Wireless hardware installation key point

Orange Project_Jordan
V1.4

This document including most frequently mistakes has made during site installation
and swap.
If you have any questions and suggestion regarding installation and swap,

please feedback
Mohammed.Ammar@huawei.com
michael.wangkun@huawei.com

HUAWEI TECHNOLOGIES CO., LTD.

Contents
1
1. Cabinet
1.1 Cabinet location
1.2 Equipment layout in BTS and TP cabinet of scenario 1

2. Main equipment
2.1 RRU Installation principle
2.2 MRFU Install Position Principle
2.3 The mounting ears and cable claw of DCDU -12B
2.4 Sensor installation in TP48200A power cabinet
2.5 AC input power cable installation
2.6 Battery installation in TP48200A power cabinet
2.7 TP48200A Power System Commissioning

3. Antenna&feeder system
3.1 Distinguish the right port of New antenna
3.2 Use double screws to fix Wireless ANT on mast/pole
3.4 Color ring principle for jumper
3.5 How to measure the azimuth of ANT
3.6 How to adjust the down-tilt of ANT

4. DC power distribution
4.1 The TP48200A MCB distribution for DCDU
4.2 The DCDU distribution for RRU

5. Cable installation
5.1 Cable route at outdoor cabinets
5.2 Monitor cable from TP to BBU
5.3 Transmission cable from MW IDU to BTS
5.4 Install AISG cable from ANT to RRU
5.5 Hoist RRU fiber

6. Grounding
6.1 cabinet & RRU grounding
6.2 RRU Power cable grounding
6.3 7/8feeder grounding

7. Waterproof
7.1 The connector of jumper waterproofed
7.2 7/8feeder grounding waterproofed

cabinet

1.1 The base &cabinet installation on concrete


BTS3900A & TP48200A cabinet on concrete must be 40-150mm
away from each other, make sure the door of cabinet can be
opened normally.
2 cabinet at same level

BTS3900A

TP48200A

800mm
BTS at Left

TP at Right

50mm

The cable between two cabinets


need to use PVC Pipe, to protect
cable from damage !!!
BTS3900A

TP48200A

1.2 Equipment layout of scenario 1 (1/3)


General view

1.2 Equipment layout of scenario 1 (2/3)


The equipment layout in BTS3900A cabinet

DCDU-12A for
BBU and Fan
BBU3910
DCDU-12B for
3G and 4G RRU
1DCDU-12B maximum
support 6 RRU, In case
more than 6RRUs, must
add another DCDU-12B
here.

DCDU-12A for
MRFU power
M
R
F
U
d

1.2 Equipment layout of scenario 1 (3/3)


The equipment layout in TP48200A cabinet

AC/DC Breaker

DDF for E1s

DCDU-12B for RTN power

RTN location

Main equipment

2.1 RRU Install Position Principle


If have space on mast/ tower, each sector install 2 RRUs, one is 3G RRU,
another is 4G RRU

4G

3G

One RRU is 1800M_4Ganother is 2100M_3G

Using joint bar connect each RRU

If no enough space on mast/ tower, 3 RRUs can be combined, they are same
frequency . the other 3RRUs also be combined.

4G

4G

4G

Same frequency 1800M_4G

3G

3G

3G

Same frequency 2100M_3G

Using joint bar connect


each RRU

2.2 MRFU Install Position Principle


MRFU module for 2G, install at the low rack of BTS3900A cabinet

If the sector of 2G is 1 3, MRFU install as below:

If the sector of 2G is 4 6, MRFU install as below:

2.3 The mounting ears and cable claw of DCDU -12B


The material of DCDU-12B :

Mounting ear

Cable claw for DCDU-12B

Before install the DCDU-12B in BTS&TP cabinet, must adjust the mounting ear to move
forward, and install cable claw at DCDU-12B right side

Move forward

Move forward

Mounting ear

Cable claw for DCDU-12B

10

2.4 Lamp & Sensor installation inTP48200A cabinet


Sensor Installation Layout

Smoke Sensor

Sensor Cable Port

Lamp

Temperature
and Humidity
Sensor

Water Sensor

11

2.4 Lamp installation(1/4)


Installing a lamp
Procedure:
Install a lamp on the fastener on the right of the cabinet.
Connect the negative (-) lamp power cable for the lamp to the 10A (C10)
load circuit breaker.
Connect the positive (+) lamp power cable to the RTN+ busbar.

