You are on page 1of 1

52380 Federal Register / Vol. 70, No.

170 / Friday, September 2, 2005 / Notices

Notice of the Availability of the DEIS: of $9,016,929, (a 7.3 percent increase), Period Ends: 10/17/2005, Contact:
May 2006. including the increase in the purchased Linda A. DeVine 757–764–9434.
Notice of the Availability of the FEIS: power adder, beginning January 1, 2006, EIS No. 20050355, Draft EIS, COE, LA,
November 2006. are needed to satisfy repayment criteria. Port of Iberia Project, To Determine
Ready for Commission’s decision on the Page 48122, under SUPPLEMENTARY the Feasibility of Deepening the
application: February 2007. INFORMATION, correct the second Existing Navigation Channels between
Final amendments to the application sentence of the fourth paragraph to read: the POI and the Gulf of Mexico,
must be filed with the Commission no The proposed new rates would Portions of the Gulf Intracoastal
later than 30 days from the issuance increase estimated annual revenues Waterway (GIWW) and Freshwater
date of the notice of ready for from $124,325,100 to $133,342,029 and Bayou (FWB), LA, Comment Period
environmental analysis. would satisfy the present financial Ends: 10/17/2005, Contact: Michael
criteria for repayment of the project and Salyer 504–862–2037.
Magalie R. Salas, EIS No. 20050356, Draft EIS, FRC, TX,
transmission * * *.
Secretary. Port Arthur Liquefield Natural Gas
Dated: August 29, 2005.
[FR Doc. E5–4818 Filed 9–1–05; 8:45 am] (LNG) Project, Construction and
BILLING CODE 6717–01–P
Jon Worthington, Operation, U.S. Army COE Section 10
Assistant Administrator. and 404 Permits, (FERC/EIS–0182D),
[FR Doc. 05–17501 Filed 9–1–05; 8:45 am] Jefferson and Orange Counties TX and
DEPARTMENT OF ENERGY BILLING CODE 6450–01–P Cameron, Calcasieu and Beauregard
Parishes, LA, Comment Period Ends:
Southwestern Power Administration 10/17/2005, Contact: Thomas Russo
ENVIRONMENTAL PROTECTION 1–866–208–FERC.
Integrated System Power Rates:
Correction AGENCY Amended Notices
AGENCY: Southwestern Power [ER–FRL–6666–9] EIS No. 20050342, Draft EIS, NOA,
Administration, DOE. 00, Consolidated Atlantic Highly
Environmental Impacts Statements; Migratory Species Fishery Management
ACTION: Correction to notice of proposed
rate increase.
Notice of Availability Plan for Atlantic Tunas, Swordfish, and
Shark and the Atlantic Billfish Fishery
Responsible Agency: Office of Federal Management Plan, Implementation,
SUMMARY: Southwestern Area Power
Activities, General Information (202) Atlantic Coast, Caribbean and Gulf of
Administration published a document
564–7167 or http://www.epa.gov/ Mexico, Comment Period Ends: 10/18/
in the Federal Register (70 FR 48121) on
compliance/nepa/. 2005, Contact: Karyl Brewster Geisz
August 16, 2005, announcing the public
review and comment period on Weekly receipt of Environmental Impact 301–713–2347 Revision of Notice
proposed rates. This rate proposal will Statements Filed 08/22/2005 Through Published in FR: 08/19/2005. Correction
increase annual system revenues 08/26/2005. Pursuant to 40 CFR to Comment Period from 10/03/2005 to
approximately 7.3 percent from 1506.9. 10/18/2005.
$124,325,100 to $133,342,029. EIS No. 20050351, Draft EIS, SFW, CA, Dated: August 30, 2005.
Inadvertently, the amount of the East Contra Costa County Habitat
Robert W. Hargrove,
proposed increase for the purchased Conservation Plan and Natural
Director, NEPA Compliance Division, Office
power adder rate component ($227,100 Community Conservation Plan,
of Federal Activities.
or 0.2 percent) was not included in the Implementation, Incidental Take
[FR Doc. 05–17541 Filed 9–1–05; 8:45 am]
initial notice. Permit, Cities of Brentwood, Clayton,
BILLING CODE 6560–50–P
Oakley and Pittsburg, Contra Costa
FOR FURTHER INFORMATION CONTACT: Mr.
County, CA, Comment Period Ends:
Forrest E. Reeves, Assistant
10/17/2005, Contact: Sheila Larsen
Administrator, Office of Corporate ENVIRONMENTAL PROTECTION
916–444–6600.
Operations, Southwestern Power AGENCY
EIS No. 20050352, Final Supplement,
Administration, U.S. Department of
NPS, WA, Elwha River Ecosystem [ER–FRL–6667–1]
Energy, One West Third Street, Tulsa,
Restoration Implementation Project,
Oklahoma 74103, (918) 595–6696, Environmental Impact Statements and
Update Information, Olympic
gene.reeves@swpa.gov. Regulations; Availability of EPA
Peninsula, Challam County, WA, Wait
Corrections Period Ends: 10/03/2005, Contact: Comments
In the Federal Register on August 16, Brian Winter 360–565–1320. Availability of EPA comments
2005, in FR Doc. 05–16190: EIS No. 20050353, Draft EIS, FHW, NY, prepared pursuant to the Environmental
Page 48121, under SUMMARY, correct Willis Avenue Bridge Reconstruction, Review Process (EDP), under section
the last sentence to read: Proposing Reconstruction of 100-year 309 of the Clean Air Act and Section
Beginning January 1, 2006, and old Willis Avenue Bridge over the 102(2)(c) of the National Environmental
thereafter, the proposed rates would Harem River between Manhattan and Policy Act as amended. Requests for
increase annual system revenues the Bronx, New York and Bronx copies of EPA comments can be directed
approximately 7.3 percent from Counties, NY, Comment Period Ends: to the Office of Federal Activities at
$124,325,100 to $133,342,029, which 10/28/2005, Contact: Robert Arnold 202–564–7167. An explanation of the
includes an increase in the purchased 518–431–4125. ratings assigned to draft environmental
power adder. EIS No. 20050354, Draft EIS, UAF, 00, impact statements (EISs) was published
Page 48122, under SUPPLEMENTARY Shaw Air Base Airspace Training in FR dated April 1, 2005 (70 FR 16815).
INFORMATION, correct the last sentence of Initiative (ATI), 20th Fighter Wing
the third paragraph to read: Proposal to Modify the Training Draft EISs
The Revised Power Repayment Study Airspace Overlying Parts, South EIS No. 20050168, ERP No. D–BLM–
shows that additional annual revenues Carolina and Georgia, Comment L65484–AK, East Alaska Draft Resource

VerDate Aug<18>2005 18:00 Sep 01, 2005 Jkt 205001 PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 E:\FR\FM\02SEN1.SGM 02SEN1

You might also like