You are on page 1of 2

33884 Federal Register / Vol. 70, No.

111 / Friday, June 10, 2005 / Notices

Dated: June 7, 2005. • Propose ways to enhance the Dated: June 3, 2005.
David Bearden, quality, utility, and clarity of the Doug Gerry,
Deputy Assistant Secretary of Commerce for information to be collected; and Acting Director of Office of Grants
Economic Development. • Propose ways to minimize the Management.
[FR Doc. 05–11583 Filed 6–9–05; 8:45 am] burden of the collection of information [FR Doc. 05–11485 Filed 6–9–05; 8:45 am]
BILLING CODE 3510–24–P on those who are to respond, including BILLING CODE 6050–$$–P
through the use of appropriate
automated, electronic, mechanical, or
CORPORATION FOR NATIONAL AND other technological collection DEPARTMENT OF DEFENSE
COMMUNITY SERVICE techniques or other forms of information
technology, e.g., permitting electronic Department of the Army
Information Collection; Submission for submissions of responses.
OMB Review, Comment Request Board of Visitors, United States
Comments Military Academy (USMA)
AGENCY: Corporation for National and
A 60-day public comment Notice was AGENCY: Department of the Army, DoD.
Community Service.
published in the Federal Register on ACTION: Notice of open meeting.
ACTION: Notice. February 28, 2005. This comment
period ended April 28, 2004. No public SUMMARY: In accordance with Section
SUMMARY: The Corporation for National 10(a)(2) of the Federal Advisory
and Community Service (hereinafter the comments were received from this
notice. Committee Act (Pub. L. 92–463),
‘‘Corporation’’), has submitted a public announcement is made of the following
information collection request (ICR) Description: The Corporation is
seeking approval of the modified committee meeting:
entitled the Financial Status Report Name of Committee: Board of
(FSR) form to the Office of Management Financial Status Report form to review
Visitors, United States Military
and Budget (OMB) for review and and approve federal and non-federal
Academy.
approval in accordance with the expenditure of funds by Grants
Date: Friday, July 15, 2005.
Paperwork Reduction Act of 1995, Pub. Management Specialists in the Office of Place of Meeting: Superintendent’s
L. 104–13, (44 U.S.C. Chapter 35). Grants Management, in order to Conference Room, Taylor Hall, Building
Copies of this ICR, with applicable determine the grantee is meeting their 600, West Point, NY.
supporting documentation, may be statutory match requirements. Start Time of Meeting: Approximately
obtained by calling the Corporation for The Financial Status Report form will 1 p.m.
National and Community Service, Ms. be completed electronically in the FOR FURTHER INFORMATION CONTACT:
Margaret Rosenberry at (202) 606–5000, Corporation’s grant system (eGrants) to Lieutenant Colonel Shaun T. Wurzbach,
ext. 124. Individuals who use a evaluate their financial performance of United States Military Academy, West
telecommunications device for the deaf federal funds. This modified form is Point, NY 10996–5000, (845) 938–4200.
(TTY–TDD) may call (202) 565–2799 also used exclusively to monitor our SUPPLEMENTARY INFORMATION: Proposed
between 8:30 a.m. and 5 p.m. eastern grantee’s compliance levels required for Agenda: Summer Meeting of the Board
time, Monday through Friday. the AmeriCorps program. The cost share of Visitors. Review of the Academic,
ADDRESSES: Comments may be requirements must indicate a minimum Military and Physical Programs at the
submitted, identified by the title of the of 15% cash for members support USMA. Sub Committee meetings on
information collection activity, to the expenses and at least 33% of program Academics, Military/Physical and
Office of Information and Regulatory operating expenses. Financial Status Quality of Life to be held prior to Spring
Affairs, Attn: Ms. Katherine Astrich, Reports are requested semi-annually. meeting. One closed session pending
OMB Desk Officer for the Corporation The information collected has proven to Secretary of the Army approval.
for National and Community Service, by be an effective tracking tool to maintain
adequate financial management Brenda S. Bowen,
any of the following two methods
integrity. Army Federal Register Liaison Officer.
within 30 days from the date of
publication in this Federal Register: Type of Review: Renewal. [FR Doc. 05–11500 Filed 6–9–05; 8:45 am]
(1) By fax to: (202) 395–6974, Agency: Corporation for National and BILLING CODE 3710–08–M

Attention: Ms. Katherine Astrich, OMB Community Service.


