Fiscal Year 7/1/2014- 6/30/2015 Projects Report By City

Project Nam

Total Hours

Apprentice African
Hours
American

Total Wages

Asian

Caucasian

Hispanic

Native
Not
American Specified

Other

457 17th Street

OAKLAND

485.00 53.95%

$34,401.83 54.44%

176.00

0.00

0.00

29.00

145.00

0.00

311.00

0.00

OTHER

414.00 46.05%

$28,786.46 45.56%

0.00

0.00

0.00

0.00

363.00

0.00

51.00

0.00

176.00

0.00

0.00

29.00

508.00

0.00

362.00

0.00

19.58%

0.00%

0.00%

3.23%

56.51%

0.00%

40.27%

0.00%

0.00

0.00

0.00

0.00

38.50

0.00

0.00

0.00

0.00

0.00

0.00

4.50

124.00

0.00

0.00

0.00

0.00

0.00

0.00

4.50

162.50

0.00

0.00

0.00

0.00%

0.00%

0.00%

2.69%

97.31%

0.00%

0.00%

0.00%

0.00

10.00

0.00

0.00

232.50

0.00

0.00

0.00

0.00

10.00

0.00

0.00

232.50

0.00

0.00

0.00

0.00%

4.12%

0.00%

0.00%

95.88%

0.00%

0.00%

0.00%

0.00

0.00

0.00

8.50

0.00

0.00

0.00

0.00

Project Total
Percentage

899.00

$63,188.29

7101 Edgewater Facility Building #4 Renovation

OAKLAND

38.50 23.05%

OTHER

128.50 76.95%

Project Total
Percentage

167.00

$2,988.21

21.12%

$11,163.56 78.88%
$14,151.77

7th Street West Oakland Transit Village

OTHER
Project Total
Percentage

242.50 100.00%
242.50

$12,507.07 100.00%
$12,507.07

911 Facility Cat 6 Cabling

OAKLAND

8.50 100.00%

Tuesday, October 06, 2015

$767.90 100.00%

Page 1 of 22

Project Nam
Project Total
Percentage

Total Hours
8.50

Apprentice African
Hours
American

Total Wages
$767.90

Asian

Caucasian

Hispanic

Native
Not
American Specified

Other

0.00

0.00

8.50

0.00

0.00

0.00

0.00

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

0.00%

0.00

83.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

83.00

0.00

0.00

0.00

0.00

0.00

0.00

100.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00

Arroyo Park Restroom Repairs

OAKLAND
Project Total
Percentage

83.00 100.00%
83.00

$7,292.71

100.00%

$7,292.71

0.00%

As Needed Elevator Inspection and Maintenance on City of Oakland Facilities

OTHER
Project Total
Percentage

55.50 100.00%
55.50

$5,068.21

100.00%

$5,068.21

8.00

0.00

0.00

50.50

0.00

5.00

0.00

0.00

8.00

0.00

0.00

50.50

0.00

5.00

0.00

0.00

14.41%

0.00%

0.00%

90.99%

0.00%

9.01%

0.00%

0.00%

As Needed Roof Repairs On City of Oakland Facilities

OAKLAND

46.00 58.23%

$2,167.71

57.05%

12.50

0.00

0.00

0.00

46.00

0.00

0.00

0.00

OTHER

33.00 41.77%

$1,632.13

42.95%

0.00

0.00

0.00

0.00

33.00

0.00

0.00

0.00

12.50

0.00

0.00

0.00

79.00

0.00

0.00

0.00

15.82%

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

Project Total
Percentage

79.00

$3,799.84

Bart 17th Street Gateway

OAKLAND

171.00 30.91%

$10,879.70 31.28%

49.50

131.00

0.00

24.00

16.00

0.00

0.00

0.00

OTHER

382.25 69.09%

$23,897.91 68.72%

81.00

0.00

0.00

324.75

57.50

0.00

0.00

0.00

Tuesday, October 06, 2015

Page 2 of 22

Project Nam
Project Total
Percentage

Total Hours
553.25

Total Wages
$34,777.61

Apprentice African
Hours
American

Asian

Caucasian

Hispanic

Native
Not
American Specified

Other

130.50

131.00

0.00

348.75

73.50

0.00

0.00

0.00

23.59%

23.68%

0.00%

63.04%

13.29%

0.00%

0.00%

0.00%

Bike Lane Improvements at Grand Ave and 27th Street

OAKLAND

23.50 8.67%

$989.88 7.12%

23.50

0.00

0.00

23.50

0.00

0.00

0.00

0.00

OTHER

247.50 91.33%

$12,916.41 92.88%

0.00

0.00

32.00

17.00

190.50

0.00

0.00

8.00

23.50

0.00

32.00

40.50

190.50

0.00

0.00

8.00

8.67%

0.00%

11.81%

14.94%

70.30%

0.00%

0.00%

2.95%

Project Total
Percentage

271.00

$13,906.29

Brooklyn Basin - Demolition

OAKLAND
OTHER
Project Total
Percentage

176.00 7.95%

$8,994.88 6.46%

0.00

0.00

0.00

0.00

176.00

0.00

0.00

0.00

2,039.00 92.05%

$130,286.97 93.54%

0.00

136.00

0.00

1,024.00

727.00

0.00

152.00

0.00

0.00

136.00

0.00

1,024.00

903.00

0.00

152.00

0.00

0.00%

6.14%

0.00%

46.23%

40.77%

0.00%

6.86%

0.00%

2,215.00

$139,281.85

Brooklyn Basin Bay Trail

OAKLAND

2,013.00 71.87%

$98,208.69 71.57%

266.00

0.00

0.00

0.00

2,013.00

0.00

0.00

0.00

OTHER

788.00 28.13%

$39,006.06 28.43%

0.00

0.00

0.00

0.00

788.00

0.00

0.00

0.00

266.00

0.00

0.00

0.00

2,801.00

0.00

0.00

0.00

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

Project Total
Percentage

2,801.00

$137,214.75

9.50%

Brooklyn Basin Phase 1A

Tuesday, October 06, 2015

Page 3 of 22

Project Nam

Total Hours

Total Wages

Apprentice African
Hours
American

Asian

Caucasian

Hispanic

Native
Not
American Specified

Other

