CONTRACTOR shall perform to COMPANY approval the detail design, procurement,
supply and construction of foundations and superstructure for the following structures:

IFB LSTK LAB & TUNNEL

ISSUED FOR 90% FEED REVIEW

JAF

6.0

6.2

10-01402
8/7/15

10-01402

JO/EWO

00A

02-14

DATE

REV
NO.

New EXPEC ARC Laboratory Building.

New Maintenance Building.

New Electrical Building.

New Connecting Tunnel

New Bus Shelter

Codes and Standards


6.2.1

DISCIPLINE
ENGINEER
DB

CONTRACTOR shall conform to Referenced Codes and Standards, applicable


COMPANY Codes and Standards, and all of their referenced COMPANY and
Industry documents, including but not limited to the following:

International Building Code 2009 (IBC)

American Society of Civil Engineers, Minimum Design Loads for Buildings and
other Structures (ASCE 7-05)

American Concrete Institute, Building Code Requirements for Reinforced


Concrete, (ACI 318-11)

American Institute of Steel Construction, Specification for Structural Steel


Buildings, (AISC 360-05)

American Institute of Steel Construction, Code of Standard Practice for Steel


Buildings and Bridges, March 18, 2005

Americans with Disabilities Act of 1991 (ADA)

SAES-M-100 (4 June 2013)

SAUDI ARAMCO Building Code

SAES-A-112 (1 October 2013)

Meteorological and Seismic Design Data

STCOI015

Structural Design Criteria

SAES-M-009 (3 July 2012)

Design Criteria for Blast Resistant


Buildings

SAES-Q-001 (15 May 2010)

Criteria for Design and Construction of


Concrete Structures

SAES-Q-005 (20 November 2013) Concrete Foundations

8/7/15

DATE:
PROJECT
ENGINEER

JF
8/7/15

DATE:

CERTIFIED
DB
DATE:

8/7/15

CONSTRUCTION
AGENCY

DATE:

OPERATIONS

BY:

DATE:
(DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
REVISIONCERTIFICATION
CERTIFICATE

THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

CONTROL NUMBER

DATE:

SCOPE OF WORK
EXPEC ADVANCED RESEARCH CENTER EXPANSION

DWG.TYPE PLANT NO. INDEX

DOC

IFB LSTK LAB & TUNNEL


DHAHRAN

SAUDI ARABIA

502
JO / EWO:

DRAWING NO.

HE-348820

SHT.NO.

REV.NO.

00A

10-01402
EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

SAUDI ARABIAN OIL COMPANY

DESCRIPTION

ENGG CERT

PMT OPRNS

SAUDI ARAMCO 2616-ENG (03/99)

SAES-Q-009 (28 September 2008) Concrete Retaining Walls

SAES-Q-010 (22 August 2009)

Cement Based, Non-Shrink Grout for


Structural and Equipment Grouting

SAES-A-114 (23 February 2010)

Backfill and Compaction

SAES-A-204 (28 April 2009)

Structural Calculations

Metal Building Manufacturers Association, Metal Building Systems Manual,


2010

6.2.1 Codes and Standards shall be based on the March 2014 issue date, unless
otherwise instructed by COMPANY Representative.
6.3

Design Loads
CONTRACTOR shall design structures for the design loads shown, but not limited to the
following:

10-01402

6.3.1

Live Loads: Typical live loads shall include the following:

8/7/15

Occupancy

00A

REV
NO.

02-14

DATE

10-01402

JO/EWO

Occupancy Category: Designer shall use an Occupancy Category II.

DISCIPLINE
ENGINEER
DB

8/7/15
DATE:
PROJECT
ENGINEER
JF

Design Live Load (Kg/m2)

Laboratories

625

Toilet Rooms

320

Offices (including partitions)

325*

File Rooms

6251

Meeting Room

500

Computer Rooms

6251

First Floor Corridors

500*

Corridors Above First Floor

400*

Lobbies

500*

Light Storage

600*

Mechanical Rooms

7501

Electrical Rooms

6251

Telephone Rooms

7501

Loading Dock

1500

8/7/15

DATE:

CERTIFIED
DB
DATE:

8/7/15

CONSTRUCTION
AGENCY

DATE:

OPERATIONS

BY:

DATE:
(DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
REVISIONCERTIFICATION
CERTIFICATE

THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

CONTROL NUMBER

DATE:

SCOPE OF WORK
EXPEC ADVANCED RESEARCH CENTER EXPANSION

DWG.TYPE PLANT NO. INDEX

DOC

IFB LSTK LAB & TUNNEL


DHAHRAN

SAUDI ARABIA

502
JO / EWO:

DRAWING NO.

