You are on page 1of 7

SABS 1209 LC-19SI

UDC 6 2 4 (083.7.5)

SOUTH AFRICAN BUREAU OF STANDARDS

STANDARD I Z EU SP E C I F 1CAT I0N

for

C I V I I, ENGINEER1 NG CONSTRU C'L'ION

LC : CABLE DUCTS

Approved by t h e
COUNCIL OF THE
SOUTH AFRICAN
BUREAU OF STANDARDS
on 4 November 1981

O b t a i n a b l e from t h e
S A BUREAU OF STANDAKDS
P r i v a t e Bag X191
Pretoria
0001 R e p u b l i c of South A f r i c a

Telegrams : Comparator, P r e t o r i a
P u b l i s h e d and p r i n t e d i n t h e R e p u b l i c of S o u t h A f r i c a by t h e
S o u t h A f r i c a n Bureau of S t a n d a r d s

ISBN 0-626-06042-7

Gr5

SABS I200 LC-1981


Cable ducts

SOUTH AFRICAN BUREAU OF STANDARDS


STANDARDIZED SPECIFICATION
for
CIVIL ENGINEERING CONSTRUCTION
LC : CABLE DUCTS
I.
1.1

SCOPE
This specification covers the supply and the laying and bedding in trenches of pipes as ducts for the
protection of telephone and electric power cables.

2.

INTEKPRETATIONS
SUPPOKTING SPECIFICATIONS. Where this specification is required for a project, the following specifications
shall, inter alia, form part of the contract document:
a) Project specification;
b) SABS 1200 A or SABS 1200 AA, as applicable;
c) SABS 1200 C, if relevant;
d) SABS 1200 D;
e) SABS 1200 DB.

2. I

2.2

APPLICATION. T h i s specification contains clauses that are generally applicable to cable ducts.
Interpretations of and variations to this specification are set out in Portion 2 of the project
specification which precedes this specification in a contract document.

2.3

DEFINITIONS. For the purposes of this specification the definitions given in the applicable of the
specifications listed in 2.I(b)-(e)
and the following definitions shall apply:
Duct. A pipe, generally of diameter up to 150 mm, through which one or more cables are to be laid.
Nest (or batch) (of ducts). Two or more ducts laid parallel to one another in a regular pattern in the
same trench.

2.4

ABBREVIATIONS.
specifications
ESCOM or ESC
GPO
PI

3.

3. I

3.2
3.2.1
3.2.2

For the purposes of this specification the abbreviations given in the applicable of the
listed in 2.I(b)-(e)
and the following abbreviations shall apply:
:
Electricity Supply Commission
:
Department of Posts and Telecomnunications
:
Plasticity Index

MATERIALS
DUCTS. Except that the GPO will supply all pipes for cable ducts required for GPO purposes, the
Contractor shall provide all pipes for cable ducts of the type(s) and class(es) specified in the
project specification, or scheduled, or shown on the drawings, and pipes provided by the Contractor
shall comply with
a) SABS 921 in the case of pitch-impregnated fibre pipes (see 5.7);
b) SABS 791 in the case of unplasticized polyvinyl chloride pipes;
c) SABS 286, SABS 819, or SABS 946, or they shall be of Class T cable conduit pipes, in the case of
asbestos cement pipes; and
d) SABS 559 in the case of vitrified clay pipes.
Joints for ducts shall be rubber jointing sleeves or sleeve-type couplings, as scheduled.
BEDDING
Electricity Supply Cable Ducts. Material for use in bedding electricity supply cable ducts shall be a
selected soil of a granular nature that has a PI not exceeding 6 and that is free from vegetation and
from lumps and stones of diameter exceeding 15 mm.
Telephone Cable Ducts. Material for bedding telephone cable ducts shall be selected granular material
a s specified in 3 . 2 . 1 or crusher run graded from 13.2 mm to dust.
In addition, in the case of telephone cable ducts of internal diameter greater than 75 mm, the material
shall have a compactibility factor not exceeding 0,2.