OAKLAND

1,823.50 23.74%

$105,909.05 21.96%

302.50

909.00

385.50

0.00

529.00

0.00

0.00

0.00

OTHER

5,856.50 76.26%

$376,431.73 78.04%

138.50

41.00

244.50

3,728.00

1,621.50

0.00

173.50

48.00

441.00

950.00

630.00

3,728.00

2,150.50

0.00

173.50

48.00

5.74%

12.37%

8.20%

48.54%

28.00%

0.00%

2.26%

0.63%

Project Total
Percentage

7,680.00

$482,340.78

Building Demolition at 9409, 9415, 9431, and 9437 International Avenue

OAKLAND
OTHER

Project Total
Percentage

136.00 86.08%

$7,140.80 81.06%

24.00

0.00

0.00

0.00

136.00

0.00

0.00

0.00

22.00 13.92%

$1,668.66 18.94%

0.00

0.00

0.00

22.00

0.00

0.00

0.00

0.00

24.00

0.00

0.00

22.00

136.00

0.00

0.00

0.00

15.19%

0.00%

0.00%

13.92%

86.08%

0.00%

0.00%

0.00%

136.00

136.00

0.00

0.00

276.00

0.00

0.00

0.00

0.00

0.00

0.00

32.00

0.00

0.00

0.00

136.00

136.00

0.00

0.00

308.00

0.00

0.00

0.00

30.63%

30.63%

0.00%

0.00%

69.37%

0.00%

0.00%

0.00%

158.00

$8,809.46

Burckhalter Park Restrooms ADA Improvements

OAKLAND
OTHER

Project Total
Percentage

412.00 92.79%

$21,559.80 92.97%

32.00 7.21%

$1,631.04 7.03%

444.00

$23,190.84

0.00

Citywide Bicycle Rack Installations and Detector Pavement Markings

OAKLAND

87.00 69.05%

$4,261.97 68.59%

0.00

0.00

0.00

0.00

79.00

0.00

8.00

0.00

OTHER

39.00 30.95%

$1,951.99 31.41%

0.00

0.00

0.00

0.00

39.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

118.00

0.00

8.00

0.00

0.00%

0.00%

0.00%

93.65%

0.00%

6.35%

0.00%

Project Total
Percentage

126.00

Tuesday, October 06, 2015

$6,213.96

0.00%

Page 4 of 22

Project Nam

Total Hours

Total Wages

Apprentice African
Hours
American

Asian

Caucasian

Hispanic

Native
Not
American Specified

Other

Citywide Curb Ramps and Sidewalk Repair

OAKLAND

1,425.00 75.52%

$70,074.27 67.67%

436.00

0.00

0.00

0.00

1,425.00

0.00

0.00

0.00

OTHER

462.00 24.48%

$33,483.64 32.33%

0.00

0.00

0.00

0.00

462.00

0.00

0.00

0.00

436.00

0.00

0.00

0.00

1,887.00

0.00

0.00

0.00

23.11%

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

Project Total
Percentage

1,887.00

$103,557.91

Citywide Curb Ramps and Sidewalk Repair-AJW

OAKLAND

2,529.00 68.12%

$136,569.42 69.17%

151.75

0.00

0.00

226.75

2,112.25

0.00

190.00

0.00

OTHER

1,183.50 31.88%

$60,864.00 30.83%

55.00

0.00

0.00

0.00

1,183.50

0.00

0.00

0.00

206.75

0.00

0.00

226.75

3,295.75

0.00

190.00

0.00

5.57%

0.00%

0.00%

6.11%

88.77%

0.00%

5.12%

0.00%

Project Total
Percentage

3,712.50

$197,433.42

Citywide Street Rehabilitation & Reconstruction Phase II

OAKLAND

30.50 22.59%

$1,529.58 22.41%

0.00

0.00

0.00

0.00

30.50

0.00

0.00

0.00

OTHER

104.50 77.41%

$5,295.82 77.59%

0.00

0.00

0.00

0.00

104.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

135.00

0.00

0.00

0.00

0.00%

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

$176,124.94 27.98%

624.50

321.50

0.00

0.00

2,964.50

0.00

0.00

8.00

$453,360.43 72.02%

211.00

118.50

53.50

1,801.00

5,085.00

0.00

9.00

144.50

Project Total
Percentage

135.00

$6,825.40

Citywide Street Resurfacing -C369640

OAKLAND
OTHER

3,294.00 31.36%
7,211.50 68.64%

Tuesday, October 06, 2015

Page 5 of 22

Project Nam
Project Total
Percentage

Total Hours

Total Wages

10,505.50

$629,485.37

Apprentice African
Hours
American

Asian

Caucasian

Hispanic

Native
Not
American Specified

Other

835.50

440.00

53.50

1,801.00

8,049.50

0.00

9.00

152.50

7.95%

4.19%

0.51%

17.14%

76.62%

0.00%

0.09%

1.45%

104.00

88.50

0.00

58.00

975.00

0.00

61.00

0.00

133.50

61.50

0.00

353.50

1,232.50

0.00

0.00

9.50

237.50

150.00

0.00

411.50

2,207.50

0.00

61.00

9.50

8.36%

5.28%

0.00%

14.49%

77.74%

0.00%

2.15%

0.33%

80.00

0.00

0.00

467.00

0.00

0.00

0.00

8.00

0.00

94.50

110.00

0.00

114.00

39.55

357.00

88.00

0.00

94.50

577.00

0.00

114.00

39.55

39.10%

9.64%

0.00%

10.35%

63.19%

0.00%

12.49%

4.33%

Citywide Street Resurfacing II

OAKLAND

1,182.50 41.64%

OTHER

1,657.00 58.36%

Project Total
Percentage

$64,113.68 38.84%
$100,941.41 61.16%

2,839.50

$165,055.09

Coliseum Transit Village

OAKLAND

547.00 59.91%

$23,486.33 49.53%

357.00

OTHER

366.05 40.09%

$23,932.95 50.47%

0.00

Project Total
Percentage

913.05

$47,419.28

Dunsmuir Estate Park Trenchless Bore & Electrical Repair

OAKLAND

439.50 73.07%

$22,150.32 69.97%

171.00

8.00

0.00

19.00

396.50

0.00

16.00

0.00

OTHER

162.00 26.93%

$9,506.91 30.03%

0.00

0.00

0.00

24.00

114.00

0.00

