TECHNICAL SUBMISSION

SECTION C PART 2

PROJECT SPECIFICATION
SECTION 1: GENERAL

GENERAL REQUIREMENTS
AND SPECIFICATIONS
1.

PROJECT SPECIFIC SPECIFICATIONS


The following clauses delete, substitute, amend, supplement, or are additional to the
clauses in the various sections of QCS 2010:

SECTION 1 PART 1

INTRODUCTION

Delete sub clauses 1.4.2 and 1.4.5 and substitute with the following:
1.4.2

THE CONTRACT
This Contract is between the Public Work Authority of the State of Qatar and the
Contractor for the design, construction and completion of the works in accordance
with employers requirements described in Section C of this document.

1.4.5

THE ENGINEER
Engineer means the person appointed by the Employer to act as Engineer for the
purposes of the Contract and named as such in the Appendix to Tender, or other
person appointed from time to time by the Employer and notified as such to the
Contractor.
Add new clause as follows:

1.7

OTHER REQUIREMENTS

1.7.1

Site Specific Geotechnical Requirements

The Contractors attention is drawn to the ground conditions likely to be encountered


in the area as provided for information in Geotechnical Investigation Report provided
under the Preliminary Engineering Design Report which is part of this tender
package. Construction works may involve excavation in very hard rock and in filled
and reclaimed land and excavations below the level of the ground water table. The
Contractor should assess and make allowance for working in such conditions.

1.7.2

Blasting Requirements

The Contractors attention is drawn to the fact that the Works may be
constructed in developed areas where blasting may be restricted.
Add new clause as follows:

1.8

PROGRAMME

1.8.1

The Contract Programme includes preparing the design of the permanent works
and securing approval for the design from the Employer prior to construction
commencement.

IA 12/13 C 057 ST
C2/S1/1
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2

PROJECT SPECIFICATION
SECTION 1: GENERAL

Primavera version 6 shall be used for producing the programme.


SECTION 1 PART 1A
1

GENERAL RESPONSIBILITIES FOR UTILITY WORKS

The contractor shall be responsible for liaison with Public Utility Departments
with regards to the overall coordination and programming of utility works.
No trench or chamber excavation will be permitted until:i)

The locations and depth of all existing services have been established by trial
holes to the satisfaction of the Engineer.

ii)

The contractor has provided the Engineer with accurate setting out information
for the line and level of the proposed utility installation.

iii)

The Engineer has confirmed the accurate setting information for the line and
levels of the proposed utility installation.

The contractor shall include for the requirements of this clause in his programme of
works and his Bill of Rates.
The contractor shall be responsible for arranging, providing and maintaining all road
closures and traffic diversions required by the works with the Traffic Police
Department and the Engineer.
The contractor shall be responsible for liaison with the concerned authorities for
obtaining all necessary building permits for any new building/structure related to the
public utility departments.

IA 12/13 C 057 ST
C2/S1/2
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2
PART 3

SITE ACCESS AND ENTRY ONTO THE SITE

3.2

ACCESS ROADS

3.2.1

Temporary Access Roads

PROJECT SPECIFICATION
SECTION 1: GENERAL

Delete paragraph 2 and substitute with the following:


2

Reinstatement shall include restoring the area of any route to at least the degree of
safety, stability, drainage, level, contour and landscaping that existed at the time the
Contractor is given Possession of Site.

3.3

SITE ENTRY

3.3.1

Entry onto the Site


Delete paragraph 3.
Add new paragraph 8 as follows:

The work permit for plants, which are under operation by PWA Operations and
Maintenance Department will be issued as per 'Operations and Maintenance
Department Permit Procedure' based on the Contractors application through the
Engineer or his designated representative.

IA 12/13 C 057 ST
C2/S1/3
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2
PART 4

PROTECTION

4.3

PROTECTION OF OTHER WORKS

4.3.2

Procedure for Complaints and Claims for Damage

PROJECT SPECIFICATION
SECTION 1: GENERAL

Delete paragraph 1 and substitute with the following:


1

Details of all claims for damage or warning of intended claims for damage which the
Contractor may receive shall be brought to the attention of the Engineer without
delay. Likewise, any such claims or warnings, which may be submitted directly to
the Engineer, shall be passed on to the Contractor without delay.

4.3.3

Protection of Survey Control Points


Add new paragraphs 4 to 7 as follows:

The Contractor shall consult the Survey Section of the Ministry of Municipality and
Urban Planning (MMUP) and Public Works Authority (PWA) prior to the
commencement of any works to determine if the work is likely to disturb survey
marks. If the Survey Section requires a survey mark to be moved the Contractor
will be responsible for recreating the survey mark to an approved design and
specification, and for resurveying the point using survey companies approved by
the Survey Section.

The Contractor shall be responsible for the protection of the survey marks within the
boundaries of the Site for the duration of the Contract and shall be liable for all
costs of any remedial work required by the Survey Section.

Prior to the issuing of the Certificate of Completion of Works the Survey Section will
issue a certificate stating that all survey marks, whether disturbed or otherwise by
the Contractor, have been reinstated or protected to the satisfaction of the Survey
Section.

In the event of failure to comply with the requirements of this Clause the PWA,
without prejudice to any other method of recovery, may deduct the costs of any
remedial work after the Time for Completion carried out by the Survey Section, from
any monies in its hands or which may become due to the Contractor.

IA 12/13 C 057 ST
C2/S1/4
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2
PART 5

INTERFERENCE

5.2

GENERAL

5.2.1

Land Interests

PROJECT SPECIFICATION
SECTION 1: GENERAL

Delete paragraph 3 and substitute with the following:


3

The Contractor shall notify the Engineer in writing of his intention to utilise any land
outside the Site and obtain the written approval of the Engineer before approaching
any landowner for use of their land.
Add new paragraph 4 as follows:

Before exercising any right negotiated by him in connection with using land outside
the Site, the Contractor shall notify the Engineer in writing of such arrangements.
The details of the arrangement shall include drawings and description of the land to
be used, purpose of its use and duration of the Contractors use of the land

5.2.2

Existing Properties
Delete paragraph 1 and substitute with the following:

The Contractor shall obtain the approval of the Engineer before interfering with
access to any property, and shall also obtain the approval of the Engineer to any
alternative access arrangements.
Add new paragraph 2 as follows:

The Contractor shall notify the Engineer and the relevant owners and occupiers in
writing fourteen (14) days in advance of any such interference and shall confirm to
the Engineer that the alternative arrangements have been agreed with the relevant
owners and occupiers.

5.2.3

Existing Roads
Add new paragraph 4 as follows:

The Contractor shall be held responsible for any damage caused by him,
Contractor's Employees, sub-contractors or suppliers to public or private roads,
paved areas, paths verges, trees, shrubs, fences, boundary walls, gates, signs,
drains, ducts and services arising out of or by reason of the execution of the Works
and shall bear the cost of making good any damage to the entire satisfaction of the
local and other authorities and owners. The Contractor shall keep all private roads
and paths clean and free from dirt and debris and any obstruction associated with
the Works, which would prejudice the safe and unimpeded normal use of the said
roads and paths.

IA 12/13 C 057 ST
C2/S1/5
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2
PART 7

SUBMITTALS

7.9

PHOTOGRAPHS

7.9.1

General

PROJECT SPECIFICATION
SECTION 1: GENERAL

Add new paragraph 5 as follows:


5

The Contractor shall provide six digital cameras and one digital video camera for
the exclusive use of the Engineer or his designated representative and supply
software, batteries, cables and USB flash drives or external hard drives as required.
The digital camera shall have a minimum specification of 35105 zoom, with a
minimum of 10.0 megapixels for prints up to 20 x 30, 4GB internal memory and
video/audio facility. The cameras shall be returned to the Contractor at the end of
the contract period.

