Federal Register / Vol. 70, No.

226 / Friday, November 25, 2005 / Notices 71169

DEPARTMENT OF THE INTERIOR Project Area. The project is located discharged into ephemeral stream
approximately 20 miles northeast of courses;
Bureau of Land Management Rawlins, Wyoming near Seminoe 3. Alternative C, the proposed action,
[WY–030–1310–DB] Reservoir, Townships 21–24 North, modified to provide for produced water
Ranges 84–86 West, Sixth Principal discharge in the North Platte River
Notice of Availability of a Draft Meridian, Carbon County. system using pipelines, aqueducts, or
Environmental Impact Statement for The Operators will drill up to 1,240 other water transportation features; and
the Seminoe Road Gas Development wells on up to 785 well pad sites over 4. Alternative D, the proposed action,
Project the next 30 to 40 years. Depending on with produced water re-injected into
geologic conditions, well density would underground aquifers.
AGENCY: Bureau of Land Management, range from two wells per 640 acres to Agency Preferred Alternative: BLM’s
Interior. four wells per 640 acres. preferred alternative is Alternative C.
ACTION: Notice of availability. Forty-nine percent of the The proposed action is to proceed
approximately 137,000 surface acre area with field development through
SUMMARY: The Bureau of Land is public land administered primarily by establishing 785 well pad sites, drilling
Management (BLM) announces the the BLM. Of the remaining project area up to 1,240 natural gas wells,
availability of the Seminoe Road Gas surface, 49 percent is privately owned developing access roads and siting
Development Project DEIS that analyzes and less than 2 percent is owned and pipelines and other ancillary facilities
the environmental consequences of a administered by the State of Wyoming. (gas processing plant, compressor
proposed coalbed natural gas The Federal mineral estate ownership stations, water disposal sites, etc.). The
development and production operation pattern is the same as the surface proposed action identifies the drilling of
in south central Wyoming. ownership pattern. Currently, multiple wells from a single pad and
DATES: The DEIS will be available for approximately 18 gas wells operate well completion in multiple coal
review and comment for 60 calendar within the Seminoe Road Project Area formations. Produced water would be
days from the date the Environmental from a pilot project drilled in 2001. The released into surface drainages running
Protection Agency (EPA) publishes its Operators propose to drill up to 1,240 into the North Platte River.
NOA in the Federal Register. The BLM additional wells over the next 30 to 40
can best use comments and resource years. How To Submit Comments
information if they are submitted by or The BLM published its Notice of Comments must be submitted using
before close of business the day of the Intent to prepare an Environmental one of the following methods:
end of the comment and review period. Impact Statement (EIS) for the Seminoe 1. Comments may be electronically
If you are uncertain as to what Road Gas Development Project in the mailed to rawlins_wymail@blm.gov with
constitutes acceptable comment format Federal Register on March 13, 2003. ‘‘Attention: Seminoe Road Project
or when comments are due, please Based upon issues and concerns Manager’’ in the subject line, and
contact the Project Leader or the identified during scoping and during avoiding the use of special characters or
Rawlins Field Office at the address the development of National any form of encryption. If you do not
below. Environmental Policy Act (NEPA) receive a confirmation from our system
analysis, the Seminoe Road DEIS that your comment has been received,
ADDRESSES: A copy of the DEIS was sent
focuses on individual and cumulative please contact David Simons, Project
to affected Federal, State, and local
impacts to air quality, biological and Manager, Rawlins Field Office, (307)
government agencies and to interested
physical resources, transportation, and 328–4328;
parties. The document may also be 2. Written comments may be mailed
socio-economics factors. In compliance
available electronically on the following directly or delivered to the BLM at:
with section 7(c) of the Endangered
Web site: http://www.wy.blm.gov/nepa/ Seminoe Road DEIS, Project Manager,
Species Act, as amended, the DEIS
nepadocs.htm. Copies of the DEIS will Bureau of Land Management Rawlins
includes a biological assessment that
be available for public inspection at the Field Office, 1300 N. Third Street, P.O.
identifies endangered or threatened
following locations: Box 2407, Rawlins, WY 82301; and
• Bureau of Land Management, species which may be affected by the
Proposed Action. 3. Comments may be sent via telefax
Wyoming State Office, 5353 to the BLM, Attn: David Simons, at
This DEIS assesses the effects of
Yellowstone Road, Cheyenne, Wyoming (307) 328–4224.
implementing the proposed action at the
82003. To be given consideration by BLM, all
scale presented by the project
• Bureau of Land Management, DEIS comments must include the
proponent. Subsequent site-specific
Rawlins Field Office, 1300 N. Third commenter’s name and street address.
development proposals would be
Street, Rawlins, Wyoming 82301. BLM’s practice is to make all
submitted to the BLM in the form of
FOR FURTHER INFORMATION CONTACT: comments, including the names and
Applications to Drill (APD). A NEPA
David Simons, Project Leader, BLM analysis of the, APDs would be street addresses of each respondent,
Rawlins Field Office, 1300 N. Third conducted and analyzed to address site available for public review at the BLM
Street, Rawlins, WY 82301. Requests for specific effects using best management office listed above during business
information may be sent electronically practices. These site-specific hours (7:45 a.m. to 4:30 p.m.), Monday
to: rawlins_wymail@blm.gov with environmental analyses would be tiered through Friday, except for Federal
‘‘Attention: Seminoe Road DEIS to this EIS. holidays. Your comments may be
Information Request’’ in the subject line. The Seminoe Road DEIS analyzes four published as part of the EIS process.
Mr. Simons may also be reached at (307) alternatives in detail: Individual respondents may request
328–4328. 1. Alternative A, the No Action confidentiality. If you wish to withhold
SUPPLEMENTARY INFORMATION: Dudley & alternative. This means the project as your name or street address or both from
Associates, LLC (the Operators) propose proposed would not be approved; public review or from disclosure under
to explore and develop natural gas 2. Alternative B, the proposed action, the Freedom of Information Act, you
resources from coal beds within their with produced water from coalbed must state this prominently at the
existing leases within the Seminoe Road natural gas drilling and production beginning of your written comments.

