roof

23A

2nd STOREY

1st STOREY

BASEMENT

The Sale and Purchase Agreement shall form the entire agreement between the Developer and Purchaser and shall supersede all
statements, representations or promise made prior to the signing of the Sale and Purchase Agreement and shall in no way modified
by any statements, representations or promise made by the Developer or the Marketing Agents.

STRATA AREA = 378 SQM / 4,069 SQFT

HOUSE NO. 19A

Space
for
Jacuzzi

(Inclusive of void, RC ledge and metal roof)

STRATA AREA = 384 SQM / 4,133 SQFT


pes

pes

Trellis

RC LEDGE

balcony

RC LEDGE

Trellis
2400 x 4800
private car park lot

living
roof terrace

master
bath

dining

RC LEDGE

master bedroom

family room

pitched roof

bath 3

dry
kitchen

wc
RC LEDGE

ROOF

ATTIC

bedroom 3

ROOF

bath 1
wc
RC LEDGE

2nd STOREY

3rd STOREY

cabinet

ROOF

3rd STOREY

ATTIC

RC LEDGE

terrace/yard
VOID ABOVE

pes

pes

2nd STOREY

BASEMENT

BASEMENT

wet
kitchen

void

void

powder
room

roof terrace

STRATA AREA = 399 SQM / 4,295 SQFT

HOUSE NO. 21A

Space
for
Jacuzzi

(Inclusive of void, RC ledge and metal roof)

dry
kitchen
pes

1st STOREY

1st STOREY

HOUSE NO. 21

2nd STOREY

bedroom 1

bath 3

VOID ABOVE

pes

RC LEDGE

hs

m&e space

terrace/
yard

bath 1

bedroom 1

master
bedroom

bath 4
wet
kitchen

bedroom 1

bath 1

family room

hall

cabinet

bedroom 3

master
bath

DB

hall
hs

pitched roof

store

bedroom 4

powder
room

roof terrace
below

pitched roof

hall

bath 4

hall

mc

powder
room

dining

wet
kitchen

store

master
bath

bedroom 2

mc

dry
kitchen
DB

bedroom 4

m&e space

2400 x 4800
private car park lot

bath 2

pitched roof

pitched roof

(Inclusive of void, RC ledge and metal roof)

roof terrace

master bedroom

hall

2400 x 4800
private car park lot

living

bath 2
bedroom 2

STRATA AREA = 403 SQM / 4,338 SQFT

RC LEDGE

balcony

RC LEDGE

roof terrace below

RC LEDGE

roof terrace below

2400 x 4800
private car park lot

HOUSE NO. 25

Space
for
Jacuzzi

(Inclusive of void, RC ledge and metal roof)

RC LEDGE

HOUSE NO. 19

pes

bedroom 4

dining

m&e
space

STRATA AREA = 371 SQM / 3,993 SQFT

Space
for
Jacuzzi

(Inclusive of void, RC ledge and metal roof)

living

bath 4

pes

pes
Trellis
living

living
Trellis

balcony

RC LEDGE

2400 x 4800
private car park lot

RC LEDGE

2400 x 4800
private car park lot

Trellis

roof terrace below

ATTIC

1st STOREY

roof terrace below

powder
room

dining

bath 2
bedroom 2

master
bath

master
bedroom

bedroom 2

roof terrace

dry
kitchen

DB

dining

mc

mc

master bedroom
store

DB

pitched roof

bath 2

bedroom 4

hs

bath 4

pitched roof

m&e space
bedroom 3
bath 3

bedroom 1

wc

bath 1

RC LEDGE

pes

hs
bath 3

bedroom 1

bedroom 2

m&e space

3rd STOREY

ATTIC

bedroom 3

wc

0
80 lot
x 4 ark
00 p
24 te car
a
v
pri

pes

terrace/yard

balcony
RC LEDGE

RC LEDGE

2nd STOREY

ROOF

3rd STOREY

ATTIC

0
80 lot
x 4 ark
00 p
24 te car
va
pri

family
room

mc

E
OV

ID
VO

VOID ABOVE

ROOF

DB

powder
room

bedroom 3

store

hall

bath 1

cabinet

bath 4

terrace/yard

hall

bath 3

hs
wet
kitchen

wc
bath 2

hall

hall

hall

family room

pitched roof

family room
dry
kitchen

bedroom 4

wet
kitchen

master
bath

RC LEDGE

roof terrace

pitched roof

for
ace i
Sp acuzz
J

2400 x 4800
private car park lot

RC LEDGE

balcony

RC LEDGE

2400 x 4800
private car park lot

AB

terrace/
yard

2nd STOREY

3rd STOREY

BASEMENT

void
void

BASEMENT
1st STOREY

BASEMENT

1st STOREY

HOUSE NO. 23

HOUSE NO. 23A

STRATA AREA = 377 SQM / 4,058 SQFT


(Inclusive of void, RC ledge and metal roof)

pes
void
VOID
ABOVE

RC LEDGE

wet
kitchen

RC LEDGE

cabinet

terrace/yard

STRATA AREA = 381 SQM / 4,101 SQFT

23

(Inclusive of void, RC ledge and metal roof)

void

wc

pes

dry
kitchen

RC LEDGE

m&e space

bath 3

bedroom 3

bath 1
bedroom 1

dry
kitchen
store

pitched roof

bedroom 4

powder
room

hs
mc

hall

bedroom 3

bath 4

family room
dining

roof terrace below

roof terrace

master
bath

living

roof terrace below


0
x 480
2400 r park lot
ca
private

balcony

master bedroom

bedroom 2

master bedroom

bath 2

RC LEDGE

hs
mc

pes
Trellis

All plans are for visual representation only and are subject to amendments as approved or required by the Building and Construction
Authority and/or the relevant authorities. Floor areas indicated are approximate measurement and subject to final survey.

hall

hall
bedroom 4

DB

family room

g
dinin

pitched roof

living

bedroom 2

wc

bedroom 1

bath 4

hall

terrace/
yard

bath 1

pes

pitched roof

DB

VOID
ABOVE

powder
room

bath 3

m&e space

0
x 480
2400 r park lot
ca
private

r
maste
bath

roof terrace

bath

Trellis
E

EDG

Space
for
Jacuzzi

RC L

0
80 lot
x 4 ark
00 p
24 te car
a
v
pri

pes

or
ce f
Spa cuzzi
Ja

y
alcon

0
80 lot
x 4 ark
00 p
24 te car
va
pri

ROOF
ATTIC

3rd STOREY

2nd STOREY

BASEMENT
1st STOREY

ATTIC

3rd STOREY

All information, specifications and statements herein shall not be treated to form part of an offer or contract. Floor plans are subject
to amendments as may be required by the relevant authorities. Visual representations, illustrations, photographs, art renderings and
other graphic representations and references, not limited to landscape and furniture, are intended to portray only artistic impressions
of the development and cannot be regarded as representations of fact. No part of the materials shall constitute a representation or
warranty. All plans, information and specifications are current at the time of press and are subject to change as may be required and
cannot form part of an offer or contract. The developer reserves the rights to modify any part or parts of the building prior to completion
as directed or approved by the building authority. Floor areas are only approximate measurements and subject to final survey.