7.9.2

Pre-Construction Photographs
Delete paragraph 1 and substitute with the following:

The Contractor shall arrange to obtain a photographic and video record of the Site
before the start of the Works to fully record the existing conditions of the Site and
other matters of interest in connection with the Works or their surroundings of the
Project, by taking photographs and video films from positions agreed with the
Engineer. Two number 125 x 90 mm prints of each photograph and a digital copy of
the photographs/video film on a CD shall be handed to the Engineer within 7 days
of the photographs/videos being taken. Any photograph/video which is not clear
and distinct, double exposed, over exposed, blurred, etc., shall be retaken until
approved by the Engineer at the Contractors expense.

7.9.3

Monthly Photographs and Videos


Delete paragraph 1 and substitute with the following:
The Contractor shall take photographs during the course of the Works in order to provide a
visual record of the Works and their construction, from positions agreed with the Engineer.
Two number 125 x 90 mm prints of each photograph and a digital copy on CD shall be
handed to the Engineer within 7 days of the photographs being taken.

Add new Sub-Clause 7.9.4 as follows:


7.9.4

Monthly Photographs/Videos

The Contractor shall obtain photographic and video records showing the progress of
the Works in every month, and or as necessary, in order to provide sufficient visual
evidence of the progress and to record the specialized events features of the Works
or other matters of interest in connection with the Works or their surroundings of the
Contract. Such media documentation shall be submitted to the Engineer in the form
of an accepted media documental presentation, as and when required during the
progress of the Works and as a complete package at the completion of the Contract.
Two number 125 mm x 90 mm prints of each photograph and a digital copy of the
photographs/video film on a CD shall be handed to the Engineer within 7 days of the

IA 12/13 C 057 ST
C2/S1/6
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2

PROJECT SPECIFICATION
SECTION 1: GENERAL

photographs/videos being taken. Any photograph/video which is not clear and


distinct, double exposed, over exposed, blurred, etc., shall be retaken until approved
by the Engineer at the Contractors expense.
7.10

AS BUILT DOCUMENTS
The following are to be read in conjunction with QCS 2010, Section 1, Part 7, Clause
7.10 Drawings. The following provisions have precedence over the corresponding
provisions of QCS 2010.

7.10.1

Drawings to be provided by the Contractor


The Contractor shall be required to provide soft and hard copies submissions of all As Built
Documents prior to the issue of the Certificate of Completion as per the relevant provisions
detailed within the standards and specifications, as cited within the Tender Documents. As
Built Documents include As Built Drawings and plans, As Built Survey Drawings and As Built
Record Drawings:-

As Built drawings and Survey drawings are based on topographical surveys that
show changes to topography as a result of the construction of the Works, including
but not limited to, the construction of new assets (such as structures and roads),
demolition of existing structures and roads and the like. The As Built Survey
Drawings shall form a comprehensive record of the topographical changes resulting
from the construction of the Works in all respects. The As Built Survey Drawings
shall also show all sub-surface elements of the Works, including but not limited to,
pipelines, ducts, cables, chambers, manholes and the like. The As Built Survey
Drawings shall form a comprehensive record of above and sub-surface physical
elements of the Works as constructed in all respects.

As Built Record Drawings are drawings that show the Works as constructed in all
respects. They are in addition to the elements of the Works shown on the As Built
Survey Drawings, and should include, at least, all finished horizontal and vertical
alignments, chainages, setting out, levels, and details. They shall also include all
underground services, utilities, surface features, and any additional information
deemed necessary to comprehensively represent the works.
No later than the date on which the Contractor shall apply by notice to the Engineer
for a Certificate of Completion, the Contractor shall supply to the Engineer the AsBuilt Documents for all Design and for all Constructed Elements, inclusive of:(i)

As Built drawings as specified in Appendix A herein (Information To Be


Supplied As part of As Built Documents).

(ii)

For Road Structures, the As Built, Operational and Maintenance Records to


be in accordance with BD 62 of the UK DMRB, and for any road structure
designed, it should include a fully indexed and referenced set of Design and
Design Check calculations (certified by the Designer and Checker).

(iii)

For all Elements, the following shall be provided:-

IA 12/13 C 057 ST
C2/S1/7
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2

PROJECT SPECIFICATION
SECTION 1: GENERAL

a)

One copy of each of the drawings specified in Appendix A herein


(Information To Be Supplied As part of As Built Documents) on A1
size paper clearly marked "As Built Drawing" in red, and

b)

Digital "soft" copies of all the As-Built Documents in Autodesk's


AutoCAD Civil 3D format (surveys/drawings/records/schedules), and
other deliverable formats such as Microsoft Word, Excel or Access as
appropriate, in a suitable and as appropriate storage medium (such
as a CD-ROM) with a lifetime warranty, to enable transfer, upload
and integration to PWAs systems (according to its standards) and
MMUP CGIS's 3D City Model and its GIS system.

(iv)

If any design of roadway elements is undertaken, a completed Roads Design


Criteria certificate, for every designed section, in the form set out in Appendix
B herein.

(v)

An Execution and Completion Report identifying the actual types of materials


and execution that were used throughout the Works. The Execution and
Completion Report shall:a)

Summarize the information obtained by the laboratory or field tests on


the road materials employed in the Works;

b)

Comment on the remedial and corrective actions taken;

c)

Discuss points of interest or the use of "unusual" and "special"


materials and methods of execution;

d)

Contain a statement setting out the problems and defects


encountered during the execution of the Works and how they were
overcome or rectified.

e)

Record material compliance, such as certification, quality assurance,


external testing and otherwise; and

f)

Form a complete record of sampling and testing data.

For the purposes of these As Built Documents, a defect shall mean a failure of any
component in the Works during the execution of the Works, including, deterioration
in the road pavement including chip loss, unexpected movement of earthworks
slopes, evidence of poor drainage and subsequent identification of the use of
materials within the Works that would not have met the requirements of the Design
and/or the Specification.
Notwithstanding any other provisions of the Contract, the Contractor shall supply to
the Engineer within 7 days after the latest of the expiry dates of the Warranty
Periods, As-Built Documents as follows:(i)

Where applicable, a Supplementary Report setting out any changes to the


As-Built Documents

(ii)

A Roadworks Maintenance Manual which shall include, but shall not be


limited to, all relevant details in respect to constructed and/or designed
elements, cross referenced where necessary to information compiled

IA 12/13 C 057 ST
C2/S1/8
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2

PROJECT SPECIFICATION
SECTION 1: GENERAL

elsewhere as part of the As-Built Documents, and shall comprise Design


information, Materials details, as well as, Maintenance facilities, procedures,
manuals and list of drawings, as relevant to each element constructed and/or
designed and referenced to those provided elsewhere as part of the As Built
Documents.
Notwithstanding any other provisions of the Contract, the Contractor shall store all
records relating to the Design and execution of the Works and the remedying of
defects in good condition for a period of three months from the end of Defects
Liability Period for the Works. At the end of this period the Contractor shall supply,
free of charge, a copy of these records to the Employer and may thereafter destroy
or dispense with such records.
All As Built Documents shall be completed by the Contractor and submitted to the
Engineer prior to the issue of a Certificate of Completion.

IA 12/13 C 057 ST
C2/S1/9
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2

PROJECT SPECIFICATION
SECTION 1: GENERAL

APPENDIX A Information to Be Supplied As Part of As Built Documents


The drawings, plans, records, schedules and other information detailed herein shall be provided
as appropriate to form one or multiple composite document elements incorporating information
on individual structures making up the works. A separate group of as-built documents would
need to be established for major structures such as a tunnel.
Notwithstanding any other provisions of the Contract, the format, media and numbers of copies
of the As Built Documents shall be agreed between the Contractor and the clients
Representative.
The As Built Documents shall:1.

Be compiled and delivered, no later than the date on which the Contractor shall apply by
notice to the Engineer for a Certificate of Completion of the overall project or on a
structure-by-structure basis as appropriate.

2.

Be of sufficient details for the constructed assets, in terms of attributes coverage of As


Built Documents, to meet the needs of on-going operation and maintenance
management.

3.

Contain an index listing of all drawings and other information provided with particular
reference to other records to which cross-referencing is made.

4.