3.3

BACKFILL. Material excavated from a trench may be used as backfill, provided that it contains no
rubble or other debris, that it excludes stone of average dimension greater than 150 mn, and that it
can be placed without significant voids and be compacted to at least 90 X modified AASHTO maximum
density.

3.4

CABLE DUCT MARKERS. Temporary and permanent markers for cable ducts shall comply with the relevant
requirements of the project specification.

4.

PLANT
EXCAVATION EQUIPMENT. Excavations nay be carried out with any plant capable of fulfilling the
requirements in regard to trench width and depth.

4.1
4.2

TAMPING TOOL. Where more than one duct is to be laid in the same trench, the Contractor shall provide
and use a T-shaped tamper consisting of a mild steel rod of diameter approximately 37 mn and of length
approximately 300 mn with a metal rod for a handle of diameter approximately 20 nun and of length
approximately I 350 mm. or a similar approved tool.

SXBS I200 1.C-1981


Cable d u c t s

5.
5. I
5.1.1
5.1. I . I
5.1.1.2

5.1.1.3

5. I . 1.4
5. I . 2

5.2
5.2.1

5.2.2
5.2.2. I

5.2.2.2

5.2.3

5.2.4

CONSTRUCTION
EXCAVAIION OF TRENCHES
Widths and Depths
.Trench
--Subject t o t h e requirements of 5. I . 1.3 and 5.2.4, trenches f o r d u c t s f o r telephone and low-tension (up t o
500 V) c a b l e s s h a l l be excavated t o widths not l e s s than those shown on Drawing 1.C-I f o r each p a r t i c u l a r
duct o r n e s t ( b a t c h ) of d u c t s , a s a p p l i c a b l e .
Subject t o t h e requirements of 5.1.1.3 and 5.2.4, and unless otherwise shown on t h e drawings, t r e n c h e s s h a l l
be excavated t o such a depth t h a t , a f t e r t h e duct o r n e s t (batch) of d u c t s has been l a i d a s shown on Drawing
I,(:-!, t h e r e i s a minimum cover t o ground l e v e l of a t l e a s t
a ) 600 nuu f o r telephone s e r v i c e s ,
b) 900 mm f o r high-tension e l e c t r i c c a b l e s , and
c ) 600 nun f o r low-tension e l e c t r i c c a b l e s .
Where trenches a r e t o be excavated a c r o s s roads and t h e requirements of t h e a u t h o r i t y r e s p o n s i b l e f o r t h e
roads d i f f e r from those given i n 5. I . 1.2, the dimensions of t h e trenches s h a l l conform t o t h e requirements
of t h e s a i d a u t h o r i t y .
Trenches f o r high-tension (exceeding 500 V) e l e c t r i c c a b l e s s h a l l be excavated t o widths and depths not l e s s
than those shown on t h e drawings o r s p e c i f i e d i n t h e p r o j e c t s p e c i f i c a t i o n .
P r o t e c t i o n of S t r u c t u r e s . Where work i s required t o be c a r r i e d o u t i n t h e proximity of b u i l d i n g s , b r i d g e s ,
tanks, o r o t h e r s t r u c t u r e s , t h e Contractor shall take a l l necessary p r e c a u t i o n s required i n terms of t h e
r e g u l a t i o n s framed under t h e F a c t o r i e s , Machinery and Building Works Act, 1941 (Act 22 of 1 9 4 1 ) , and t h e
Nines and Works Act, 1956 (Act 27 of 1956). including shoring, where necessary, t o ensure the s a f e t y of
structures that are at risk.
BEI)DtNC AN[) COlIPACTION OF BEDDING

'l'renchBotLom. The Contractor s h a l l c o n s t r u c t t h e trench bottom in accordance with t h e r e l e v a n t requirements


