You are on page 1of 2

Federal Register / Vol. 70, No.

157 / Tuesday, August 16, 2005 / Notices 48127

comment contains copyrighted material, stakeholders in the permitting process: Changes in the Estimates: There is no
confidential business information (CBI), the permitting agency, the permit change in the total estimated burden
or other information whose public applicant, and the community where a currently identified in the OMB
disclosure is restricted by statute. When facility is located. Some facilities may Inventory of Approved ICR Burdens.
EPA identifies a comment containing be required to develop information Dated: August 8, 2005.
copyrighted material, EPA will provide repositories to allow for expanded
Oscar Morales,
a reference to that material in the public participation and access to
Director, Collection Strategies Division.
version of the comment that is placed in detailed facility information as part of
EDOCKET. The entire printed comment, the permitting process. [FR Doc. 05–16198 Filed 8–15–05; 8:45 am]
including the copyrighted material, will EPA sought to reduce the reporting BILLING CODE 6560–50–P

be available in the public docket. frequency to the minimum that is


Although identified as an item in the necessary to ensure compliance with the
official docket, information claimed as rule. It would not be possible to collect ENVIRONMENTAL PROTECTION
CBI, or whose disclosure is otherwise this information less frequently and still AGENCY
restricted by statute, is not included in assure that the requirements of permit [OECA–2005–0025; FRL–7953–1]
the official public docket, and will not and public involvement regulations are
be available for public viewing in met by owners or operators. The Agency Information Collection
EDOCKET. For further information reporting frequency is essential to Activities; Submission for OMB Review
about the electronic docket, see EPA’s assure that any changes in the trial burn and Approval; Comment Request;
Federal Register notice describing the plans or in the anticipated permit NSPS for Sulfuric Acid Plants
electronic docket at 67 FR 38102 (May application contents are made known to (Renewal), ICR Number 1057.10, OMB
31, 2002), or go to http://www.epa.gov/ EPA and to the public. Number 2060–0041
edocket. An agency may not conduct or
Title: RCRA Expanded Public sponsor, and a person is not required to AGENCY: Environmental Protection
Participation (Renewal). respond to, a collection of information Agency (EPA).
Abstract: Section 7004(b) of RCRA unless it displays a currently valid OMB ACTION: Notice.
gives EPA broad authority to provide control number. The OMB control
for, encourage, and assist public SUMMARY: In compliance with the
numbers for EPA’s regulations in 40
participation in the development, CFR are listed in 40 CFR part 9 and are Paperwork Reduction Act, this
revision, implementation, and identified on the form and/or document announces that an
enforcement of any regulation, instrument, if applicable. Information Collection Request (ICR)
guideline, information, or program Burden Statement: The annual public has been forwarded to the Office of
under RCRA. In addition, the statute reporting and recordkeeping burden for Management and Budget (OMB) for
specifies certain public notices (i.e., this collection of information is review and approval. This is a request
radio, newspaper, and a letter to estimated to average 91 hours per to renew an existing approved
relevant agencies) that EPA must response. Burden means the total time, collection. This ICR is scheduled to
provide before issuing any RCRA effort, or financial resources expended expire on October 31, 2005. Under OMB
permit. The statute also establishes a by persons to generate, maintain, retain, regulations, the Agency may continue to
process by which the public can dispute or disclose or provide information to or conduct or sponsor the collection of
a permit and request a public hearing to for a Federal agency. This includes the information while this submission is
discuss it. EPA carries out much of its time needed to review instructions; pending at OMB. This ICR describes the
RCRA public involvement at 40 CFR develop, acquire, install, and utilize nature of the information collection and
parts 124 and 270. technology and systems for the purposes its estimated burden and cost.
In 1995, EPA expanded the public of collecting, validating, and verifying DATES: Additional comments may be
participation requirements under the information, processing and submitted on or before September 15,
RCRA program by promulgating the maintaining information, and disclosing 2005.
RCRA Expanded Public Participation and providing information; adjust the ADDRESSES: Submit your comments,
Rule (60 FR 63417; December 11, 1995). existing ways to comply with any referencing docket ID number OECA–
The rule responded to calls by the previously applicable instructions and 2005–0025, to (1) EPA online using
Administration and stakeholders (e.g., requirements; train personnel to be able EDOCKET (our preferred method), by
States and private citizens) to provide to respond to a collection of email to docket.oeca@epa.gov, or by
earlier and better public participation in information; search data sources; mail to: Environmental Protection
EPA’s permitting programs, including complete and review the collection of Agency, EPA Docket Center (EPA/DC),
procedures for more timely information information; and transmit or otherwise Enforcement and Compliance Docket
sharing. In particular, the rule requires disclose the information. and Information Center, Mail Code
earlier public involvement in the Respondents/Affected Entities: 2201T, 1200 Pennsylvania Avenue,
permitting process (e.g., pre-application Facility owners or operators applying NW., Washington, DC 20460, and (2)
meetings), expanded public notice for for an initial Part B permit or a Part B OMB at: Office of Information and
significant events (e.g., notices of permit renewal. Regulatory Affairs, Office of
upcoming trial burns), and more Estimated Number of Respondents: Management and Budget (OMB),
opportunities for the exchange of 33. Attention: Desk Officer for EPA, 725
permitting information (e.g., Frequency of Response: On occasion.
17th Street, NW., Washington, DC
information repository). Estimated Total Annual Hour Burden:
The required activities and 20503.
3,005 hours.
information are needed to help assure Estimated Total Annual Cost: FOR FURTHER INFORMATION CONTACT:
timely and effective public participation $176,311, which includes $546 Learia Williams, Compliance
in the permitting process. The annualized capital/startup costs, $2,863 Assessment and Media Programs
requirements are intended to provide O&M costs, and $172,902 annual labor Division, Office of Compliance, (Mail
equal access to information to all costs. Code 2223A), Environmental Protection