24.00

0.00

171.00

8.00

0.00

43.00

510.50

0.00

40.00

0.00

28.43%

1.33%

0.00%

7.15%

84.87%

0.00%

6.65%

0.00%

Project Total
Percentage

601.50

$31,657.23

Durant Mini Park Improvements Project

Tuesday, October 06, 2015

Page 6 of 22

Project Nam

Total Hours

Total Wages

Apprentice African
Hours
American

Asian

Caucasian

Hispanic

Native
Not
American Specified

Other

OAKLAND

2,292.50 52.58%

$145,801.34 57.66%

711.00

0.00

0.00

1,179.50

1,113.00

0.00

0.00

0.00

OTHER

2,067.50 47.42%

$107,058.57 42.34%

358.00

0.00

0.00

510.00

1,557.50

0.00

0.00

0.00

1,069.00

0.00

0.00

1,689.50

2,670.50

0.00

0.00

0.00

0.00%

0.00%

38.75%

61.25%

0.00%

0.00%

0.00%

0.00

0.00

3.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

0.00

0.00

0.00

0.00%

100.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Project Total
Percentage

4,360.00

$252,859.91

24.52%

Effie's House (Ivy Hill) Project

OAKLAND
Project Total
Percentage

3.00 100.00%

$135.54 100.00%

3.00

$135.54

0.00%

Emergency Electrical Repairs for Henry J. Kaiser Convention Center (HJKCC)

OAKLAND

41.00 82.00%

$2,994.95 86.36%

9.00

0.00

0.00

32.00

0.00

0.00

9.00

0.00

OTHER

9.00 18.00%

$472.98 13.64%

0.00

0.00

0.00

0.00

9.00

0.00

0.00

0.00

50.00

$3,467.93

9.00

0.00

0.00

32.00

9.00

0.00

9.00

0.00

0.00%

0.00%

64.00%

18.00%

0.00%

18.00%

0.00%

0.00

0.00

0.00

0.00

16.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

16.00

0.00

0.00

0.00

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

Project Total
Percentage

18.00%

Emergency tarping over landslide opposite 6818 Charing Cross Road

OAKLAND
Project Total
Percentage

16.00 100.00%
16.00

$1,187.28 100.00%
$1,187.28

0.00%

Fannie Wall Playground Replacement Project

Tuesday, October 06, 2015

Page 7 of 22

Project Nam
OTHER
Project Total
Percentage

Total Hours
104.00 100.00%
104.00

Apprentice African
Hours
American

Total Wages
$3,069.60 100.00%
$3,069.60

Asian

Caucasian

Hispanic

Native
Not
American Specified

Other

0.00

0.00

0.00

0.00

16.00

0.00

88.00

0.00

0.00

0.00

0.00

0.00

16.00

0.00

88.00

0.00

0.00%

0.00%

0.00%

15.38%

0.00%

84.62%

0.00%

0.00%

Foothill Boulevard Streetscape Improvement Phase II From Austin Street to 35th Avenue

596.00

125.50

0.00

3,232.00

0.00

56.00

0.00

37.00

0.00

1,337.25

2,353.50

0.00

0.00

0.00

1,256.50

633.00

125.50

1,337.25

5,585.50

0.00

56.00

0.00

16.24%

8.18%

1.62%

17.28%

72.19%

0.00%

0.72%

0.00%

1,470.00

62.00

484.00

0.00

6,637.30

0.00

0.00

0.00

116.00

126.50

0.00

654.00

3,361.50

0.00

0.00

16.00

1,586.00

188.50

484.00

654.00

9,998.80

0.00

0.00

16.00

13.98%

1.66%

4.27%

5.77%

88.16%

0.00%

0.00%

0.14%

2,237.80

479.00

9.00

7,355.00

0.00

24.00

0.00

OAKLAND

4,009.50 51.82%

$194,408.09 47.19%

1,240.50

OTHER

3,727.75 48.18%

$217,529.84 52.81%

16.00

Project Total
Percentage

7,737.25

$411,937.93

Foothill High Melrose Streetscape Improvements

OAKLAND

7,183.30 63.34%

$362,815.84 61.16%

OTHER

4,158.00 36.66%

$230,399.51

Project Total
Percentage

11,341.30

38.84%

$593,215.35

Foothill Seminary Public Transit Hub Streetscape

OAKLAND

10,104.80 48.97%

$485,410.94 43.36%

2,326.00

OTHER

10,529.95 51.03%

$634,025.65 56.64%

305.50

383.50

32.50

2,672.25

6,812.60

0.00

317.00

312.10

2,631.50

2,621.30

511.50

2,681.25

14,167.60

0.00

341.00

312.10

12.70%

2.48%

12.99%

68.66%

0.00%

1.65%

1.51%

Project Total
Percentage

20,634.75

Tuesday, October 06, 2015

$1,119,436.59

12.75%

Page 8 of 22

Project Nam

Total Hours

Total Wages

Apprentice African
Hours
American

Asian

Caucasian

Hispanic

Native
Not
American Specified

Other

Frank H. Ogawa Bike Rack Upgrade Project

OAKLAND

15.50 50.00%

$1,056.02 50.00%

0.00

0.00

0.00

0.00

15.50

0.00

0.00

0.00

OTHER

15.50 50.00%

$1,056.02 50.00%

0.00

0.00

0.00

0.00

0.00

0.00

0.00

15.50

0.00

0.00

0.00

0.00

15.50

0.00

0.00

15.50

0.00%

0.00%

0.00%

0.00%

50.00%

0.00%

0.00%

50.00%

Project Total
Percentage

31.00

$2,112.03

Fremont Pool Shell Resurfacing

OAKLAND

110.00 43.65%

$4,367.62 45.62%

0.00

0.00

110.00

0.00

0.00

0.00

0.00

0.00

OTHER

142.00 56.35%

$5,205.52 54.38%

0.00

0.00

0.00

75.00

0.00

0.00

0.00

67.00

0.00

0.00

110.00

75.00

0.00

0.00

0.00

67.00

0.00%

43.65%

29.76%

0.00%

0.00%

0.00%

26.59%

Project Total
Percentage

252.00

$9,573.14

0.00%

Fruitvale Avenue Controller Upgrade & Signal Modifications at Webster Street/19th Street

