Professional Documents
Culture Documents
VerDate jul<14>2003 19:06 Jun 23, 2005 Jkt 205001 PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 E:\FR\FM\24JNN1.SGM 24JNN1
36578 Federal Register / Vol. 70, No. 121 / Friday, June 24, 2005 / Notices
Department reports on information DEPARTMENT OF ENERGY (Point Comfort), Three Riverway, Suite
gathered and compiled from its facilities 525, Houston, Texas 77056 filed an
nationwide on the usage of in-house Federal Energy Regulatory application, pursuant to section 7(c) of
printing and duplicating facilities as Commission the Natural Gas Act (NGA), for
well as all printing procedures from [Project No. 10482–000] authorization to construct, own and
external vendors. operate the Point Comfort Pipeline and
DATES: Comments regarding this Mirant NY-Gen LLC; Notice Rejecting related facilities, and for approval of its
collection must be received on or before Request for Rehearing Pro Forma Tariff and proposed initial
July 25, 2005. If you anticipate that you rates for service. Point Comfort also
will be submitting comments, but find June 17, 2005. requests blanket certificates authorizing
it difficult to do so within the period of On April 18, 2005, the Commission it to engage in certain routine activities
time allowed by this notice, please issued an order denying the licensee’s under part 157, subpart F and for
advise the OMB Desk Officer of your application to amend the recreation authority to transport natural gas under
intention to make a submission as soon plan for the Swinging Bridge Project No. part 284, subpart G of the Commission’s
as possible. The Desk Officer may be 10482.1 On May 16, 2005, the regulations.
telephoned at 202–395–4650. Woodstone Lakes Development, LLC The Point Comfort Pipeline facilities
(Woodstone Lakes) submitted a request would consist of an approximately 27-
ADDRESSES: Written comments should
for rehearing to the Director of the mile-long, 36-inch-diameter pipeline in
be sent to: DOE Desk Officer, Office of
Division of Hydropower Administration Calhoun and Jackson Counties, Texas
Information and Regulatory Affairs,
and Compliance. connecting the proposed Calhoun LNG
Office of Management and Budget, New Pursuant to section 313(a) of the
Executive Office Building, Room 10102, import terminal (filed on March 18,
Federal Power Act, 16 U.S.C. 825l(a), a 2005 in Docket No. CP05–91–000) to
735 17th Street, NW., Washington, DC request for rehearing may be filed only
20503. interconnects with interstate and
by a party to the proceeding. In order for intrastate pipelines and two industrial
Comments should also be addressed
Woodstone Lakes to be a party to the facilities located near the proposed
to:
proceeding, it must have timely filed a pipeline route.
Sharon A. Evelin, U.S. Department of motion to intervene pursuant to Rule The Point Comfort Pipeline facilities
Energy, M/S IM–11, 19901 214 of the Rules of Practice and would also include two approximately
Germantown Road, Germantown, Procedure, 18 CFR 385.214.2 Since 0.25-mile-long lateral pipelines, above
Maryland, 20874, or by fax at 301– Woodstone Lakes did not file a motion ground pig launcher and receiver
903–9061 or by e-mail at to intervene, its request for rehearing facilities, metering and regulation
Sharon.evelin@hq.doe.gov, and to must be rejected.3 facilities and a supervisory control and
Dallas Woodruff, Team Leader This notice constitutes final agency data acquisition system. The Point
Printing Specialist, US Department of action. Request for rehearing by the Comfort Pipeline facilities are designed
Energy, 1000 Independence Ave., Commission of this rejection notice to transport a maximum average daily
SW., M/S ME–421, Washington, DC must be filed within 30 days of the date throughput of 1.0 billion cubic feet per
20585, or by fax at 202–586–0753 or of issuance of this notice, pursuant to 18 day of natural gas.
by e-mail at CFR 385.713. This application is on file with the
dallas.woodruff@hq.doe.gov. Commission and open to public
Magalie R. Salas,
FOR FURTHER INFORMATION CONTACT: The inspection. This filing is available for
Secretary.
individuals listed in the above review at the Commission in the Public
ADDRESSES. [FR Doc. E5–3292 Filed 6–23–05; 8:45 am] Reference Room or may be viewed on
SUPPLEMENTARY INFORMATION: This
BILLING CODE 6717–01–P the Commission’s Web site at http://
package contains: (1) OMB No.: 1910– www.ferc.gov using the ‘‘eLibrary’’ link.
0100; (2) Package Title: Printing and Enter the docket number excluding the
DEPARTMENT OF ENERGY last three digits in the docket number
Publishing Activities; (3) Purpose: The
Department of Energy collects data from Federal Energy Regulatory field to access the document. For
its printing and duplicating facilities Commission assistance, please contact FERC Online
nationwide regarding its inventory and Support at
[Docket Nos. CP05–380–000, CP05–381– FERCOnlineSupport@ferc.gov or toll
printing procurement activities. This 000, and CP05–382–000]
information is reported to the Joint free at (866) 208–3676, or for TTY,
Committee on Printing. See U.S. Code contact (202) 502–8659.
Point Comfort Pipeline Company, L.P.; Any questions concerning this
Title 44, sections 101–103. (4) Estimated Notice of Application application should be directed to
Number of Respondents: 336; (5)
June 17, 2005. Counsel for Point Comfort Pipeline,
Estimated Total Burden Hours: 947 (6)
Take notice that on June 10, 2005, L.P., Tania S. Perez, King & Spalding
Number of Collections: The package
Point Comfort Pipeline Company, L.P. LLP, 1185 Avenue of the Americas, New
contains 4 information and/or
York, NY 10036, at (212) 556–2161 or
recordkeeping requirements.
1 Mirant NY-Gen LLC, 111 FERC ¶ 61,077. The fax (212) 556–2222 or
Statutory Authority: Rules pursuant to proposed amendment would have closed a boat tperez@kslaw.com.
Title 44 U.S. Code sections 101–103. launch and expanded a recreation area. There are two ways to become
2 See Pacific Gas and Electric Company, 40 FERC
Issued in Washington, DC on June 17, involved in the Commission’s review of
¶ 61,035 (1987). Notice of the application in this
2005. this project. First, any person wishing to
proceeding was issued on November 5, 2004,
Lorretta Bryant, setting December 6, 2004 as the deadline for filing obtain legal status by becoming a party
Acting Director, Records Management interventions. to the proceedings for this project
3 In addition, Woodstone Lakes did not file its
Division, Office of the Chief Information should file with the Federal Energy
Officer. request for rehearing with the Commission
Secretary as required by Rule 2001 of the
Regulatory Commission, 888 First
[FR Doc. 05–12520 Filed 6–23–05; 8:45 am] Commission’s Rules of Practice and Procedure. 18 Street, NE., Washington, DC 20426, a
BILLING CODE 6450–01–P CFR 385.2001. motion to intervene in accordance with
VerDate jul<14>2003 19:06 Jun 23, 2005 Jkt 205001 PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 E:\FR\FM\24JNN1.SGM 24JNN1