HE-348820

SHT.NO.

REV.NO.

00A

10-01402
EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

IFB LSTK LAB & TUNNEL

ISSUED FOR 90% FEED REVIEW

JF

JAF

DB

DKB

SAUDI ARABIAN OIL COMPANY

DESCRIPTION

ENGG CERT

PMT OPRNS

SAUDI ARAMCO 2616-ENG (03/99)

Stairs and Exits

500*
Design Live Load (Kg/m2)

DB

DKB

Occupancy
Roof
JF

150

Fork Lift

Subject to verification with actual equipment layouts.

IFB LSTK LAB & TUNNEL

Those noted with an asterisk (*) are Code mandated minimums.

6.3.2

Snow Loads: Snow load (including snow drifting) shall be calculated per the Code.
0 Kg/m2

Ground snow load (pg)


6.3.3

Live Load Reduction

10-01402

For Code mandated live loads of 500 Kg/m2 or less and for live loads identified in
this SOC that are not minimums mandated by Code, the design live load for
members having support area of 37.16 square meters or more may be reduced in
accordance with the Code.
No reduction shall be taken for live loadings on roofs.

8/7/15

6.3.4

Concentrated Live Loads:


Typical Floor:

910 Kg upon an area 750 mm by 750mm

Stair Treads:

136 Kg on 2,580 mm2

00A

REV
NO.

02-14

DATE

10-01402

JO/EWO

DESCRIPTION

ISSUED FOR 90% FEED REVIEW

15,000 kg

DISCIPLINE
ENGINEER
DB

6.3.5

8/7/15
DATE:
PROJECT
ENGINEER

Floor/Roof Superimposed Dead Loads


Acoustical Tile:

25 Kg/m2

Drywall:

50 Kg/m2

JF
8/7/15

DATE:

CERTIFIED
DB
DATE:

Surcharge on Buried Structures: 1200 Kg/m2

8/7/15

CONSTRUCTION
AGENCY

6.3.6

DATE:

Suspended Mechanical Electrical/Plumbing


Above Laboratory:

100 Kg/m2

Above Mechanical Rooms,


Penthouses and Service Corridors:

150 Kg/m2

Tunnel:

25 Kg/m2

Above all other occupancies:

50 Kg/m2

OPERATIONS

BY:

DATE:
(DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
REVISIONCERTIFICATION
CERTIFICATE

THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

CONTROL NUMBER

DATE:

In addition to the above uniform load allowance, for piping 300 mm in diameter and
greater, and for concrete encased high voltage conduit, the routing shall be
specifically identified and the support points and anticipated loads shown.

SCOPE OF WORK
EXPEC ADVANCED RESEARCH CENTER EXPANSION

DWG.TYPE PLANT NO. INDEX

DOC

IFB LSTK LAB & TUNNEL


DHAHRAN

SAUDI ARABIA

502
JO / EWO:

DRAWING NO.

HE-348820

SHT.NO.

REV.NO.

00A

10-01402
EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

SAUDI ARABIAN OIL COMPANY

JAF

ENGG CERT

PMT OPRNS

SAUDI ARAMCO 2616-ENG (03/99)

DKB

DB
JF

6.3.7

In offices and other areas where subdividing partitions are to be used and the
design live load is 400 Kg/m2 or less, a partition load of 75 Kg/m2 shall be used to
allow for random placement of demising drywall partitions.
Interior masonry partition loads shall be calculated for the specific weight and
location of the partition based on the unit weight of the masonry used.

IFB LSTK LAB & TUNNEL

ISSUED FOR 90% FEED REVIEW

6.3.8

DESCRIPTION

Partitions

6.3.9

Cladding (Must be verified with final systems selected)


Exterior 100 mm Stone Walls with
masonry Backup

500 Kg/m2

Curtain Wall

100 Kg/m2

Roofing (Must be verified with final systems selected)


Lab and Office IRMA Roof: 125 kg/m2
Canopy Roof: 25 kg/m2
Roofing loads do not include weight of concrete fill above roof decks.

10-01402
8/7/15
00A

REV
NO.

02-14

DATE

10-01402

JO/EWO

6.3.10 Wind Loads:

DISCIPLINE
ENGINEER
DB

Wind loads shall be calculated per the Code.

Basic Wind Speed (V): 145 km/hr.