OAKLAND
OTHER

Project Total
Percentage

576.50 80.69%

$34,307.34 82.75%

88.00

0.00

0.00

160.00

352.50

0.00

64.00

0.00

138.00 19.31%

$7,150.55 17.25%

0.00

0.00

0.00

0.00

138.00

0.00

0.00

0.00

88.00

0.00

0.00

160.00

490.50

0.00

64.00

0.00

0.00%

0.00%

22.39%

68.65%

0.00%

8.96%

0.00%

2,312.00

70.00

210.00

2,197.50

0.00

208.00

0.00

445.25

448.00

3,849.50

3,916.00

11.00

372.50

392.50

714.50

$41,457.89

12.32%

Golden Gate Recreation Center Improvements

OAKLAND

4,997.50 34.63%

$316,918.56 32.60%

1,535.50

OTHER

9,434.75 65.37%

$655,246.43 67.40%

778.00

Tuesday, October 06, 2015

Page 9 of 22

Project Nam
Project Total
Percentage

Total Hours
14,432.25

Apprentice African
Hours
American

Total Wages
$972,164.99

Asian

Caucasian

Hispanic

Native
Not
American Specified

Other

2,313.50

2,757.25

518.00

4,059.50

6,113.50

11.00

580.50

392.50

16.03%

19.10%

3.59%

28.13%

42.36%

0.08%

4.02%

2.72%

Greenman Field Vandalism Repairs

OAKLAND

230.00 44.19%

$15,333.50 41.80%

79.00

230.00

0.00

0.00

0.00

0.00

0.00

0.00

OTHER

290.50 55.81%

$21,346.69 58.20%

80.50

30.00

0.00

185.00

0.00

0.00

0.00

75.50

159.50

260.00

0.00

185.00

0.00

0.00

0.00

75.50

30.64%

49.95%

0.00%

35.54%

0.00%

0.00%

0.00%

14.51%

0.00

0.00

0.00

0.00

0.00

0.00

35.80

0.00

0.00

0.00

0.00

0.00

0.00

0.00

35.80

0.00

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

0.00%

0.00

0.00

0.00

0.00

24.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

24.00

0.00

0.00

0.00

0.00%

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

332.00

202.50

250.50

39.00

1,763.00

0.00

128.50

0.00

49.50

108.00

5,639.25

6,092.50

0.00

165.00

16.00

520.50

Project Total
Percentage

$36,680.19

Keith Avenue Striping Between College Avenue and Broadway

OTHER

35.80 100.00%
35.80

Project Total
Percentage

$1,893.19 100.00%
$1,893.19

Kevin Court Bumps

OAKLAND
Project Total
Percentage

24.00 100.00%
24.00

$1,193.28 100.00%
$1,193.28

Lake Merritt Channel Improvement at 10th Street

OAKLAND

2,383.50 16.49%

OTHER

12,070.25 83.51%

Tuesday, October 06, 2015

$133,869.21

14.17%

$811,106.56 85.83%

1,468.00

Page 10 of 22

Project Nam
Project Total
Percentage

Total Hours
14,453.75

Apprentice African
Hours
American

Total Wages
$944,975.77

Asian

Caucasian

Hispanic

Native
Not
American Specified

Other

252.00

358.50

5,678.25

7,855.50

0.00

293.50

16.00

1.74%

2.48%

39.29%

54.35%

0.00%

2.03%

0.11%

1,390.00

1,779.50

88.00

0.00

5,242.50

0.00

1,071.50

0.00

4,048.00

1,273.50

121.50

8,596.00

7,006.50

0.00

1,568.00

174.75

5,438.00

3,053.00

209.50

8,596.00

12,249.00

0.00

2,639.50

174.75

20.20%

11.34%

0.78%

31.93%

45.50%

0.00%

9.80%

0.65%

16.00

16.00

0.00

0.00

104.00

0.00

0.00

0.00

16.00

16.00

0.00

0.00

104.00

0.00

0.00

0.00

13.33%

13.33%

0.00%

0.00%

86.67%

0.00%

0.00%

0.00%

1,800.00

12.45%

Lake Merritt Sail Boat House Shoreline Improvement Project

OAKLAND
OTHER

Project Total
Percentage

8,181.50 30.39%

$460,924.32 27.99%

18,740.25 69.61% $1,185,926.31


26,921.75

72.01%

$1,646,850.63

Lake Merritt Trash Booms & Anchors

OAKLAND
Project Total
Percentage

120.00 100.00%

$6,478.64 100.00%

120.00

$6,478.64

Latham Square Streetscape Improvements

OAKLAND

824.50 38.44%

$35,518.92 27.00%

311.00

0.00

0.00

0.00

824.50

0.00

0.00

0.00

OTHER

1,320.35 61.56%

$96,027.38 73.00%

40.50

9.75

7.00

682.50

482.00

0.00

0.00

139.10

351.50

9.75

7.00

682.50

1,306.50

0.00

0.00

139.10

16.39%

0.45%

0.33%

31.82%

60.91%

0.00%

0.00%

6.49%

257.00

66.00

0.00

48.00

830.50

0.00

0.00

0.00

Project Total
Percentage

2,144.85

$131,546.30

Linden Park Improvements

OAKLAND

944.50 47.98%

Tuesday, October 06, 2015

$47,561.47 45.83%

Page 11 of 22

Project Nam
OTHER
Project Total
Percentage

Total Hours
1,024.00 52.02%
1,968.50

Total Wages
$56,215.24 54.17%
$103,776.71

Apprentice African
Hours
American

Asian

Caucasian

Hispanic

Native
Not
American Specified

Other

0.00

0.00

136.00

840.00

0.00

48.00

0.00

265.00

66.00

0.00

184.00

1,670.50

0.00

48.00

0.00

13.46%

3.35%

0.00%

9.35%

84.86%

0.00%

2.44%

0.00%

8.00

MacArthur Bart Transit Village-Phase 1 BART Garage-Project 4 Garage

OAKLAND

OTHER
Project Total
Percentage

11.50 1.55%

$1,046.68 1.73%

0.00

0.00

0.00

11.50

0.00

0.00

0.00

0.00

732.76 98.45%

$59,446.94 98.27%

0.00

0.00

0.00

149.00

40.76

0.00

543.00

0.00

0.00