No bedding s h a l l be placed u n t i l t h e Engineer has approved t h e trench
of Subclause 5.5 of SABS 1200 DB.
bottom and authorized t h e l a y i n g of bedding.
Bedding
Bottom l a y e r . Subject t o t h e provisions of 5.2.4 and except where otherwise required i n terms of t h e
drawings o r t h e p r o j e c t s p e c i f i c a t i o n , a l a y e r of thickness 100 mi s h a l l be placed i n t h e bottom of t h e
trench and well compacted b e f o r e t h e d u c t ( s ) a r e l a i d .
Other l a y e r s . A f t e r t h e ducL(s) have been l a i d , t h e surrounding space s h a l l be f i l l e d i n and w e l l
compacted (when r e l e v a n t . by means of t h e tamping t o o l r e f e r r e d t o i n 4.2) u n t i l t h e thickness of the
bedding l a y e r o v e r t h e d u c t ( s ) i s , s u b j e c t t o t h e provisions of 5.2.4 and except where otherwise required i n
terms of t h e drawings o r p r o j e c t s p e c i f i c a t i o n , a t l e a s t
a ) 150 mm over t h e top of d u c t s of diameter 75 IMI and less,
b) 100 nun over t h e top of d u c t s of diameter l a r g e r than 75 nnn; and
c ) 150 nun over t h e top of t h e top row of d u c t s i n a multi-layer i n s t a l l a t i o n .
Bedding around a duct o r a nest of d u c t s s h a l l be c a r r i e d out a s laying proceeds. Bedding m a t e r i a l s h a l l be
placed around and over the d u c t ( s ) and thoroughly and evenly compacted, and cornpaction s h a l l be so done t h a t
d u c t s a r e not d i s t u r b e d o r j o i n t s impaired i n any way.
!lulti-layer Pitch-Impregnated F i b r e Pipe I n s t a l l a t i o n s . The procedure f o r m u l t i - l a y e r pitch-impregnated
f i b r e pipe i n s t a l l a t i o n s s h a l l be i n accordance with 5.2.2 and, i n a d d i t i o n , t h e compacted l a y e r s of bedding
m a t e r i a l between one l a y e r of pipes and t h e next s h a l l provide f o r a s e p a r a t i o n of approximately 75 nun a s
All bedding m a t e r i a l s h a l l be s t a b i l i z e d by t h e a d d i t i o n of 2 pockets of
shown i n ( e ) of Drawing 1.C-I.
cement p e r cubic metre a t carriageway c r o s s i n g s , o r as d i r e c t e d by t h e Engineer where u n s t a b l e s o i l
c o n d i t i o n s e x i s t . Cement-stabilized m a t e r i a l s h a l l be mixed damp and s h a l l be placed immediately a f t e r
being mixed and compacted w i t h i n 4 h a f t e r being placed.
Trenches i n Clay o r Unstable Material. Where a t r e n c h has been excavated i n clay o r i n s o i l which, i n t h e
opinion of the Engineer, is unstable, bedding of thickness a t l e a s t 150 mm s h a l l be placed under and
alongside t h e d u c t o r n e s t and above t h e duct o r upper l a y e r of d u c t s .
_
_
I
-

5.3

DUCT LAYING

5.3. I

S t r a i g h t Laying.
--

5.3.2

5.3.3

---

5.3.4

5.4

Ducts s h a l l be l a i d and j o i n t e d t r u e t o l i n e and s h a l l be evenly supported f o r t h e i r f u l l


