Federal Register / Vol. 70, No.

226 / Friday, November 25, 2005 / Notices 71131

i. FERC Contact: Robert Bell, (202) preliminary permit application must filing’’ link. The Commission strongly
502–6062. conform with 18 CFR 4.30(b) and 4.36. encourages electronic filing.
j. Deadline for filing comments, o. Competing Development s. Filing and Service of Responsive
protests, and motions to intervene: 60 Application: Any qualified development Documents: Any filings must bear in all
days from the issuance date of this applicant desiring to file a competing capital letters the title ‘‘COMMENTS’’,
notice. development application must submit to ‘‘COMPETING APPLICATION’’,
The Commission’s Rules of Practice the Commission, on or before a ‘‘RECOMMENDATIONS FOR TERMS
and Procedure require all intervenors specified comment date for the AND CONDITIONS’’, ‘‘PROTEST’’, or
filing documents with the Commission particular application, either a ‘‘MOTION TO INTERVENE’’, as
to serve a copy of that document on competing development application or a applicable, and the Project Number of
each person in the official service list notice of intent to file such an the particular application to which the
for the project. Further, if an intervenor application. Submission of a timely filing refers. Any of the above-named
files comments or documents with the notice of intent to file a development documents must be filed by providing
Commission relating to the merits of an application allows an interested person the original and the number of copies
issue that may affect the responsibilities to file the competing application no provided by the Commission’s
of a particular resource agency, they later than 120 days after the specified regulations to: The Secretary, Federal
must also serve a copy of the document comment date for the particular Energy Regulatory Commission, 888
on that resource agency. application. A competing license First Street, NE., Washington, DC 20426.
k. Description of Project: The application must conform with 18 CFR A copy of any motion to intervene must
proposed project would use the U.S. 4.30(b) and 4.36. also be served upon each representative
Army Corps of Engineer’s Tygart Dam p. Notice of Intent: A notice of intent of the Applicant specified in the
and consist of: (1) A proposed must specify the exact name, business particular application.
powerhouse containing two generating address, and telephone number of the t. Agency Comments: Federal, State,
units with a total installed capacity of prospective applicant, and must include and local agencies are invited to file
20 megawatts, (2) a proposed 6,700-foot- an unequivocal statement of intent to comments on the described application.
long, 138-kilovolt transmission line; and submit, if such an application may be A copy of the application may be
(3) appurtenant facilities. The project filed, either a preliminary permit obtained by agencies directly from the
would have an annual generation of 117 application or a development Applicant. If an agency does not file
gigawatt hours, which would be sold to application (specify which type of comments within the time specified for
a local utility. application). A notice of intent must be filing comments, it will be presumed to
l. Locations of Applications: A copy of served on the applicant(s) named in this have no comments. One copy of an
the application is available for public notice. agency’s comments must also be sent to
inspection and reproduction at the q. Proposed Scope of Studies Under the Applicant’s representatives.
Commission in the Public Reference Permit: A preliminary permit, if issued, Magalie R. Salas,
Room, located at 888 First Street NE., does not authorize construction. The Secretary.
Room 2A, Washington, DC 20426, or by term of the proposed preliminary permit
[FR Doc. E5–6495 Filed 11–23–05; 8:45 am]
calling (202) 502–8371. This filing may would be 36 months. The work
BILLING CODE 6717–01–P
also be viewed on the Commission’s proposed under the preliminary permit
Web site at http://www.ferc.gov using would include economic analysis,
the ‘‘eLibrary’’ link. Enter the docket preparation of preliminary engineering
DEPARTMENT OF ENERGY
number excluding the last three digits in plans, and a study of environmental
the docket number field to access the impacts. Based on the results of these Federal Energy Regulatory
document. For assistance, call toll-free studies, the Applicant would decide Commission
1–866–208–3676 or e-mail whether to proceed with the preparation
FERCOnlineSupport@ferc.gov. For TTY, of a development application to Notice of Applications Accepted for
call (202) 502–8659. A copy is also construct and operate the project. Filing and Soliciting Comments,
available for inspection and r. Comments, Protests, or Motions To Motions To Intervene, and Protests
reproduction at the address in item h. Intervene: Anyone may submit
above. comments, a protest, or a motion to November 18, 2005.
m. Individuals desiring to be included intervene in accordance with the Take notice that the following
on the Commission’s mailing list should requirements of Rules of Practice and hydroelectric applications have been
so indicate by writing to the Secretary Procedure, 18 CFR 385.210, .211, .214. filed with the Commission and are
of the Commission. In determining the appropriate action to available for public inspection:
n. Competing Preliminary Permit: take, the Commission will consider all a. Type of Applications: Preliminary
Anyone desiring to file a competing protests or other comments filed, but Permit (Competing).
application for preliminary permit for a only those who file a motion to b. Applicants, Project Numbers, and
proposed project must submit the intervene in accordance with the Dates Filed:
competing application itself, or a notice Commission’s Rules may become a Minnesota Municipal Power Company
of intent to file such an application, to party to the proceeding. Any comments, filed the application for Project No.
the Commission on or before the protests, or motions to intervene must 12616–000 on October 3, 2005 at 8:35
specified comment date for the be received on or before the specified a.m.
particular application (see 18 CFR 4.36). comment date for the particular Three Rivers Park District filed the
Submission of a timely notice of intent application. application for Project No. 12618–000
allows an interested person to file the Comments, protests and interventions on October 3, 2005 at 8:35 a.m.
competing preliminary permit may be filed electronically via the c. Name of the project is Coon Rapids
application no later than 30 days after Internet in lieu of paper. See 18 CFR Project. The project would be located on
the specified comment date for the 385.2001 (a)(1)(iii) and the instructions the Mississippi River in Hennepin and
particular application. A competing on the Commission’s Web site under ‘‘e- Anoka Counties, Minnesota. The