0.00

0.00

160.50

40.76

0.00

543.00

0.00

0.00%

0.00%

0.00%

21.57%

5.48%

0.00%

72.96%

0.00%

744.26

$60,493.62

MacArthur Bart Transit Village-Site Development-Phase B

OAKLAND

49.00 36.57%

$4,189.32 37.32%

0.00

0.00

0.00

0.00

49.00

0.00

0.00

0.00

OTHER

85.00 63.43%

$7,035.60 62.68%

0.00

0.00

0.00

70.00

15.00

0.00

0.00

0.00

0.00

0.00

0.00

70.00

64.00

0.00

0.00

0.00

0.00%

0.00%

0.00%

52.24%

47.76%

0.00%

0.00%

0.00%

Project Total
Percentage

134.00

$11,224.92

MH-1 Caltrans Relocation Alarcon-Bohm Special Projects

OAKLAND

1,688.00 89.26%

$89,629.82 89.98%

179.00

0.00

0.00

0.00

1,688.00

0.00

0.00

0.00

OTHER

203.00 10.74%

$9,980.36 10.02%

8.00

8.00

0.00

0.00

195.00

0.00

0.00

0.00

187.00

8.00

0.00

0.00

1,883.00

0.00

0.00

0.00

9.89%

0.42%

0.00%

0.00%

99.58%

0.00%

0.00%

0.00%

Project Total
Percentage

1,891.00

Tuesday, October 06, 2015

$99,610.18

Page 12 of 22

Project Nam

Total Hours

Apprentice African
Hours
American

Total Wages

Asian

Caucasian

Hispanic

Native
Not
American Specified

Other

MH-1 Caltrans Relocation-Morrow Meadows

435.00

0.00

512.00

80.00

0.00

0.00

0.00

0.00

128.00

84.00

75.50

0.00

8.00

0.00

433.00

435.00

128.00

596.00

155.50

0.00

8.00

0.00

32.74%

32.89%

9.68%

45.07%

11.76%

0.00%

0.60%

0.00%

OAKLAND

1,027.00 77.66%

$85,151.56 74.49%

433.00

OTHER

295.50 22.34%

$29,168.50 25.51%

0.00

Project Total
Percentage

1,322.50

$114,320.06

MH-1 Caltrans Relocation-Turner Construction

OAKLAND

2,184.50 63.37%

$119,179.31

59.44%

293.00

1,688.50

0.00

220.50

219.00

0.00

0.00

56.50

OTHER

1,262.50 36.63%

$81,330.84 40.56%

161.50

171.00

0.00

912.50

179.00

0.00

0.00

0.00

454.50

1,859.50

0.00

1,133.00

398.00

0.00

0.00

56.50

13.19%

53.95%

0.00%

32.87%

11.55%

0.00%

0.00%

1.64%

Project Total
Percentage

3,447.00

$200,510.15

New Curb and Gutter on 30th Street between Adeline and Magnolia

OAKLAND

34.00 58.62%

$1,860.74 59.78%

0.00

0.00

0.00

0.00

29.00

0.00

5.00

0.00

OTHER

24.00 41.38%

$1,252.00 40.22%

0.00

0.00

0.00

0.00

24.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

53.00

0.00

5.00

0.00

0.00%

0.00%

0.00%

0.00%

91.38%

0.00%

8.62%

0.00%

8.00

8.00

0.00

0.00

24.00

0.00

0.00

0.00

Project Total
Percentage

58.00

$3,112.74

New Rock Trench Drain in City ROW at 6060 Thornhill Road

OAKLAND

32.00 100.00%

Tuesday, October 06, 2015

$1,756.08 100.00%

Page 13 of 22

Project Nam
Project Total
Percentage

Total Hours

Total Wages

Apprentice African
Hours
American

Asian

Caucasian

Hispanic

Native
Not
American Specified

Other

8.00

0.00

0.00

24.00

0.00

0.00

0.00

25.00%

0.00%

0.00%

75.00%

0.00%

0.00%

0.00%

86,098.90 46.49% $4,726,596.63 42.89% #########

21,795.45

657.00

6,285.50

48,384.40 0.00

7,265.55

1,711.00

99,104.13 53.51% $6,293,233.22 57.11%

6,728.25

6,192.55

1,184.25

50,626.85 28,925.25

225.00

9,004.90

2,945.33

185,203.03

35,226.45

27,988.00

1,841.25

56,912.35

77,309.65

225.00

16,270.45

4,656.33

19.02%

15.11%

0.99%

30.73%

41.74%

0.12%

8.79%

2.51%

32.00

$1,756.08

8.00

25.00%

Oakland Army Base Project

OAKLAND
OTHER

Project Total
Percentage

$11,019,829.85

Oakland Convention Center-Deck Coat

OAKLAND

435.00 86.05%

$18,373.61 83.56%

184.50

0.00

0.00

0.00

435.00

0.00

0.00

0.00

OTHER

70.50 13.95%

$3,614.88 16.44%

0.00

0.00

0.00

0.00

70.50

0.00

0.00

0.00

184.50

0.00

0.00

0.00

505.50

0.00

0.00

0.00

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

Project Total
Percentage

505.50

$21,988.49

36.50%

Path Repair and Improvements at Montclair Railroad Trail

OAKLAND

24.00 75.00%

$1,222.08 68.65%

0.00

0.00

0.00

0.00

24.00

0.00

0.00

0.00

OTHER

8.00 25.00%

$558.16 31.35%

0.00

0.00

0.00

0.00

8.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

32.00

0.00

0.00

0.00

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

Project Total
Percentage

32.00

$1,780.24

0.00%

Pedestrian Safety Improvement Project

Tuesday, October 06, 2015

Page 14 of 22

Project Nam

Total Hours

Apprentice African
Hours
American

Total Wages

Asian

Caucasian

Hispanic

Native
Not
American Specified

Other

OAKLAND

72.00 81.82%

$3,647.48 81.72%

24.00

0.00

0.00

6.00

58.00

0.00

8.00

0.00

OTHER

16.00 18.18%

$815.84 18.28%

0.00

0.00

0.00

0.00

16.00

0.00

0.00

0.00

88.00

$4,463.32

24.00

0.00

0.00

6.00

74.00

0.00

8.00

0.00

27.27%

0.00%

0.00%

6.82%