l e n g t h on t h e bedding. which s h a l l be evenly and thoroughly compacted. I f lengths of ducting a r e j o i n t e d
alongside t h e trench, c a r e s h a l l be taken t o avoid s t r a i n i n g of the j o i n t s when t h e ducting i s lowered i n t o
t h e trench. The i n s i d e s of d u c t s s h a l l be kept c l e a n a s they a r e l a i d .
Curved Laying. A change of d i r e c t i o n o r grade of a duct i s p e r m i s s i b l e only i n t h e case of d u c t s f o r
telephone c a b l e s , and s h a l l be achieved by o f f s e t t i n g i n d i v i d u a l duct l e n g t h s by not more than 35 nun f o r
each 3 m of duct length.
Draw Wire. A s i n g l e s t r a n d of galvanized i r o n draw wire of nominal diameter 2,5 m s h a l l be i n s e r t e d
through each l e n g t h of d u c t i n g a f t e r proving (see 7.3) has been completed. A s u r p l u s of wire of length a t
l e a s t 2 m , n e a t l y c o i l e d , s h a l l be l e f t a t each end of each l e n g t h of d u c t i n g . A l l open ends of d u c t s s h a l l
be plugged t o prevent t h e i n g r e s s of d i r t .
If draw p i t s a r e included i n the c o n t r a c t , they s h a l l be constructed where shown on the drawings
Draw P i ; s .
o r ordered.
Unless otherwise shown on t h e drawings, draw p i t s s h a l l be of i n t e r n a l s i z e a t l e a s t 600 m x 600 nun and of
depth a t l e a s t I m and s h a l l be b u i l t i n 230 nun brickwork on a concrete base s l a b of thickness a t l e a s t
150 mm. The d u c t s s h a l l be s e c u r e l y b u i l t i n t o t h e b r i c k w a l l s . Each draw p i t s h a l l be provided with a
manhole cover s e t a t a l e v e l t h a t conforms t o t h e e x i s t i n g road o r footway l e v e l and camber. The type of
cover s h a l l be one of t h e following, as scheduled:
a ) An approved footway-type o r roadway-type frame and cover, a s a p p l i c a b l e , f o r telephone s e r v i c e s ; o r
b) a Type 2A c i r c u l a r manhole cover and frame ( f o r use i n roadways) o r a Type 6 square manhole cover and
frame ( f o r use elsewhere than i n roadways) complying, i n each case, with t h e r e l e v a n t requirements of SABS
558.
BACKFILLING AND COMPACTION.

The r e l e v a n t requirements of Subclauses 5.6 and 5.7 of SABS 1200 DB s h a l l apply.

SABS 1200 LC-1981


Cable ductn

5.5

CONCRETE ENCASEMENT. Where so required, d u c t s s h a l l be encased i n concrete i n accordance w i t h the


requirements of t h e p r o j e c t s p e c i f i c a t i o n .

5.6

LAYING OF CABLES WITH OTHEK SEKVICES. Where one or more c a b l e s a r e t o be l a i d i n a trench containing
o t h e r s e r v i c e s , t h e Contractor s h a l l l a y t h e c a b l e d u c t ( s ) along one s i d e of t h e trench with the o t h e r
s e r v i c e s occupying t h e o t h e r s i d e b u t , b e f o r e comnencing excavation f o r such a trench, t h e Contractor
s h a l l , u n l e s s t h e requirements a r e given i n t h e p r o j e c t s p e c i f i c a t i o n , o r on t h e drawings, or i n the
schedule, o b t a i n from t h e Engineer i n s t r u c t i o n s on whether the requirements of 5.1.1 and 5.7 and t h e
requirements of Subclauses 5.4 and 8.2.3 of SABS 1200 DB a r e a p p l i c a b l e , or whether some o t h e r
requirement i s a p p l i c a b l e to t h e trench width.

5.7

CROSSINGS OF TELEPHONE AND ELECTRICITY CABLE DUCTS. Wherever telephone c a b l e d u c t s c r o s s e l e c t r i c i t y