EDG

RC L

RC LEDGE

ROOF

25

21A 21 19A 19

wet kitchen
RC LEDGE

pitched roof

23A

2nd STOREY

1st STOREY

BASEMENT

The Sale and Purchase Agreement shall form the entire agreement between the Developer and Purchaser and shall supersede all
statements, representations or promise made prior to the signing of the Sale and Purchase Agreement and shall in no way modified
by any statements, representations or promise made by the Developer or the Marketing Agents.

STRATA AREA = 378 SQM / 4,069 SQFT

HOUSE NO. 19A

Space
for
Jacuzzi

(Inclusive of void, RC ledge and metal roof)

STRATA AREA = 384 SQM / 4,133 SQFT


pes

pes

Trellis

RC LEDGE

balcony

RC LEDGE

Trellis
2400 x 4800
private car park lot

living
roof terrace

master
bath

dining

RC LEDGE

master bedroom

family room

pitched roof

bath 3

dry
kitchen

wc
RC LEDGE

ROOF

ATTIC

bedroom 3

ROOF

bath 1
wc
RC LEDGE

2nd STOREY

3rd STOREY

cabinet

ROOF

3rd STOREY

ATTIC

RC LEDGE

terrace/yard
VOID ABOVE

pes

pes

2nd STOREY

BASEMENT

BASEMENT

wet
kitchen

void

void

powder
room

roof terrace

STRATA AREA = 399 SQM / 4,295 SQFT

HOUSE NO. 21A

Space
for
Jacuzzi

(Inclusive of void, RC ledge and metal roof)

dry
kitchen
pes

1st STOREY

1st STOREY

HOUSE NO. 21

2nd STOREY

bedroom 1

bath 3

VOID ABOVE

pes

RC LEDGE

hs

m&e space

terrace/
yard

bath 1

bedroom 1

master
bedroom

bath 4
wet
kitchen

bedroom 1

bath 1

family room

hall

cabinet

bedroom 3

master
bath

DB

hall
hs

pitched roof

store

bedroom 4

powder
room

roof terrace
below

pitched roof

hall

bath 4

hall

mc

powder
room

dining

wet
kitchen

store

master
bath

bedroom 2

mc

dry
kitchen
DB

bedroom 4

m&e space

2400 x 4800
private car park lot

bath 2

pitched roof

pitched roof

(Inclusive of void, RC ledge and metal roof)

roof terrace

master bedroom

hall

2400 x 4800
private car park lot

living

bath 2
bedroom 2

STRATA AREA = 403 SQM / 4,338 SQFT

RC LEDGE

balcony

RC LEDGE

roof terrace below

RC LEDGE

roof terrace below

2400 x 4800
private car park lot

HOUSE NO. 25

Space
for
Jacuzzi

(Inclusive of void, RC ledge and metal roof)

RC LEDGE

HOUSE NO. 19

pes

bedroom 4

dining

m&e
space

STRATA AREA = 371 SQM / 3,993 SQFT

Space
for
Jacuzzi

(Inclusive of void, RC ledge and metal roof)

living

bath 4

pes

pes
Trellis
living

living
Trellis

balcony

RC LEDGE

2400 x 4800
private car park lot

RC LEDGE

2400 x 4800
private car park lot

Trellis

roof terrace below

ATTIC

1st STOREY

roof terrace below

powder
room

dining

bath 2
bedroom 2

master
bath

master
bedroom

bedroom 2

roof terrace

dry
kitchen

DB

dining

mc

mc

master bedroom
store

DB

pitched roof

bath 2

bedroom 4

hs

bath 4

pitched roof

m&e space
bedroom 3
bath 3

bedroom 1

wc

bath 1

RC LEDGE

pes

hs
bath 3

bedroom 1

bedroom 2

m&e space

3rd STOREY

ATTIC

bedroom 3

wc

0
80 lot
x 4 ark
00 p
24 te car
a
v
pri

pes

terrace/yard

balcony
RC LEDGE

RC LEDGE

2nd STOREY

ROOF

3rd STOREY

ATTIC

0
80 lot
x 4 ark
00 p
24 te car
va
pri

family
room

mc

E
OV

ID
VO

VOID ABOVE

ROOF

DB

powder
room

bedroom 3

store

hall

bath 1

cabinet

bath 4

terrace/yard

hall

bath 3

hs
wet
kitchen

wc
bath 2

hall

hall

hall

family room

pitched roof

family room
dry
kitchen

bedroom 4

wet
kitchen

master
bath

RC LEDGE

roof terrace

pitched roof

for
ace i
Sp acuzz
J

2400 x 4800
private car park lot

RC LEDGE

balcony

RC LEDGE

2400 x 4800
private car park lot

AB

terrace/
yard

2nd STOREY

3rd STOREY

BASEMENT

void
void

BASEMENT
1st STOREY

BASEMENT

1st STOREY

HOUSE NO. 23

HOUSE NO. 23A

STRATA AREA = 377 SQM / 4,058 SQFT


(Inclusive of void, RC ledge and metal roof)

pes
void
VOID
ABOVE

RC LEDGE

wet
kitchen

RC LEDGE

cabinet

terrace/yard

STRATA AREA = 381 SQM / 4,101 SQFT

23

(Inclusive of void, RC ledge and metal roof)

void

wc

pes

dry
kitchen

RC LEDGE

m&e space

bath 3

bedroom 3

bath 1
bedroom 1

dry
kitchen
store

pitched roof

bedroom 4

powder
room

hs
mc

hall

bedroom 3

bath 4

family room
dining

roof terrace below

roof terrace

master
bath

living

roof terrace below


0
x 480
2400 r park lot
ca
private

balcony

master bedroom

bedroom 2

master bedroom

bath 2

RC LEDGE

hs
mc

pes
Trellis

All plans are for visual representation only and are subject to amendments as approved or required by the Building and Construction
Authority and/or the relevant authorities. Floor areas indicated are approximate measurement and subject to final survey.

hall

hall
bedroom 4

DB

family room

g
dinin

pitched roof

living

bedroom 2

wc

bedroom 1

bath 4

hall

terrace/
yard

bath 1

pes

pitched roof

DB

VOID
ABOVE

powder
room

bath 3

m&e space

0
x 480
2400 r park lot
ca
private

r
maste
bath

roof terrace

bath

Trellis
E

EDG

Space
for
Jacuzzi

RC L

0
80 lot
x 4 ark
00 p
24 te car
a
v
pri

pes

or
ce f
Spa cuzzi
Ja

y
alcon

0
80 lot
x 4 ark
00 p
24 te car
va
pri

ROOF
ATTIC

3rd STOREY

2nd STOREY

BASEMENT
1st STOREY

ATTIC

3rd STOREY

All information, specifications and statements herein shall not be treated to form part of an offer or contract. Floor plans are subject
to amendments as may be required by the relevant authorities. Visual representations, illustrations, photographs, art renderings and
other graphic representations and references, not limited to landscape and furniture, are intended to portray only artistic impressions
of the development and cannot be regarded as representations of fact. No part of the materials shall constitute a representation or
warranty. All plans, information and specifications are current at the time of press and are subject to change as may be required and
cannot form part of an offer or contract. The developer reserves the rights to modify any part or parts of the building prior to completion
as directed or approved by the building authority. Floor areas are only approximate measurements and subject to final survey.