Importance Factor (IW): 1.0.

Exposure Category: C.

6.3.11 Seismic Loads: Seismic load will be calculated per the Code.

8/7/15
DATE:
PROJECT
ENGINEER

Seismic importance factor (Is)

JF

1.0

8/7/15

DATE:

CERTIFIED

Spectral response acceleration at short periods (Ss)

0.082

Spectral response acceleration at 1 second periods (S1)

0.028

DB
DATE:

8/7/15

CONSTRUCTION
AGENCY

Site Class

DATE:

OPERATIONS

Seismic design category

BY:

DATE:
(DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
REVISIONCERTIFICATION
CERTIFICATE

THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

CONTROL NUMBER

DATE:

Seismic Loads on Architectural Components: The buildings Code established


Seismic Design Category does not require seismic load evaluation for
Architectural components.

Seismic Load on Mechanical and Electrical Systems or Components: The


buildings Seismic Design Category does not require seismic load evaluation
for Mechanical and Electrical systems or components.

SCOPE OF WORK
EXPEC ADVANCED RESEARCH CENTER EXPANSION

DWG.TYPE PLANT NO. INDEX

DOC

IFB LSTK LAB & TUNNEL


DHAHRAN

SAUDI ARABIA

502
JO / EWO:

DRAWING NO.

HE-348820

SHT.NO.

REV.NO.

00A

10-01402
EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

SAUDI ARABIAN OIL COMPANY

JAF

ENGG CERT

PMT OPRNS

SAUDI ARAMCO 2616-ENG (03/99)

DKB

DB
JF
10-01402
00A

DISCIPLINE
ENGINEER
DB

0.24 kN/m2

Surrounding elevator and mechanical shafts

0.48 kN/m2

Surrounding atriums

0.48 kN/m2

Elevator machinery loads

100 percent

Moving elevator loads

100 percent

Light, motor-driven machinery

20 percent

Reciprocating machinery

50 percent

Hangers

33 percent

6.3.14 Railing Loads

8/7/15

DATE:
PROJECT
ENGINEER

JF
8/7/15

DATE:

Typical partitions

6.3.13 Impact Load Factors

8/7/15

10-01402

JO/EWO

02-14

DATE

REV
NO.

Interior walls and partitions, where the loading is not controlled by seismic
conditions, will be designed for the following minimum lateral loads in order to
provide appropriate safety and stiffness. The following loads are from IBC 1607.13
and design recommendations:

IFB LSTK LAB & TUNNEL

ISSUED FOR 90% FEED REVIEW

JAF

6.3.12 Lateral Loads on Interior Partitions

Handrails and Guardrails: Handrails are intended to be grasped by hand and


used primarily for guidance or support. Guardrails are located near open sides
of walking surfaces to minimize the possibility of falling. Handrails and
guardrails shall be designed for the following loading:

CERTIFIED
DB
DATE:

8/7/15

CONSTRUCTION
AGENCY

Concentrated load

0.89 kN at any point, in any direction

Uniform load

0.73 kN/m in any direction at the top

Infill load

0.22 kN on 305 mm2, horizontal, at any point

DATE:

OPERATIONS

DATE:

Vehicle Barriers: Safety provisions intended to prevent cars from proceeding


into areas inappropriate for access. Auto Guardrails (or their equivalent
substituted member) will be designed for the following recommended loading:
Concentrated Load

27.7 kN applied horizontally at a minimum of 460


mm above the floor on an area not to exceed 305

(DCC) NO. _____________________

BY:

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
REVISIONCERTIFICATION
CERTIFICATE

THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

CONTROL NUMBER

DATE:

mm square.

SCOPE OF WORK
EXPEC ADVANCED RESEARCH CENTER EXPANSION

DWG.TYPE PLANT NO. INDEX

DOC

IFB LSTK LAB & TUNNEL


DHAHRAN

SAUDI ARABIA

502
JO / EWO:

DRAWING NO.

HE-348820

SHT.NO.

REV.NO.