supply c a b l e d u c t s , s t r i c t precautions and c a r e s h a l l be taken and c l o s e supervision given t o t h e
laying o f t h e ducts. E l e c t r i c i t y supply c a b l e d u c t s s h a l l c r o s s below telephone c a b l e ducts.
Except where i t i s acceptably encased, no e l e c t r i c i t y supply c a b l e s h a l l be l a i d w i t h i n a d i s t a n c e of
600 mm measured h o r i z o n t a l l y , nor s h a l l any such c a b l e c r o s s w i t h i n a d i s t a n c e of 300 mm measured
v e r t i c a l l y . from any telephone cable.
Where a n e l e c t r i c i t y supply c a b l e and a telephone duct a r e l a i d i n a common trench the h o r i z o n t a l
d i s t a n c e between t h e c a b l e and t h e d u c t s h a l l be a s d i r e c t e d by t h e Engineer.
A t each c r o s s i n g t h e Contractor s h a l l provide and i n s t a l l a n approved type of s p l i t s l e e v e c o n s i s t i n g
of two half-round pipe s e c t i o n s f i r m l y f a s t e n e d together w i t h r o b u s t s t a i n l e s s steel s t r a p s . The
s l e e v e s h a l l extend a t l e a s t 1,0 m on each s i d e of t h e c r o s s i n g and s h a l l be e f f e c t i v e l y s e a l e d a t the
ends.
The m a t e r i a l used f o r t h e s p l i t s l e e v e s h a l l be as s p e c i f i e d i n t h e p r o j e c t s p e c i f i c a t i o n .

5.8

ROAD CROSSINGS. A t each road c r o s s i n g a d u c t or d u c t s , of s i z e s u f f i c i e n t to r e c e i v e t h e c a b l e o r


c a b l e s t o be l a i d , s h a l l be i n s t a l l e d under t h e road. The d u c t ( s ) s h a l l be l a i d t o the same l i n e and
l e v e l as t h a t a t which t h e c a b l e ( s ) a r e t o be l a i d , with due regard f o r t h e requirements of minimum
cover under t h e road. The d u c t ( s ) s h a l l extend a d i s t a n c e of a t l e a s t 0 , s m beyond each kerb f a c e o r
t h e edge of t h e road, a s a p p l i c a b l e .

5.9

DUCT ROUTE MARKERS. Duct r o u t e markers ( s e e 3.4) s h a l l be placed above t h e c a b l e a t a l l changes of


d i r e c t i o n , and a t i n t e r v a l s not exceeding 60 m along the s t r a i g h t . Duct r o u t e markers s h a l l protrude
approximately 25 mm above t h e f i n i s h e d ground l e v e l , except where they a r e l i k e l y t o cause o b s t r u c t i o n
o r be i n t h e way of moving t r a f f i c , i n which c a s e t h e Contractor s h a l l a s k t h e Engineer f o r i n s t r u c t i o n s i n t h i s regard.
In a d d i t i o n t o marking t h e route, the Contractor s h a l l submit t o t h e Engineer a record s e t t i n g out the
p o s i t i o n of a l l r o u t e markers.

5.10

POSITION TO BE MARKED.
I f required in terms of t h e p r o j e c t s p e c i f i c a t i o n , t h e p o s i t i o n of each duct
c r o s s i n g s h a l l be i n d i c a t e d by t h e letters "GPO" o r "ESC", a s a p p l i c a b l e , p a i n t e d by means of an
approved s t e n c i l w i t h red p a i n t on t h e kerb f a c e d i r e c t l y above t h e p o s i t i o n of t h e duct.
Where t h e r e i s no kerb f a c e , a s i n t h e case of unconstructed roads, r o u t e markers s h a l l be i n s t a l l e d a t
such c r o s s i n g s .

5.11

REPAIRS AND REINSTATEMENT OF SURFACES. E x i s t i n g paved s u r f a c e s s h a l l be r e p a i r e d and r e i n s t a t e d a s


r e q u i r e d i n terms of Subclauses 5.9 and 5.10 of SABS 1200 1)B.

6.
6. I

TOLERANCES
ALIGNMENT AND GRADE. Except where a change of d i r e c t i o n or o t h e r alignment is shown on t h e drawings o r
ordered, t h e d e v i a t i o n from a s t r a i g h t l i n e j o i n i n g t h e ends of any s t r a i g h t s e c t i o n of d u c t i n g s h a l l
n o t a t any p o i n t along a duct exceed 35 mm.

6.2

MOISTURE CONTENT AND DENSITY. The p e r m i s s i b l e d e v i a t i o n from OMC during f i e l d compaction is


t h e a c t u a l d e n s i t y s h a l l be nowhere l e s s than t h e s p e c i f i e d d e n s i t y .