VerDate jul<14>2003 18:02 Aug 15, 2005 Jkt 205001 PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 E:\FR\FM\16AUN1.SGM 16AUN1
48128 Federal Register / Vol. 70, No. 157 / Tuesday, August 16, 2005 / Notices

Agency, 1200 Pennsylvania Avenue, Federal Register notice describing the needed to review instructions; develop,
NW., Washington, DC 20460; telephone electronic docket at 67 FR 38102 (May acquire, install, and utilize technology
number: (202) 564–4113; fax number: 31, 2002), or go to http://www.epa.gov/ and systems for the purposes of
(202) 564–0050; e-mail address: edocket. collecting, validating, and verifying
williams.learia@epa.gov. Title: NSPS for Sulfuric Acid Plants information, processing and
(40 CFR part 60, subpart H) (Renewal) maintaining information, and disclosing
SUPPLEMENTARY INFORMATION: EPA has
Abstract: The New Source and providing information; adjust the
submitted the following ICR to OMB for
Performance Standards (NSPS), for
review and approval according to the existing ways to comply with any
Sulfuric Acid Plants were proposed on
procedures prescribed in 5 CFR 1320.12. August 17, 1971, and promulgated on previously applicable instructions and
On May 6, 2005 (70 FR 24020), EPA December 23, 1971. These standards requirements; train personnel to be able
sought comments on this ICR pursuant apply to any sulfuric acid facility to respond to a collection of
to 5 CFR 1320.8(d). EPA received no commencing construction, modification information; search data sources;
comments. or reconstruction after the date of complete and review the collection of
EPA has established a public docket information; and transmit or otherwise
proposal. The control of sulfur dioxide
for this ICR under Docket ID No. OECA– (SO2) and acid mist requires not only disclose the information.
2005–0025, which is available for public the installation of properly designed
viewing at the Enforcement and Respondents/Affected Entities:
equipment, but also the proper Owners or operators of sulfuric acid
Compliance Docket and Information operation and maintenance of that
Center in the EPA Docket Center (EPA/ plants.
equipment. Sulfur dioxide and acid mist
DC), EPA West, Room B102, 1301 emissions from sulfuric acid plants Estimated Number of Respondents:
Constitution Avenue, NW., Washington, result from the burning of sulfur or 103.
DC. The EPA Docket Center Public sulfur-bearing feed stocks to form SO2, Frequency of Response:
Reading Room is open from 8:30 a.m. to catalytic oxidation of SO2 to sulfur Semiannually, on occasion and initially.
4:30 p.m., Monday through Friday, trioxide, and absorption of SO2 in a
excluding legal holidays. The telephone Estimated Total Annual Hour Burden:
strong acid stream. These standards rely 26,177 hours.
number for the Reading Room is (202) on the capture of SO2 and acid mist by
566–1744, and the telephone number for venting to a control device. Estimated Total Annual Costs:
the Enforcement and Compliance Owners or operators of sulfuric acid $2,577,271, which includes $0
Docket and Information Center Docket plants are required to make the annualized capital/startup costs,
is: (202) 566–1752. An electronic following one-time-only reports: $464,000 annual O&M costs, and
version of the public docket is available notification of the date of construction $2,113,271 annual labor costs.
through EPA Dockets (EDOCKET) at or reconstruction; notification of actual
http://www.epa.gov/edocket. Use Changes in the Estimates: There is an
startup dates; notification of any increase of 2,857 hours in the total