00A

10-01402
EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

SAUDI ARABIAN OIL COMPANY

DESCRIPTION

ENGG CERT

PMT OPRNS

SAUDI ARAMCO 2616-ENG (03/99)

6.3.15 Deflection

Framing Element

Loading

Control Criteria

Typical Floor Member*

Live Load

Span/360

Floor Member Supporting Glass

Superimposed Load

Span/480

Floor Member Supporting Masonry

Superimposed Load

Span/600

Typical Roof Member*

Live Load

Span/240

Pre-Engineered Metal Building Roof

Live Load

Span/150

Live Load

Span/1666

IFB LSTK LAB & TUNNEL

ISSUED FOR 90% FEED REVIEW

JF

JAF

DB

DKB

Structural elements shall be designed within the deflection control limits below:

Member

10-01402

10-01402

JO/EWO

Elevator Supports

* Spandrel deflection shall be controlled within detailing requirements of the exterior

8/7/15

6.3.16 Compensation for Self-weight Deflection

00A

REV
NO.

02-14

DATE

cladding, but long term deflection shall not exceed 13mm.

The move-in flatness and levelness of the floors shall satisfy overall floor flatness
Ff of 25 and the levelness FL of 20 when measured in accordance with ASTM
E1155.

DISCIPLINE
ENGINEER
DB

8/7/15
DATE:
PROJECT
ENGINEER

6.3.17 Vibration
The structure shall be configured and designed to control vibrations to within the
following parameters:

JF
8/7/15

DATE:

CERTIFIED
DB
DATE:

Mechanical Equipment: Generally, mechanical equipment and components


capable of transmitting vibrations shall be isolated from the structure.

Walking Footfall: The floor framing shall be designed within the following
footfall induced vibration control parameters.

Vibration Sensitive Equipment: Vibration sensitive equipment to be placed on


slab-on-grade. Slab isolation shall be provided where vibration sensitive
equipment is intended.

8/7/15

CONSTRUCTION
AGENCY

DATE:

OPERATIONS

BY:

DATE:
(DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
REVISIONCERTIFICATION
CERTIFICATE

THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

CONTROL NUMBER

DATE:

SCOPE OF WORK
EXPEC ADVANCED RESEARCH CENTER EXPANSION

DWG.TYPE PLANT NO. INDEX

DOC

IFB LSTK LAB & TUNNEL


DHAHRAN

SAUDI ARABIA

502
JO / EWO:

DRAWING NO.

HE-348820

SHT.NO.

REV.NO.

00A

10-01402
EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

SAUDI ARABIAN OIL COMPANY

DESCRIPTION

ENGG CERT

PMT OPRNS

SAUDI ARAMCO 2616-ENG (03/99)

DKB

DB

JAF

JF

Occupancy

Walking Speed

Maximum Vibration
Velocity

Laboratories

50 paces/min.

50.8x10-3 mm/sec.

Laboratories

75 paces/min.

50.8x10-3 mm/sec.

100 paces/min.

203x10-3 mm/sec.

Office and Metering Areas

75 paces/min.

406x10-3 mm/sec.

Office and Metering Areas

100 paces/min.

406x10-3 mm/sec.

100 paces/min.

813x10-3 mm/sec.

IFB LSTK LAB & TUNNEL

ISSUED FOR 90% FEED REVIEW

(from adjacent corridors)


Laboratories
(from adjacent corridors)

10-01402

Corridors

8/7/15

6.3.18 Drift
The inter-story (between any two (2) floors) and total drift of the structural frame
shall be designed within the drift control limits of height/400. Drift shall also be
controlled within detailing limits of building expansion joints. Drift for seismic and
wind shall be checked for conformance with code limits and against limitations of
selected faade systems. Drift for Pre-Engineered Metal Buildings shall not exceed
allowable drift specified in Metal Building Systems Manual.

00A

REV
NO.

02-14

DATE

10-01402

JO/EWO

(from adjacent corridors)

DISCIPLINE
ENGINEER
DB

8/7/15
DATE:
PROJECT
ENGINEER

6.3.19 Durability/Maintenance

JF
8/7/15

DATE:

Steel members exposed to the exterior shall be either galvanized or painted for
protection against environmental corrosive effects.

Concrete mix design for foundations shall be designed for Exposure II using
Type V cement according to SAUDI ARAMCO Standard SAES-Q-001 (15 May
2010).

Fusion bonded epoxy coated rebar shall be used for foundations, basement
walls, retaining walls, slabs-on-grade and below grade concrete structures.

Concrete structures shall be cured for Exposure II according to SAUDI


ARAMCO Standard SAES-Q-001 (15 May 2010).

Concrete structures shall be protected according to SAUDI ARAMCO Standard


SAES-Q-001 (15 May 2010).

Concrete cover for rebar according to SAUDI ARAMCO Standard SAES-Q-001


(15 May 2010).