EDG

RC L

RC LEDGE

ROOF

25

21A 21 19A 19

wet kitchen
RC LEDGE

pitched roof

23A

2nd STOREY

1st STOREY

BASEMENT

The Sale and Purchase Agreement shall form the entire agreement between the Developer and Purchaser and shall supersede all
statements, representations or promise made prior to the signing of the Sale and Purchase Agreement and shall in no way modified
by any statements, representations or promise made by the Developer or the Marketing Agents.

STRATA AREA = 378 SQM / 4,069 SQFT

HOUSE NO. 19A

Space
for
Jacuzzi

(Inclusive of void, RC ledge and metal roof)

STRATA AREA = 384 SQM / 4,133 SQFT


pes

pes

Trellis

RC LEDGE

balcony

RC LEDGE

Trellis
2400 x 4800
private car park lot

living
roof terrace

master
bath

dining

RC LEDGE

master bedroom

family room

pitched roof

bath 3

dry
kitchen

wc
RC LEDGE

ROOF

ATTIC

bedroom 3

ROOF

bath 1
wc
RC LEDGE

2nd STOREY

3rd STOREY

cabinet

ROOF

3rd STOREY

ATTIC

RC LEDGE

terrace/yard
VOID ABOVE

pes

pes

2nd STOREY

BASEMENT

BASEMENT

wet
kitchen

void

void

powder
room

roof terrace

STRATA AREA = 399 SQM / 4,295 SQFT

HOUSE NO. 21A

Space
for
Jacuzzi

(Inclusive of void, RC ledge and metal roof)

dry
kitchen
pes

1st STOREY

1st STOREY

HOUSE NO. 21

2nd STOREY

bedroom 1

bath 3

VOID ABOVE

pes

RC LEDGE

hs

m&e space

terrace/
yard

bath 1

bedroom 1

master
bedroom

bath 4
wet
kitchen

bedroom 1

bath 1

family room

hall

cabinet

bedroom 3

master
bath

DB

hall
hs

pitched roof

store

bedroom 4

powder
room

roof terrace
below

pitched roof

hall

bath 4

hall

mc

powder
room

dining

wet
kitchen

store

master
bath

bedroom 2

mc

dry
kitchen
DB

bedroom 4

m&e space

2400 x 4800
private car park lot

bath 2

pitched roof

pitched roof

(Inclusive of void, RC ledge and metal roof)

roof terrace

master bedroom

hall

2400 x 4800
private car park lot

living

bath 2
bedroom 2

STRATA AREA = 403 SQM / 4,338 SQFT

RC LEDGE

balcony

RC LEDGE

roof terrace below

RC LEDGE

roof terrace below

2400 x 4800
private car park lot

HOUSE NO. 25

Space
for
Jacuzzi

(Inclusive of void, RC ledge and metal roof)

RC LEDGE

HOUSE NO. 19

pes

bedroom 4

dining

m&e
space

STRATA AREA = 371 SQM / 3,993 SQFT

Space
for
Jacuzzi

(Inclusive of void, RC ledge and metal roof)

living

bath 4

pes

pes
Trellis
living

living
Trellis

balcony

RC LEDGE

2400 x 4800
private car park lot

RC LEDGE

2400 x 4800
private car park lot

Trellis

roof terrace below

ATTIC

1st STOREY

roof terrace below

powder
room

dining

bath 2
bedroom 2

master
bath

master
bedroom

bedroom 2

roof terrace

dry
kitchen

DB

dining

mc

mc

master bedroom
store

DB

pitched roof

bath 2

bedroom 4

hs

bath 4

pitched roof

m&e space
bedroom 3
bath 3

bedroom 1

wc

bath 1

RC LEDGE

pes

hs
bath 3

bedroom 1

bedroom 2

m&e space

3rd STOREY

ATTIC

bedroom 3

wc

0
80 lot
x 4 ark
00 p
24 te car
a
v
pri

pes

terrace/yard

balcony
RC LEDGE

RC LEDGE

2nd STOREY

ROOF

3rd STOREY

ATTIC

0
80 lot
x 4 ark
00 p
24 te car
va
pri

family
room

mc

E
OV

ID
VO

VOID ABOVE

ROOF

DB

powder
room

bedroom 3

store

hall

bath 1

cabinet

bath 4

terrace/yard

hall

bath 3

hs
wet
kitchen

wc
bath 2

hall

hall

hall

family room

pitched roof

family room
dry
kitchen

bedroom 4

wet
kitchen

master
bath

RC LEDGE

roof terrace

pitched roof

for
ace i
Sp acuzz
J

2400 x 4800
private car park lot

RC LEDGE

balcony

RC LEDGE

2400 x 4800
private car park lot

AB

terrace/
yard

2nd STOREY

3rd STOREY

BASEMENT

void
void

BASEMENT
1st STOREY

BASEMENT

1st STOREY

HOUSE NO. 23

HOUSE NO. 23A

STRATA AREA = 377 SQM / 4,058 SQFT


(Inclusive of void, RC ledge and metal roof)

pes
void
VOID
ABOVE

RC LEDGE

wet
kitchen

RC LEDGE

cabinet

terrace/yard

STRATA AREA = 381 SQM / 4,101 SQFT

23

(Inclusive of void, RC ledge and metal roof)

void

wc

pes

dry
kitchen

RC LEDGE

m&e space

bath 3

bedroom 3

bath 1
bedroom 1

dry
kitchen
store

pitched roof

bedroom 4

powder
room

hs
mc

hall

bedroom 3

bath 4

family room
dining

roof terrace below

roof terrace

master
bath

living

roof terrace below


0
x 480
2400 r park lot
ca
private

balcony

master bedroom

bedroom 2

master bedroom

bath 2

RC LEDGE

hs
mc

pes
Trellis

All plans are for visual representation only and are subject to amendments as approved or required by the Building and Construction
Authority and/or the relevant authorities. Floor areas indicated are approximate measurement and subject to final survey.

hall

hall
bedroom 4

DB

family room

g
dinin

pitched roof

living

bedroom 2

wc

bedroom 1

bath 4

hall

terrace/
yard

bath 1

pes

pitched roof

DB

VOID
ABOVE

powder
room

bath 3

m&e space

0
x 480
2400 r park lot
ca
private

r
maste
bath

roof terrace

bath

Trellis
E

EDG

Space
for
Jacuzzi

RC L

0
80 lot
x 4 ark
00 p
24 te car
a
v
pri

pes

or
ce f
Spa cuzzi
Ja

y
alcon

0
80 lot
x 4 ark
00 p
24 te car
va
pri

ROOF
ATTIC

3rd STOREY

2nd STOREY

BASEMENT
1st STOREY

ATTIC

3rd STOREY

All information, specifications and statements herein shall not be treated to form part of an offer or contract. Floor plans are subject
to amendments as may be required by the relevant authorities. Visual representations, illustrations, photographs, art renderings and
other graphic representations and references, not limited to landscape and furniture, are intended to portray only artistic impressions
of the development and cannot be regarded as representations of fact. No part of the materials shall constitute a representation or
warranty. All plans, information and specifications are current at the time of press and are subject to change as may be required and
cannot form part of an offer or contract. The developer reserves the rights to modify any part or parts of the building prior to completion
as directed or approved by the building authority. Floor areas are only approximate measurements and subject to final survey.

