66374 Federal Register / Vol. 70, No.

211 / Wednesday, November 2, 2005 / Notices

DEPARTMENT OF ENERGY (866) 208–3676 (toll free). For TTY, call hurricanes.2 Enbridge explains further,
(202) 502–8659. that, as a result of the substantial
Federal Energy Regulatory Comment Date: 5 p.m. Eastern Time damage caused to the energy
Commission October 28, 2005. infrastructure in the Gulf Coast area, the
Offshore Pipelines are suffering
Magalie R. Salas,
[Docket Nos. AI05–1–000 and AC06–5–000] emergencies affecting their systems’
Secretary. reliability. Enbridge states that it is
Jurisdictional Public Utilities and [FR Doc. E5–6031 Filed 11–1–05; 8:45 am] necessary for the Offshore Pipeline
Licensees; Natural Gas Companies Oil BILLING CODE 6717–01–P employees who are assisting in the
Pipeline Companies; El Paso Natural restoration efforts to communicate with
Gas Company; Notice of Accounting other Enbridge employees and with
Assessment Costs DEPARTMENT OF ENERGY third-party employees about the status
of the restoration efforts and to
October 21, 2005. Federal Energy Regulatory coordinate joint operations and repair
Take notice that on October 19, 2005, Commission work, without regard to their
El Paso Natural Gas Company (El Paso) designation under the Standards of
[Docket Nos. RM01–10–000 and EY06–4–
tendered for filing a request for approval 000] Conduct. Enbridge states that the
by the Chief Accountant to adopt the requirement to log each individual
provisions of the June 30, 2005 Order Standards of Conduct for deviation would be burdensome and
under Docket No. AI05–1–00, effective Transmission Providers; Enbridge Inc. would complicate the Offshore
December 1, 2005.1 and Enbridge Energy Partners, L.P.; Pipelines’ restoration efforts. Enbridge
Any person desiring to intervene or to Notice Granting Waiver of notes that its waiver is limited to those
protest this filing must file in Recordkeeping Requirements employees involved in the ongoing
accordance with Rules 211 and 214 of restoration efforts and the
the Commission’s Rules of Practice and October 24, 2005.
communications required in connection
Procedure (18 CFR 385.211 and On October 18, 2005, Enbridge Inc. with that effort. Enbridge states that the
385.214). Protests will be considered by and Enbridge Energy Partners, L.P. affected employees will observe the no-
the Commission in determining the (collectively, Enbridge), on behalf of conduit requirement in the Standards of
appropriate action to be taken, but will certain of their respective Offshore Conduct.
not serve to make protestants parties to Pipelines,1 filed to seek a temporary Due to the emergency conditions in
the proceeding. Any person wishing to emergency waiver of section 358.4(a)(2) Louisiana and Texas created by
become a party must file a notice of of the Commission’s regulations and for Hurricane Rita, on September 23, 2005,
intervention or motion to intervene, as any other waivers necessary for the Commission issued a notice that,
appropriate. Such notices, motions, or Enbridge to proceed with the restoration among other things, allowed affected
protests must be filed on or before the work on its Offshore Pipelines. Enbridge transmission providers to delay, until
date as indicated below. Anyone filing requests that the waivers begin October October 7, 2005, compliance with the
an intervention or protest must serve a 7, 2005 and continue until the earlier of requirement of section 358.4(a)(2) of the
copy of that document on the Applicant. the end of the gas day on March 31, Commission’s regulations, 18 CFR
Anyone filing an intervention or protest 2006 (the last day of the 2005–2006 358.4(a)(2) (2005), to report to the
on or before the intervention or protest winter heating season) or the date on Commission and post on the OASIS or
date need not serve motions to intervene which the throughput expected for the Internet Web site, as applicable, each
or protests on persons other than the particular pipeline is fully restored. emergency that resulted in any
Applicant. Effective on the date of this notice, the deviation from the Standards of
The Commission encourages Commission will grant each of the Conduct.3 Due to the extreme nature of
electronic submission of protests and Enbridge Offshore Pipelines a waiver of the emergency, the Commission also
interventions in lieu of paper using the the otherwise applicable requirements waived, until October 7, 2005, the
‘‘eFiling’’ link at http://www.ferc.gov. of section 358.4(a)(2) to record a log of requirements to record and retain a
Persons unable to file electronically emergency-related deviations from the record of each deviation of the
should submit an original and 14 copies Standards of Conduct and to post these Standards of Conduct.4 The notice
of the protest or intervention to the deviations on their Web sites; this added that the Commission would
Federal Energy Regulatory Commission, extension will expire individually for consider extending the waiver if it
888 First Street, NE., Washington, DC each pipeline on the earlier of when that continued to be needed after October 7,
20426. pipeline has completed its hurricane- 2005. The Commission had previously
This filing is accessible on-line at related repairs and is ready to return to granted similar waivers due to
http://www.ferc.gov, using the service, or January 13, 2006. Hurricane Katrina.5
‘‘eLibrary’’ link and is available for Enbridge explains that, in the area
review in the Commission’s Public impacted by Hurricanes Katrina and 2 Enbridge states that the Offshore Pipelines are