Where the project involves alterations or additions to roads, assets or other features
outside the lands made available by the client for the works and the lands made
available to the Contractor for the works, the information pertaining to such, shall be
separately identified so that it can be passed to the "'owner" of the roads, assets or
other features, (this also includes Accommodation Works undertaken on other than
private domestic properties), in such cases it shall not be acceptable to cross-refer to
other records and the As Built Documents shall be submitted as standalone. This shall
be particularly so for structures where information to BD 62 of the UK DMRB shall need
to be separately provided.

5.

Be referenced to the general road network (as acceptable by the Clients


Representative) so that it can be easily accessed and updated when future Works or
maintenance are undertaken.

Notwithstanding any other provisions of the Contract, The As Built Documents shall cover as a
minimum, As Built Drawings covering Schemes, General arrangement, Drainage, Carriageway,
pavement, structures, Fencing, Safety barrier systems, road markings, Traffic Signs, Lighting,
utilities networks, equipment, ITS, related stakeholders ancillary assets such as utilities
companies and any associated legislative and approval documents acquired as part of works
execution.

IA 12/13 C 057 ST
C2/S1/10
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2

PROJECT SPECIFICATION
SECTION 1: GENERAL

APPENDIX B As Built Roads Design Criteria Certificate


(Note, the completion of the below certificate is subject to the inclusion of designed
elements / parameters within the Contract)

IA 12/13 C 057 ST
C2/S1/11
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2
PART 9

MATERIALS

9.3

TESTING OF MATERIALS

9.3.1

General

PROJECT SPECIFICATION
SECTION 1: GENERAL

Delete paragraph 9 and substitute with the following:


9

The laboratory shall be provided with equipment and trained personnel sufficient for
carrying out all the tests for earthworks, subbase / road base, concrete, asphalt,
etc. referred to in the Specification. The laboratory shall be capable of carrying out
all the relevant tests at the frequency required by the Specification and by the rate
of progress required by the Contractors approved programme for the Works.

IA 12/13 C 057 ST
C2/S1/12
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2

PROJECT SPECIFICATION
SECTION 1: GENERAL

PART 10

HEALTH AND SAFETY

10.1

GENERAL

10.1.1

Scope
Delete paragraph 2 and substitute with the following:

Related Sections and Parts are as follows:


This section

Part 4 Protection
Part 11 Engineers Site Facilities

Section 2
Section 11
Section 11

Part 3
Part 1
Part 2

Hazardous Materials
Regulatory Document
SAMAS

10.7

WELFARE OF WORKMEN

10.7.2

Safety Equipment
Add new paragraphs 9 and 10 as follows:

The Contractor shall provide and maintain in good working order one compressed
air escape respirator set (Drger Saver Auto PP or similar) in the Contractors site
office.

10

One oxygen resuscitation unit shall be provided in the Contractors site office.

10.7.3

Support Facilities for Contractors Staff and Labour


Delete paragraph 5 and substitute with the following:

The Contractor shall provide transportation between staff accommodation and


areas of work for his staff and labourers.
Add new Sub-Clauses 10.7.5 and 10.7.6 as follows:

10.7.5

Additional Environmental Protection and Pollution Control

The Contractor shall comply with all conditions of Environmental Clearance issued
for the Contract by the Ministry of Environment (MoE), and also where relevant, the
predecessor to the MoE, the Supreme Council for the Environment and Natural
Reserves.

The Contractor shall comply with all rules and regulations regarding environmental
protection and pollution control issued by the MoE, and also where relevant, the
predecessor to the MoE, the Supreme Council for the Environment and Natural
Reserves.

IA 12/13 C 057 ST
C2/S1/13
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2

PROJECT SPECIFICATION
SECTION 1: GENERAL

10.7.6

Plant and Equipment Test Certificates

Cranes, whether used to construct the Works or provided as part of the permanent
Works, must have a current test certificate.

Each sling, shackle or other item of loose lifting tackle, whether used to construct
the Works or provided as part of the permanent Works, must have either a current
manufacturers test certificate or a current test certificate.

Test certificates must be issued by a competent testing authority approved by the


Engineer.

The Contractor must have a copy of each test certificate on-site available for
inspection by the Engineer.

The following British Standards and Code of Practice shall be complied with:
(a)
(b)
(c)
(d)
(e)

Mobile and Tower Cranes: BS 1757, BS 2799 and CP 3010


Overhead Cranes: BS 466 and BS 5744
Slings: BS 1290
Chain Blocks: BS 3243
Shackles: Alloy: BS 3551, High Tensile Steel: BS 3032

IA 12/13 C 057 ST
C2/S1/14
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2

PROJECT SPECIFICATION
SECTION 1: GENERAL

PART 11 ENGINEERS SITE FACILITIES


11.2

ENGINEERS SITE OFFICES

11.2.1

General
Replace paragraph 1 with the following:

The Contractor shall provide, maintain and remove on completion of the Works the
Engineers Site Offices Type 3. The position and location of the site offices shall be
subject to the approval of the Engineer.
Add new Sub-Clause 11.2.5 as follow:

11.2.5

Engineers Site Office Furniture and other Equipment

All furniture and equipment for the Engineers Site Office Type 3 shall be fit for its purpose,
and is to be new, of high quality and durability to sustain heavy duty usage, requiring least
maintenance, to the approval of the Engineer. The list of furniture and equipment
requirements is given below.

The Contractor shall provide, maintain and keep clean and in a sanitary condition,
temporary site office facilities with all associated equipment and services for the
exclusive use of the PWA representative, the PMCs staff and the Engineer's
Representative and his staff from the commencement of the Project. The site office
facilities shall remain, in whole or in part as required by the Engineer until the end of
the Maintenance Period, or such earlier time as the Engineer may approve.

The Contractor shall proceed with the site office facilities immediately following the
award
of
the
Contract
and
shall
provide
temporary
alternative
accommodation/offices to the Engineers approval until such time as the site office
facilities are made available.

The Contractor shall submit all necessary specifications, drawings and calculations
for the fabrication and installation of the site office facilities no later than 14 days
after the commencement date, showing the accommodation proposed complete with
furnishings, equipments and fittings for the Engineer's approval before placing any
orders or commencing fabrication and construction and shall be responsible for
ensuring that the offices are structurally sound. The Engineer may request
alterations at this stage. The drawings shall be approved in writing by the Engineer
before installation / construction shall commence.

The site office facilities shall conform to the general configuration shown below and
shall be either prefabricated portable unit/s or of other form of weatherproof design
and construction to the approval of the Engineer. The facilities shall have full
partitions and room sizes shall be as shown in the attached Schedule of offices. All
rooms shall have individual entrance doors. Corridors and entrance areas shall be
additional to the office sizes. Corridors shall be a minimum width of 2.0 metres. The
Contractor may propose open plan style offices with suitable rooms for the
Engineers consideration and approval. The Contractor shall insure the site offices
against fire, burglary and other risks.

IA 12/13 C 057 ST
C2/S1/15
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2

PROJECT SPECIFICATION
SECTION 1: GENERAL

The site office facilities shall be mounted on adequate concrete foundations and
shall be provided with concrete access steps where necessary. Walls and roofs of
the facilities may be constructed of composite timber framed panels with metal
cladding, or alternative forms to the Engineers approval, with thermal conductance
of 0.60 w/m2 C and fire resistance of one hour. Roof coverings shall be selected for
durability, freedom from excessive maintenance, and the ability to withstand extreme
exposure to sun, heat and humidity. All rooms shall have glazed windows complete
with fly screens.

The offices shall be air-conditioned with the exception of toilets and kitchen areas.
The offices shall be air-conditioned with dual (cooling/heating) split type units to
maintain each room at a maximum steady dry bulb temperature between 20C and
25C at a relative humidity of 50% under the expected climatic conditions expected
at the Site. Extract fans capable of 10 air changes per hour shall be provided in the
kitchen and toilets.

Adequate fitted hardware, electrical switches, sockets, lighting and plumbing fittings,
sanitary ware and fittings and fixtures etc., shall be provided as necessary for the
different areas. The electrical installation shall provide for simultaneous use of all
electrical appliances. The installation and testing of wiring and electrical equipment
shall be in accordance with the latest requirements of the Qatar General Electricity &
Water Corporation.