CERTIFIED
DB
DATE:

8/7/15

CONSTRUCTION
AGENCY

DATE:

OPERATIONS

BY:

DATE:
(DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
REVISIONCERTIFICATION
CERTIFICATE

THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

CONTROL NUMBER

DATE:

SCOPE OF WORK
EXPEC ADVANCED RESEARCH CENTER EXPANSION

DWG.TYPE PLANT NO. INDEX

DOC

IFB LSTK LAB & TUNNEL


DHAHRAN

SAUDI ARABIA

502
JO / EWO:

DRAWING NO.

HE-348820

SHT.NO.

REV.NO.

00A

10-01402
EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

SAUDI ARABIAN OIL COMPANY

DESCRIPTION

ENGG CERT

PMT OPRNS

SAUDI ARAMCO 2616-ENG (03/99)

DKB

DB
JF

6.4

10-01402
8/7/15

IFB LSTK LAB & TUNNEL

10-01402

6.4.1

Structural Calculations: CONTRACTOR shall be responsible for the structural


calculations and design of all structural members and systems using the design
criteria in the above section. (see Structural Calculations in Appendix)

6.4.2

CONTRACTOR shall submit calculations for Company review.

Sustainability
6.5.1

CONTRACTOR shall provide product data, certification letter, and costs for
material with recycled content.

6.5.2

CONTRACTOR shall provide product data and costs for material within 800 Km of
Project Site.

6.5.3

CONTRACTOR shall provide data indicating VOC content.

6.5.4

Concrete Aggregate: Recycled content shall comply with Codes and Standards in
the Section 6.2.

6.5.5

Fly Ash: Shall comply with Codes and Standards in Section above. Provide a
maximum of 25 percent fly ash.

6.5.6

Ground Granulated Blast Furnace Slag: Shall comply with Codes and Standards in
the Section above. Provide a maximum of 50 percent slag.

6.5.7

Concrete Reinforcing Bars: Recycled content shall comply with Codes and
Standards in the Section 6.2.

6.5.8

Structural Steel, Metal Deck and Steel Stud Shear Connectors: Recycled content
shall comply with Codes and Standards in the Section 6.2.

00A

JO/EWO

02-14
A

REV
NO.

DATE

DESCRIPTION

ISSUED FOR 90% FEED REVIEW

6.5

Calculations

DISCIPLINE
ENGINEER
DB

8/7/15

DATE:
PROJECT
ENGINEER

6.6

Structural Deliverables

JF
8/7/15

DATE:

6.6.1

CERTIFIED
DB
DATE:

8/7/15

CONSTRUCTION
AGENCY

DATE:

CONTRACTOR detail design drawings, construction specifications and all other


documents to COMPANY for review. Documents shall include but not limited to the
following;

Calculations of structural concrete and steel framing for all structural systems.

Concrete and Structural Steel Drawings for all structural systems.

Foundation Drawings.

Steel sections and details.

Concrete reinforcement schedules, sections and details.

Materials list.

Specifications for testing and inspection of earthwork, concrete and steel


structures.

OPERATIONS

BY:

DATE:
(DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
REVISIONCERTIFICATION
CERTIFICATE

THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

CONTROL NUMBER

DATE:

SCOPE OF WORK
EXPEC ADVANCED RESEARCH CENTER EXPANSION

DWG.TYPE PLANT NO. INDEX

DOC

IFB LSTK LAB & TUNNEL


DHAHRAN

SAUDI ARABIA

502
JO / EWO:

DRAWING NO.

HE-348820

SHT.NO.

REV.NO.

00A

10-01402
EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

SAUDI ARABIAN OIL COMPANY

JAF

ENGG CERT

PMT OPRNS

SAUDI ARAMCO 2616-ENG (03/99)

DKB

DB
JF

6.6.2

10-01402
8/7/15

IFB LSTK LAB & TUNNEL

10-01402

CONTRACTOR shall coordinate all structural drawings, sections, details and


specifications with architectural, mechanical, plumbing and electrical systems.

Geotechnical Investigation and Foundation Design for Building and Related


Structures
6.7.1

CONTRACTOR shall provide complete foundation system as shown on the


Drawings and indicated in this Scope of Work.

6.7.2

CONTRACTOR scope shall include, as a minimum, but not limited to the following:

00A

JO/EWO

02-14
A

REV
NO.

DATE

DESCRIPTION

ISSUED FOR 90% FEED REVIEW

6.7

A Geotechnical Report containing subsurface data, foundation and earthwork


recommendations was prepared by Riyadh Geotechnique & Foundations
Company, and is available from the COMPANY. CONTRACTOR shall
consider all recommendations contained in the Geotechnical Report as part of
the contract documents, and it shall be the basis for all foundation design
specifications and construction.