7.
7. I

TESTING
ACCESS FOR ENGINEER. For t h e purpose of examining and sampling t h e d u c t s and o t h e r m a t e r i a l s and, i f
necessary, f o r t h e i n s p e c t i o n and t e s t i n g of the d u c t s d u r i n g manufacture, t h e Contractor s h a l l arrange
f o r t h e Engineer t o have f r e e access a t a l l reasonable times t o the place where t h e d u c t s and o t h e r
m a t e r i a l s a r e manufactured. The Contractor s h a l l a l s o a r r a n g e f o r t h e manufacturer t o supply, f r e e of
charge, every f a c i l i t y , including p r o p e r l y c a l i b r a t e d and maintained t e s t a p p a r a t u s , and a l l labour
r e q u i r e d f o r such i n s p e c t i o n and t e s t i n g (including sampling) and f o r t h e marking of the d u c t s before
delivery.

7.2

COMPACTION TESTS. The Engineer may order d e n s i t y t e s t s t o be c a r r i e d out t o determine t h e compaction


of t h e b a c k f i l l i n g . I f t h e t e s t r e s u l t s show t h a t t h e d e n s i t y of t h e b a c k f i l l does not comply with the
r e l e v a n t requirements, t h e c o s t s of t h e t e s t i n g and any reconipaction and r e t e s t i n g t h a t may be ordered
by t h e Engineer s h a l l be borne by t h e Contractor.

7.3

PROVING.

22

%,

and

A f t e r t h e l a y i n g of d u c t s and t h e b a c k f i l l i n g have been completed, t h e i n t e r i o r of t h e d u c t s


s h a l l be thoroughly cleaned by twice drawing a c y l i n d r i c a l c l e a n i n g brush through each d u c t , once i n
each d i r e c t i o n . The d u c t s s h a l l then be proved by drawing through them a polished hardwood mandrel
having s p h e r i c a l ends and of length 300 mm.
The diameter of t h e mandrel s h a l l be less than t h e
i n t e r n a l diameter of t h e duct by
a ) 2 nun i n t h e case of d u c t s of diameter up t o and including 75 mm; and
b ) 3 mm i n t h e case of d u c t s of diameter g r e a t e r than 75 mm.

SABS 1200 LC-1981


Cable d u c t s

8.

8. I

8.2
8.2. I

MEASUREMENT AND PAYMENT


GENEKAL. Although measurement and payment f o r excavation and b a c k f i l l i n g of t r e n c h e s i s covered i n SABS
1200 D B , t h e r e l e v a n t items f o r t r e n c h e s w i l l be scheduled s e p a r a t e l y w i t h t h e a p p r o p r i a t e s e r v i c e s .
SCHEDULED lTEMS
S i t e clearance. When s i t e clearance i s t o be c a r r i e d o u t by t h e Contractor, t h e r e l e v a n t items given i n
Subclause 8 . 2 of SABS 1200 C s h a l l apply.
Excavation
a ) Excavate
i n a l l m a t e r i a l s f o r trenches, b a c k f i l l , compact, and dispose of s u r p l u s
. .
7
material
Unit: m o r m
Items w i l l be provided f o r trenches of various widths and depths according t o s i z e and number of d u c t s a s
shown on t h e a p p l i c a b l e drawing.
Where measured v o l u m e t r i c a l l y i n terms of Subclause 8.1.2(a) of SABS 1200 DB, t h e volumes of d u c t and c a b l e
t r e n c h excavations w i l l be computed from each l e n g t h and t h e i n v e r t depth i n d i c a t e d on t h e drawings o r t h e
depth t o t h e bottom of t h e s p e c i f i e d bedding l a y e r , whichever is t h e g r e a t e r , and from the base width
determined from the r e l e v a n t s i d e allowance given on the a p p l i c a b l e drawing.
The r a t e s h a l l cover t h e c o s t of complying with t h e s a f e t y and p r o t e c t i o n requirements of 5.1.2 (except
where p a r t i c u l a r items a r e scheduled t o cover p a r t i c u l a r c o s t s ) , excavation, b a c k f i l l i n g , compacting, and
disposing of s u r p l u s m a t e r i a l .
b) Extra-over i t k m (a) above f o r :
1 ) Intermediate excavation
Unit: m,3
2) Hard rock excavation
Unit: m.
3) Boulder excavation, Class A
Unit: m3
Unit: m3
4) Boulder excavation, Class B
The r a t e s h a l l cover t h e a d d i t i o n a l c o s t of t h e excavation and t h e handling of t h e more d i f f i c u l t m a t e r i a l
and, i n t h e case of rock, of t h e d i s p o s a l within a d i s t a n c e of 0.5 km and the replacement of t h e higher
proportion of u n s u i t a b l e m a t e r i a l .
Unit: m 3
c ) Excavate u n s u i t a b l e m a t e r i a l from t r e n c h bottom and d i s o s e of i t ( p r o v i s i o n a l )
Thdvolume w i l l be computed from t h e trench width d e t e r m d d i n accordance with 8.2.2(a) and t h e a d d i t i o n a l
depth ordered.
The rate s h a l l cover t h e c o s t of t h e excavation of t h e a d d i t i o n a l depth i n any m a t e r i a l and t h e d i s p o s a l of
I
_
_
-