Reference Room in Washington, DC. Rita, the Offshore Pipelines are either currently experiencing approximately 1,315,000
There is an ‘‘eSubscription’’ link on the off-line entirely or are continuing to Dth/d in decreased throughput due to hurricane-
experience throughput that is related damage along the Gulf Coast and in the Gulf
Web site that enables subscribers to of Mexico.
receive e-mail notification when a substantially lower than the throughput 3 Notice Granting Extension of Time To Comply
document is added to a subscribed projected for these pipelines prior to the With Posting and Other Requirements, Standards of
docket(s). For assistance with any FERC Conduct for Transmission Providers, Docket Nos.
Online service, please e-mail 1 Enbridge is filing on behalf of Enbridge Offshore EY05–20–000, et al. (September 23, 2005).
4 Id.
FERCOnlineSupport@ferc.gov, or call Pipelines (UTOS) L.L.C. Enbridge Energy Partners,
L.P. is filing on behalf of Garden Banks Gas 5 Notice Granting Extension of Time To Comply

Pipeline, LLC, Mississippi Canyon Gas Pipeline, With Posting and Other Requirements, Standards of
1 Jurisdictional Public Utilities and Licensees, LLC, Nautilus Pipeline Company, L.L.C. and Conduct for Transmission Providers, Docket Nos.
Natural Gas Companies, Oil Pipeline Companies, Stingray Pipeline Company, L.L.C. (collectively, EY05–14–000, et al. (August 31, 2005); Notice
111 FERC ¶ 61,501 (2005). Offshore Pipelines). Waiving Record Keeping Requirements, Standards

VerDate Aug<31>2005 17:22 Nov 01, 2005 Jkt 208001 PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 E:\FR\FM\02NON1.SGM 02NON1
Federal Register / Vol. 70, No. 211 / Wednesday, November 2, 2005 / Notices 66375