In accordance with the Geotechnical Report, a foundation system consisting of


conventional reinforced concrete footings shall be designed and constructed
for all structures. CONTRACTOR shall comply with all recommendations for
excavation, fill, backfill, and compaction and design criteria for basement wall,
retaining wall and foundation wall design.

All foundations shown on the structural drawings are preliminary, and based on
a preliminary allowable soil bearing pressure of 300 KPa. CONTRACTOR
shall provide Geotechnical Engineer with specific foundation design loads for
each individual spread footing, combined footing and continuous footing.
Geotechnical Engineer will analyze the soils based on the given loading and
advise CONTRACTOR on the required foundation footprint. CONTRACTOR
shall comply with Geotechnical Engineers recommendations and design and
construct foundations according to the referenced codes and standards.

DISCIPLINE
ENGINEER
DB

8/7/15
DATE:
PROJECT
ENGINEER
JF
8/7/15

DATE:

CERTIFIED

6.8

DB
DATE:

8/7/15

Ground Floor for Buildings and Related Structures


6.8.1

CONTRACTOR shall provide ground floor system as shown on the Drawings and
indicated in this Scope of Work.

6.8.2

CONTRACTOR scope shall include as a minimum, but not limited to the following:

CONSTRUCTION
AGENCY

DATE:

Specifications for earthwork, concrete and steel structures and all their
components.

OPERATIONS

CONTRACTOR shall design and construct slab on grade for the required loads
according to the referenced design criteria, codes and standards. Slab-ongrade shall be constructed on a vapor retarder and porous fill on compacted
subgrade as required in the Geotechnical Report.

CONTRACTOR shall provide slab-on-grade capable of carrying high density


storage, heavy equipment, fork lift traffic and other loads as shown on Index R
and COMPANY requirements.

BY:

DATE:
(DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
REVISIONCERTIFICATION
CERTIFICATE

THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

CONTROL NUMBER

DATE:

SCOPE OF WORK
EXPEC ADVANCED RESEARCH CENTER EXPANSION

DWG.TYPE PLANT NO. INDEX

DOC

IFB LSTK LAB & TUNNEL


DHAHRAN

SAUDI ARABIA

502
JO / EWO:

DRAWING NO.

HE-348820

SHT.NO.

REV.NO.

00A

10-01402
EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

SAUDI ARABIAN OIL COMPANY

JAF

ENGG CERT

PMT OPRNS

SAUDI ARAMCO 2616-ENG (03/99)

DKB

DB
JF

ISSUED FOR 90% FEED REVIEW

10-01402
8/7/15
00A

IFB LSTK LAB & TUNNEL

DESCRIPTION

10-01402
A

REV
NO.

DATE

JO/EWO

JAF

6.9

DISCIPLINE
ENGINEER
DB

8/7/15
DATE:
PROJECT
ENGINEER

EXPEC ARC Laboratory Building


6.9.1

CONTRACTOR shall provide complete structural system as shown on the


Drawings and indicated in this Scope of Work. The sizes shown on the structural
drawings are preliminary. CONTRACTOR shall be fully responsible for the final
member size and design.

6.9.2

CONTRACTOR shall include as a minimum, but not limited to the following:

CONTRACTOR shall provide roof and floor framing systems consisting of one
way and two way reinforced concrete slabs supported by reinforced concrete
beams and columns. Rooftop structures used for elevator over-runs, elevator
machine rooms and roof access shall be provided using this same structural
system. Loading dock canopy roof structures shall consist of galvanized metal
roof deck supported by structural steel beams and posts.

CONTRACTOR shall provide a lateral load resisting system to resist lateral


loads resultant from wind and seismic forces. Lateral loads shall be resisted by
the diaphragm action of the roof and floor slabs, and transfer the lateral loads
to the reinforced concrete beams and columns. The reinforced concrete slabs,
beams and columns shall be inter-connected and resist lateral loads using
frame action.

CONTRACTOR shall provide shear walls in the basement to resist lateral loads
resulting from lateral earth pressure against the basement walls. Shear walls
shall extend from the ground floor to the first floor. Reinforce openings in shear
walls.

CONTRACTOR shall provide reinforced concrete basement walls and elevator


pits.

