You are on page 1of 3

SMU MBA FALL 2015 -2016

Dear Students,

SMU MBA FALL 2015-2016 Assignments are available. For Booking ,Kindly
mail us on kvsude@gmail.com OR call us to +91 9995105420 or S M S your
Email ID us in the following Format On +91 9995105420 we will reach
back you with in 24H

DRIVE
PROGRAM
SUBJECT CODE & NAME
BK ID
CREDIT AND MARKS

Q.N
o
1

ASSIGNM
ENT
Fall 2015
MBADS (SEM 4/SEM
6) MBAFLEX/ MBA
(SEM 4) PGDPMN
PM 0015 QUANTITATIVE METHODS IN
PROJECT MANAGEMENT
B2011
4 CREDITS AND 60 MARKS

Criteria

Marks

Total Marks

Write short notes on:

Kano model

Differences between a sponsors view and projects view in a project


balance
sheet

Triangular distribution

Organisational break down structure

Kano model

Differences

between

10 (2.5 marks each)

10

10

sponsors

view and projects view in a project


balance sheet

Triangular distribution

Organisational break down structure

Discuss capital budgeting in project management.

describe use of capital budgeting to an


organisation in terms of undertaking
multiple projects
Explain the importance of capital budgeting
in project selection
Discuss the aspects of capital budgeting that
an organisation should consider while
selecting a project.

4
A

2
6 (1.5 marks each)

Write short notes on:


Rolling wave planning

Time centric earned value

Rolling wave planning

Time centric earned value

10 (5 marks each)

10

Describe the various cost incurred in a project. Describe the applications of three point estimates.
10
Discuss the THREE types of costs incurred
7.5 (2.5 marks
in a project
Discuss the applications of three point estimates.

Explain the six sigma methodologies.

Discuss the 2 six sigma project


methodologies Compare the 2 six sigma
project methodologies

each) 2.5

8
2

10

Discuss the time and materials contract.

Solve the following problem


Consider a the time and materials contract as
follows: Labour is billed according to the following
schedule
1 software engineer :
$45/hr 1 tester: $ 45/hr
1 senior software engineer: $65/hr
Material is billed according to the following
schedule: Cost of materials + 30 %
profit/overhead
Actual cost of the material is $2140

Describe the time and materials

contract Calculation of material cost

Calculation of contract payable

10

*A-Answer
Note Answer all questions. Kindly note that answers for 10 marks questions should be
approximately of 400 words. Each question is followed by evaluation scheme.

SMU MBA FALL 2015 -2016

Dear Students,

SMU MBA FALL 2015-2016 Assignments are available. For Booking ,Kindly
mail us on kvsude@gmail.com OR call us to +91 9995105420 or S M S your
Email ID us in the following Format On +91 9995105420 we will reach
back you with in 24H

You might also like