EDG

RC L

RC LEDGE

ROOF

25

21A 21 19A 19

wet kitchen
RC LEDGE

pitched roof

23A

2nd STOREY

1st STOREY

BASEMENT

The Sale and Purchase Agreement shall form the entire agreement between the Developer and Purchaser and shall supersede all
statements, representations or promise made prior to the signing of the Sale and Purchase Agreement and shall in no way modified
by any statements, representations or promise made by the Developer or the Marketing Agents.

STRATA AREA = 378 SQM / 4,069 SQFT

HOUSE NO. 19A

Space
for
Jacuzzi

(Inclusive of void, RC ledge and metal roof)

STRATA AREA = 384 SQM / 4,133 SQFT


pes

pes

Trellis

RC LEDGE

balcony

RC LEDGE

Trellis
2400 x 4800
private car park lot

living
roof terrace

master
bath

dining

RC LEDGE

master bedroom

family room

pitched roof

bath 3

dry
kitchen

wc
RC LEDGE

ROOF

ATTIC

bedroom 3

ROOF

bath 1
wc
RC LEDGE

2nd STOREY

3rd STOREY

cabinet

ROOF

3rd STOREY

ATTIC

RC LEDGE

terrace/yard
VOID ABOVE

pes

pes

2nd STOREY

BASEMENT

BASEMENT

wet
kitchen

void

void

powder
room

roof terrace

STRATA AREA = 399 SQM / 4,295 SQFT

HOUSE NO. 21A

Space
for
Jacuzzi

(Inclusive of void, RC ledge and metal roof)

dry
kitchen
pes

1st STOREY

1st STOREY

HOUSE NO. 21

2nd STOREY

bedroom 1

bath 3

VOID ABOVE

pes

RC LEDGE

hs

m&e space

terrace/
yard

bath 1

bedroom 1

master
bedroom

bath 4
wet
kitchen

bedroom 1

bath 1

family room

hall

cabinet

bedroom 3

master
bath

DB

hall
hs

pitched roof

store

bedroom 4

powder
room

roof terrace
below

pitched roof

hall

bath 4

hall

mc

powder
room

dining

wet
kitchen

store

master
bath

bedroom 2

mc

dry
kitchen
DB

bedroom 4

m&e space

2400 x 4800
private car park lot

bath 2

pitched roof

pitched roof

(Inclusive of void, RC ledge and metal roof)

roof terrace

master bedroom

hall

2400 x 4800
private car park lot

living

bath 2
bedroom 2

STRATA AREA = 403 SQM / 4,338 SQFT

RC LEDGE

balcony

RC LEDGE

roof terrace below

RC LEDGE

roof terrace below

2400 x 4800
private car park lot

HOUSE NO. 25

Space
for
Jacuzzi

(Inclusive of void, RC ledge and metal roof)

RC LEDGE

HOUSE NO. 19

pes

bedroom 4

dining

m&e
space

STRATA AREA = 371 SQM / 3,993 SQFT

Space
for
Jacuzzi

(Inclusive of void, RC ledge and metal roof)

living

bath 4

pes

pes
Trellis
living

living
Trellis

balcony

RC LEDGE

2400 x 4800
private car park lot

RC LEDGE

2400 x 4800
private car park lot

Trellis

roof terrace below

ATTIC

1st STOREY

roof terrace below

powder
room

dining

bath 2
bedroom 2

master
bath

master
bedroom

bedroom 2

roof terrace

dry
kitchen

DB

dining

mc

mc

master bedroom
store

DB

pitched roof

bath 2

bedroom 4

hs

bath 4

pitched roof

m&e space
bedroom 3
bath 3

bedroom 1

wc

bath 1

RC LEDGE

pes

hs
bath 3

bedroom 1

bedroom 2

m&e space

3rd STOREY

ATTIC

bedroom 3

wc

0
80 lot
x 4 ark
00 p
24 te car
a
v
pri

pes

terrace/yard

balcony
RC LEDGE

RC LEDGE

2nd STOREY

ROOF

3rd STOREY

ATTIC

0
80 lot
x 4 ark
00 p
24 te car
va
pri

family
room

mc

E
OV

ID
VO

VOID ABOVE

ROOF

DB

powder
room

bedroom 3

store

hall

bath 1

cabinet

bath 4

terrace/yard

hall

bath 3

hs
wet
kitchen

wc
bath 2

hall

hall

hall

family room

pitched roof

family room
dry
kitchen

bedroom 4

wet
kitchen

master
bath

RC LEDGE

roof terrace

pitched roof

for
ace i
Sp acuzz
J

2400 x 4800
private car park lot

RC LEDGE

balcony

RC LEDGE

2400 x 4800
private car park lot

AB

terrace/
yard

2nd STOREY

3rd STOREY

BASEMENT

void
void

BASEMENT
1st STOREY

BASEMENT

1st STOREY

HOUSE NO. 23

HOUSE NO. 23A

STRATA AREA = 377 SQM / 4,058 SQFT


(Inclusive of void, RC ledge and metal roof)

pes
void
VOID
ABOVE

RC LEDGE

wet
kitchen

RC LEDGE

cabinet

terrace/yard

STRATA AREA = 381 SQM / 4,101 SQFT

23

(Inclusive of void, RC ledge and metal roof)

void

wc

pes

dry
kitchen

RC LEDGE

m&e space

bath 3

bedroom 3

bath 1
bedroom 1

dry
kitchen
store

pitched roof

bedroom 4

powder
room

hs
mc

hall

bedroom 3

bath 4

family room
dining

roof terrace below

roof terrace

master
bath

living

roof terrace below


0
x 480
2400 r park lot
ca
private

balcony

master bedroom

bedroom 2

master bedroom

bath 2

RC LEDGE

hs
mc

pes
Trellis

All plans are for visual representation only and are subject to amendments as approved or required by the Building and Construction
Authority and/or the relevant authorities. Floor areas indicated are approximate measurement and subject to final survey.