CONTRACTOR shall provide stairs constructed of reinforced concrete; and


stairs and monumental stairs constructed of structural steel shapes according
to the Index R Drawings.

CONTRACTOR shall provide vertical and horizontal structure for support of the
building penthouse and screen wall cladding systems. This structure shall
consist of steel wind posts, girts and diagonal braces. Posts and diagonal
braces shall be anchored to the concrete penthouses and roofs. Provide steel
structure for support of louvers, windows and doors.

CONTRACTOR shall provide steel support structure roof rootop mechanical


equipment, duct and pipe. Support structure shall be 1200 mm above the roof,
and support grating, guardrails and access stairs.

CONTRACTOR shall provide steel structure for elevator hoist beams, divider
beams, guide rails supports and counter weight supports.

CONTRACTOR shall provide steel structure for support of top running bridge
cranes and trolley hoists.

CONTRACTOR shall provide window washing davits consisting of structural


steel shapes as shown on the Index R roof plans. Window washing davits
shall be anchored to the reinforced concrete roof structure.

JF
8/7/15

DATE:

CERTIFIED
DB
DATE:

8/7/15

CONSTRUCTION
AGENCY

DATE:

OPERATIONS

BY:

DATE:
(DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
REVISIONCERTIFICATION
CERTIFICATE

THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

CONTROL NUMBER

DATE:

SCOPE OF WORK
EXPEC ADVANCED RESEARCH CENTER EXPANSION

DWG.TYPE PLANT NO. INDEX

DOC

IFB LSTK LAB & TUNNEL


DHAHRAN

SAUDI ARABIA

502
JO / EWO:

DRAWING NO.

HE-348820

SHT.NO.

REV.NO.

00A

10-01402
EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

SAUDI ARABIAN OIL COMPANY

02-14

ENGG CERT

PMT OPRNS

SAUDI ARAMCO 2616-ENG (03/99)

CONTRACTOR shall provide concrete wearing slab over the fire pump room.

6.11

10-01402
8/7/15
00A

CONTRACTOR shall provide reinforced concrete tunnel roof structure


consisting of reinforced concrete one-way slabs supported by reinforced
concrete walls and foundations.

CONTRACTOR shall coordinate tunnel layout and structure with existing


underground utilities and other unknown underground obstructions. Plan
layout, location, elevation of tunnel and structure are based on current survey
information of existing utilities and other potential underground obstructions
without guarantee of accuracy and/or completeness. CONTRACTOR shall
inform COMPANY in writing of all proposed revisions to tunnel layout, location,
elevations and structure to accommodate existing utilities or other unknown
underground obstructions.

Ancillary Buildings and Structures


6.11.1 CONTRACTOR shall provide complete structural system as shown on the
Drawings and indicated in this Scope of Work.

8/7/15
DATE:
PROJECT
ENGINEER
JF

6.11.2 CONTRACTOR scope shall include as a minimum, but not limited to the following:

8/7/15

DATE:

Connecting Tunnel

CERTIFIED
DB

CONTRACTOR shall provide Pre-Engineered, Pre-Manufactured metal


building structure for Maintenance Building and reinforced concrete
foundations.

CONTRACTOR shall provide structure for switchgear building consisting of


precast concrete double TPE roof structure, supported by precast panel walls,
cast-in-place slab-on-grade and foundations.

CONTRACTOR shall provide structure for shared cylinder area, service yard
screen wall, smoking shelter and shaded parking structures consisting of
structural steel beams, columns and reinforced concrete footings as shown on
Architectural Drawings.

8/7/15

CONSTRUCTION
AGENCY

DATE:

OPERATIONS

BY:

DATE:
(DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
REVISIONCERTIFICATION
CERTIFICATE

THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

CONTROL NUMBER

DATE:

SCOPE OF WORK
EXPEC ADVANCED RESEARCH CENTER EXPANSION

DWG.TYPE PLANT NO. INDEX

DOC

IFB LSTK LAB & TUNNEL


DHAHRAN

SAUDI ARABIA

502
JO / EWO:

DRAWING NO.

HE-348820

SHT.NO.

REV.NO.

00A

10-01402
EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

IFB LSTK LAB & TUNNEL

ISSUED FOR 90% FEED REVIEW


10-01402

JO/EWO

CONTRACTOR shall provide walls for blast resistant rooms as shown on the
Architectural Drawings. Floor structure shall also resist blast loads.

6.10.2 CONTRACTOR scope shall include, as a minimum, but not limited to the following:

02-14

DATE

6.10.1 CONTRACTOR shall provide complete structural system as shown on the


Drawings and indicated in this Scope of Work.

