Professional Documents
Culture Documents
comment contains copyrighted material, stakeholders in the permitting process: Changes in the Estimates: There is no
confidential business information (CBI), the permitting agency, the permit change in the total estimated burden
or other information whose public applicant, and the community where a currently identified in the OMB
disclosure is restricted by statute. When facility is located. Some facilities may Inventory of Approved ICR Burdens.
EPA identifies a comment containing be required to develop information Dated: August 8, 2005.
copyrighted material, EPA will provide repositories to allow for expanded
Oscar Morales,
a reference to that material in the public participation and access to
Director, Collection Strategies Division.
version of the comment that is placed in detailed facility information as part of
EDOCKET. The entire printed comment, the permitting process. [FR Doc. 05–16198 Filed 8–15–05; 8:45 am]
including the copyrighted material, will EPA sought to reduce the reporting BILLING CODE 6560–50–P
VerDate jul<14>2003 18:02 Aug 15, 2005 Jkt 205001 PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 E:\FR\FM\16AUN1.SGM 16AUN1
48128 Federal Register / Vol. 70, No. 157 / Tuesday, August 16, 2005 / Notices
Agency, 1200 Pennsylvania Avenue, Federal Register notice describing the needed to review instructions; develop,
NW., Washington, DC 20460; telephone electronic docket at 67 FR 38102 (May acquire, install, and utilize technology
number: (202) 564–4113; fax number: 31, 2002), or go to http://www.epa.gov/ and systems for the purposes of
(202) 564–0050; e-mail address: edocket. collecting, validating, and verifying
williams.learia@epa.gov. Title: NSPS for Sulfuric Acid Plants information, processing and
(40 CFR part 60, subpart H) (Renewal) maintaining information, and disclosing
SUPPLEMENTARY INFORMATION: EPA has
Abstract: The New Source and providing information; adjust the
submitted the following ICR to OMB for
Performance Standards (NSPS), for
review and approval according to the existing ways to comply with any
Sulfuric Acid Plants were proposed on
procedures prescribed in 5 CFR 1320.12. August 17, 1971, and promulgated on previously applicable instructions and
On May 6, 2005 (70 FR 24020), EPA December 23, 1971. These standards requirements; train personnel to be able
sought comments on this ICR pursuant apply to any sulfuric acid facility to respond to a collection of
to 5 CFR 1320.8(d). EPA received no commencing construction, modification information; search data sources;
comments. or reconstruction after the date of complete and review the collection of
EPA has established a public docket information; and transmit or otherwise
proposal. The control of sulfur dioxide
for this ICR under Docket ID No. OECA– (SO2) and acid mist requires not only disclose the information.
2005–0025, which is available for public the installation of properly designed
viewing at the Enforcement and Respondents/Affected Entities:
equipment, but also the proper Owners or operators of sulfuric acid
Compliance Docket and Information operation and maintenance of that
Center in the EPA Docket Center (EPA/ plants.
equipment. Sulfur dioxide and acid mist
DC), EPA West, Room B102, 1301 emissions from sulfuric acid plants Estimated Number of Respondents:
Constitution Avenue, NW., Washington, result from the burning of sulfur or 103.
DC. The EPA Docket Center Public sulfur-bearing feed stocks to form SO2, Frequency of Response:
Reading Room is open from 8:30 a.m. to catalytic oxidation of SO2 to sulfur Semiannually, on occasion and initially.
4:30 p.m., Monday through Friday, trioxide, and absorption of SO2 in a
excluding legal holidays. The telephone Estimated Total Annual Hour Burden:
strong acid stream. These standards rely 26,177 hours.
number for the Reading Room is (202) on the capture of SO2 and acid mist by
566–1744, and the telephone number for venting to a control device. Estimated Total Annual Costs:
the Enforcement and Compliance Owners or operators of sulfuric acid $2,577,271, which includes $0
Docket and Information Center Docket plants are required to make the annualized capital/startup costs,
is: (202) 566–1752. An electronic following one-time-only reports: $464,000 annual O&M costs, and
version of the public docket is available notification of the date of construction $2,113,271 annual labor costs.
through EPA Dockets (EDOCKET) at or reconstruction; notification of actual
http://www.epa.gov/edocket. Use Changes in the Estimates: There is an
startup dates; notification of any increase of 2,857 hours in the total
EDOCKET to submit or view public physical or operational change to an
comments, access the index listing of estimated burden currently identified in
existing facility; notification of
the contents of the public docket, and to the OMB Inventory of Approved ICR
demonstration of the continuous
access those documents in the public emissions monitoring system (CEMS); Burdens. This increase is due to the fact
docket that are available electronically. notification date of the initial that we are presently accounting for
When in the system, select ‘‘search,’’ performance test; and the results of the management and clerical person hours
then key in the docket ID number initial performance test. After the initial per year, which was omitted in the
identified above. recordkeeping and reporting previous ICR. There is also an increase
Any comments related to this ICR requirements, semiannual reports are in the cost burden, which consisted of
should be submitted to EPA and OMB required if there has been an exceedance the accounting for management and
within 30 days of this notice. EPA’s of control device operating parameters. clerical person hours per year and a
policy is that public comments, whether Respondents are also required to revised salary table. There is however,
submitted electronically or in paper, maintain records of occurrence and a decline in the number of sources. The
will be made available for public duration of any startup, shutdown, or renewal ICR shows that there are
viewing in EDOCKET as EPA receives malfunction, or any period during approximately 103 sources subject to
them and without change, unless the which the monitoring system is the rule, as compared to the active ICR
comment contains copyrighted material, inoperative. An agency may not conduct that shows 106 sources. This decline in
Confidential Business Information (CBI), or sponsor, and a person is not required sources is due to plant closure. No new
or other information whose public to respond to, a collection of facilities are expected to be constructed
disclosure is restricted by statute. When information unless it displays a in the next three years.
EPA identifies a comment containing currently valid OMB Control Number.
copyrighted material, EPA will provide The OMB Control Numbers for EPA’s Dated: August 9, 2005.
a reference to that material in the regulations are listed in 40 CFR part 9 Oscar Morales,
version of the comment that is placed in and 48 CFR chapter 15, and are Director, Collection Strategies Division.
EDOCKET. The entire printed comment, identified on the form and/or [FR Doc. 05–16199 Filed 8–15–05; 8:45 am]
including the copyrighted material, will instrument, if applicable. BILLING CODE 6560–50–P
be available in the public docket. Burden Statement: The annual public
Although identified as an item in the reporting and recordkeeping burden for
official docket, information claimed as this collection of information is
CBI, or whose disclosure is otherwise estimated to average 127 hours per
restricted by statute, is not included in response. Burden means the total time,
the official public docket, and will not effort, or financial resources expended
be available for public viewing in by persons to generate, maintain, retain,
EDOCKET. For further information disclose or provide information to or for
about the electronic docket, see EPA’s a Federal agency. This includes the time
VerDate jul<14>2003 18:02 Aug 15, 2005 Jkt 205001 PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 E:\FR\FM\16AUN1.SGM 16AUN1