Lamp Power Cable (-)

RTN+
busbar

Lamp Power Cable (+)


Lamp

12

2.4 Smoke Sensor installation(2/4)


Installing a Smoke Sensor
Procedure:
Remove screws that secure the smoke sensor to the right of the cabinet top.
Dismantle smoke sensor base from the sensor, secure the smoke sensor base to
the top of the cabinet by using the removed screws.
Secure the smoke sensor to the base.
Connect one end of the signal cable to the smoke sensor and the other end to
the SMOKE port on the UIM panel.

1
Smoke Sensor
Installation Location

Smoke Sensor Base

Smoke
Sensor

Smoke Sensor Port

Smoke Sensor Port

13

2.4 Water Sensor installation (3/4)


Installing a Water Sensor
Procedure:
Put the water sensor in the cable strip in the right part of the cabinet bottom
(ensure that the sensor is 5 mm to 10 mm away from the cabinet bottom), and
secure the sensor with a cable tie.
Connect the water sensor signal cable to the WATER port on the UIM panel.

Water Sensor Port

Water Sensor Port

Water Sensor

14

2.4 Temperature & Humidity Sensor installation(4/4)


Installing a Temperature and Humidity Sensor
Procedure:
Remove the fastener for the temperature and humidity sensor from the left of
the cabinet.
Open the cover of the temperature and humidity sensor, and install the sensor
on the fastener.
Connect one end of the signal cable for the temperature and humidity sensor
to the sensor.
Close the cover of the temperature and humidity sensor.
Reinstall the fastener for the temperature and humidity sensor on the cabinet.

T Cables

RH Cables

Temperature & Humidity


Sensor Port
15

2.5 AC input power cable installation


Installing AC Input Power Cables
Procedure:
Lay out an AC input power cable, and route it into the cabinet through the
cable hole in the left part of the cabinet bottom.
Find a spare(or new purchase and install) 3*25A(there-phase 25A) AC circuit
breaker in AC box.
Secure the AC input power cable to the corresponding AC input circuit breakers
and terminal.

AC INPUT
Circuit Breaker
in Power System

3*25A
Circuit Breaker
in AC box

Note:
If the AC box cant reuse or re-install 3*25A breaker, only allow to

use single-phase breaker(at least 1*10A) for temporary precommissioning of BTS/MW, But should turn off the existing power
system before swapping, and relocate Huawei power system AC
INPUT to three-phase circuit breaker(3*25A).
16

2.6 Battery installation


Installing Batteries
Procedure:
Install batteries into the
battery compartment in the
sequence.

Remove the insulation cover from the


batteries.
Install copper bars between batteries.
Reinstall the insulation covers onto the
two batteries in the middle.

Insulation Cover

Copper Bar

Take negative battery cables from the left side of the battery compartment, and
connect the cables to negative battery terminals.
After you install all negative battery cables, take positive battery cables from the
right side of the battery compartment, and connect the cables to positive battery
terminals.
Reinstall the insulation covers onto the batteries on the left and right sides.

17

2.7 Power System Commissioning(1/2)


1. Connecting the AC Power Supply
Procedure:
Measure the input voltage on the AC input circuit breaker. The value should
range from 85 V AC to 300 V AC.
Switch on the AC input circuit breaker and measure the output voltage of the
AC input circuit breaker. The value should range from 85 V AC to 300 V AC.
Check that the indicators on the rectifiers are steady on.
Measure the voltage between the -48 V busbar and the RTN+ busbar. The value
should range from -42 V DC to -58 V DC.
2. Setting the Display Language
Procedure:

3. Setting the Date and Time

Main Menu

Setting
Wizard

Second-Level Menu

Third-Level Menu

Default Value

Setting

Date and Time

Set to the local date


and time.

Time Zone

UTC +08:00
Beijing

Set to the local time


zone.
Yes/No

Date and Time


NTP Enable

18

No

NOTE
Set the parameter to
Yes if you need to
synchronize the SMU
time and the site
network server time.

2.7 Power System Commissioning (2/2)


4. Setting Battery Parameters
Main
Menu

SecondLevel Menu

Parameter
s Settings

Battery

ThirdLevel Menu

FourthLevel Menu

Default
Value

Battery 1
Connected

Yes

Battery 2
Connected

Yes

Basic
Parameters

If 2 battery strings are


connected, set Battery 1
Connected to Battery 2
Connected to Yes.

Rated capacity of the


batteries in a battery string.
Rated Capacity

Other
Parameters

Setting Value

Installation
Time

150 Ah NOTE
The batteries controlled by
one circuit breaker or fuse
are called a battery string.
-

Set to the current date

5. Setting Sensor Parameters


Main Menu

Parameters
Settings

SecondLevel Menu

ThirdLevel Menu

FourthLevel Menu

Default Value

Water Sensor

None

Smoke Sensor

None

Config. Ambient Temp.