REV
NO.

CONTRACTOR shall provide aluminum structure for entrance canopy and


reinforced concrete foundations. See Index R Drawing HA-347611-004 for
plans and details.

JF

JAF

6.10

DISCIPLINE
ENGINEER
DB

DATE:

DB

DKB

SAUDI ARABIAN OIL COMPANY

DESCRIPTION

ENGG CERT

PMT OPRNS

SAUDI ARAMCO 2616-ENG (03/99)

6.12

Structural Materials

DB

DKB

6.12.1 CONTRACTOR shall provide the following structural materials:


6.12.1.1 Concrete:
JF

10-01402

10-01402

02-14

8/7/15

IFB LSTK LAB & TUNNEL

JO/EWO
DATE

DESCRIPTION

ISSUED FOR 90% FEED REVIEW

Element

Strength (MPa)

Max. W/C Ratio

Unit Weight
(Kg/m3)

Site Work

31

0.40

2320

Foundation Work

28

0.40

2320

Slab-On-Grade

28

0.40

2320

Structural
Slabs/Beams

28

0.40

2320

Columns

28

0.40

2320

Metal Deck Slabs

28

0.40

2320

Architectural Fills

28

0.40

2320

00A

REV
NO.

6.12.1.1 Concrete Reinforcing


DISCIPLINE
ENGINEER
DB

8/7/15
DATE:
PROJECT
ENGINEER
JF

Deformed Bars: ASTM A 615M, Grade 420.

Epoxy Coated Deformed Bars: ASTM A 775.

Epoxy Coated Welded Wire Fabric: ASTM A 884.

8/7/15

DATE:

CERTIFIED

6.12.1.2 Structural Steel

DB
DATE:

8/7/15

CONSTRUCTION
AGENCY

Element/Shape

Standard/Grade

WF Shapes

ASTM A 992M

M, S and Channel Shapes

ASTM A 36MM

Hollow Structural Sections

ASTM A 500M, Grade B

Structural Pipe

ASTM A 53M, Grade B

Angles and Miscellaneous

ASTM A 36M

DATE:

OPERATIONS

BY:

DATE:
(DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
REVISIONCERTIFICATION
CERTIFICATE

THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

CONTROL NUMBER

DATE:

SCOPE OF WORK
EXPEC ADVANCED RESEARCH CENTER EXPANSION

DWG.TYPE PLANT NO. INDEX

DOC

IFB LSTK LAB & TUNNEL


DHAHRAN

SAUDI ARABIA

502
JO / EWO:

DRAWING NO.

HE-348820

SHT.NO.

REV.NO.

00A

10-01402
EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

SAUDI ARABIAN OIL COMPANY

JAF

ENGG CERT

PMT OPRNS

SAUDI ARAMCO 2616-ENG (03/99)

REVISION
REVISIONCERTIFICATION
CERTIFICATE

(DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

00A

REV
NO.

8/7/15

02-14

DATE

10-01402

10-01402

JO/EWO

IFB LSTK LAB & TUNNEL

ISSUED FOR 90% FEED REVIEW

DESCRIPTION

JF

JAF
DB

DKB

ENGG CERT

PMT OPRNS

SAUDI ARABIAN OIL COMPANY


6.12.1.3 Metal Deck

DHAHRAN

ASTM A 653M, galvanized: G90 roof, G60 Floors.

6.12.1.4 Steel Stud Shear Connectors: ASTM A 108.

DISCIPLINE
ENGINEER
DB

8/7/15
DATE:
PROJECT
ENGINEER

JF

CERTIFIED
8/7/15

DB

CONSTRUCTION
AGENCY

8/7/15

DATE:

OPERATIONS

DATE:

SCOPE OF WORK
EXPEC ADVANCED RESEARCH CENTER EXPANSION

DWG.TYPE PLANT NO. INDEX

DOC

IFB LSTK LAB & TUNNEL

SAUDI ARABIA

502

JO / EWO:

DRAWING NO.

HE-348820

SHT.NO.

REV.NO.

10-01402

00A

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

DATE:

BY:

CONTROL NUMBER

DATE:

APPROVAL/CERTIFICATION REQUIREMENTS,

EDSD
VERIFICATION
DATE:

OF THIS DRAWING IS COVERED, FOR ALL

THIS INDICATES THAT REV. NO.__________

SAUDI ARAMCO 2616-ENG (03/99)

You might also like