hall

hall
bedroom 4

DB

family room

g
dinin

pitched roof

living

bedroom 2

wc

bedroom 1

bath 4

hall

terrace/
yard

bath 1

pes

pitched roof

DB

VOID
ABOVE

powder
room

bath 3

m&e space

0
x 480
2400 r park lot
ca
private

r
maste
bath

roof terrace

bath

Trellis
E

EDG

Space
for
Jacuzzi

RC L

0
80 lot
x 4 ark
00 p
24 te car
a
v
pri

pes

or
ce f
Spa cuzzi
Ja

y
alcon

0
80 lot
x 4 ark
00 p
24 te car
va
pri

ROOF
ATTIC

3rd STOREY

2nd STOREY

BASEMENT
1st STOREY

ATTIC

3rd STOREY

All information, specifications and statements herein shall not be treated to form part of an offer or contract. Floor plans are subject
to amendments as may be required by the relevant authorities. Visual representations, illustrations, photographs, art renderings and
other graphic representations and references, not limited to landscape and furniture, are intended to portray only artistic impressions
of the development and cannot be regarded as representations of fact. No part of the materials shall constitute a representation or
warranty. All plans, information and specifications are current at the time of press and are subject to change as may be required and
cannot form part of an offer or contract. The developer reserves the rights to modify any part or parts of the building prior to completion
as directed or approved by the building authority. Floor areas are only approximate measurements and subject to final survey.

EDG

RC L

RC LEDGE

ROOF

25

21A 21 19A 19

wet kitchen
RC LEDGE

pitched roof

23A

2nd STOREY

1st STOREY

BASEMENT

The Sale and Purchase Agreement shall form the entire agreement between the Developer and Purchaser and shall supersede all
statements, representations or promise made prior to the signing of the Sale and Purchase Agreement and shall in no way modified
by any statements, representations or promise made by the Developer or the Marketing Agents.

SPECIFICATIONS

TA CORPORATION LTD

1. FOUNDATION
Reinforced concrete pile

We are currently known as TA Corporation Ltd after turning into a public listed company
(formerly known as Tiong Aik Group of Companies). We have retained our reputation for our
standard of excellence in developing premium homes and further built upon that, offering
you the best.

3. WALLS
a. External Walls
b. Internal Walls

2. SUBSTRUCTURE/SUPERSTRUCTURE
Reinforced concrete structure

4. ROOF
a. Flat Roof/ Terrace
b. Pitch Roof

23

5. CEILING
a. Family Room, Living,
Dining, Bedrooms, Yard,
HS, Car Park
b. All Bathrooms, Wet
Kitchen

23A
25

Recognised for our high quality housing in Singapore, TA Corporation is a significant developer
best known for our hallmark materials, stellar finishes and unwavering workmanship. Our team
of acclaimed consultants from architects to engineers to landscape artists set the gold standard
in providing lifestyle homes for your discerning tastes.

6. WALL FINISHES
Units
a. Family Room, Living,
Dining, Dry Kitchen,
Bedrooms, Balcony,
Roof Terrace
b. Master Bathroom/
Powder Room/
Common Bathrooms

At TA Corporation, we bring comfort, luxury and elegance to your homes.

c. Wet Kitchen, WC
(To exposed surface only)

21A

21

19A

19

Common area
a. External walls

Parc Seabreeze

7. FLOOR FINISHES
Units
a. Family Room, Living,
Dining, Dry Kitchen
b. Master Bathroom/
Powder Room/ Common
Bathrooms, Kitchen, WC
c. All Bedrooms
d. Balcony, Roof Terrace, PES

SA
VE

NU

E E
A

ST

Starlight Suites

16. PAINTING
a. External wall: Spray texture coating and/or emulsion paint finish
b. Internal wall: Emulsion paint finish

SIM

e. Internal Staircase
f. Car Park
Common area
a. Walkway, BBQ Area
b. Common staircase

20. ADDITIONAL ITEMS


a. Kitchen Cabinets

: Moisture resistance ceiling board with


emulsion paint (up to false ceiling and on
exposed area only)

b. Kitchen Appliances

: Cement and sand plaster and/or skim


coat with emulsion paint finish (up to false
ceiling and on exposed area only)

d. Wardrobe
e. Water-heater

: Natural marble and/or Homogenous


tiles and/or Ceramic tiles to false ceiling
height (up to false ceiling and on exposed
area only)
: Homogenous tiles and/or Ceramic tiles
(up to false ceiling height and exposed
area only) with back painted glass on
designated area
: Cement sand plaster with spray textured
coating and/or emulsion paint finish

: Natural marble with matching skirting


: Natural marble and/or Homogenous
tiles and/or Ceramic tiles
: Timber strip flooring with timber skirting
: Homogenous tiles and/or Ceramic tiles
with matching skirting
: Timber finish
: Concrete finish
: Granite and/or Homogeneous tiles
: Cement sand screed with nosing tiles

Landscape

Pavilion

Pedestrian Entrance

10. IRONMONGERY
Selected quality lockset to main door and other doors.

Reflective Pool

Basement Carpark Entrance

11. RAILING
Units
a. Roof Terrace, Balcony

Eunos Industrial
Estate
NEW

ER
UPP

CHA

NGI

The Cristallo
EW8

: Ceiling board and/or skim coat with


emulsion paint

BBQ Area

Common Area
a. Escape Staircase

Leoniehill Residences

19. RECREATIONAL FACILITIES


a. BBQ Area
b. Reflective Pool
c. Pavilion

9. DOORS
a. Basement Entrance Door
b. Main Entrance Door
c. All Bedrooms
d. All Bathrooms
e. Kitchen
f. Yard, Roof Terrace
g. PES
h. WC
i. HS

b. Internal Staircase
c. PES

CC9

RD

:
:
:
:
:
:
:
:
:

Approved fire rated timber door


Solid core timber flush door
Hollow core timber flush door
Hollow core timber flush door
Sliding frameless glass door
Aluminium framed glass door
Aluminium Frame Vertical Grille
UPVC door
Approved Metal blast door

: Bricks parapet with cement sand plaster


and/or tempered laminated glass with
stainless steel capping
: Stainless steel with glass panel
: Bricks parapet with cement sand plaster
with spray textured paint and/or emulsion
paint
: Galvanized mild steel with paint finish

12. SANITARY WARES AND FITTINGS


Units
a. Master Bathrooms
- 1 vanity top complete with basin, mixer tap and vanity cabinet
- 1 shower cubicle with shower screen with mixer, hand shower and rain shower
- 1 long bathtub with mixer
- 1 water closet
- 1 towel rail
- 1 toilet paper holder
- 1 mirror
b. Common Bathrooms
- 1 vanity top complete with basin, mixer tap and vanity cabinet
- 1 shower cubicle with shower screen with mixer and hand shower
- 1 water closet
- 1 toilet towel rail
- 1 paper holder
- 1 mirror
c. Powder Room
- 1 vanity top complete with basin, mixer tap and vanity cabinet
- 1 water closet
- 1 toilet paper holder
- 1 mirror
d. WC
- 1 wall hung basin with tap
- 1 hand shower
- 1 water closet
- 1 toilet paper holder
e. Yard, PES, Roof Terrace
- 1 bib tap
13. ELECTRICAL INSTALLATION
All electrical wiring to be in concealed conduits and/or in surface trunking/
pipes below false ceiling levels. (Refer to Electrical Schedule for details)
14. TV / TELEPHONE
Ample television points and telephone ready outlets shall be provided in the unit.