VerDate Aug<31>2005 14:11 Nov 23, 2005 Jkt 205001 PO 00000 Frm 00091 Fmt 4703 Sfmt 4703 E:\FR\FM\25NON1.SGM 25NON1
71170 Federal Register / Vol. 70, No. 226 / Friday, November 25, 2005 / Notices

Such requests will be honored to the on this matter can be obtained by Toshiba America Electronic
extent allowed by law. BLM will not contacting the Commission’s TDD Components, Inc., 19900 MacArthur
consider anonymous comments. All terminal on 202–205–1810. Persons Blvd., Suite 400, Irvine, California
submissions from organizations or with mobility impairments who will 92612.
businesses will be made available for need special assistance in gaining access Toshiba America Information
public inspection in their entirety. to the Commission should contact the
Systems, Inc., 9740 Irvine Blvd., Irvine,
Dated: November 15, 2005. Office of the Secretary at 202–205–2000.
California 92618.
Martin G. Griffith, General information concerning the
Commission may also be obtained by Toshiba America Consumer Products,
Acting State Director.
accessing its Internet server at http:// L.L.C., 82 Totowa Road, Wayne, New
[FR Doc. 05–23064 Filed 11–23–05; 8:45 am] Jersey 07470.
www.usitc.gov. The public record for
BILLING CODE 4310–22–P
this investigation may be viewed on the (c) Steven R. Pedersen, Esq., Office of
Commission’s electronic docket (EDIS) Unfair Import Investigations, U.S.
at http://edis.usitc.gov. International Trade Commission, 500 E
INTERNATIONAL TRADE
FOR FURTHER INFORMATION CONTACT: Street, SW., Suite 401, Washington, DC
COMMISSION
Steven R. Pedersen, Esq., Office of 20436, who shall be the Commission
[Inv. No. 337–TA–553] Unfair Import Investigations, U.S. investigative attorney, party to this
International Trade Commission, investigation; and
In the Matter of Certain NAND Flash telephone 202–205–2781.
Memory Devices and Products (3) For the investigation so instituted,
Containing Same; Notice of Authority: The authority for institution of the Honorable Sidney Harris is
this investigation is contained in section 337
Investigation designated as the presiding
of the Tariff Act of 1930, as amended, and
in section 210.10 of the Commission’s Rules administrative law judge.
AGENCY: U.S. International Trade
Commission. of Practice and Procedure, 19 CFR 210.10 Responses to the complaint and the
(2005). notice of investigation must be
ACTION: Institution of investigation
pursuant to 19 U.S.C. 1337. submitted by the named respondents in
Scope of Investigation: Having
accordance with section 210.13 of the
SUMMARY: Notice is hereby given that a considered the complaint, the U.S.
Commission’s Rules of Practice and
complaint was filed with the U.S. International Trade Commission, on
Procedure, 19 CFR 210.13. Pursuant to
International Trade Commission on November 17, 2005, Ordered That:
19 CFR 201.16(d) and 210.13(a), such
October 20, 2005, under section 337 of (1) Pursuant to subsection (b) of
section 337 of the Tariff Act of 1930, as responses will be considered by the
the Tariff Act of 1930, as amended, 19 Commission if received not later than 20
U.S.C. 1337, on behalf of Hynix amended, an investigation be instituted
to determine whether there is a days after the date of service by the
Semiconductor Inc. of Korea; Hynix
violation of subsection (a)(1)(B) of Commission of the complaint and the