Throughout the duration of the Contract, the Contractor shall ensure adequate
uninterrupted supplies of clean fresh water, electricity, telephones, fax machines,
internet connections to all computers, refreshments, waste paper baskets, filing
trays to the offices.

10

The Contractor shall provide all typical items listed in the following schedules, and
final configuration shall be as specified by the Engineer. All keys for the Engineers
site offices shall be held by the Engineer until such offices are removed or vacated
by the Engineer.

11

Unless noted otherwise within the following schedules, as a minimum each office
shall be provided with the following furniture to the approval of the Engineer:

12

1 No. kneehole pattern desk with lockable drawers, 1500x800x760mm in size.


1 No. swivel chair with armrests.
1 No stacking or folding chairs
1 No. hanging file or plan chest suitable for AO size prints.
1 No. wastepaper basket.
1 No. two drawer filing cabinet.
1 No. wall mounted pin board, 1000x2000mm in size.

Unless noted otherwise within the following schedules, as a minimum each toilet
shall be provided with the following sanitary fittings to the approval of the Engineer
and an adequate supply of hot and cold water at all times:

3 No. low level WC suite.


3 No. wash-hand basin.
1 No. shower tray, mixer fittings, rose and shower curtains.
3 No. toilet roll holder, towel rail, soap dish and mirror.

IA 12/13 C 057 ST
C2/S1/16
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2

13

PROJECT SPECIFICATION
SECTION 1: GENERAL

1 No. hand/face dryer


Adequate supply of paper towels

Unless noted otherwise within the following schedules, as a minimum, the sample
room shall be provided with the following furniture to the approval of the Engineer:

2 No. tables, each approximately 1200x2000mm in size.


folding or stacking chairs
1 No. wall mounted blackboard, 1000x2000mm in size.
1 No. wall mounted pin board, 1000x3000 mm in size.
1 No. shelf unit for approved samples with 5 tiers of shelves, 400mx2400mm
overall.

14

Unless noted otherwise within the following schedules, as a minimum, the Archives
and the storage room shall be provided with adequate storage racking or shelving
for the archiving of documents all to the approval of the Engineer.

15

Unless noted otherwise within the following schedules, as a minimum, the server
room shall be air-conditioned with dual (cooling/heating) split type unit to maintain
the room at a maximum steady dry bulb temperature of 20C at a relative humidity of
50% under the climatic conditions expected at the Site. In addition it is to be fitted
out with an environmental monitoring system, and video surveillance all to the
approval of the Engineer.

16

Unless noted otherwise within the following schedules, as a minimum, the meeting
room shall be provided with the following furniture to the approval of the Engineer:

17

Very long meeting table and chairs to suit room size.


42 flat plasma TV, a VCR/DVD, a ceiling mounted projector, computer
connections
1 No. wall mounted white board, 1000x2000mm in size.
1 No. wall mounted pin board, 1000x3000 mm in size.
1 No. wall mounted folding screen, 2000x3000mm in size, for presentations
1 No. shelf unit for approved samples with 5 tiers of shelves, 400mx2400mm
overall.

Unless noted otherwise within the following schedules, as a minimum, the kitchen
shall be provided with the following equipment to the approval of the Engineer:

1 No. stainless steel dual bowl drainer sink, hot and cold taps, cupboards
underneath.
4 ring cooker, 1 micro-wave
Cabinets and shelves to match sink, as required.
1 No. 20 cu.ft refrigerator
Sufficient capacity electrical kettles and crockery and cutlery.
A suitable number of cups, saucers and drinking glasses.

18

Corridors shall be provided with three portable dry powder fire extinguisher and 4
water coolers.

19

The offices shall be equipped with fire and smoke detectors in each room and/or
corridor to be fully maintained by the Contractor.

IA 12/13 C 057 ST
C2/S1/17
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2
20

PROJECT SPECIFICATION
SECTION 1: GENERAL

Offices and the Contractors Office compound are to be smart in appearance with a
solid boundary fence with Ashghal logos (as per attached example ASHGHAL
Standard Hoarding Skins for Expressway Programme, Drawing No. EXW-GENL0000-PO-ASH-DG-00042 Rev. A), all to be to the approval of the Engineer.
All site office structures including Contractors site offices should closely align with
ASHGHALs brand colours as long as safety on site is in no way compromised. The
colour proposed for site offices shall be to the approval of the Engineer.
The hoarding shall be made of steel sheet covered with outdoor tarpaulin of 2.4
metre height to be approved by the Engineer. The Steel hoarding shall be 2.4
metres high Continuous Steel hoarding with 2.4 metres Powder Coated Sheets and
Rails, with surface mounted concrete blocks 400 mm x 400 mm x 600 mm. The top
rail will be 2.4 metre from the ground. The fencing will be backed stayed every 2.5
metres. The Hoarding consists of 0.7mm Profile Steel sheet and rails polyester
powder. The hoarding is to be suitable for the fixing of advertising fabric.
The graphics will be in a good resolution printed on a tarpaulin suitable for outdoor
use; the project pictures to be electronically provided by the Engineer. A minimum of
2 pcs- 7 metres wide galvanized mesh vehicle gates and 2 pcs-1.2 metres wide
galvanized pedestrian gates will be provided on each enclosed area.
In addition the Site Offices are to be provided with a Project Sign Board (as per
attached ASHGHAL Standard Sign Board, Drawing No. EXW-GENL-0000-PO-ASHDG-00041 Rev. C), to the approval of the Engineer. Rev C introduces a revamped
standard ASGHAL signboard design, along with an elaboration on project signboard
requirements.

21

Smoking room shall be separate from the office. It shall have adequate seating
arrangement and floor standing sanded ashtrays. Room shall be fitted with Extract
fans capable of 10 air changes per hour.

22

Mosque/prayer room is to be provided and floor shall be suitably carpeted.

23

Offices shall be to the approval of the Civil Defence Department and shall be
provided with a valid Fire Safety Certificate.

IA 12/13 C 057 ST
C2/S1/18
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2

PROJECT SPECIFICATION
SECTION 1: GENERAL

Type 3: Engineers Site Offices


Room

Post

Room Size

No.

Remarks

Supervision Consultant

8m x 4m

w/ Toilet + Shower complete

Supervision Consultant

4m x 4m

Supervision Consultant

4m x 4m

Supervision Consultant

4m x 4m

Supervision Consultant

4m x 4m

Supervision Consultant

4m x 4m

Supervision Consultant

4m x 4m

Supervision Consultant

4m x 4m

Supervision Consultant

4m x 4m

10

Supervision Consultant

6m x 4m

11

Supervision Consultant

4m x 4m

12

Supervision Consultant

4m x 4m

13

Supervision Consultant

4m x 4m

14

Supervision Consultant

4m x 4m

15

Supervision Consultant

4m x 4m

16

Supervision Consultant

4m x 4m

17

Supervision Consultant

4m x 4m

18

Supervision Consultant

4m x 4m

19

Supervision Consultant

4m x 4m

20

Supervision Consultant

8m x 4m

21

Supervision Consultant

8m x 4m

22

Supervision Consultant

8m x 4m

23

Supervision Consultant

6m x 4m

24

Supervision Consultant

4m x 4m

25

Supervision Consultant

6m x 4m

26

Supervision Consultant

6m x 4m

27

Supervision Consultant

6m x 4m

28

Supervision Consultant

6m x 4m

29

Supervision Consultant

4m x 4m

30

Supervision Consultant

4m x 4m

31

Supervision Consultant

8m x 4m

32

Supervision Consultant

6m x 4m

33

Supervision Consultant

4m x 4m

34

Kitchen Complete

4m x 6m

35

Toilet + Shower Complete

4m x 4m

36

Lobby + Reception

8m x 6m

37

Archives

12m x 4m

38

Store Room

4m x 4m

39

Samples Room

4m x 4m

40

Server Room

4m x 2m

41

Printing/Plotting Room

4m x 4m

42

Conference Room

12m x 4m

IA 12/13 C 057 ST
C2/S1/19
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

Shares with 19

1 Female

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2

PROJECT SPECIFICATION
SECTION 1: GENERAL

Room

Post

Room Size

No.