Gambir Ridge

15.LIGHTNING PROTECTION
Lightning protection system shall be provided in accordance with SS555.2010.

Tao Nan
Sch

112
Katong

To Changi Airport

18. DRIVEWAY AND CAR PARK


Basement carpark, driveway and ramp: RC slab with floor hardener

: Reinforced concrete with waterproofing


and insulation
: Metal roofing with insulation

8. WINDOWS
Powder coated aluminium frame with glass according to authority requirements.
Note: Color of frames and glass subject to architects selection.

JALAN SAYANG

Coralis

: Reinforced Concrete and/or bricks


: Reinforced Concrete and/or bricks

17. WATERPROOFING
Waterproofing to Basement, Bathrooms, Powder Room, Wet Kitchen, Balcony,
Roof Terrace, PES, AC ledge, where applicable

c. Air-conditioning

f. Intercom System
g. Security System
h. Cable Vision

: Solid surface counter top complete with


high and low level kitchen cabinets with
sink and tap
: (Dry Kitchen) Electrical hob and microwave
(Wet Kitchen) Gas hob, hood and oven
: Split type wall-mounted air-conditioning
system to Family room, living, dining and
all bedrooms
: Built in wardrobe to all bedrooms
: Hot water supply from electric storage water
heater to all bathrooms and kitchen
: Audio Video Intercom system to all units
: Auto swing gate for vehicular access with
wireless remote control and proximity
card access system for pedestrian gate
: Provision of cable outlet only for cable
vision services

Note:
Marble/ Granite: Marble and granite is a natural material containing veins with
tonality differences. There will be colour differences and marking caused by
their complex mineral composition and incorporated impurities. While such
materials can be pre-selected before installation, this non-conformity cannot
be totally avoided. Granite are pre-polished before laying and care has
been taken for their installation. However, granite being a much harder
material than marble, cannot be re-polished after installation. Hence, some
differences may be felt at the joints. The tonality and pattern of marble,
limestone or granite selected and installed shall be subject to availability.
Timber: Timber is a natural material that does not have total consistency of
colour and grain. Thus it is not possible to achieve a total consistency of colour
and grain in their selection and installation. Timber strip also subject to
thermal expansion and contraction beyond the control of builder and vendor.
Natural timber that is used outdoor will become bleached due to sunlight and
rain. Thus, the cycle of maintenance on staining wall need to be increase as
required. Notwithstanding this note, the vendor shall remain fully responsible
for the performance of its obligations.
Tiles Finishes: Selected tiles sizes and tile surface flatness cannot be perfect and
are subject to acceptable ranged described in Singapore Standards SS483:2000
Sanitary Wares/Fittings: Brand and model of all sanitary wares/fittings
supplied will be provided subject to availability.
Air-conditioning: Air-conditioning system has to be maintained and cleaned
on a regular basis by the Purchaser. This includes the cleaning of filters and
clearing the condensate pipes to ensure that the system be in good working
condition. The purchaser is advised to engage his/her own contractor to service
the air-conditioning system regularly.
Mechanical Ventilation System: Mechanical ventilation fans and ducting are
provided to toilets which are not naturally ventilated. To ensure good working
condition of the system, the exhaust system within internal toilets, where
applicable, is to be maintained by the purchaser on a regular basis.
No tiles behind/below kitchen cabinet, long bath and mirror. Wall surface above
the false ceiling level will be left in its original bare condition.
Layout/location of wardrobe, kitchen cabinets, fan coil units, electrical points,
television points, telecommunication points, audio intercom system, door
swing positions and plaster ceiling board are subject to Architects final decision
and design.
Where the Unit is provided with PES/Open Terrace, the Purchaser shall not
cover up or erect any roof or structure over or enclosing the PES/Open Terrace,
nor shall the Purchaser allow the PES/Open Terrace to be covered up or roofed over.
Television and/or Cable Television (SCV): Purchaser is responsible for paying
annual fee, subscription fees and such other fees to Singapore Cable Vision
Pte Ltd (SCV) or any other relevant authorities. Developer is not responsible
to make arrangements with SCV for the service connection to individual units.
Internet: The purchaser is liable to pay Asymmetrical Digital Subscriber Line
(ADSL) connection, annual fee, subscription fee and such other fees to Internet
Service Provider (ISP). The vendor is not responsible to make arrangements
with any said parties for the service connection for their respective subscription.
Recreational Facilities: All recreational facilities are subject to change/approval
by relevant authorities and/or technical requirement/compliance.
The brand, colour and model of all materials, fittings, equipment, finishes,
installations and appliances supplied shall be provided subject to Architects
selection, market availability.
Web portal of the housing project: The purchaser will have to pay annual fee,
subscription fee or any such fee to the service provider of the web portal of the
housing project as may be appointed by the vendor or the management
corporation with it is formed.
False Ceiling space provision allows for the optimal function and installation
of M&E services. Access panels are allocated for ease of maintenance access to
concealed M&E equipment for regular cleaning purposes. Where removal of
equipment is needed, ceiling works will be required. Location of false ceiling
is subject to the Architects sole discretion and final design.
Glass is manufactured material that is not 100% pure. Invisible nickel sulphide
impurities may cause spontaneous glass breakage, which may occur in all glass
by all manufacturers. The purchaser is recommended to take up home insurance
covering glass breakage to cover this possible event.
Where warranties are given by the manufacturers and/or contractors and/or
suppliers of any of the equipment and/or appliances installed by the Vendor at
the Unit, the Vendor shall assign to the Purchaser such warranties at the time
when possession of the Unit is delivered to the Purchaser.
Electrical Schedule
TYPE/HOUSE NO.

19

19A

21

21A

23

23A

25

LIGHTING POINT

37

38

38

37

37

37

39

13A SWITCH SOCKET OUTLET

45

45

45

43

45

45

47

TELEPHONE POINT

SCV TV POINT

BELL POINT

WATER HEATER POINT

COOKER HOOD POINT

COOKER HOB POINT

OVEN POINT

ISOLATOR FOR AIR-CONDITIONING

Another Prestigious Development


By TA Corporation Ltd

Parkway
Parade

East Coast Park

To City

Developer: Tiong Aik Investments Pte Ltd (199501550N) Developers Licence No.: C0963 Tenure of Land: Freehold Lot/Mukim No.: Lots 4680C & 7204X MK 28
BP Approval No.: A1553-00204-2011-BP01 dated 06 August 2012 Expected Date of Vacant Possession: 30 September 2016 Expected Date of Legal Completion:
30 September 2019.