84.09%

0.00%

9.09%

0.00%

Project Total
Percentage

Radio Facility Upgrades APL Building-1111 Broadway

OAKLAND
OTHER

Project Total
Percentage

898.75 80.88%

$66,657.91 81.54%

161.75

0.00

0.00

604.00

133.00

0.00

161.75

0.00

212.50 19.12%

$15,089.75 18.46%

145.00

0.00

0.00

16.50

164.00

0.00

32.00

0.00

306.75

0.00

0.00

620.50

297.00

0.00

193.75

0.00

27.60%

0.00%

0.00%

55.84%

26.73%

0.00%

17.44%

0.00%

1,111.25

$81,747.66

Radio Facility Upgrades OFD Building 1605 Martin Luther King Carpet Installation

OAKLAND
OTHER

Project Total
Percentage

438.50 69.88%

$29,315.41 69.43%

105.00

0.00

0.00

180.50

153.00

0.00

105.00

0.00

189.00 30.12%

$12,909.99 30.57%

151.00

0.00

0.00

24.00

159.00

0.00

0.00

6.00

256.00

0.00

0.00

204.50

312.00

0.00

105.00

6.00

40.80%

0.00%

0.00%

32.59%

49.72%

0.00%

16.73%

0.96%

156.50

0.00

0.00

0.00

583.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

425.50

0.00

0.00

0.00

156.50

0.00

0.00

0.00

1,009.00

0.00

0.00

0.00

15.51%

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

627.50

$42,225.40

Rehabilitation of Sanitary Sewers at Lakeside Park Boat House

OAKLAND

583.50 57.83%

$28,556.15

OTHER

425.50 42.17%

$27,330.88 48.90%

Project Total
Percentage

1,009.00

Tuesday, October 06, 2015

$55,887.02

51.10%

Page 15 of 22

Project Nam

Total Hours

Total Wages

Apprentice African
Hours
American

Asian

Caucasian

Hispanic

Native
Not
American Specified

Other

Rehabilitation of Sanitary Sewers at Lakeside Park Pump Station

OTHER
Project Total
Percentage

65.50 100.00%
65.50

$3,375.43 100.00%
$3,375.43

31.50

0.00

0.00

31.50

34.00

0.00

0.00

0.00

31.50

0.00

0.00

31.50

34.00

0.00

0.00

0.00

0.00%

0.00%

48.09%

51.91%

0.00%

0.00%

0.00%

48.09%

Rehabilitation of Sanitary Sewers Bounded at 57th Avenue between San Leandro Street and International Boulevard

OAKLAND

OTHER
Project Total
Percentage

1,533.00 93.73%

$85,874.45 93.56%

102.50 6.27%

$5,914.88 6.44%

1,635.50

$91,789.33

275.00

0.00

0.00

0.00

1,533.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

102.50

0.00

0.00

0.00

275.00

0.00

0.00

0.00

1,635.50

0.00

0.00

0.00

16.81%

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

Rehabilitation of Sanitary Sewers Bounded by Golf Links Road, Encina Way and Calandria Avenue

OAKLAND

OTHER
Project Total
Percentage

4,546.00 93.47%

$262,420.26 92.39%

317.50 6.53%

$21,630.16 7.61%

4,863.50

$284,050.42

1,093.50

0.00

0.00

0.00

4,546.00

0.00

0.00

0.00

81.00

0.00

0.00

0.00

317.50

0.00

0.00

0.00

1,174.50

0.00

0.00

0.00

4,863.50

0.00

0.00

0.00

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

24.15%

Rehabilitation of Sanitary Sewers bounded by MacArthur Boulevard, Maple Avenue, Barner Avenue, and Frye Street

OAKLAND

517.50 70.50%

$29,238.32 70.83%

88.00

6.50

0.00

0.00

511.00

0.00

0.00

0.00

OTHER

216.50 29.50%

$12,038.54 29.17%

0.00

7.00

0.00

0.00

209.50

0.00

0.00

0.00

Tuesday, October 06, 2015

Page 16 of 22

Project Nam
Project Total
Percentage

Total Hours
734.00

Apprentice African
Hours
American

Total Wages
$41,276.86

Asian

Caucasian

Hispanic

Native
Not
American Specified

Other

88.00

13.50

0.00

0.00

720.50

0.00

0.00

0.00

11.99%

1.84%

0.00%

0.00%

98.16%

0.00%

0.00%

0.00%

Rehabilitation of Sanitary Sewers in Bridge Avenue bounded by Foothill Boulevard and E.16th Street, and in the Easement bounded by Carrington Street,
42nd Avenue, Santa Rita Street, and High Street
OAKLAND
OTHER

Project Total
Percentage

412.00 90.65%

$33,894.52 90.19%

45.50

0.00

0.00

0.00

412.00

0.00

0.00

0.00

42.50 9.35%

$3,688.42 9.81%

0.00

0.00

0.00

0.00

42.50

0.00

0.00

0.00

45.50

0.00

0.00

0.00

454.50

0.00

0.00

0.00

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

454.50

$37,582.94

10.01%

Rehabilitation of Sanitary Sewers in the Area Bounded by Broadway, Golden Gate Avenue, and Contra Costa Road

OAKLAND

3,002.50 67.54%

$154,015.71

OTHER

1,443.00 32.46%

$84,807.20 35.51%

Project Total
Percentage

4,445.50

64.49%

$238,822.91

767.00

0.00

0.00

0.00

3,002.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,443.00

0.00

0.00

0.00

767.00

0.00

0.00

0.00

4,445.50

0.00

0.00

0.00

17.25%

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

Rehabilitation of Sanitary Sewers in the area bounded by Embarcadero Street, Dennison Street, King Street, Frederick Street and Kennedy Street (SubBasin 61-01)
112.00