Remarks

43

Prayer Room

8m x 4m

Carpeted

44

Smoking Room (External)

4m x 4m

45

PWA Representative

8m x 4m

w/ toilet+ shower complete

46

PMC Representative

8m x 4m

w/ toilet+ shower complete

47

PMC Representative

6m x 4m

48

PMC Representative

4m x 4m

49

PMC Representative

4m x 4m

Shaded Car Park

3m x 6m

65

Asphalted

Elevated Water Tank

6 day consumption

Underground Septic Tank

6 day consumption

Generator/ Generator Room

Paved Walkways, Steps

2m x Lm

Lit Parking Lot and Access Road

1200m

Landscaping Area

300m

w/ Diesel Tank
Asphalted

Asphalted

As required

Supervision Consultant

Supervision Consultant

Supervision Consultant

Supervision Consultant

Supervision Consultant

Supervision Consultant

Supervision Consultant

10

Supervision Consultant

11
12

1*

19L*

1*

1*

19L*

1*

1*

19L*

1*

Sc

Cub

MT
2

CT

PB

Supervision Consultant

Sh

PC

AC

Supervision Consultant

Cab

CLB

CHB

LD

CHBL

XLD

Post

Room

Type 3: Engineers Site Office Furniture and Equipment

1*

19L*

1*

2*

19L*

2*

1*

19L*

1*

1*

19L*

1*

2*

19L*

2*

2*

19L*

2*

19L*

3*

Supervision Consultant

19L*

2*

Supervision Consultant

2*

19L*

2*

13

Supervision Consultant

2*

19L*

2*

14

Supervision Consultant

2*

19L*

2*

15

Supervision Consultant

2*

19L*

2*

16

Supervision Consultant

1*

19L*

1*

17

Supervision Consultant

2*

19L*

2*

18

Supervision Consultant

2*

19L*

2*

19

Supervision Consultant

2*

19L*

2*

20

Supervision Consultant

4*

19L*

4*

21

Supervision Consultant

4*

19L*

4*

22

Supervision Consultant

4*

19L*

4*

23

Supervision Consultant

3*

19L*

3*

24

Supervision Consultant

2*

19L*

2*

25

Supervision Consultant

3*

19L*

3*

IA 12/13 C 057 ST
C2/S1/20
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

PC

Sh

PB

3*

19L*

3*

3*

19L*

3*

28

Supervision Consultant

3*

19L*

3*

29

Supervision Consultant

2*

19L*

2*

30

Supervision Consultant

2*

19L*

2*

31

Supervision Consultant

4*

19L*

4*

32

Supervision Consultant

3*

19L*

3*

33

Supervision Consultant

2*

19L*

2*

34

Kitchen complete

35

Toilet + Shower Complete

36

Lobby + Reception

2*

19L*

2*

37

Archives

38

Store Room

39

Samples Room

40

Server Room

41

Plotting/ Printing Room

42

Conference Room

43

Prayer Room

44

Smoking Room External


1

19L

45

PWA Representative

46

PMC Representative

47

PMC Representative

48

PMC Representative

49

PMC Representative

MT

AC
S

Sc

Cab
3

Cub
3

CT

CHB

CLB

Supervision Consultant

LD

27

XLD

Supervision Consultant

Post

26

XLD

PROJECT SPECIFICATION
SECTION 1: GENERAL
CHBL

Room

TECHNICAL SUBMISSION
SECTION C PART 2

19L

19L

19L

19L

Executive Large Desk with 2x3 locking drawers, L shape

Sc

Screen, Size indicated, L for flat LCD

LD

Large Desk with 2x3 locking drawers, L shape

Printer, HP LaserJet A4

Straight Desk with 1x3 locking drawers

Sh

Shelves, as required

CHB

Chair, High Back

PB

Pin Board, as required

CLB

Chair, Low Back or Visitor Chair (Meeting Table)

CT

Conference Table

MT

Meeting Table/Stacking Table

CHLB

Chair, High Back Leather Chair

Cab

Cabinet, vertical, 2x six locking drawers

Cup

Cupboard

AC

S: Split Unit, 2.5 tons W: Window Unit, 2.5 tons (All units heating/cooling)

PC

Personal Computer, with Screen, on network, See Specifications

Computers and printers will be supplied by the Consultant for the use of his staff. The
Contractor shall provide and maintain network cable infrastructure, hubs, router, power and
data outlet points, internet connections including payment of bills for the Consultant and
Engineer. Internet connectivity shall be of sufficient bandwidth to enable the timely and
efficient uploading/downloading of electronic documents and files in to the Programmes
internet-based collaboration environment provided by the Client.

IA 12/13 C 057 ST
C2/S1/21
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2
11.3

UTILITY CONNECTIONS

11.3.3

Water

PROJECT SPECIFICATION
SECTION 1: GENERAL

Add new paragraph 2 as follows:


2

The Contractor shall provide inline filters on all water supplies into the Client and
Engineers Site Facilities. The Contractor shall maintain these at regular intervals as
per manufacturers instructions throughout the duration of contract and maintenance
period.

11.3.4

Telephone
Delete paragraph 1 and substitute with the following:

The Contractor shall provide 6 land lines for the Engineers Site Office Type 3, two
of which are for facsimile lines and one for a super internet connection, for the sole
use of the Engineer.

11.4

PROVISIONS OF EQUIPMENT AND SUPPLIES

11.4.3

Photocopier
Add new paragraphs 3 and 4 as follows:

The Contractor shall provide and maintain 1 No multi-functional digital A3


photocopier with a minimum of 60 copies/minute and 600 x 600 dpi resolution for the
exclusive use of the Engineer (PWA representative and PMC staff) together with
servicing, accessories and materials for the contract period. The photocopier shall
have an automatic document feed and minimum 10-copy sorting capacity.

The Contractor shall provide 6 digital cameras for the use of the Engineer as
specified below:

Compact digital still camera with built-in flash, 3.3x Optical & 4x Digital & 13x
Combined Zoom

Image Capture Device:


Type 1:- 10.0 Megapixel, 1/2.3-inch type Charge Coupled Device (CCD)
Total Pixels:- Approx. 10.0 Megapixels
Effective Pixels:- Approx. 10.0 Megapixels

Lens
Focal Length:- 6.6 (W) - 21.6 (T)mm - 35mm (film equivalent: 37 - 122mm)
Digital Zoom:- 4x
Focusing Range:- Normal: 0.4 in. (1cm) - infinity (W), 9.8 in. (25cm) - infinity (T)
Macro: 0.4 in. - 1.6 ft. (1-50cm) (W), 9.8 in. - 1.6 ft. (25 - 50cm) (T)
Autofocus System:- TTL Autofocus

Viewfinders
LCD Monitor:- 2.5-inch TFT colour
LCD Pixels:- Approx. 115,000 dots
LCD Coverage:- Approx. 100%

Aperture and Shutter

IA 12/13 C 057 ST
C2/S1/22
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2

PROJECT SPECIFICATION
SECTION 1: GENERAL

Maximum Aperture:- f/3.0(W) - f/5.8 (T)


Shutter Speed:- 1 - 1/2000 sec.
15 - 1/2000 sec. (Total shutter speed range)

11.4.4

Exposure Control
Sensitivity:- Auto, ISO 100/200/400/800/1600
Low Light: ISO 500-3200
Light Metering Method:- Evaluative, Centre-weighted average, Spot
Exposure Control Method:- AE Lock
Exposure Compensation:- +/-2 stops in 1/3-stop increments

White Balance
White Balance Control:- Auto*, Daylight, Cloudy, Tungsten, Fluorescent

Flash
Built-in Flash:- Auto, On, Slow Synchro, Off
Flash Range:- 12 in. - 9.8 ft. (W), 12 in. - 6.6 ft. (T) (30cm - 3.0m (W), 30cm 2.0m (T))
Recycling Time:- 10 sec. or less (battery voltage: 3.0 V)

Image Storage
Storage Media:- SD/SDHC/SDXC Memory Card 16GB
Number of Recording Pixels:- Still Images: 3648 x 2736 (Large), 2816 x 2112
(Medium 1), 1600 x 1200 (Medium 2), 640 x 480 (Small), 3648 x 2048
(Widescreen)

Measuring and Recording Equipment


Delete paragraph 1 and substitute with the following:

The Contractor shall supply the following equipment for the use of the Engineers
Representative for the duration of the Contract:
(i)

Full set of Total Station Equipment.