ARTISTS IMPRESSION

ANGLE IN ON LIVING AT ITS FINEST


It's time to take a bold new look at the art of contemporary living, and time to discover how
beauty and functionality can come together in perfect geometry. Terra Villas presents a rare
collection of 7 strata terrace houses, each architectured to redefine luxury living as stunning
design meets exceptional comfort, and soothing greenery finds peace with exciting modernity.
The eye-catching facade exhibits a strong visual play with vertical strip patterns juxtaposed against
full-height windows, which also make for abundant natural light and ventilation. Within the walls
is living space ingeniously configured to provide warmth and comfort, with a soothing ambience
accentuated by exquisite fittings and perfect finishings. A central communal area and lush perimeter
greenery add the final touches, inviting residents to share in the experience of a joyful lifestyle.
Located amidst a prestigious residential enclave in the East, Terra Villas brings it all to you, with
shopping, leisure, entertainment, schools and other amenities in close proximity to add even
more attraction to living with a perfect angle.

SPECIFICATIONS

TA CORPORATION LTD

1. FOUNDATION
Reinforced concrete pile

We are currently known as TA Corporation Ltd after turning into a public listed company
(formerly known as Tiong Aik Group of Companies). We have retained our reputation for our
standard of excellence in developing premium homes and further built upon that, offering
you the best.

3. WALLS
a. External Walls
b. Internal Walls

2. SUBSTRUCTURE/SUPERSTRUCTURE
Reinforced concrete structure

4. ROOF
a. Flat Roof/ Terrace
b. Pitch Roof

23

5. CEILING
a. Family Room, Living,
Dining, Bedrooms, Yard,
HS, Car Park
b. All Bathrooms, Wet
Kitchen

23A
25

Recognised for our high quality housing in Singapore, TA Corporation is a significant developer
best known for our hallmark materials, stellar finishes and unwavering workmanship. Our team
of acclaimed consultants from architects to engineers to landscape artists set the gold standard
in providing lifestyle homes for your discerning tastes.

6. WALL FINISHES
Units
a. Family Room, Living,
Dining, Dry Kitchen,
Bedrooms, Balcony,
Roof Terrace
b. Master Bathroom/
Powder Room/
Common Bathrooms

At TA Corporation, we bring comfort, luxury and elegance to your homes.

c. Wet Kitchen, WC
(To exposed surface only)

21A

21

19A

19

Common area
a. External walls

Parc Seabreeze

7. FLOOR FINISHES
Units
a. Family Room, Living,
Dining, Dry Kitchen
b. Master Bathroom/
Powder Room/ Common
Bathrooms, Kitchen, WC
c. All Bedrooms
d. Balcony, Roof Terrace, PES

SA
VE

NU

E E
A

ST

Starlight Suites

16. PAINTING
a. External wall: Spray texture coating and/or emulsion paint finish
b. Internal wall: Emulsion paint finish

SIM

e. Internal Staircase
f. Car Park
Common area
a. Walkway, BBQ Area
b. Common staircase

20. ADDITIONAL ITEMS


a. Kitchen Cabinets

: Moisture resistance ceiling board with


emulsion paint (up to false ceiling and on
exposed area only)

b. Kitchen Appliances

: Cement and sand plaster and/or skim


coat with emulsion paint finish (up to false
ceiling and on exposed area only)

d. Wardrobe
e. Water-heater

: Natural marble and/or Homogenous


tiles and/or Ceramic tiles to false ceiling
height (up to false ceiling and on exposed
area only)
: Homogenous tiles and/or Ceramic tiles
(up to false ceiling height and exposed
area only) with back painted glass on
designated area
: Cement sand plaster with spray textured
coating and/or emulsion paint finish

: Natural marble with matching skirting


: Natural marble and/or Homogenous
tiles and/or Ceramic tiles
: Timber strip flooring with timber skirting
: Homogenous tiles and/or Ceramic tiles
with matching skirting
: Timber finish
: Concrete finish
: Granite and/or Homogeneous tiles
: Cement sand screed with nosing tiles

Landscape

Pavilion

Pedestrian Entrance

10. IRONMONGERY
Selected quality lockset to main door and other doors.

Reflective Pool

Basement Carpark Entrance

11. RAILING
Units
a. Roof Terrace, Balcony

Eunos Industrial
Estate
NEW

ER
UPP

CHA

NGI

The Cristallo
EW8

: Ceiling board and/or skim coat with


emulsion paint

BBQ Area

Common Area
a. Escape Staircase

Leoniehill Residences

19. RECREATIONAL FACILITIES


a. BBQ Area
b. Reflective Pool
c. Pavilion

9. DOORS
a. Basement Entrance Door
b. Main Entrance Door
c. All Bedrooms
d. All Bathrooms
e. Kitchen
f. Yard, Roof Terrace
g. PES
h. WC
i. HS

b. Internal Staircase
c. PES

CC9

RD

:
:
:
:
:
:
:
:
:

Approved fire rated timber door


Solid core timber flush door
Hollow core timber flush door
Hollow core timber flush door
Sliding frameless glass door
Aluminium framed glass door
Aluminium Frame Vertical Grille
UPVC door
Approved Metal blast door

: Bricks parapet with cement sand plaster


and/or tempered laminated glass with
stainless steel capping
: Stainless steel with glass panel
: Bricks parapet with cement sand plaster
with spray textured paint and/or emulsion
paint
: Galvanized mild steel with paint finish

12. SANITARY WARES AND FITTINGS


Units
a. Master Bathrooms
- 1 vanity top complete with basin, mixer tap and vanity cabinet
- 1 shower cubicle with shower screen with mixer, hand shower and rain shower
- 1 long bathtub with mixer
- 1 water closet
- 1 towel rail
- 1 toilet paper holder
- 1 mirror
b. Common Bathrooms
- 1 vanity top complete with basin, mixer tap and vanity cabinet
- 1 shower cubicle with shower screen with mixer and hand shower
- 1 water closet
- 1 toilet towel rail
- 1 paper holder
- 1 mirror
c. Powder Room
- 1 vanity top complete with basin, mixer tap and vanity cabinet
- 1 water closet
- 1 toilet paper holder
- 1 mirror
d. WC
- 1 wall hung basin with tap
- 1 hand shower
- 1 water closet
- 1 toilet paper holder
e. Yard, PES, Roof Terrace
- 1 bib tap
13. ELECTRICAL INSTALLATION
All electrical wiring to be in concealed conduits and/or in surface trunking/
pipes below false ceiling levels. (Refer to Electrical Schedule for details)
14. TV / TELEPHONE
Ample television points and telephone ready outlets shall be provided in the unit.

Gambir Ridge

15.LIGHTNING PROTECTION
Lightning protection system shall be provided in accordance with SS555.2010.

Tao Nan
Sch

112
Katong

To Changi Airport

18. DRIVEWAY AND CAR PARK


Basement carpark, driveway and ramp: RC slab with floor hardener

: Reinforced concrete with waterproofing


and insulation
: Metal roofing with insulation

8. WINDOWS
Powder coated aluminium frame with glass according to authority requirements.
Note: Color of frames and glass subject to architects selection.