0.00

0.00

352.00

0.00

0.00

0.00

0.00

0.00

0.00

88.00

0.00

0.00

0.00

0.00

112.00

112.00

0.00

88.00

352.00

0.00

0.00

0.00

20.29%

20.29%

0.00%

15.94%

63.77%

0.00%

0.00%

0.00%

OAKLAND

464.00 84.06%

$22,380.00 75.39%

112.00

OTHER

88.00 15.94%

$7,304.00 24.61%

Project Total
Percentage

552.00

$29,684.00

Rehabilitation of Sanitary Sewers in the Area Bounded by Shattuck Avenue, 59th Street, Telegraph Avenue and Woolsey Street (Sub-Basin 50-10)

Tuesday, October 06, 2015

Page 17 of 22

Project Nam

Total Hours

Total Wages

Apprentice African
Hours
American

Asian

Caucasian

Hispanic

Native
Not
American Specified

Other

OAKLAND

1,188.00 83.14%

$73,367.50 83.37%

219.00

0.00

0.00

0.00

1,188.00

0.00

0.00

0.00

OTHER

241.00 16.86%

$14,632.03 16.63%

0.00

0.00

0.00

0.00

241.00

0.00

0.00

0.00

219.00

0.00

0.00

0.00

1,429.00

0.00

0.00

0.00

15.33%

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

Project Total
Percentage

1,429.00

$87,999.53

Rehabilitation of Sanitary Sewers in the Area of Ostrander Road and Broadway Terrace, and in the Easement by Margarido Drive

184.00

0.00

0.00

1,136.00

0.00

0.00

0.00

0.00

0.00

216.00

0.00

0.00

0.00

0.00

184.00

184.00

0.00

216.00

1,136.00

0.00

0.00

0.00

11.98%

11.98%

0.00%

14.06%

73.96%

0.00%

0.00%

0.00%

OAKLAND

1,320.00 85.94%

$64,042.48 81.79%

184.00

OTHER

216.00 14.06%

$14,256.00 18.21%

0.00

Project Total
Percentage

1,536.00

$78,298.48

Rehabilitation of Sanitary Sewers in the Easement Between Delmont Avenue and Edgemoor Place, the Easement Between Majestic Avenue and Laird
Avenue, and the Easement Between Modesto Street and Madera Avenue
OAKLAND
OTHER

Project Total
Percentage

312.00

0.00

0.00

720.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

136.00

0.00

0.00

0.00

312.00

312.00

0.00

0.00

856.00

0.00

0.00

0.00

26.71%

26.71%

0.00%

0.00%

73.29%

0.00%

0.00%

0.00%

1,032.00 88.36%

$50,867.84 87.94%

312.00

136.00 11.64%

$6,978.88 12.06%

1,168.00

$57,846.72

Rehabilitation of Sanitary Sewers in the Easement between Shepherd Canyon Road and Moore Drive, and in Larry Lane between Ascot Lane and
Mastlands Drive
OAKLAND
OTHER
Project Total
Percentage

585.50

0.00

0.00

2,742.50

0.00

0.00

0.00

0.00

0.00

593.50

48.50

0.00

0.00

0.00

585.50

585.50

0.00

593.50

2,791.00

0.00

0.00

0.00

14.75%

14.75%

0.00%

14.95%

70.30%

0.00%

0.00%

0.00%

3,328.00 83.83%

$158,918.62 79.06%

585.50

642.00 16.17%

$42,094.84 20.94%

0.00

3,970.00

Tuesday, October 06, 2015

$201,013.46

Page 18 of 22

Project Nam

Total Hours

Total Wages

Apprentice African
Hours
American

Asian

Caucasian

Hispanic

Native
Not
American Specified

Other

Rehabilitation of Sanitary Sewers in the Easement of Clarendon Crescent Avenue and Sunny Hills Road

OAKLAND
OTHER
Project Total
Percentage

1,133.50 64.29%

$63,249.49 67.42%

0.00

0.00

0.00

0.00

1,133.50

0.00

0.00

0.00

629.50 35.71%

$30,567.03 32.58%

235.00

0.00

0.00

0.00

629.50

0.00

0.00

0.00

235.00

0.00

0.00

0.00

1,763.00

0.00

0.00

0.00

13.33%

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

1,763.00

$93,816.52

Renovation of 3824 West Street

OAKLAND

855.00 70.37%

$49,720.89 64.15%

0.00

0.00

0.00

840.00

15.00

0.00

0.00

0.00

OTHER

360.00 29.63%

$27,783.63 35.85%

0.00

0.00

20.00

317.00

23.00

0.00

0.00

0.00

0.00

0.00

20.00

1,157.00

38.00

0.00

0.00

0.00

0.00%

0.00%

1.65%

95.23%

3.13%

0.00%

0.00%

0.00%

4.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

4.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

100.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

0.00%

235.00

0.00

0.00

300.00

0.00

0.00

0.00

0.00

0.00

0.00

128.00

0.00

0.00

0.00

Project Total
Percentage

1,215.00

$77,504.52

Repair of Fortel Speed Radar Feedback Signs

OAKLAND
Project Total
Percentage

4.00 100.00%
4.00

$186.84 100.00%
$186.84

Repair of Pedestrian Stair Paths #91 and #92 (Locarno Way)

