b. The technical proposal which do not contain EMD will be rejected and will not be
considered as eligible bidder.
c. The technical proposal shall include the proof of turnover of past 3 years, duly
certified by a charted accountant.
d. It shall also include the bio data of the experts as mentioned in eligibility criteria and
the consent of the experts that they are willing to be associated with the assignment.
e. Any replacement in the names of expert submitted will only be possible after getting
prior consent of the bid sanctioning authority. The replacement is permitted only
with the experts having equal or better qualification for each expert category.
f. The technical proposals shall also be accompanied by verified signatures of the
person responsible for management of contract on behalf of the bidder. The
authorized person will be responsible for signing the contract and provide the
deliverables.
g. The bidder has to quote the rates on lump sum basis for the entire work. The
financial proposal shall include the total cost for the assignment, inclusive of all the
taxes and duties. The contract will be assigned on all inclusive cost. The financial
proposal accompanied with physical submission of the hard copy of the technical
proposals shall be rejected.
h. The financial proposals of technically qualified bidders will be opened.
i. The financial proposals of technically unqualified bidders will not be opened.
j. The work will be awarded to L1 bidder. In case L1 bidder refuses the assignment on
any grounds, L2 bidder may be considered. The successful bidder is required to sign
an agreement within 15 days from the date of issue of Letter of Acceptance.
k. Important Dates:
Dates
24.09.2015
12.10.2015
28.10.2015
29.10.2015
30.09.2015
Particulars
Bid Publication
Pre bid meeting
Last date of bid
submission (online)
Last date of bid
submission (physical)
Bid opening (technical)
Time
11:30 hrs.
17:30 hrs.
17:30 hrs.
11:00 hrs.
4. Committee:
The Public Works Department, Govt. of M.P. vide order no. R
517/2015/B/19 Bhopal dt. 14/8/2015 have constituted a committee to monitor that the work
is being carried out as per the scope as defined in para 5 and 6 below. The committee will
submit the draft manual for approval to the State government.
3|Page
5. Overall Objective of the Assignment: The overall objectives of the assignment shall
include (but not limited to) the following:
a. The Firm/ organization is required to study latest similar manuals like the Central
Public Works Department Manual 2014 or Works Manual of other States and
suggest appropriate changes in the existing manual.
b. The Firm/ organization is also expected to suggest additions regarding provisions
of strict quality control, Inspection and monitoring methodology, contract
management, action against defaulting contractors, recoveries and settlement of
Audit paras.
c. The Firm/ organization is also expected to suggest deletion of existing provisions
which have lost their relevance in the current scenario.
6. Specific Objectives of the Assignment: The specific objectives of the assignment shall
include (but not limited to) the following:
a. The Firm/ organization is expected to extensively study various provisions of
similar manuals like the Central Public Works Department Manual 2014 or latest
Works Manual of other States and make a comparative statement of the provisions
with respect to Madhya Pradesh Works Department Manual 1983, highlighting the
deficiencies / strengths of the existing manual.
b. The Firm/ organization shall specifically study the quality control aspects of all the
infrastructures like roads, buildings, bridges, canals, dams etc. and suggest
appropriate provisions in the draft manual. The responsibility of quality control
shall be entrusted to the officers at various levels in the departmental hierarchy, the
primary responsibility shall lie with the officers directly responsible for
construction activities.
c. The draft manual shall include strict monitoring provisions by various levels in the
departmental hierarchy. A monitoring schedule for every type of construction as
well as at every level of construction shall be included as annexure.
d. The provisions of inspections at various levels in the departmental hierarchy shall
also be included in the draft manual. Various aspects of inspection shall also be
covered in detail.
e. The draft manual shall also include provisions regarding survey, preparation of
estimates, administrative and technical sanctions, execution of work, maintenance
of and recording in measurement book, bill preparation and passing of bills.
f. The draft manual shall also include provisions regarding Green building norms.
g. The draft manual shall also include provisions regarding tendering process starting
with preparation of tender document in conformity with standard tender document
of the department, publicity, invitation of tenders, bid evaluation, awarding the
contract, receiving bid security, performance security including e- tendering.
4|Page
h. The draft manual shall also include provisions for registration of contractors,
receiving registration fee and monitoring the performance of contractors and
considering it at the time of revalidation of registration.
i. The draft manual shall also include provisions regarding contract management
including but not limited to progress monitoring as per work schedule, timely
recoveries from the contractors for delayed progress, timely return of security to
contractors along with arbitration and litigation.
j. The draft manual shall also include provisions regarding store management.
k. The draft manual shall also include provisions regarding accounting processes,
budget, Internal audit/ Audit by Accountant General, time limits for disposal of
audit para, actions required to be taken in E in C office/ Zonal/Circle/Divisional
offices for settlement of draft audit para. It should also include fixing
responsibilities of various officers including Divisional Accountants/ Account
Officers/ Executive engineers regarding disposal of audit para.
l. The draft manual shall also include provisions regarding fair wages and labour
regulations.
m. The Firm/ organization is required to study various new initiatives like online
registration of contractors, works department drawl facility (WDDF), Integrated
Financial Management & Information System (IFMIS), Standard Bid document
and other initiatives undertaken by Government departments of Madhya Pradesh so
as to include appropriate provisions in the manual.
n. The draft manual shall also include provisions regarding duties and responsibilities
of different officers.
o. The draft manual shall also include provisions regarding powers assigned to
different officers regarding technical / administrative approvals, incur expenditure
and taking disciplinary actions as defined in M.P. Book of Financial Powers, M.P.
Civil Services conduct Rules and other rules/ manuals so as to provide consolidated
information to field staff.
p. The draft manual shall also include provisions regarding training needs of user
departments.
q. The above mentioned scope is suggestive only, the Firm/ organization is free to
include best practices being adopted by Central Government/ State Governments /
Union Territories.
r. On the basis of above, the Firm/ organization shall prepare a preliminary draft,
which will be discussed by a committee appointed by public works department.
Appropriate changes in the draft are required to be accommodated after every
discussion. The final draft will be submitted for approval of the committee.
5|Page
7.
Deliverable
Initial discussions and preparation of
work plan
Submission of comparative statement
as per clause 6
Submission of preliminary draft.
Submission of final draft.
Approval of the draft manual by the
administrative department
% of contracted
amount to be paid
5%
10%
30%
45%
10%
6|Page
10. Duration & Penalty: The assignment shall be completed in 4 months. The successful
bidder is required to submit a work plan accordingly. In case of delays, 2% per week
penalty will be levied and will be deducted from the amount payable at every stage. The
maximum penalty will be limited to 10% of the contracted amount.