MR Credit 1.1: Building Reuse- Maintain existing walls, floors and roof
Intention: Extend the life cycle of existing building stock, conserve resources, retain
cultural resources, recue waste and reduce environmental impacts of new buildings
as they relate to materials manufacturing and transport. Requirements: NC,
Schools, CS Maintain existing building structure (including structural floor.
Requirements:
Extend the life cycle of existing building stock, conserve resources, retain
cultural resources, recue waste and reduce environmental impacts of new
buildings as they relate to materials manufacturing and transport.
If project includes an addition with sq. ft. > 2 times the area of the existing
building, this credit is NA.
Requirements:
Use materials with recycled content such that the sum of post-consumer
recycled content plus of the pre-consumer content constitutes at least 10%
or 20%, based on cost of total value of materials in project.
Minimum percentage of materials recycled for each point threshold is as
follows:
10% = 1 Pt.
20% = 2 Pts.