8.2.2

-~

...............................................................................

.............................................................
................................................................
.........................................................
.........................................................

.....

it.

8.2.3
8.2.4

-Shore trench a t structure?


The p r o v i s i o n s of i t e m ( a )
R e i n s t a t e road s u r f a c e s complete with a l l courses. The
--s h a l l apply.

8.2.5

Supply,
-

8.2.6

8.2.7

8.2.8

8.2.9

of Subclause 8.3.4 of SAAS 1200 DA s h a l l apply.


p r o v i s i o n s of Subclause 8.3.6.1 of SABS 1200 DB

.......................................................

Unit: m
lay, bed, and prove d u c .
Separate items w i l l be scheduled f o r each diameter of duct.
The r a t e s s h a l l cover
a ) f o r GPO d u c t s , t h e c o s t of c o l l e c t i n g t h e d u c t s and t h e c o s t of l a y i n g , j o i n t i n g . bedding, b u i l d i n g i n t o
draw p i t s , proving, and providing draw wire a s s p e c i f i e d ; and
b) f o r a l l o t h e r d u c t s , a s f o r ( a ) above and t h e c o s t of providing t h e d u c t s .
3
Imported beddin m a t e r i a l , where ordered
Unit: m
A s e p a r a t e itemgwill be scheduled f o r eahi s e l e c t e d m a t e r i a l obtained from designated sources. The r a t e
s h a l l cover the c o s t of a c q u i r i n g , loading, and t r a n s p o r t i n g the m a t e r i a l from t h e designated s o u r c e , and of
d i s t r i b u t i n g t h e m a t e r i a l along the l e n g t h of t h e trench.
Draw pits/manholes
Unit: No.
Separate items w i l l be scheduled f o r d i f f e r e n t s i z e s of draw p i t s and manholes. The r a t e s h a l l cover the
c o s t of a d d i t i o n a l excavation, d i s p o s a l of s u r p l u s excavated m a t e r i a l , supplying m a t e r i a l s , and c o n s t r u c t i n g
t h e draw p i t o r manhole, a s a p p l i c a b l e , complete i n accordance with t h e d e t a i l s shown on the drawings.
Cable markers
~a ) Route markers
Unit: No.
b) Kerb marks
Unit: No.
The r a t e s h a l l cover t h e c o s t of t h e manufacture and i n s t a l l a t i o n of t h e markers, t h e painting. i n s c r i b i n g ,
o r stamping ( a s a p p l i c a b l e ) of t h e i d e n t i f i c a t i o n marks on t h e markers or kerb (as r e l e v a n t ) , and of
preparing and submitting t h e record of a l l c a b l e r o u t e markers (see 3.4, 5.9, and 5.10).
Overhaul of s u r l u s excavation ( p r o v i s i o n a l )
Unit: m3.km
The r a t e s h a l l :over t h e c o s r o f loading and overhaul of s u r p l u s excavation where ordered i n w r i t i n g ,
measured from t h e p o i n t of loading t o t h e p o i n t of placing i n one d i r e c t i o n only by t h e s h o r t e s t p r a c t i c a b l e
route.