Power System Sensor
Para.
Sensor

None

Ambient Humi.
Sensor

None

Setting

Set to Yes.

6. Connecting the Battery Supply


Procedure:
Switch off AC input circuit breakers.
Switch on the battery circuit breaker, then switch on AC input circuit breakers.
Switch all the circuit breakers to the appropriate status based on site requirements.
Observe the power system for 15 minutes. If no alarm (excluding door alarms) is
generated on the LCD during this period, the voltage and current for batteries and
loads are normal.
19

Antenna&feeder system

20

3.1 Distinguish the right port of New antenna


For this type antenna, the left port yL is defined 1800M, the right port
yyR is defined 2100M.
900M
3G-2100M

4G-1800M

AISG
Female

AISG
Male

Left is 1800M, 4G

Right is 2100M, 3G

21

3.2 Use double screws to fix Wireless ANT

22

3.3 Color ring principle


900M_GSM
TX
RX
1

900M_GSM
TX
RX
1

Sector A
Blue
2100M_3G
TX
RX
3

Sector C
Yellow
2100M_3G
TX
RX
3

1800M_4G
TX
RX
5

900M_GSM
TX
RX

1800M_4G
TX
RX
5

900M_GSM
TX
RX

23

Sector B
Red
2100M_3G
TX
RX
3

Sector D
White
2100M_3G
TX
RX
3

1800M_4G
TX
RX
5

1800M_4G
TX
RX
5

3.4 How to measure the azimuth of ANT


Be sure that the position of compass was put it correctly
Dont test on the tower
Keep more than 2 meters from the tower
Keep the compass in horizontal
Make the compass in same direction with target
antenna

horizontal

Step1: Make the mid-line of compass is same with the


direction of Antenna
Azimut h= the red value found on the compass via the
observing hole
Record the value.

Make the compass same direction with


antenna

Read the Red number from the observe


window (the first number)

Record and call OMC to confirm the azimuth value of all the sectors

24

3.5 How to adjust the down-tilt of ANT


The HW Tri-band antenna length is 2.6 meters, should set mechanical tilt
according to the marker of L=2.6

This small triangle using to


define mechanical down tilt

Record and call OMC to confirm the M-tilt value of all the sectors

25

DC power distribution

26

4.1 The TP48200A MCB distribution for DCDU


LLVD

BLVD

BAT

Note:
IF RRU more than 6pcs, must add one new DCDU-12B_2. It is the red color in the BTS
cabinet as picture.

27

4.2 The RRU Power distribution at DCDU-12B


1DCDU-12B maximum support
6RRU,iF RRU more than 6pcs,
must add one new DCDU-12B.
It is the red one DCDU-12B_2
in the picture.

28

Cable installation

29

5.1 Cable route at cabinet

30

5.2 Install Monitor cable from TP to BBU


The blue cable is monitor cable from TP to BBU
Note:
For temporary scenario, BBU
install at TP cabinet, the monitor
cable from TP to BBU, BBU side
is port Monitor0at UPEU
board.

31

5.3 Transmission cable from MW IDU to BTS

Connect to RTN905 GE port3

NOTE:
If use the RTN950, the transmission
cable should connect to the GE
electrical port 3 of EG4 board.

Connect to RTN950 EG4--GE port3

32

5.4 Install AISG cable from ANT to RRU


AISG cable will be installed from 3G RRU 3839 to antenna

3G RRU

AISG cable input on


the antenna

AISG cable input


inside the RRU

AISG cable is waterproof, no need waterproof for connector.

33

5.5 Hoist RRU fiber

Do not remove the stretch


sling and protection pipe
when lifting RRU fiber !!!

Making a
simple wire
spool tools

3 fibers
twist
together

Using wire
spool tools

34

Grounding

35

6.1 Cabinet & RRU grounding


BTS3900A cabinet grounding

TP48200A cabinet grounding

RRU grounding

36

6.2 RRU power cable grounding (1/2)


The shielding layer of RRU power cable need to grounding using
clip in RRU

37

6.2 RRU power cable grounding(2/2)


When RRU power cable through into BTS cabinet, must use 6 in 1 grounding clamp for shield
layer grounding of RRU power cable !

6 in 1 grounding clamp, 1clamp can fix 6pcs RRU power


cable. remove the black cover of power cable, and fix in
clamp

38

6.3 7/8feeder grounding


7/8 feeder need to grounding at the bottom of tower/mast.

39

Waterproof

40

7.1 The connector of jumper waterproof

41

7.2 7/8feeder waterproof


The shielding layer of 7/8 feeder need to grounding at the bottom
of tower /mast !!!