Federal Register / Vol. 70, No.

170 / Friday, September 2, 2005 / Notices 52377

at 1–866–208–FERC or on the FERC g. Filed Pursuant to: Public Utility kilowatts (kW); (6) an existing 150 kW
Internet Web site (http://www.ferc.gov) Regulatory Policies Act of 1978, 16 turbine; (7) a 100-foot-long buried
using the eLibrary link. Click on the U.S.C. §§ 2705, 2708. transmission line; and (8) an existing
‘‘eLibrary’’ link, click on ‘‘General h. Applicant Contact: Linda A. Parker, trashrack.
Search’’ and enter the docket number Small Hydro of Texas, Inc., 1298 FM n. A copy of the application is
excluding the last three digits in the 766, Cuero, Texas 77954. (361) 275– available for review at the Commission
Docket Number field. Be sure you have 9395. in the Public Reference Room or may be
selected an appropriate date range. For i. FERC Contact: Monte TerHaar, viewed on the Commission’s Web site at
assistance, please contact FERC Online monte.terhaar@ferc.gov, (202) 502– http://www.ferc.gov using the
Support at: 6035. ‘‘eLibrary’’ link. Enter the docket
FERCOnlineSupport@ferc.gov or toll j. Deadline for filing comments, number (P–12588) in the docket number
free at 1–866–208–3676, or for TTY at motions to intervene, and protests, and field to access the document. For
(202) 502–8659. The eLibrary link on deadline for filing scoping comments: assistance, contact FERC Online
the FERC Internet Web site also 60 days from the issuance date of this Support at
provides access to the texts of formal notice. FERCOnlineSupport@ferc.gov or toll-
documents issued by the Commission, Any comments (original and eight free at 1–866–208–3676, or for TTY,
such as orders, notices, and copies) should be addressed to the (202) 502–8659. A copy of the
rulemakings. Secretary, Federal Energy Regulatory application is also available for
In addition, the Commission now Commission, 888 First Street, NE., inspection and reproduction at the
offers a free service called eSubscription Room 1–A, Washington, DC 20426. addresses in item h above.
which allows you to keep track of all Please affix ‘‘A.H. Smith Dam Project All filings must (1) bear in all capital
formal issuances and submittals in No. 12588–000’’ to all comments. letters the title ‘‘PROTEST’’, ‘‘MOTION
specific dockets. This can reduce the Comments may be filed electronically TO INTERVENE’’, ‘‘COMMENTS’’,
amount of time you spend researching via Internet in lieu of paper. The ‘‘SCOPING COMMENTS’’; (2) set forth
proceedings by automatically providing Commission strongly encourages in the heading the name of the applicant
you with notification of these filings, electronic filings. See 18 CFR and the project number of the
document summaries, and direct links 385.2001(a)(1)(iii) and the instructions application to which the filing
to the documents. Go to the on the Commission’s Web site (http:// responds; (3) furnish the name, address,
eSubscription link on the FERC Internet www.ferc.gov) under the ‘‘eFiling’’ link. and telephone number of the person
The Commission’s Rules of Practice submitting the filing; and (4) otherwise
Web site.
require all intervenors filing documents comply with the requirements of 18 CFR
Magalie R. Salas, with the Commission to serve a copy of 385.2001 through 385.2005. Agencies
Secretary. that document on each person on the may obtain copies of the application
