This document including most frequently mistakes has made during site installation
and swap.
If you have any questions and suggestion regarding installation and swap,
please feedback
Mohammed.Ammar@huawei.com
michael.wangkun@huawei.com
Contents
1
1. Cabinet
1.1 Cabinet location
1.2 Equipment layout in BTS and TP cabinet of scenario 1
2. Main equipment
2.1 RRU Installation principle
2.2 MRFU Install Position Principle
2.3 The mounting ears and cable claw of DCDU -12B
2.4 Sensor installation in TP48200A power cabinet
2.5 AC input power cable installation
2.6 Battery installation in TP48200A power cabinet
2.7 TP48200A Power System Commissioning
3. Antenna&feeder system
3.1 Distinguish the right port of New antenna
3.2 Use double screws to fix Wireless ANT on mast/pole
3.4 Color ring principle for jumper
3.5 How to measure the azimuth of ANT
3.6 How to adjust the down-tilt of ANT
4. DC power distribution
4.1 The TP48200A MCB distribution for DCDU
4.2 The DCDU distribution for RRU
5. Cable installation
5.1 Cable route at outdoor cabinets
5.2 Monitor cable from TP to BBU
5.3 Transmission cable from MW IDU to BTS
5.4 Install AISG cable from ANT to RRU
5.5 Hoist RRU fiber
6. Grounding
6.1 cabinet & RRU grounding
6.2 RRU Power cable grounding
6.3 7/8feeder grounding
7. Waterproof
7.1 The connector of jumper waterproofed
7.2 7/8feeder grounding waterproofed
cabinet
BTS3900A
TP48200A
800mm
BTS at Left
TP at Right
50mm
TP48200A
DCDU-12A for
BBU and Fan
BBU3910
DCDU-12B for
3G and 4G RRU
1DCDU-12B maximum
support 6 RRU, In case
more than 6RRUs, must
add another DCDU-12B
here.
DCDU-12A for
MRFU power
M
R
F
U
d
AC/DC Breaker
RTN location
Main equipment
4G
3G
If no enough space on mast/ tower, 3 RRUs can be combined, they are same
frequency . the other 3RRUs also be combined.
4G
4G
4G
3G
3G
3G
Mounting ear
Before install the DCDU-12B in BTS&TP cabinet, must adjust the mounting ear to move
forward, and install cable claw at DCDU-12B right side
Move forward
Move forward
Mounting ear
10
Smoke Sensor
Lamp
Temperature
and Humidity
Sensor
Water Sensor
11
RTN+
busbar
12
1
Smoke Sensor
Installation Location
Smoke
Sensor
13
Water Sensor
14
T Cables
RH Cables
AC INPUT
Circuit Breaker
in Power System
3*25A
Circuit Breaker
in AC box
Note:
If the AC box cant reuse or re-install 3*25A breaker, only allow to
use single-phase breaker(at least 1*10A) for temporary precommissioning of BTS/MW, But should turn off the existing power
system before swapping, and relocate Huawei power system AC
INPUT to three-phase circuit breaker(3*25A).
16
Insulation Cover
Copper Bar
Take negative battery cables from the left side of the battery compartment, and
connect the cables to negative battery terminals.
After you install all negative battery cables, take positive battery cables from the
right side of the battery compartment, and connect the cables to positive battery
terminals.
Reinstall the insulation covers onto the batteries on the left and right sides.
17
Main Menu
Setting
Wizard
Second-Level Menu
Third-Level Menu
Default Value
Setting
Time Zone
UTC +08:00
Beijing
18
No
NOTE
Set the parameter to
Yes if you need to
synchronize the SMU
time and the site
network server time.
SecondLevel Menu
Parameter
s Settings
Battery
ThirdLevel Menu
FourthLevel Menu
Default
Value
Battery 1
Connected
Yes
Battery 2
Connected
Yes
Basic
Parameters
Other
Parameters
Setting Value
Installation
Time
150 Ah NOTE
The batteries controlled by
one circuit breaker or fuse
are called a battery string.
-
Parameters
Settings
SecondLevel Menu
ThirdLevel Menu
FourthLevel Menu
Default Value
Water Sensor
None
Smoke Sensor
None
None
Ambient Humi.
Sensor
None
Setting
Set to Yes.
Antenna&feeder system
20
4G-1800M
AISG
Female
AISG
Male
Left is 1800M, 4G
Right is 2100M, 3G
21
22
900M_GSM
TX
RX
1
Sector A
Blue
2100M_3G
TX
RX
3
Sector C
Yellow
2100M_3G
TX
RX
3
1800M_4G
TX
RX
5
900M_GSM
TX
RX
1800M_4G
TX
RX
5
900M_GSM
TX
RX
23
Sector B
Red
2100M_3G
TX
RX
3
Sector D
White
2100M_3G
TX
RX
3
1800M_4G
TX
RX
5
1800M_4G
TX
RX
5
horizontal
Record and call OMC to confirm the azimuth value of all the sectors
24
Record and call OMC to confirm the M-tilt value of all the sectors
25
DC power distribution
26
BLVD
BAT
Note:
IF RRU more than 6pcs, must add one new DCDU-12B_2. It is the red color in the BTS
cabinet as picture.
27
28
Cable installation
29
30
31
NOTE:
If use the RTN950, the transmission
cable should connect to the GE
electrical port 3 of EG4 board.
32
3G RRU
33
Making a
simple wire
spool tools
3 fibers
twist
together
Using wire
spool tools
34
Grounding
35
RRU grounding
36
37
38
39
Waterproof
40
41
42