JALAN SAYANG

Coralis

: Reinforced Concrete and/or bricks


: Reinforced Concrete and/or bricks

17. WATERPROOFING
Waterproofing to Basement, Bathrooms, Powder Room, Wet Kitchen, Balcony,
Roof Terrace, PES, AC ledge, where applicable

c. Air-conditioning

f. Intercom System
g. Security System
h. Cable Vision

: Solid surface counter top complete with


high and low level kitchen cabinets with
sink and tap
: (Dry Kitchen) Electrical hob and microwave
(Wet Kitchen) Gas hob, hood and oven
: Split type wall-mounted air-conditioning
system to Family room, living, dining and
all bedrooms
: Built in wardrobe to all bedrooms
: Hot water supply from electric storage water
heater to all bathrooms and kitchen
: Audio Video Intercom system to all units
: Auto swing gate for vehicular access with
wireless remote control and proximity
card access system for pedestrian gate
: Provision of cable outlet only for cable
vision services

Note:
Marble/ Granite: Marble and granite is a natural material containing veins with
tonality differences. There will be colour differences and marking caused by
their complex mineral composition and incorporated impurities. While such
materials can be pre-selected before installation, this non-conformity cannot
be totally avoided. Granite are pre-polished before laying and care has
been taken for their installation. However, granite being a much harder
material than marble, cannot be re-polished after installation. Hence, some
differences may be felt at the joints. The tonality and pattern of marble,
limestone or granite selected and installed shall be subject to availability.
Timber: Timber is a natural material that does not have total consistency of
colour and grain. Thus it is not possible to achieve a total consistency of colour
and grain in their selection and installation. Timber strip also subject to
thermal expansion and contraction beyond the control of builder and vendor.
Natural timber that is used outdoor will become bleached due to sunlight and
rain. Thus, the cycle of maintenance on staining wall need to be increase as
required. Notwithstanding this note, the vendor shall remain fully responsible
for the performance of its obligations.
Tiles Finishes: Selected tiles sizes and tile surface flatness cannot be perfect and
are subject to acceptable ranged described in Singapore Standards SS483:2000
Sanitary Wares/Fittings: Brand and model of all sanitary wares/fittings
supplied will be provided subject to availability.
Air-conditioning: Air-conditioning system has to be maintained and cleaned
on a regular basis by the Purchaser. This includes the cleaning of filters and
clearing the condensate pipes to ensure that the system be in good working
condition. The purchaser is advised to engage his/her own contractor to service
the air-conditioning system regularly.
Mechanical Ventilation System: Mechanical ventilation fans and ducting are
provided to toilets which are not naturally ventilated. To ensure good working
condition of the system, the exhaust system within internal toilets, where
applicable, is to be maintained by the purchaser on a regular basis.
No tiles behind/below kitchen cabinet, long bath and mirror. Wall surface above
the false ceiling level will be left in its original bare condition.
Layout/location of wardrobe, kitchen cabinets, fan coil units, electrical points,
television points, telecommunication points, audio intercom system, door
swing positions and plaster ceiling board are subject to Architects final decision
and design.
Where the Unit is provided with PES/Open Terrace, the Purchaser shall not
cover up or erect any roof or structure over or enclosing the PES/Open Terrace,
nor shall the Purchaser allow the PES/Open Terrace to be covered up or roofed over.
Television and/or Cable Television (SCV): Purchaser is responsible for paying
annual fee, subscription fees and such other fees to Singapore Cable Vision
Pte Ltd (SCV) or any other relevant authorities. Developer is not responsible
to make arrangements with SCV for the service connection to individual units.
Internet: The purchaser is liable to pay Asymmetrical Digital Subscriber Line
(ADSL) connection, annual fee, subscription fee and such other fees to Internet
Service Provider (ISP). The vendor is not responsible to make arrangements
with any said parties for the service connection for their respective subscription.
Recreational Facilities: All recreational facilities are subject to change/approval
by relevant authorities and/or technical requirement/compliance.
The brand, colour and model of all materials, fittings, equipment, finishes,
installations and appliances supplied shall be provided subject to Architects
selection, market availability.
Web portal of the housing project: The purchaser will have to pay annual fee,
subscription fee or any such fee to the service provider of the web portal of the
housing project as may be appointed by the vendor or the management
corporation with it is formed.
False Ceiling space provision allows for the optimal function and installation
of M&E services. Access panels are allocated for ease of maintenance access to
concealed M&E equipment for regular cleaning purposes. Where removal of
equipment is needed, ceiling works will be required. Location of false ceiling
is subject to the Architects sole discretion and final design.
Glass is manufactured material that is not 100% pure. Invisible nickel sulphide
impurities may cause spontaneous glass breakage, which may occur in all glass
by all manufacturers. The purchaser is recommended to take up home insurance
covering glass breakage to cover this possible event.
Where warranties are given by the manufacturers and/or contractors and/or
suppliers of any of the equipment and/or appliances installed by the Vendor at
the Unit, the Vendor shall assign to the Purchaser such warranties at the time
when possession of the Unit is delivered to the Purchaser.
Electrical Schedule
TYPE/HOUSE NO.

19

19A

21

21A

23

23A

25

LIGHTING POINT

37

38

38

37

37

37

39

13A SWITCH SOCKET OUTLET

45

45

45

43

45

45

47

TELEPHONE POINT

SCV TV POINT

BELL POINT

WATER HEATER POINT

COOKER HOOD POINT

COOKER HOB POINT

OVEN POINT

ISOLATOR FOR AIR-CONDITIONING

Another Prestigious Development


By TA Corporation Ltd

Parkway
Parade

East Coast Park

To City

Developer: Tiong Aik Investments Pte Ltd (199501550N) Developers Licence No.: C0963 Tenure of Land: Freehold Lot/Mukim No.: Lots 4680C & 7204X MK 28
BP Approval No.: A1553-00204-2011-BP01 dated 06 August 2012 Expected Date of Vacant Possession: 30 September 2016 Expected Date of Legal Completion:
30 September 2019.

ARTISTS IMPRESSION

ANGLE IN ON LIVING AT ITS FINEST


It's time to take a bold new look at the art of contemporary living, and time to discover how
beauty and functionality can come together in perfect geometry. Terra Villas presents a rare
collection of 7 strata terrace houses, each architectured to redefine luxury living as stunning
design meets exceptional comfort, and soothing greenery finds peace with exciting modernity.
The eye-catching facade exhibits a strong visual play with vertical strip patterns juxtaposed against
full-height windows, which also make for abundant natural light and ventilation. Within the walls
is living space ingeniously configured to provide warmth and comfort, with a soothing ambience
accentuated by exquisite fittings and perfect finishings. A central communal area and lush perimeter
greenery add the final touches, inviting residents to share in the experience of a joyful lifestyle.
Located amidst a prestigious residential enclave in the East, Terra Villas brings it all to you, with
shopping, leisure, entertainment, schools and other amenities in close proximity to add even
more attraction to living with a perfect angle.

You might also like