[FR Doc. E5–4811 Filed 9–1–05; 8:45 am] official service list for the project. directly from the applicant. Each filing
BILLING CODE 6717–01–P Further, if an intervenor files comments must be accompanied by proof of
or documents with the Commission service on all persons listed on the
relating to the merits of an issue that service list prepared by the Commission
DEPARTMENT OF ENERGY may affect the responsibilities of a in this proceeding, in accordance with
particular resource agency, they must 18 CFR 4.34(b), and 385.2010.
Federal Energy Regulatory also serve a copy of the document on You may also register online at http://
Commission that resource agency. www.ferc.gov/docs-filing/
k. You may also register online at esubscription.asp to be notified via e-
[ P–12588–000] http://www.ferc.gov/docs-filing/ mail of new filings and issuances
esubscription.asp to be notified via e- related to this or other pending projects.
Hydraco Power, Inc.; Notice of mail of new filings and issuances For assistance, contact FERC Online
Application Accepted for Filing; related to this or other pending projects. Support.
Soliciting Comments, Motions To For assistance, contact FERC Online o. Scoping Process:
Intervene and Protests; Paper Scoping Support. The Commission staff intends to
and Soliciting Scoping Comments; l. This application has been accepted, prepare a single Environmental
Establishing a Deadline for but is not ready for environmental Assessment (EA) for the A. H. Smith
Submission of Final Amendments; and analysis at this time. Dam Project in accordance with the
Schedule for Processing Application m. Project Description: Hydraco National Environmental Policy Act. The
proposes to restore existing facilities EA will consider both site-specific and
August 26, 2005. and operate run-of-river, at all times cumulative environmental impacts and
Take notice that the following providing flow over the dam. The reasonable alternatives to the proposed
hydroelectric application has been filed project would cease generation and pass action.
with the Commission and is available all flows over the dam when inflows to Commission staff does not propose to
for public inspection. the impoundment are 100cfs or less. conduct any on-site scoping meetings at
a. Types of Application: Exemption The proposed project consists of: (1) this time. Instead, we will solicit
from License, 5 MW or Less. An existing 10.5-foot-high by 86.5-foot- comments, recommendations,
b. Project Nos.: P–12588–000. long concrete dam with a 20-foot-wide information, and alternatives in the
c. Date filed: May 3, 2005. concrete apron; (2) an existing 3-foot- Scoping Document (SD).
d. Applicant: Hydraco Power, Inc. wide by 4-foot-high wooden stopgate Copies of the SD outlining the subject
e. Name of Project: A. H. Smith Dam positioned in the east bank of the dam areas to be addressed in the EA were
Project. which regulates flows to the turbines; distributed to the parties on the
f. Location: On the San Marcos River (3) a 10.62-acre impoundment; (4) an Commission’s mailing list. Copies of the
near the town of Martindale, Caldwell existing 20-foot-wide by 30-foot-long SD may be viewed on the Web at http://
County, Texas. The project does not brick powerhouse; (5) an existing www.ferc.gov using the ‘‘eLibrary’’ link,
affect Federal lands. generator with installed capacity of 150 as indicated in item number n.

