Professional Documents
Culture Documents
By
BABAR SALEEM
Reg. No. 2013-GCUF-03768
B-Tech (Pass)
Electrical Technology
Session: 2013-2015
Dedication
I dedicate my work to my parents who made me from
nothing to what I am today. Their prayers are with me at
every moment of my life and to my teachers who are the
become of knowledge. They helped me to determine the
path of glory and in last to those people who helped me
in fulfillment of goals developing personality and
knowledge and development of my knowledge
personality.
ACKNOWLEDGEMENT
First of All I thank Almighty Allah, The Compassionate and
The Most Merciful, who bestowed on me the potential and
ability to complete this Project. All and every respect is
for His Holy Prophet MUHAMMAD (Peace be upon him),
whose teachings enabled us to recognize out creator.
Babar Saleem
B-Tech (Pass)
Electrical
FINAL APPROVAL
It is to certify that we gone through this project
Submitted by
Babar Saleem
Reg. No.2013-Gcuf-03768
Roll No.14017
B Tech. (Pass) Electrical
Our judgment is that this project is up to the standard to
warrant its acceptance by the
Govt. College University, Faisalabad
for B-Tech Pass degree in electrical Technology
PANNEL OF EXAMINERS
External Examiner :
____________________________
Coordinator:
Ubaidullah
Mr.
Dr.
1. Introduction of company
Department of Company
There are nine major departments working in Al-Muqeet Textile Mill is as under,
1)
2)
3)
4)
5)
6)
7)
8)
9)
2.
Mixing
Blow Room
Carding
Drawing
Simplex
Ring
Auto Cone
Power House
Electrical & Electronics
There are two gas engine generators in Al-Muqeet Textiles Mill Plant.
The rating of gas engine generators are as follow:
4000 KVA
50 HZ
11000 V
P.F 0.8
2.7 MW
210 A
1500 R.P.M
There are batteries for servo motor rotation. There is a jacket water motor for
cooling purpose temperature of jacket water.
The gas engines are controlled by SCADA panels and synchronizing in these
generators are on auto basis.
We prefer to use gas engines due to low per unit cost rather than H.F.O
and WAPDA supply.
2.2.
Differential Protection
Under normal condition current at two ends are equal. If current vary
on both ends due to any fault. Difference of current is arranged to pass
to through the corresponding relay coil.
The relay will energized and change its contacts thus the supply
passed to shunt trip coil of Circuit breaker , which cause to trip the
circuit breaker.
Identical sets of CTs are placed on each phases on both sides.
In Al-Muqeet Textiles Mill Plant differential protection is used to
protect engines and generators.
2.3.
Synchronizing System
10
Advantages Of Synchronizing:
11
12
We know that for two inputs of PLC both 1 st & 2nd priority relays
will operates.
4.2.
13
5. Substation
Sub-Station is a central point between Power House and loads.
In Al-Muqeet Textiles Mill plant Sub-Station, we receive high voltages (11KV),
from Power House and WAPDA.
Ten we convert HT voltages to LT voltages (11KV to 400V) with transformers and
then forward it to loads.
The main power switchgear of loads are at Sub-Station, after this the supply pass to
departments. There are the panels, which have full control system of that machine.
The panels are based on star delta circuits; some are based on PLC and Inverter.
Following are the main purpose of Sub-Station:
1)
2)
3)
4)
Switching
Protection
Improving power factor
Converting the power
14
Circuit breakers
Fuses
Relays
Current transformers ( CT )
Potential transformers ( PT )
Load break switches ( LBS )
Power factor improving panels
Transformers
Volt meters
Ampere meters
Ohm meters
CT & PT
Indication lights
5.1.
Bus Bar
5.2.
case of fault.
It is designed to protect an electric circuit from damage caused by
over load and short circuit. Its basic function is interrupt current flow
in fault condition.
All circuit breakers have common features in their operation, although
details vary substantially depend on voltage class, current rating and
type of circuit breaker.
When current is interrupted, an arc is generated. This arc must be
contained cooled and extinguished in a controlled way. So that the gap
between the contacts can again withstand the voltage in the circuit.
Circuit breakers are usually able to terminate all currents very quickly,
typically the arc is extinguished between 30 ms and 150 ms after the
mechanism has tripped, depending on the construction of device.
15
5.3.
VCB have minimal arc (as there is nothing to ionize other than the
contact material). So the arc quenches when it is stretched a very
small amount. VCB are frequently use in our Sub-Station to 11 KV.
VCB used on HT side at Sub-Station and power house.
The rating of VCB as follow:
1) 11 KV
2) 630 A
3) 25 KA
5.4.