VerDate Aug<31>2005 14:11 Nov 23, 2005 Jkt 205001 PO 00000 Frm 00053 Fmt 4703 Sfmt 4703 E:\FR\FM\25NON1.SGM 25NON1
71132 Federal Register / Vol. 70, No. 226 / Friday, November 25, 2005 / Notices

existing dam is owned and operated by calling (202) 502–8371. This filing may proposed under the preliminary permit
the Three Rivers Park District. also be viewed on the Commission’s would include economic analysis,
d. Filed Pursuant to: Federal Power Web site at http://www.ferc.gov using preparation of preliminary engineering
Act, 16 U.S.C. 791a–825r. the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental
e. Applicants Contacts: For Minnesota number excluding the last three digits in impacts. Based on the results of these
Municipal Power Company: Mr. James the docket number field to access the studies, the Applicant would decide
D. Larson, Minnesota Municipal Power document. For assistance, call toll-free whether to proceed with the preparation
Company, 200 South Sixth Street, Suite 1–866–208–3676 or e-mail of a development application to
300, Minneapolis, MN 55402, (612) FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project.
349–6868. For Three Rivers Park call (202) 502–8659. A copy is also o. Comments, Protests, or Motions to
District: Mr. Douglas F. Bryant, Three available for inspection and Intervene: Anyone may submit
Rivers Park District, 3000 Xenium Lane reproduction at the address in item h comments, a protest, or a motion to
N, Plymouth, MN 55441, (763) 559– above. intervene in accordance with the
6764. j. Individuals desiring to be included requirements of Rules of Practice and
f. FERC Contact: Robert Bell, (202) on the Commission’s mailing list should Procedure, 18 CFR 385.210, .211, .214.
502–6062. so indicate by writing to the Secretary In determining the appropriate action to
g. Deadline for filing comments, of the Commission. take, the Commission will consider all
protests, and motions to intervene: 60 k. Competing Preliminary Permit:
days from the issuance date of this protests or other comments filed, but
Anyone desiring to file a competing only those who file a motion to
notice. application for preliminary permit for a
The Commission’s Rules of Practice intervene in accordance with the
proposed project must submit the Commission’s Rules may become a
and Procedure require all intervenors competing application itself, or a notice
filing documents with the Commission party to the proceeding. Any comments,
of intent to file such an application, to
to serve a copy of that document on protests, or motions to intervene must
the Commission on or before the
each person in the official service list be received on or before the specified
specified comment date for the
for the project. Further, if an intervenor comment date for the particular
particular application (see 18 CFR 4.36).
files comments or documents with the application.
Submission of a timely notice of intent
Commission relating to the merits of an allows an interested person to file the Comments, protests and interventions
issue that may affect the responsibilities competing preliminary permit may be filed electronically via the
of a particular resource agency, they application no later than 30 days after Internet in lieu of paper; See 18 CFR
must also serve a copy of the document the specified comment date for the 385.2001 (a)(1)(iii) and the instructions
on that resource agency. particular application. A competing on the Commission’s Web site under ‘‘e-
h. Description of Projects: The project preliminary permit application must filing’’ link. The Commission strongly
proposed by Minnesota Municipal conform with 18 CFR 4.30(b) and 4.36. encourages electronic filing.
Power Company would consist of: (1) l. Competing Development p. Filing and Service of Responsive