Comprising:
Qty 4 Nos.
Total Station with internal memory

8 Nos. Target Set (Tribrach, Adaptor and Prism with holder).

4 Nos. Pogo with single prism and prism holder


15 Nos. Tripod (Wild GST 20 or equivalent)
Other accessories like Batteries, Cables, Battery Chargers, Carrying Case etc.

(ii)

Leveling Instrument.
Comprising:
Qty 3 Nos. Automatic Sprit level.

3 Nos. Tripod (Wild GST 10 or equivalent)

6 Nos. Leveling staff with bubble. Target Set

(iii)

Other Survey Accessories.


Qty 9 Nos.
9 Nos.
9 Nos.

50 metre steel tape


30 metre steel tape
30 metre Glass Fibre Plastic / Nylon Tape

IA 12/13 C 057 ST
C2/S1/23
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2

PROJECT SPECIFICATION
SECTION 1: GENERAL

30 Nos. 5 metre pocket tape


6 Nos. 1 metre folding measure
6 Nos. 1 metre spirit level
6 Nos. Thermometers
24 Nos. Ranging Rods
6 Nos. Optical square
6 Nos. Lump hammer (4 lbs.);
6 Nos. Sledge hammer (7 lbs.);
9 Nos. Portable surveying safety sign
12 Nos. Surveying umbrella
12 Nos. Torch (9 volt);
6 Nos. Plumb bobs and lines;
6 Nos. Safety harness;
Surveying pins - Number as required
Surveying marking materials - Number as required
String chalk lines - Number as required
Surveyors field books - Number as required.
(iv)

GPS Equipment.
Qty 3 Nos. -

GPS Surveying Units suitable for use in static survey mode for
control observations and in Real Time Kinematic (RTK) mode
for detail surveying.

The units must be capable of achieving the following accuracies.


Measurement Performance & Accuracy
Accuracy (rms) Code differential with DGPS / RTCM 2
DGPS / RTCM:
Typically 25 cm (rms)
Accuracy (rms) with Real-Time (RTK)
Standard of compliance:
Compliance with ISO17123-8
Rapid static (phase):
Horizontal: 5 mm + 0.5 ppm (rms)
Static mode after initialization:
Vertical: 10 mm + 0.5 ppm (rms)
Kinematic (phase):
Horizontal: 10 mm + 1 ppm (rms)
Moving mode after initialization:
Vertical: 20 mm + 1 ppm (rms)
Accuracy (rms) with Post Processing
Static (phase) w/ long observations: Horizontal: 3 mm + 0.1 ppm (rms)
Vertical: 3.5 mm + 0.4 ppm (rms)
Static and rapid static (phase):
Horizontal: 5 mm + 0.5 ppm (rms)
Vertical: 10 mm + 0.5 ppm (rms)
Kinematic (phase):
Horizontal: 10 mm + 1 ppm (rms)
Vertical: 20 mm + 1 ppm (rms)
It should be noted that the above list is typical only. All survey equipment to be as noted or
equivalent and as required and approved by the Engineer.

IA 12/13 C 057 ST
C2/S1/24
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2
11.4.7

PROJECT SPECIFICATION
SECTION 1: GENERAL

Telephones and Facsimile Machines


Add new paragraph 3 as follows:

For Type 3 Offices, the Contractor shall supply and install a telephone at each desk
and the meeting room. Each telephone shall be connected to a private address box
exchange (PABX) system. The Contractor shall also supply and install 3 facsimile
machines. The telephones, PABX system and facsimile shall conform to the relevant
provisions of any Q-TEL standard or requirement.
Add new Sub-Clause 11.4.8 as follows:

11.4.8

Electronic Construction Management Tool (ECMT)


As part of the initiative to use the most up-to-date technology for the Expressway
Programme, Ashghal and the Programme Management Consultant (PMC) intend to
implement an Electronic Construction Management Tool (ECMT). This system will
facilitate capture of required information at source locations and enable all
Programme participants to have online access, based on their access rights, to
undertake the following tasks:

Dashboard status reporting


Online completion, responses and tracking of Technical Queries, Requests for
Inspection, Inspection Reports and Test Reports, all with signatures, as required
Viewing Inspection & Testing Plans
Uploading, marking up and attaching photographs to Technical Queries
Interrogating online information via reporting and data exports

All Supervision Consultants and Construction Contractors, as well as their


subcontractors, will be required to enter identified information specified by both
Ashghal and the PMC into this online management system.
Information will be able to be entered online or offline and then synchronised into the
system using desktop or laptop PCs or field-based tablet PCs. This includes the
online storage of scanned signatures and password for insertion of signatures in the
designated report areas based on pre-determined management rules. Online, fieldbased data capture is performed via laptops or tablets with mobile internet
connections.
The online system will be made available to the Supervision Consultants, and input
devices (tablets) will be made available by the Supervision Consultants. A
Provisional Amount of QR 550,000 for the purchase of all required software and
licences necessary to enable the ECMT system has been included in the Contract
Price. All tablets and broadband connection for the Contractors field team shall be
provided and supported as part of the Contractors tender price. In addition, if
desired for use with the ECMT, desktop and/or laptop computers will need to be
provided and supported by the Contractor in accordance with the minimum
specifications provided below.
Neither Ashghal nor the PMC will provide
configuration or consultant/contractor-owned infrastructure or firewall configuration
support, other than assistance with the ECMT installation and use, as well as ECMT
system helpdesk functions.

IA 12/13 C 057 ST
C2/S1/25
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2

PROJECT SPECIFICATION
SECTION 1: GENERAL

Qatar-based help will be available to assist with queries and provide required usage
and process training associated with use of the ECMT at no cost to Supervision
Consultants or Construction Contractors.
Desktop and Laptop Computer Minimum Specifications

Hardware
- Desktop Intel core i5, DVD/CD, Memory 6GB DDR3, hard drive 500GB
SATA, video card 512MB.
- Laptop (Tablet) wireless and Bluetooth. 3G or Mobile internet connectivity
for field-based access.

Software
Windows7 Professional, Office 2010, Adobe Professional and Internet
Explorer 9 with appropriate and up-to-date and appropriate virus protection
software.

Add new Sub-Clause 11.4.9 as follows:


11.4.9

Desktop Computer Minimum Specifications

Hardware
Desktop Intel core i5, DVD/CD, Memory 6GB DDR3, hard drive 500GB
SATA, video card 512MB.

Software
- Windows7 Professional, Office 2010, Adobe Professional and Internet
Explorer 9 with appropriate and up-to-date virus protection software.

IA 12/13 C 057 ST
C2/S1/26
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2

IA 12/13 C 057 ST
C2/S1/27
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

PROJECT SPECIFICATION
SECTION 1: GENERAL

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2

IA 12/13 C 057 ST
C2/S1/28
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

PROJECT SPECIFICATION
SECTION 1: GENERAL

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2
PART 13

PROJECT SPECIFICATION
SECTION 1: GENERAL

SETTING OUT OF THE WORKS

13.3

LEVELS AND REFERENCE GRID

13.3.1

Temporary Bench Marks


Delete paragraph 1 and substitute with the following:

13.3.2

The Contractor shall establish accurate temporary bench marks on permanent


blocks from which the levels to which the Works are to be constructed may be
transferred. The location of temporary bench marks shall be agreed with the
Engineer. The level of temporary bench marks shall be related to the Qatar
National Height Datum.
Site Grid
Delete paragraphs 1 and 2 and substitute with the following:

Should the Contractor choose to establish a local site grid then the grid shall be tied
to the Qatar National Grid and a survey report provided to the Engineer which
establishes the process for conversion between the two.