Air circuit breaker may use compressed air to blowout the arc or
alternatively the contacts are rapidly swung into a small sealed
chamber. The escaping of displaced air thus blowing out the arc.
ACB used on LT side at in Al-Muqeet Textiles Mill Sub-Station.
The rating of ACB as follow:
For 2000 KVA transformer
3200 A,
400 V
85 KA
For 2500 KVA transformer
4000 A,
85 KA
400v
16
5.5.
LBS is an additional protection, used before VCB. We have three LBS on HT side
Al-Muqeet Textiles Mill plant Sub-station. Which have ratings as follow:
11 KV,
400 V
12.5 KA
5.6.
Power Factor
The power factor of an AC power system is defined as the ratio of
Active power and Apparent power.
P.F = True power / Apparent power
In Al-Muqeet Textiles Mill plant Sub-Station, there are five power
factor panels. Two power factor improvement ( PFI ) panels are
installed between WAPDA supply. Three PFI panels are installed
between generation supply panels.
The ratings of power improving units are as following:
1)
2)
3)
4)
5)
750 KVAR
850 KVAR
850 KVAR
650 KVAR
850 KVAR
17
125 A,
500 V
120 KA
Following are the rating of capacitor from PFI panels:
50 KVAR,
400 V
5.7.
Capacitor Bank
75 A
18
5.8.
Protective Relays
Protective Relay is a device which is used between the main circuit
and circuit breaker in such a way that, in case of any abnormality the
relay sends the signal to the circuit breaker for tripping.
Faulty element will be separated by tripping of circuit breaker.
5.9.
Magnetic Contactor
The Magnetic Contactor is an electromagnetic device. It is used to
make and break the circuit.
It has 110 V DC or 220 V AC or 24 V DC supply for its coils. When
supply passes to coil of magnetic contactor, the coil will work like a
magnet and towing the core.
By this way the supply pass from power contacts of magnetic
contactor.
There are some auxiliaries contacts on contactor. Some are NO and
some are NC. When the supply passes to contactor coil, the contact
will change from NO to NC and NC to NO.
5.10. Fuses
This type of fuses are use in Al-Muqeet Textiles Mill plant SubStation for the protection of control circuit. This fuse consists of two
parts:
1) A base having two terminals
2) A fuse carrier
Cartridge fuse is tightened in a screwed fuse cap. The rating of this
fuse is 6 A.
5.11. Panels
In Al-Muqeet Textiles Mill plant, there are fourteen panels on HT
side in Sub-Station.
19
Four panels for feeders, three panels for LBS. there are nine VCB
installed in HT side.
Relay, energy meters, fault indication lamps and breakers are
installed in panels. There sixty panels in LT side. Forty nine panels
are at A side and eleven panels at B side.
All load control switches are installed in LT side. Eight ACB and
four Bus Coupler are installed in LT side panels. There are five
power factor panels are installed in LT side. Two power factor panels
installed between WAPDA supply. Three power factor panels are
installed between generation supply.
5.12. Feeders
There are four feeders come in substation from power house. There
are two transformers on feeder no. 1, one transformer on feeder no.
2, three transformers on feeder no. 3 and two transformers on feeder
no. 4.
In feeder no. 3, there is an interlocking between wapda supply and
power house supply.
5.13. Transformers
Transformer is a static device. It is used to convert high voltage to
low voltage (11KV to 400V), without changing frequency.
In Al-Muqeet Textiles Mill plant, there are only Step Down
Transformers.
In power house department there are three auxiliary transformers.
These transformers are of 630KVA.
There are eight transformers in substation department. 1 to 6
transformers are of 2000KVA ratings. 7 and 8 transformers are of
2500KVA ratings.
20
6. Motors
An electric motor is an electric machine that converts electrical energy into
mechanical energy.
In normal motoring mode, most electric motors operate through the interaction
between an electric motor's magnetic field and winding currents to generate force
within the motor.
In textiles industries the induction motor is commonly used. The detail of induction
motors are as follow:
6.1.
Induction Motor
21
22
7. Motor Starters
7.1.
7.2.
23
24
7.1 Compressors
When all safeties are cleared, the supply card gives a signal to
contactor K 6. Contactor K 6 is energized and cause to energize
relay RM. relay RM will close its N.O contacts. The supply
passed to timer T1 and to contactor of star C3. The N.O
contacts of star contactor will close after energizing, the supply
pass to contactor C1. The motor will star running in star
connection.
After completion of timer set time, it will change its contacts
and supply pass to transiant contactor C4. Transient contactor
C4 will change its contacts and this cause to OFF the star
contactor.
The supply passed to delta contactor C2, through the way of
N.C contact of star contactor C3.
The motor is now running in delta connection.
7.3.Cooling Towers
25