Semiconductor America Inc. of San
section 337 in the importation into the notice of investigation. Extensions of
Jose, California; and Hynix
Semiconductor Manufacturing America United States, the sale for importation, time for submitting responses to the
Inc. of Eugene, Oregon. A supplement or the sale within the United States after complaint and the notice of
was filed on November 8, 2005. The importation of certain NAND flash investigation will not be granted unless
complaint, as supplemented, alleges memory devices or products containing good cause therefor is shown.
violations of section 337 in the same by reason of infringement of one Failure of a respondent to file a timely
importation into the United States, the or more of claims 1–5 of U.S. Patent No. response to each allegation in the
sale for importation, and the sale within 5,509,995, or claim 6 of U.S. Patent No. complaint and in this notice may be
the United States after importation of 5,869,404, and whether an industry in deemed to constitute a waiver of the
certain NAND flash memory devices the United States exists as required by right to appear and contest the
and products containing same by reason subsection (a)(2) of section 337. allegations of the complaint and this
of infringement of claims 1–5 of U.S. (2) For the purpose of the notice, and to authorize the
Patent No. 5,509,995, and claim 6 of investigation so instituted, the following administrative law judge and the
U.S. Patent No. 5,869,404. The are hereby named as parties upon which
Commission, without further notice to
complaint further alleges that an this notice of investigation shall be
the respondents, to find the facts to be
industry in the United States exists as served:
as alleged in the complaint and this
required by subsection (a)(2) of section (a) The complainants are: Hynix
Semiconductor Inc., San 136–1, Ami-Ri notice and to enter a final determination
337.
The complainant requests that the Bubal-eub Ichon-Si, Kyoungki-do, Korea containing such findings, and may
Commission institute an investigation 467–860. result in the issuance of a limited
and, after the investigation, issue a Hynix Semiconductor America Inc., exclusion order or cease and desist
permanent exclusion order and cease 3101 North First Street, San Jose, order or both directed against the
and desist orders. California 95134. respondent.
ADDRESSES: The complaint, except for Hynix Semiconductor Manufacturing By order of the Commission.
any confidential information contained America Inc., 1830 Willow Creek, Issued: November 18, 2005.
therein, is available for inspection Eugene, Oregon 97402. Marilyn R. Abbott,
during official business hours (8:45 a.m. (b) The respondents are the following
Secretary to the Commission.
to 5:15 p.m.) in the Office of the entities alleged to be in violation of
Secretary, U.S. International Trade section 337, and are the parties upon [FR Doc. 05–23249 Filed 11–23–05; 8:45 am]
Commission, 500 E Street, SW., Room which the complaint is to be served: BILLING CODE 7020–02–P
112, Washington, DC 20436, telephone Toshiba Corporation, 1–1, Shibaura
202–205–2000. Hearing impaired 1–Chome, Minato-Ku, Tokyo 105–8001,
individuals are advised that information Japan.

VerDate Aug<31>2005 14:11 Nov 23, 2005 Jkt 205001 PO 00000 Frm 00092 Fmt 4703 Sfmt 4703 E:\FR\FM\25NON1.SGM 25NON1