13.4

SURVEYING

13.4.1

Site Survey
Delete paragraphs 1, 2, 3 and 4 and substitute with the following:

The Contractor shall provide the Site ground survey and the correctness of that
survey shall be entirely the Contractors responsibility.
The Site ground survey shall comply with the requirements of the Qatar Survey
Manual as a minimum.
The Contractor shall, within 3 weeks of the date of commencement of the Works,
carry out a check of the co-ordinates and levels of all permanent monuments, bench
marks and survey markers used in the determination of the site survey model and
proposed to be used for the setting out of the Works.

IA 12/13 C 057 ST
C2/S1/29
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2
PART 15

TEMPORARY CONTROLS

15.2

TEMPORARY CONTROLS

15.2.5

Pollution Control

PROJECT SPECIFICATION
SECTION 1: GENERAL

Add new paragraph 3 as follows:


3

The Contractor will be held responsible for and shall indemnify the PWA and the
Engineer against all claims in connection with noise, vibration, dust, smoke, diesel
spillage and any other nuisance arising from the execution of the Works.
Add new Sub-Clause 15.2.7

15.2.7

Environmental Protection

The Contractor shall comply with all conditions of the Environmental Clearance
issued for the project by the Ministry of Environment/Supreme Council for the
Environment and Natural Reserves.

The Contractor shall comply with all rules and regulations regarding environmental
protection and pollution control issued by the Ministry of Environment/Supreme
Council for the Environment and Natural Reserves.

IA 12/13 C 057 ST
C2/S1/30
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2

PROJECT SPECIFICATION
SECTION 1: GENERAL

PART 16 TRAFFIC DIVERSIONS


16.1

GENERAL
Add new Sub-Clause 16.1.6 as follows:

16.1.6

Traffic Safety and Control Officers

The Contractor shall appoint a Traffic Safety and Control Officer at the
commencement of the Works. The name, address and telephone number(s) (both
on and off-site) of the Traffic Safety and Control Officer shall be notified to the
Engineer, the Traffic Police and any relevant authority. The Traffic Safety and
Control Officer shall be a direct employee of the Contractor and shall not be an
employee of a sub-contractor. He shall be experienced in traffic safety and
management on similar highway projects, and shall be responsible on behalf of the
Contractor for:
(a)
(b)

(c)
(d)
(e)

(f)
(g)
(h)

(i)

(j)
(k)

liaison with the Engineer, any relevant highway authority, and the police in all
matters relating to traffic safety and management;
the establishment, resourcing commissioning prior to the commencement of
any work and the decommissioning and removal of all traffic management
systems on completion of that element of work;
the management of traffic during periods when traffic restrictions are in place
and for ensuring that all traffic safety and management requirements are met;
immediately notifying the Traffic Police, the Engineer and the Contractor of any
accidents, spillages or emergencies;
ensuring the safe working of plant, machinery and personnel and ensuring that
all personnel engaged in the Works are aware of the Contractors obligations
and duties in respect of site safety when working on trafficked highways.
notifying the Engineer of any deterioration in Traffic Management Equipment
and trafficked road surface;
monitoring the flow of traffic within the Traffic Management Area to detect any
incident resulting in stationary or delayed traffic and reporting to the Engineer.
submitting information sheets weekly to the Engineer logging all Traffic
Management Operations and advising the expected duration of the current
system, together with notice of the programmed commencement/duration of
the next system;
submitting information sheets weekly to the Engineer logging all incidents and
the consequential effect on the Works and, when called, all movements of the
emergency vehicles. For the purposes of this Clause, an incident is defined
as a shed load, vehicle breakdown, vehicle abandonment, or traffic accident,
whether or not the latter involves personal injury;
assisting any member of the public by ensuring that a breakdown recovery
vehicle is called when required;
ensuring that no employee of the Contractor or any sub-contractor (not
associated with the Traffic Management Operation) enters any part of a
carriageway which is not properly signed and coned off. Ensuring that
employees of the Contractor or sub-contractor are individually and specifically
warned not to step on to any part of the highway which is open to traffic except

IA 12/13 C 057 ST
C2/S1/31
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2

PROJECT SPECIFICATION
SECTION 1: GENERAL

to cross at designated crossing points when required to access other parts of


the Works;
(l)
notifying the Engineer of any deterioration of safety precautions including traffic
signs, temporary road markings, road surface, safety zones, works access
provisions and ensuring that rectification is carried out in accordance with the
relevant specified standards;
(m) ensuring that all standing plant, equipment and materials within closed off
areas on the highway are coned-off, placed tidily and in positions so as to
minimise restrictions on the passage of vehicles using the highway and so as
not to inhibit sight lines for traffic;
(n) checking that lanes, carriageways or roads temporarily closed to traffic are to
be reopened at the programmed time and confirming this to the Engineer by
means of an agreed pro-forma;
(o) informing all personnel employed on the Works of any changes to the Traffic
Management System which may affect their access or egress to the Site, or
their working conditions.
2

The Contractor shall appoint at least one deputy Traffic Safety and Control Officer
who shall be a direct employee of the Contractor, but not a sub-contractor, and be
experienced in traffic safety and management on similar highway projects. The
deputy shall undertake the responsibilities of the Traffic Safety and Control Officer
when the latter is absent. The name, address and telephone number(s) both on and
off-site of the deputy Traffic Safety and Control Officers shall be notified to the
Engineer the police and any relevant authority. Contact with either the Traffic
Safety, Control Officer or his deputy, shall be possible at all times.

The Traffic Safety and Control Officer and his Deputy shall be able to contact the
Contractors main office at any time.

The Traffic Safety and Control Officer shall patrol all traffic management systems in
service at two hourly intervals to ensure that any defect is immediately corrected.

16.2

TEMPORARY TRAFFIC DIVERSIONS

16.2.1

General Requirements
Delete paragraph 3 and substitute with following:

Where paved carriageways, unpaved carriageways or ramps are required, they shall
be provided and maintained to a standard suitable in all respects for the class or
classes of traffic or pedestrians requiring to use them. The surface provided shall be
equivalent to the surface of the existing carriageway or footway.
Delete Sub-Clause 16.2.2 and substitute with the following:

16.2.2

Maintenance of Traffic flow

The Contractor shall allow for the construction of temporary diversions to permit all
existing traffic movements for the full duration of the Contract period. Temporary
diversion routes may be required to be altered or rerouted during the course of the

IA 12/13 C 057 ST
C2/S1/32
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2

PROJECT SPECIFICATION
SECTION 1: GENERAL

Contract and the Contractor shall allow for this as necessary. Prohibition of any
traffic movement, including those shown cut off in the traffic diversion drawings shall
be to the approval of the Engineer. Cut off traffic movements shall be properly
compensated by installing alternative traffic diversion routes.
2

The Contractor shall prepare and maintain a comprehensive Temporary Traffic


Management Plan (TTMP) which shall encompass all traffic diversions required
throughout the duration of the contract. It shall provide for working drawings,
supporting descriptions and documentation of all proposed traffic diversions within,
and outside, the Limit of Works resulting from the Works. The TTMP shall be
maintained as a working document that is under continual review. The Contractor
shall coordinate the TTMP with, and obtain the approval from the Engineer, Traffic
Police and relevant PWA concerned departments and other authorities as may be
required.

Traffic diversions shall be designed by an International Roads Engineering


Consultant accredited by PWA and shall be submitted for both the Engineer and
Traffic Police approval prior to implementation. Traffic diversion drawings shall be
accompanied by traffic reports prepared by the International Roads Engineering
Consultant and presentations to the higher authorities as necessary. The traffic
reports shall be supported with data of existing and expected traffic volumes during
the course of the contract period. Analysis of traffic volumes at junctions and on
road links shall be carried out using industry standard software, or as may be
specified by the Engineer.