An existing 260-foot-long, 30-foot-high Application: Any qualified development Documents: Any filings must bear in all
dam, (2) an existing impoundment applicant desiring to file a competing capital letters the title ‘‘COMMENTS’’,
having a surface area of 600 acres with development application must submit to ‘‘RECOMMENDATIONS FOR TERMS
negligible storage and a normal water the Commission, on or before a AND CONDITIONS’’, ‘‘PROTEST’’, or
surface elevation of 830.1 feet NGVD, (3) specified comment date for the ‘‘MOTION TO INTERVENE’’, as
a proposed powerhouse containing 2 particular application, either a applicable, and the Project Number of
generating units having a total installed competing development application or a the particular application to which the
capacity of 8 MW, (4) a proposed 600- notice of intent to file such an filing refers. Any of the above-named
foot-long, 4.16 kV underground application. Submission of a timely documents must be filed by providing
transmission line; and (5) appurtenant notice of intent to file a development the original and the number of copies
facilities. The project would have an application allows an interested person provided by the Commission’s
annual generation of 45.3 GWh, which to file the competing application no regulations to: The Secretary, Federal
would be sold to a local utility. later than 120 days after the specified Energy Regulatory Commission, 888
The project proposed by Three Rivers comment date for the particular First Street, NE., Washington, DC 20426.
Park District would consist of: (1) An application. A competing license A copy of any motion to intervene must
existing 260-foot-long, 30-foot-high application must conform with 18 CFR also be served upon each representative
dam, (2) an existing impoundment 4.30(b) and 4.36. of the Applicant specified in the
having a surface area of 600 acres with m. Notice of Intent: A notice of intent particular application.
negligible storage and a normal water must specify the exact name, business q. Agency Comments: Federal, state,
surface elevation of 830.1 feet NGVD, (3) address, and telephone number of the and local agencies are invited to file
a proposed powerhouse containing 2 prospective applicant, and must include comments on the described application.
generating units having a total installed an unequivocal statement of intent to A copy of the application may be
capacity of 7.2 MW, (4) a proposed 600- submit, if such an application may be obtained by agencies directly from the
foot-long, 4.16 kV underground filed, either a preliminary permit Applicant. If an agency does not file
transmission line; and (5) appurtenant application or a development comments within the time specified for
facilities. The project would have an application (specify which type of filing comments, it will be presumed to
annual generation of 41.3 GWh, which application). A notice of intent must be have no comments. One copy of an
would be sold to a local utility. served on the applicant(s) named in this agency’s comments must also be sent to
i. Locations of Applications: A copy of public notice. the Applicant’s representatives.
the application is available for n. Proposed Scope of Studies under
inspection and reproduction at the Permit: A preliminary permit, if issued, Magalie R. Salas,
Commission in the Public Reference does not authorize construction. The Secretary.
Room, located at 888 First Street NE., term of the proposed preliminary permit [FR Doc. E5–6496 Filed 11–23–05; 8:45 am]
Room 2A, Washington DC 20426, or by would be 36 months. The work BILLING CODE 6717–01–P

VerDate Aug<31>2005 14:11 Nov 23, 2005 Jkt 205001 PO 00000 Frm 00054 Fmt 4703 Sfmt 4703 E:\FR\FM\25NON1.SGM 25NON1