OAKLAND
OTHER

535.00 80.69%

$26,138.70 80.03%

235.00

128.00 19.31%

$6,524.16 19.97%

0.00

Tuesday, October 06, 2015

Page 19 of 22

Project Nam
Project Total
Percentage

Total Hours
663.00

Total Wages
$32,662.86

Apprentice African
Hours
American

Asian

Caucasian

Hispanic

Native
Not
American Specified

Other

235.00

235.00

0.00

0.00

428.00

0.00

0.00

0.00

35.44%

35.44%

0.00%

0.00%

64.56%

0.00%

0.00%

0.00%

RFP for Oakland Street Lighting Conversion Project

OAKLAND

164.00 87.23%

$9,543.20 83.84%

0.00

94.00

0.00

0.00

70.00

0.00

0.00

0.00

OTHER

24.00 12.77%

$1,839.60 16.16%

0.00

0.00

0.00

24.00

0.00

0.00

0.00

0.00

0.00

94.00

0.00

24.00

70.00

0.00

0.00

0.00

0.00%

50.00%

0.00%

12.77%

37.23%

0.00%

0.00%

0.00%

28.00

52.00

0.00

0.00

40.00

0.00

0.00

0.00

28.00

52.00

0.00

0.00

40.00

0.00

0.00

0.00

56.52%

0.00%

0.00%

43.48%

0.00%

0.00%

0.00%

Project Total
Percentage

188.00

$11,382.80

Rock Trench Street Drain at 7013 Broadway Terrace

OAKLAND
Project Total
Percentage

92.00 100.00%
92.00

$4,605.04 100.00%
$4,605.04

30.43%

Rockridge Library Exterior Painting

OAKLAND

272.50 59.82%

$17,415.39 59.83%

0.00

0.00

0.00

0.00

22.50

0.00

250.00

0.00

OTHER

183.00 40.18%

$11,693.70 40.17%

0.00

0.00

0.00

0.00

0.00

0.00

183.00

0.00

0.00

0.00

0.00

0.00

22.50

0.00

433.00

0.00

0.00%

0.00%

0.00%

0.00%

4.94%

0.00%

95.06%

0.00%

106.00

0.00

13.00

386.00

412.50

0.00

0.00

0.00

Project Total
Percentage

455.50

$29,109.09

Safe Routes to School Cycle 10

OAKLAND

811.50 58.73%

Tuesday, October 06, 2015

$56,508.02 62.04%

Page 20 of 22

Project Nam
OTHER
Project Total
Percentage

Total Hours
570.25 41.27%

Apprentice African
Hours
American

Total Wages
$34,580.57 37.96%

1,381.75

$91,088.58

Asian

Caucasian

Hispanic

Native
Not
American Specified

Other

64.00

0.00

40.75

64.00

465.50

0.00

0.00

0.00

170.00

0.00

53.75

450.00

878.00

0.00

0.00

0.00

12.30%

0.00%

3.89%

32.57%

63.54%

0.00%

0.00%

0.00%

0.00

271.62

0.00

455.29

0.00

0.00

669.83

0.00

0.00

271.62

0.00

455.29

0.00

0.00

669.83

0.00

19.45%

0.00%

32.60%

0.00%

0.00%

47.96%

0.00%

Sanitary Sewer Root Foaming FY 2013-14

OTHER

Project Total
Percentage

1,396.74 100.00%

$72,701.11

1,396.74

100.00%

$72,701.11

0.00%

Stair Path Repairs at 200 Mandana Circle

OAKLAND

336.00 42.61%

$24,607.06 52.48%

0.00

0.00

0.00

136.00

200.00

0.00

0.00

0.00

OTHER

452.50 57.39%

$22,281.96 47.52%

176.50

0.00

0.00

176.50

276.00

0.00

0.00

0.00

176.50

0.00

0.00

312.50

476.00

0.00

0.00

0.00

22.38%

0.00%

0.00%

39.63%

60.37%

0.00%

0.00%

0.00%

Project Total
Percentage

788.50

$46,889.02

Street Rehabilitation at 17th Street between Castro Street and Lakeside Drive, and Jackson Street between 11th Street and Lakeside Drive

114.00

0.00

56.00

1,431.50

0.00

0.00

0.00

21.00

0.00

0.00

401.50

1,288.50

0.00

0.00

8.00

483.50

114.00

0.00

457.50

2,720.00

0.00

0.00

8.00

14.65%

3.46%

0.00%

13.87%

82.44%

0.00%

0.00%

0.24%

OAKLAND

1,601.50 48.54%

$82,683.05 46.63%

462.50

OTHER

1,698.00 51.46%

$94,638.63 53.37%

Project Total
Percentage

3,299.50

$177,321.68

Temescal and Lions Pool Lifts Refurbishment

Tuesday, October 06, 2015

Page 21 of 22

Project Nam

Total Hours

Total Wages

Apprentice African
Hours
American

Asian

Caucasian

Hispanic

Native
Not
American Specified

Other

OAKLAND

8.00 23.88%

$570.24 23.97%

0.00

0.00

0.00

0.00

8.00

0.00

0.00

0.00

OTHER

25.50 76.12%

$1,808.66 76.03%

0.00

0.00

0.00

0.00

25.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

33.50

0.00

0.00

0.00

0.00%

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

Project Total
Percentage

33.50

$2,378.90

Traffic Calming Undulations-2014

OAKLAND

36.25 81.92%

$1,981.47 83.40%

0.00

0.00

0.00

12.00

24.25

0.00

0.00

0.00

OTHER

8.00 18.08%

$394.48 16.60%

0.00

0.00

0.00

0.00

8.00

0.00

0.00

0.00

0.00

0.00

0.00

12.00

32.25

0.00

0.00

0.00

0.00%

0.00%

0.00%

27.12%

72.88%

0.00%

0.00%

0.00%

0.00

0.00

86.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

86.00

0.00

0.00

0.00

0.00

0.00

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00

0.00

0.00

6.00

6.00

0.00

0.00

0.00

0.00

0.00

0.00

6.00

6.00

0.00

0.00

0.00

0.00%

0.00%

50.00%

50.00%

0.00%

0.00%

0.00%

44,260.92

5,171.50

97,356.89

193,999.31

241.00

23,500.83

6,192.83

11.94%

1.39%

26.26%

52.33%

0.07%

6.34%

1.67%

Project Total
Percentage

44.25

$2,375.95

West Oakland Youth Center Public Art Installation

OAKLAND
Project Total
Percentage

86.00 100.00%
86.00

$4,821.16 100.00%
$4,821.16

Woodminster Theater ADA Improvements: Upper Ampitheater

OTHER

12.00 100.00%

Project Total
Percentage

12.00

Total

370,723.28

$474.84 100.00%
$474.84

0.00%

Percentage

Tuesday, October 06, 2015

$21,935,966.56

62,807.45

16.94%

Page 22 of 22