VerDate Aug<18>2005 18:00 Sep 01, 2005 Jkt 205001 PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 E:\FR\FM\02SEN1.SGM 02SEN1
52378 Federal Register / Vol. 70, No. 170 / Friday, September 2, 2005 / Notices

p. Procedural schedule: Recipients f. Location: On the west Fork of the proposed project must submit the
will have 30 days to provide the White River, in Hamilton County, competing application itself, or a notice
Commission with any written comments Indiana. The dam is own by PSI Energy. of intent to file such an application, to
on the EA. All comments filed with the g. Filed Pursuant to: Federal Power the Commission on or before the
Commission will be considered in the Act, 16 U.S.C. 791(a)–825(r). specified comment date for the
Order taking final action on the h. Applicant Contact: Mr. Robert L. particular application (see 18 CFR 4.36).
application. However, should Aram, Holliday Hydro, LLC, 8802E Submission of a timely notice of intent
substantive comments requiring re- 141st Street, Noblesville, IN 46060, allows an interested person to file the
analysis be received on the EA (317) 773–0128. competing preliminary permit
document, we would consider preparing i. FERC Contact: Robert Bell, (202) application no later than 30 days after
a subsequent EA document. The 502–6062. the specified comment date for the
application will be processed according j. Deadline for filing comments, particular application. A competing
to the following schedule. Revisions to protests, and motions to intervene: 60 preliminary permit application must
the schedule will be made as days from the issuance date of this conform with 18 CFR 4.30(b) and 4.36.
appropriate. notice. o. Competing Development
The Commission’s Rules of Practice Application—Any qualified
Milestone Target date and Procedure require all intervenors development applicant desiring to file a
filing documents with the Commission competing development application
Notice Accepting Appli- August 2005. to serve a copy of that document on must submit to the Commission, on or
cation, and Motion to each person in the official service list before a specified comment date for the
Intervene. for the project. Further, if an intervenor particular application, either a
Notice of Paper Scoping August 2005. files comments or documents with the competing development application or a
Interventions and/or October 2005. Commission relating to the merits of an
Scoping comments
notice of intent to file such an
issue that may affect the responsibilities application. Submission of a timely
due.
Notice Ready for Envi- October 2005.
of a particular resource agency, they notice of intent to file a development
ronmental Analysis/So- must also serve a copy of the document application allows an interested person
liciting Final Com- on that resource agency. to file the competing application no
ments, Recommenda- k. Description of Project: The later than 120 days after the specified
tions, Terms and Con- proposed project would consist of; (1) comment date for the particular
ditions. An existing 10-foot-high, 350-foot-long application. A competing license
Deadline for Agency November 2005. concrete gravity dam, (2) an existing application must conform with 18 CFR
Recommendations. impoundment having a surface area of 4.30(b) and 4.36.
Notice of the availability December 2005. 28 acres, with negligible storage and p. Notice of Intent—A notice of intent
of the EA.
normal water surface elevation of 764 must specify the exact name, business
Public Comments on EA January 2006.
due. feet mean seas level, (3) an existing address, and telephone number of the
Ready for Commission February 2006. powerhouse containing two generating prospective applicant, and must include
decision on the appli- units having a total installed capacity of an unequivocal statement of intent to
cation. 350 kilowatts, (4) a proposed 1000-foot- submit, if such an application may be
long transmission line, and (5) filed, either a preliminary permit
q. Final amendments to the appurtenant facilities. The project application or a development
application must be filed with the would have an annual generation of 1.5 application (specify which type of
Commission no later than 60 days from gigawatt-hours that would be sold to a application). A notice of intent must be
the issuance date of this notice. local utility. served on the applicant(s) named in this
l. Locations of Applications: A copy of public notice.
Magalie R. Salas,
the application is available for q. Proposed Scope of Studies Under
Secretary. inspection and reproduction at the Permit—A preliminary permit, if issued,
[FR Doc. E5–4816 Filed 9–1–05; 8:45 am] Commission in the Public Reference does not authorize construction. The
BILLING CODE 6717–01–P Room, located at 888 First Street NE., term of the proposed preliminary permit
Room 2A, Washington DC 20426, or by would be 36 months. The work
calling (202) 502–8371. This filing may proposed under the preliminary permit
DEPARTMENT OF ENERGY also be viewed on the Commission’s would include economic analysis,
Web site at http://www.ferc.gov using preparation of preliminary engineering
Federal Energy Regulatory plans, and a study of environmental
the ‘‘eLibrary’’ link. Enter the docket
Commission impacts. Based on the results of these
number excluding the last three digits in
Notice of Application Accepted For the docket number field to access the studies, the Applicant would decide
Filing and Soliciting Motions To document. For assistance, call toll-free whether to proceed with the preparation
Intervene, Protests, and Comments 1–866–208–3676 or e-mail of a development application to
FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project.
August 26, 2005. call (202) 502–8659. A copy is also r. Comments, Protests, or Motions to
Take notice that the following available for inspection and Intervene—Anyone may submit
hydroelectric application has been filed reproduction at the address in item h. comments, a protest, or a motion to
with the Commission and is available above. intervene in accordance with the
for public inspection: m. Individuals desiring to be included requirements of Rules of Practice and
a. Type of Application: Preliminary on the Commission’s mailing list should Procedure, 18 CFR 385.210, .211, .214.
Permit. so indicate by writing to the Secretary In determining the appropriate action to
b. Project No.: 12590–000. of the Commission. take, the Commission will consider all
c. Date filed: May 9, 2005. n. Competing Preliminary Permit— protests or other comments filed, but
d. Applicant: Historic Hydro, LLC. Anyone desiring to file a competing only those who file a motion to
e. Name of Project: Holliday Project. application for preliminary permit for a intervene in accordance with the

VerDate Aug<18>2005 18:00 Sep 01, 2005 Jkt 205001 PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 E:\FR\FM\02SEN1.SGM 02SEN1