Based on available information of paper using the ‘‘eFiling’’ link at or protests on persons other than the
regarding the expected restoration dates http://www.ferc.gov. Persons unable to Applicant.
for Enbridge’s pipeline operations, the file electronically should submit an The Commission encourages
Commission grants Enbridge a waiver of original and 14 copies of the protest to electronic submission of protests and
the recording and posting requirements the Federal Energy Regulatory interventions in lieu of paper using the
of section 358.4(a)(2) of the Commission, 888 First Street, NE., ‘‘eFiling’’ link at http://www.ferc.gov.
Commission’s regulations under these Washington, DC 20426. Persons unable to file electronically
emergency circumstances effective on This filing is accessible on-line at should submit an original and 14 copies
the date of this notice until the earlier http://www.ferc.gov, using the of the protest or intervention to the
of January 13, 2006, or the date on ‘‘eLibrary’’ link and is available for Federal Energy Regulatory Commission,
which each individual offshore review in the Commission’s Public 888 First Street, NE., Washington, DC
pipeline’s hurricane-related repairs are Reference Room in Washington, DC. 20426.
completed and that pipeline is ready to There is an ‘‘eSubscription’’ link on the This filing is accessible on-line at
return to service, without prejudice to Web site that enables subscribers to http://www.ferc.gov, using the
Enbridge requesting a further extension, receive e-mail notification when a ‘‘eLibrary’’ link and is available for
if necessary. document is added to a subscribed review in the Commission’s Public
docket(s). For assistance with any FERC Reference Room in Washington, DC.
Magalie R. Salas,
Online service, please e-mail There is an ‘‘eSubscription’’ link on the
Secretary. Web site that enables subscribers to
FERCOnlineSupport@ferc.gov, or call
[FR Doc. E5–6038 Filed 11–1–05; 8:45 am] (866) 208–3676 (toll free). For TTY, call receive e-mail notification when a
BILLING CODE 6717–01–P (202) 502–8659. document is added to a subscribed
docket(s). For assistance with any FERC
Magalie R. Salas,
Online service, please e-mail
DEPARTMENT OF ENERGY Secretary. FERCOnlineSupport@ferc.gov, or call
[FR Doc. E5–6039 Filed 11–1–05; 8:45 am] (866) 208–3676 (toll free). For TTY, call
Federal Energy Regulatory BILLING CODE 6717–01–P (202) 502–8659.
Commission
Comment Date: 5 p.m. Eastern Time
[Docket No. RP05–503–002] on November 18, 2005.
DEPARTMENT OF ENERGY
Equitrans, L.P.; Notice of Compliance Magalie R. Salas,
Filing Federal Energy Regulatory Secretary.
Commission [FR Doc. E5–6036 Filed 11–1–05; 8:45 am]
October 21, 2005.
BILLING CODE 6717–01–P
Take notice that on October 18, 2005, [Docket No. EL06–7–000]
Equitrans, L.P. (Equitrans) tendered for
filing as part of its FERC Gas Tariff, Metropolitan Life Insurance Company; DEPARTMENT OF ENERGY
Original Volume No. 1, the following Notice of Filing
revised tariff sheets, proposed to Federal Energy Regulatory
become effective on September 1, 2005: October 21, 2005. Commission
Second Substitute Sixth Revised Sheet No. Take notice that on October 19, 2005,
[Docket No. ER04–230–019]
308 Metropolitan Life Insurance Company
Second Substitute Third Revised Sheet No. (MetLife) filed a petition for declaratory New York Independent System
309 order requesting that the Commission Operator, Inc.; Notice of Compliance
Equitrans states the filing is being find that MetLife is not a public utility Filing
made in compliance with the under the Federal Power Act as a result
Commission’s unpublished Letter Order of the transaction authorized by the October 21, 2005.
issued October 4, 2005, at Docket No. Commission in Docket No. EC05–87– Take notice that on October 3, 2005,
RP05–503–001. 000. MetLife states that it has served its the New York Independent System
Any person desiring to protest this petition on the official service list Operator, Inc. (NYISO) tendered for
filing must file in accordance with Rule compiled in Docket No. EC05–87–000. filing a report on stakeholders process
211 of the Commission’s Rules of Any person desiring to intervene or to and cost-benefit analysis to supplement
Practice and Procedure (18 CFR protest this filing must file in is June 1, 2005 compliance filing made
385.211). Protests to this filing will be accordance with Rules 211 and 214 of in response to the Commission’s July 13,
considered by the Commission in the Commission’s Rules of Practice and 2005 Letter Order.
determining the appropriate action to be Procedure (18 CFR 385.211 and Any person desiring to intervene or to
taken, but will not serve to make 385.214). Protests will be considered by protest this filing must file in
protestants parties to the proceeding. the Commission in determining the accordance with Rules 211 and 214 of
Such protests must be filed in appropriate action to be taken, but will the Commission’s Rules of Practice and
accordance with the provisions of not serve to make protestants parties to Procedure (18 CFR 385.211, 385.214).
section 154.210 of the Commission’s the proceeding. Any person wishing to Protests will be considered by the
regulations (18 CFR 154.210). Anyone become a party must file a notice of Commission in determining the
filing a protest must serve a copy of that intervention or motion to intervene, as appropriate action to be taken, but will
document on all the parties to the appropriate. Such notices, motions, or not serve to make protestants parties to
proceeding. protests must be filed on or before the the proceeding. Any person wishing to
The Commission encourages comment date. Anyone filing a motion become a party must file a notice of
electronic submission of protests in lieu to intervene or protest must serve a copy intervention or motion to intervene, as
of that document on the Applicant. On appropriate. Such notices, motions, or
of Conduct for Transmission Providers, Docket Nos. or before the comment date, it is not protests must be filed on or before the
EY05–14–001, et al. (September 7, 2005). necessary to serve motions to intervene comment date. Anyone filing a motion

VerDate Aug<31>2005 17:22 Nov 01, 2005 Jkt 208001 PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 E:\FR\FM\02NON1.SGM 02NON1