Desk Officer for the Corporation for Title: AmeriCorps Financial Status
National and Community Service; and DEPARTMENT OF DEFENSE
Report; Standard Form 269A (Modified).
(2) Electronically by e-mail to: OMB Number: 3045–0103. Department of the Army; Corps of
Katherine_T._Astrich@omb.eop.gov. Agency Number: SF424–NSSC. Engineers
SUPPLEMENTARY INFORMATION: The OMB Affected Public: Current and
is particularly interested in comments prospective recipients of AmeriCorps Intent To Prepare a Draft Revised
which: program grants. General Reevaluation Report/Second
• Evaluate whether the proposed Supplemental Environmental Impact
Total Respondents: 732. Statement (RGRR/SEIS) for the
collection of information is necessary Frequency: Semi-annually, with a few
for the proper performance of the Modified Water Deliveries to
exceptions. Everglades National Park, Tamiami
functions of the Corporation, including
whether the information will have Average Time Per Response: 2 hours. Trail Feature
practical utility; Estimated Total Burden Hours: 2,928
AGENCY: Department of the Army, U.S.
• Evaluate the accuracy of the hours.
Army Corps of Engineers, DoD.
agency’s estimate of the burden of the Total Burden Cost (capital/startup):
ACTION: Notice of intent.
proposed collection of information, None.
including the validity of the Total Burden Cost (operating/ SUMMARY: The Jacksonville District, U.S.
methodology and assumptions used; maintenance): None. Army Corps of Engineers intends to

VerDate jul<14>2003 17:22 Jun 09, 2005 Jkt 205001 PO 00000 Frm 00006 Fmt 4703 Sfmt 4703 E:\FR\FM\10JNN1.SGM 10JNN1
Federal Register / Vol. 70, No. 111 / Friday, June 10, 2005 / Notices 33885

