Bayfront Avenue
Tel: 63278888 Fax:65348919
Tanjong Pagar Post Office PO Box 045
Singapore 910802
REV
Date
Description
Prepared
Checked
Approved
24-Jan-08
Issued for
Anbu
Christopher
Edgardo
Acceptance
Tan
CONTENTS
1. Scope of works
2. Method Statement
3. Approved Materials
4. Project organization for Health & Safety Control
5. Health & Safety Risks and Control
6. Access / Egress
7. Lighting
8. Plant & Equipment
9. Waste Management
10. Special Control Measures
11. Appendixes
1. Scope of Works
Scope of Activities
This scope defines the minimum standards to be adopted when installing Electrical cable in
buildings and structures according to Electrical specification of client. Electrical cables shall
be installed concealed or surfaced-run in the concrete slab/wall according to construction
co-ordination drawings.
Site Procedure
Site mobilization shall be done with real time monitoring the conditions & progress of builder
works. Before commencement of the work, carry out examination of the physical condition of
the area. Photographs should be taken where necessary, prior to commencement and
during works.
Method Statement
1. Installation stage
LV-Sub-main cables
a. Site survey of the proposed cable routing based on approved CSD by foreman /
sub-contractor together with Engineer.
b. Installation shall be carried out based on approved shop drawings & material used
shall be of approved brand.
c. In most cases, the distribution sub main cables will be in the form of XLPE /PVC
cables with copper conductors, all as defined in the particular specification and
drawings.
d. Cable containment shall be completed prior to cable installation. Draw the cables
into containment for installation of larger diameter cables rollers would be placed at
strategic location to ease the process.
e. If cables are to be jointed, then the manufacture recommended jointing kit and
methods are to be strictly adhered too.
f.
In the event of joints being unavoidable, such joints shall conform to the
requirements of BS7671 and clearly identified in the as built drawings.
g. Cables of the sizes and types specified shall be installed to follow the approximate
routes indicated on the drawings.
Project: The Marina Bay Sands
Document: 2100_6140_MS_TC_HTL_5400
Produced by: UES
Revision A
h. Cables shall be installed in such a manner that the cables do not come into contact
with gas, oil, steam, hot or cold water pipes.
i.
Where installed within switches, distribution boards, control panels and the like,
wiring shall be neatly and carefully bunched, being adequately supported and held
in position by means of supports or brackets or insulating material as necessary.
j.
After installation of cables, Engineer-in-charge shall check the complete works and
complete the Inspection checklist EE-INS-13 for Electrical cable installation works. (
See annex. 1 )
k. Engineer-in-charge shall arrange and request for inspection with the Owners
representative M&E clerks of works (COW) using approved Main con Request for
Inspection(RIN) form. ( See annex.2 )
ELV- cables
a. Site survey of the proposed cable routing based on approved CSD by foreman /
sub-contractor together with Engineer.
b. Installation shall be carried out based on approved shop drawings & material used
shall be of approved brand.
c. In most cases, the distribution sub main cables will be in the form of XLPE /PVC
cables with copper conductors, all as defined in the particular specification and
drawings.
d. Cable containment shall be completed prior to cable installation. Draw the cables
into containment for installation of larger diameter cables rollers would be placed at
strategic location to ease the process.
e. If cables are to be jointed, then the manufacture recommended jointing kit and
methods are to be strictly adhered too.
f.
In the event of joints being unavoidable, such joints shall conform to the
requirements of BS7671 and clearly identified in the as built drawings.
g. The wiring to all multiple socket outlet circuits shall be carried out by looping from
point to point using twin cable.
h. Lighting circuits shall be wired using single and multicolored cables as necessary,
with live connections made only at lighting point boxes or switches.
Bayfront Avenue
Tel: 63278888 Fax:65348919
Tanjong Pagar Post Office PO Box 045
Singapore 910802
i.
Cables of the sizes and types specified shall be installed to follow the approximate
routes indicated on the drawings.
j.
Cables shall be installed in such a manner that the cables do not come into contact
with gas, oil, steam, hot or cold water pipes.
k. Where installed within switches, distribution boards, control panels and the like,
wiring shall be neatly and carefully bunched, being adequately supported and held
in position by means of supports or brackets or insulating material as necessary.
l.
After installation of cables, Engineer-in-charge shall check the complete works and
complete the Inspection checklist EE-INS-13 for Electrical cable installation works. (
See annex. 1 )
m. Engineer-in-charge shall arrange and request for inspection with the Owners
representative M&E clerks of works (COW) using approved Main con Request for
Inspection (RIN) form. ( See annex.2 )
2. Approved Materials
LV Cables
Electric
cables
having
PVC
insulation
BS
6346.
Bayfront Avenue
Tel: 63278888 Fax:65348919
Tanjong Pagar Post Office PO Box 045
Singapore 910802
6. Lighting
Adequate temporary/task lighting shall be provided if work to be carried at night or at
dark places.
7. Plant & Equipment
S/N
Description
Unit
1 lot
Electrical/Data-Comm Scissors
1 lot
1 lot
1 lot
1 lot
Diagonal-Cutting Pliers
1 lot
1 lot
Side-Cutting Pliers
1 lot
Shank Screwdriver
1 lot
10
1 lot
11