The Contractor shall carryout traffic surveys by an accredited company, including


automatic traffic counts and manual classified counts at the main roads, and turning
movement counts at the existing junctions, to determine the current level of service
and forecast level of service at the junctions upon the implementation of the
temporary traffic diversion. Unless otherwise agreed with the Engineer, the main
junctions under Temporary Control shall not perform at a Level of Service greater
than the current unrestricted situation. Upon the Engineers request, the Contractor
shall install and commission additional temporary traffic signals capable of handling
the diverted traffic.

Where traffic diversion drawings are included within the Project Documentation,
these shall be considered to be conceptual only, and they shall indicate the main
traffic diversion scheme and stages representing the absolute minimum traffic
management requirements. At the discretion of the Engineer, the final traffic
diversion drawings may show an increased number of lanes at critical locations
should the need arise and they may allow for local access points as appropriate.
The Contractor shall be responsible for producing drawings which detail the
secondary diversions to the local branching roads, and which detail the interim
diversions to suit the Contractors sequence of work.

The temporary traffic diversions shall include, but not be limited to, earthworks,
pavement construction, directional signs, traffic signs, road markings, safety
barriers, temporary street lighting, temporary traffic signals (if required), relocation of
existing street furniture, relocation/protection of underground existing services,
reinstatement of permanent works, and subsequent removal of all temporary
diversion works, all to the approval of the Engineer, Traffic Police and the other

IA 12/13 C 057 ST
C2/S1/33
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2

PROJECT SPECIFICATION
SECTION 1: GENERAL

concerned PWA departments and authorities. Power supply for lighting can be from
permanent or temporary supplies subject to agreement with the relevant authority.
7

Traffic diversions shall be constructed and maintained in accordance with the UKs
Traffic Signs Manual, Chapter 8 unless otherwise specified by the Engineer. It is the
Contractors responsibility to ensure that any traffic diversion required is properly
signed, demarcated, illuminated and lit as per the category of the diverted road,
controlled and maintained at all times. The Contractor shall submit his traffic
diversion plans to the Engineer and no diversions shall be put in place until approval
is obtained from the Engineer.

Special attention shall be given when joining with existing roads and junctions to
ensure smooth transitions and ride-ability. Encountered manholes and chambers
shall be adjusted to be flush with the traffic diversion. The Contractor shall not open
any traffic diversion without the written approval of the Engineer.

Sequential arrow boards operating on a 24-hour basis (engine or solar powered)


must be used at all diversion points. The Contractor is to allow for any day-time
glare and ensure that arrows are capable of being seen sufficiently by drivers in
advance of the diversion and as required by the UKs Traffic Signs Manual, Chapter
8.

10

Within the limits of the project where pedestrian traffic is present, all excavated
areas, regardless of depth, must be cordoned off by means of wired mesh panels of
a height no less than 1.8 m connected together to form a continuous barrier wall. All
existing pedestrian routes shall be kept open at all times for the full duration of the
Works. Where a pedestrian route is required to be diverted or realigned, a minimum
width of 2.0 m is to be applied to the diverted / realigned route. Where it is
impractical to meet the 2.0 m width requirement, a reduced width shall be agreed
with the Engineer.

11

The Contractor must ensure that all temporary roads, diversions to be operating in a
safe manner. Traffic must be maintained on hard surface asphalt roads free of any
dirt, debris, holes and other obstacles. Redundant paint markings are to be
removed completely so as not to cause confusion with new temporary paint
markings. Redundant paint markings shall not be considered to have been removed
completely until written agreement has been provided by the Engineer.

12

Upon approval from Engineers representative on any road closure for the purpose
of carrying out the Works of PWA, the Contractor shall place a sufficient notification
to the general public in three local newspapers, coloured, and both in Arabic and
English languages at least on (1) week and on (3) days prior to the road closure.
The contents of notification shall be approved by the Engineer and the extent shall
not be less than a half of the standard size page of a reputed local newspaper. In
order to evident the notification the Contractor shall submit to the Engineer a copy
as appeared on the newspaper on the same day of the notification. Notice is to be
sent to the Engineer for approval 10 days prior.
Add new paragraph 13 as follows:

13

The Contractor shall allow in his pricing for maintaining existing highways within the
Project Site is a safe condition at all times.

IA 12/13 C 057 ST
C2/S1/34
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2

PROJECT SPECIFICATION
SECTION 1: GENERAL

Add new Sub-Clause 16.2.3 as follows:


16.2.3

Notice to Public on Road Closures

Upon approval from Engineer's Representative on any road closure for the purpose
of carrying out the Works of PWA, the Contractor shall place a sufficient notification
to the general public in local newspapers, coloured and both in Arabic and English
languages at least on (1) week and on (3) days prior to the road closure. The
contents of notification shall be approved by the Engineer and the extent shall not be
less than a half of the standard size page of a reputed local newspaper. In order to
evident the notification the Contractor shall submit to the Engineer a copy as
appeared on the newspaper on the same day of the notification. Notice is to be sent
to the Engineer for approval 10 days prior.

16.2.4

Maintenance of Roads/Diversions

The Contractors shall maintain the roads and diversions together with road signs
and markings within the site in a safe condition until such time as the Engineer
issues instructions to remove them.

All costs in connection with maintenance of roads/diversions shall be included for in


the Contract Price.

IA 12/13 C 057 ST
C2/S1/35
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2

PROJECT SPECIFICATION
SECTION 1: GENERAL

PART 17 PROJECT COORDINATION


17.1

GENERAL

17.1.2

Responsibility
Delete paragraph 2 and substitute with the following:

No major operations shall be commenced or work outside the usual working hours
be carried out without the consent in writing of the Engineer or without full and
complete notice also in writing being given to him sufficiently in advance of the time
of operation so as to enable him to make such arrangements as he may deem
necessary for its inspection.

IA 12/13 C 057 ST
C2/S1/36
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2

PROJECT SPECIFICATION
SECTION 1: GENERAL

PART 19 REGULATORY REQUIREMENTS


19.1

GENERAL

19.1.1

Scope
Delete paragraph 2 and substitute with the following:

This Part also specifies the requirements for co-ordination, co-operation and liaison
with the following authorities and departments:

19.2

Civil Aviation Authority


Ministry of Interior (Civil Defence Department, Traffic Police, Department of
Immigration, etc.)
Ministry of Municipal Affairs and Agriculture
Municipalities
Ports and Customs Authority
Supreme Council for the Environment and Natural Reserves
Urban Planning and Development Authority
Ministry of Environment

NOTICES
Add new Sub-Clause 19.2.3 as follows:

19.2.3
1

Notice to Public on Road closures


Upon approval from Engineer's Representative on any road closure for the purpose
of carrying out the Works of PWA, the Contractor shall place a sufficient notification
to the general public in local newspapers, coloured and both in Arabic and English
languages at least on (1) week and on (3) days prior to the road closure. The
contents of notification shall be approved by the Engineer and the extent shall not be
less than a half of the standard size page of a reputed local newspaper. In order to
evident the notification the Contractor shall submit to the Engineer a copy as
appeared on the newspaper on the same day of the notification. Notice is to be sent
to the Engineer for approval 10 days prior.

19.3

MISCELLANEOUS

19.3.2

Regulations of Road Openings


Delete paragraph 1 and substitute with the following:

For Works including road openings, the Contractor shall comply with all relevant
provisions of the PWA and the relevant provisions of the following Parts of this
Section:
Part 16:
Part 21:

Traffic Diversions.
Inspection and Handover Procedures.

IA 12/13 C 057 ST
C2/S1/37
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013

TECHNICAL SUBMISSION
SECTION C PART 2
PART 20

CLEARANCE OF SITE

20.2

FINAL CLEARING

20.2.3

The Site

PROJECT SPECIFICATION
SECTION 1: GENERAL

Delete paragraph 3(b) and substitute with the following:


3

(b)

In the case of Contractors delay or refusal to carry out such a job, he shall
have to pay a penal compensation of QR 5,000 for delay for each day or part
of day. This compensation shall be final and the judiciary shall not be entitled
to mitigate it and it does not require establishing the occurrence of any
damage to the owner.

IA 12/13 C 057 ST
C2/S1/38
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A

February 2013