prepare a Draft Second Supplemental and times will be announced in public operation and maintenance of a Federal
Environmental Impact Statement notices and local newspapers. A Public flood control project, navigation,
(DSEIS) for the Tamiami Trail feature of meeting will be held after release of the hydrology, water quality, wetlands,
the Modified Water Deliveries to Draft RGRR/SEIS; the exact location, endangered species, agricultural
Everglades National Park (MWD) project date, and times will be announced in a resources, transportation, cultural
in Miami-Dade County. The study is a public notice and local newspapers. resources, and air quality.
cooperative effort between the U.S. g. Coordination: The proposed action DATES: The projected date for public
Army Corps of Engineers, Everglades is in accordance with the Fish and release of the DEIS is November, 2006.
National Park (ENP), the Florida Wildlife Coordination Act (FWCA) of Two public scoping meetings will be
Department of Transportation, and the 1958 and the Endangered Species Act held on June 29, 2005, to receive
South Florida Water Management (ESA) of 1973. The coordinating comments on the proposed contents of
District. agencies include the U.S. Fish and the DEIS. One meeting will be held
FOR FURTHER INFORMATION CONTACT: Jon Wildlife Service, Everglades National during business hours at 1:30 p.m. and
Moulding, U.S. Army Corps of Park, the Florida Fish and Wildlife the second will be held in the evening
Engineers, Planning Division, Conservation Commission, the Florida at 7 p.m. to accommodate the schedules
Environmental Branch, P.O. Box 4970, Department of Transportation, and the of participants.
Jacksonville, FL 32232–0019, by e-mail, South Florida Water Management ADDRESSES: The scoping meetings will
jon.moulding@usace.army.mil, or by District. be held at the Lathrop Community
h. Other Environmental Review and Room, 15453 7th Street, Lathrop, CA
telephone at 904–232–2286.
Consultation: The proposed action 95330. Written comments may be
SUPPLEMENTARY INFORMATION: would involve evaluation for
a. Authorization: The MWD project in mailed to Ms. Patti Johnson at, 1325 J
compliance with guidelines pursuant to Street, Room 1480, Sacramento, CA
South Florida was authorized by the Section 404(b) of the Clean Water Act
Everglades National Park Protection and 95814–2922. All comments must be
and the National Historic Preservation received on or before July 29, 2005.
Expansion Act of 1989. Prior to the Act.
current study, a Final GRR/SEIS on the FOR FURTHER INFORMATION CONTACT:
i. Agency Role: As cooperating Questions about the proposed action
project was coordinated with the public agency, Everglades National Park will
in December 2003. The document was and the DEIS can be answered by Ms.
provide extensive information and Patti Johnson, telephone (916) 557–
withdrawn without a Record of Decision assistance on the resources to be
because additional information on costs 6611, or e-mail at
impacted and alternatives. patti.P.Johnson@usace.army.mil. Please
and benefits required a revision of plan j. DSEIS Preparation: The integrated
formulation and evaluation. refer to Identification Number
draft RGRR, including a DSEIS, is 199500412.
b. Project Scope: The primary goal of currently estimated for publication in
the MWD project is to improve water August 2005. SUPPLEMENTARY INFORMATION: River
deliveries to ENP from the Central and Islands, LLC, (applicant) has applied for
Southern Florida project. The Tamiami Dated: June 3, 2005. Corps authorization under section 404
Trail feature involves means to convey Stuart J. Appelbaum, of the Clean Water Act. The applicant is
water south under Tamiami Trail, U.S. Chief, Planning Division. also requesting the State of California
Highway 41, into Northeast Shark River [FR Doc. 05–11498 Filed 6–9–05; 8:45 am] Reclamation Board to seek permission
Slough of ENP. Specific Objectives BILLING CODE 3710–AJ–M from the Corps Chief of Engineers under
include passing peak MWD flows under 33 U.S.C. 408 to permanently alter
the highway in as natural a way as federal flood control project levees. The
practicable without adversely affecting DEPARTMENT OF DEFENSE project as proposed would also require
the roadbed and public safety. Corps authorization under Section 10 of
c. Preliminary Alternatives: The Department of the Army; Corps of the Rivers and Harbors Act. The project
previously examined alternatives will Engineers may also require other Federal, State or
be reevaluated in light of new local authorizations, including bridge
Intent To Prepare a Draft permit(s) from the U.S. Coast Guard
hydrologic modeling that indicates the
Environmental Impact Statement for under Section 9 of the Rivers and
need for a higher design water elevation,
the Proposed River Islands Project, in Harbors Act.
greater construction costs resulting from
San Joaquin County, CA The proposed project site currently
increases in market costs of material,
concerns for public safety, and the need AGENCY: Department of the Army, U.S. includes agricultural land, forested
to raise the profile of any portion of the Army Corps of Engineers, DoD. riparian habitat, and rip-rapped flood
road that would not be bridged. ACTION: Notice of intent. control levees. It is in the area known
d. Issues: The RGRR/SEIS will as West Lathrop, which was annexed to
consider impacts on health and safety, SUMMARY: The U.S. Army Corps of the City of Lathrop in 1997. Stewart
aesthetics and recreation, cultural Engineers, Sacramento District (Corps), Tract is an island in the Sacramento-San
resources, socio-economic resources, will prepare a Draft Environmental Joaquin River Delta bounded by the San
hydrology, water quality, ecosystem Impact Statement (DEIS) for Corps Joaquin River on the north and east, Old
habitat, fish and wildlife resources, authorization actions for the proposed River on the west, and Paradise Cut on
threatened and endangered species, and River Islands project. The overall project the south. Union Pacific Railroad
construction costs. purpose is to construct a large-scale, (UPRR) tracks are located along the
e. Scoping: As the nature of the issues mixed-use project consisting of eastern boundary of the largest portion
have not changed since the previous residential development, a commercial of the project site. Paradise Cut is used
document was issued, no additional complex, and which may include open for irrigation and as a flood control
scoping is planned. space and recreational amenities, bypass channel carrying flood waters
f. Public Involvement: Public located in San Joaquin County or the from the San Joaquin River to Old River.
workshops may be held over the course south delta area. The DEIS will address The area adjacent to the project site is
of the study; the exact location, dates, impacts such as major changes in the largely agricultural. However, the

VerDate jul<14>2003 17:22 Jun 09, 2005 Jkt 205001 PO 00000 Frm 00007 Fmt 4703 Sfmt 4703 E:\FR\FM\10JNN1.SGM 10JNN1

You might also like