EDOCKET to submit or view public physical or operational change to an
comments, access the index listing of estimated burden currently identified in
existing facility; notification of
the contents of the public docket, and to the OMB Inventory of Approved ICR
demonstration of the continuous
access those documents in the public emissions monitoring system (CEMS); Burdens. This increase is due to the fact
docket that are available electronically. notification date of the initial that we are presently accounting for
When in the system, select ‘‘search,’’ performance test; and the results of the management and clerical person hours
then key in the docket ID number initial performance test. After the initial per year, which was omitted in the
identified above. recordkeeping and reporting previous ICR. There is also an increase
Any comments related to this ICR requirements, semiannual reports are in the cost burden, which consisted of
should be submitted to EPA and OMB required if there has been an exceedance the accounting for management and
within 30 days of this notice. EPA’s of control device operating parameters. clerical person hours per year and a
policy is that public comments, whether Respondents are also required to revised salary table. There is however,
submitted electronically or in paper, maintain records of occurrence and a decline in the number of sources. The
will be made available for public duration of any startup, shutdown, or renewal ICR shows that there are
viewing in EDOCKET as EPA receives malfunction, or any period during approximately 103 sources subject to
them and without change, unless the which the monitoring system is the rule, as compared to the active ICR
comment contains copyrighted material, inoperative. An agency may not conduct that shows 106 sources. This decline in
Confidential Business Information (CBI), or sponsor, and a person is not required sources is due to plant closure. No new
or other information whose public to respond to, a collection of facilities are expected to be constructed
disclosure is restricted by statute. When information unless it displays a in the next three years.
EPA identifies a comment containing currently valid OMB Control Number.
copyrighted material, EPA will provide The OMB Control Numbers for EPA’s Dated: August 9, 2005.
a reference to that material in the regulations are listed in 40 CFR part 9 Oscar Morales,
version of the comment that is placed in and 48 CFR chapter 15, and are Director, Collection Strategies Division.
EDOCKET. The entire printed comment, identified on the form and/or [FR Doc. 05–16199 Filed 8–15–05; 8:45 am]
including the copyrighted material, will instrument, if applicable. BILLING CODE 6560–50–P
be available in the public docket. Burden Statement: The annual public
Although identified as an item in the reporting and recordkeeping burden for
official docket, information claimed as this collection of information is
CBI, or whose disclosure is otherwise estimated to average 127 hours per
restricted by statute, is not included in response. Burden means the total time,
the official public docket, and will not effort, or financial resources expended
be available for public viewing in by persons to generate, maintain, retain,
EDOCKET. For further information disclose or provide information to or for
about the electronic docket, see EPA’s a Federal agency. This includes the time

VerDate jul<14>2003 18:02 Aug 15, 2005 Jkt 205001 PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 E:\FR\FM\16AUN1.SGM 16AUN1

You might also like