...............................................

.....................................................................

.......................................................................
..........................................................................

...........................................

SABS 1200 LC- 1981


Cable ducts

I PIPE

2 PIPES
0

z
W

a
I-

= 300

3 PIPES

r-

=
DEPTH =

z
W

TRENCH WIDTH

450

TRENCH WIDTH

TRENCH DEPTH= 800

TRENCH

800

TRENCH DEPTH

PIPE DIAMETER (WITH


COUPLING) = 125

PIPE DIAMETER '(WITH


COUPLING) = 125

4 PIPES

5-8 PIPES

TRENCH WIDTH

8
1
I

ooio o
00
1
00
I j
I
375

(d)
TRENCH WIDTH

375

(e)

750

TRENCH DEPTH ' 8 0 0


PIPE DIAMETER (WITH
COUPLING) = 125

600'

800

PIPE DIAMETER (WITH


COUPLING) = 125

ul

=
=

MORE THAN 8 PIPES

5w

I] PIPES LAID IN HORIZONTAL


LAYERS OF 6 OR8 AND IN
VERTICAL BANKS OF THE
REQUIRED NUMBER

2) 3 OR 4 PIPES LAID ON EACH


SIDE OF CENTRE-LINE OF
TRENCH

3)SPACING BETWEEN PIPES :50


4) SPACING BETWEEN BANKS:75

sl

5 ) TRENCH WIDTH

6 ) TRENCH DEPTH

7) PIPE DIAMETER (WITH


COUPLING1 = I25

(f)

TRENCH WIDTH

750

TRENCH DEPTH

1000

PIPE DIAMETER (WITH


COUPLING) = 125

Dimensions in millimrtrer

Drawing LC - I-Trench

Cable Duct Positions

llOO(6PIPES)
I450(8PIPES)
I OOO

Dimensions and Telephone and Low Voltage Power

10

SARS 1200 LC-1981


Cab12 ducts
APPENDIX A.
R e f e r e n c e i s made
SABS
SABS
SABS
SABS
SABS
SABS

SARS
SABS
SARS

SABS
SARS

SABS

286
558
559
791
819
921
946
1200
1200
1200
1200
1200

A
AA

C
D

nB

CO

APPLICABLE SPANDARDS

t h e l a t e s t issues of t h e f o l l o w i n g s t a n d a r d s :

A s b e s t o s cement p r e s s u r e p i p e s ( c o n s c a n c o u c s l d r d i a m e t e r t y p e )
Cast i r o n s u r f a c e boxes and manhole and i n s p e c t i o n c o v e r s and f r a m e s
V i t r i f i e d c l a y sewer p i p e s and f l c t l n g s
Unplas c i c i z e d p o l y v i n y l c h l o r i d e (UPVC) sewer and d r a i n p i p e s and p i p e f i t c l n g s
A s b e s t o s cement sewer p i p e s
Pitch-impregnated f i b r e p i p e s and c o u p l i n g s
A s h e s t o s cement p r e s s u r e p i p e s ( c o n s t a n t i n t e r n a l d i a m e t e r t y p e )
C i v i l engineering c o n s t r u c t i o n : General
C i v i l e n g i n e e r i n g c o n s t r u c t i o n : G e n e r a l (small works)
C i v i l e n g i n e e r i n g cons c r u c c i o n : S i t e c l e a r a n c e
C i v i l e n g i n e e r i n g c o n s c r u c c l o n : Earchworks
C i v i l e n g i n e e r i n g c o n s t r u c t i o n : Earchworks ( p i p e t r e n c h e s )

ISBN 0626-06042-7

wba pia

You might also like