You are on page 1of 2

33142 Federal Register / Vol. 70, No.

108 / Tuesday, June 7, 2005 / Notices

than any one particular function or Applicants: Midwest Independent Docket Numbers: ER05–1023–000.
activity. Transmission System Operator, Inc. Applicants: TransAlta Centralia
Comments are invited on: (1) Whether Description: Midwest Independent Generation L.L.C.
the proposed collection of information Transmission System Operator, Inc. Description: TransAlta Centralia
is necessary for the proper performance submits a Large Generator Generation, L.L.C. submits FERC Electric
of the functions of the Commission, Interconnection Agreement among the Rate Schedule 2 for Reactive Supply
including whether the information will PPM Energy, Inc., itself, and Northern and Voltage Control from Generation
have practical utility; (2) the accuracy of States Power Company dba Xcel Energy Sources Service that it provides to
the agency’s estimate of the burden of under ER05–1018. Bonneville Power Administration from
the proposed collection of information, Filed Date: 5/25/2005. its Big Hanaford generating plant under
including the validity of the Accession Number: 20050526–0217. ER05–1023.
methodology and assumptions used; (3) Comment Date: 5 p.m. Eastern Time Filed Date: 5/26/2005.
ways to enhance the quality, utility and on Wednesday, June 15, 2005. Accession Number: 20050531–0124.
clarity of the information to be Docket Numbers: ER05–1019–000. Comment Date: 5 p.m. Eastern Time
collected; and (4) ways to minimize the Applicants: Nevada Power Company. on Thursday, June 16, 2005.
burden of the collection of information Description: Nevada Power Company Docket Numbers: ER05–1024–000.
on those who are to respond, including submits a Notice of Cancellation of an Applicants: PJM Interconnection,
the use of appropriate automated, Agreement for Long-Term Firm Point-to- L.L.C.
electronic, mechanical, or other Point Transmission Service Between Description: PJM Interconnection,
technological collection techniques or Nevada Power Company and Duke L.L.C. submits an executed
other forms of information technology Energy Trading and Marketing—Service interconnection service agreement with
e.g. permitting electronic submission of Agreement No. 97. Eastern Landfill Gas, LLC and Baltimore
responses. Filed Date: 5/26/2005. Gas and Electric Company under ER05–
Accession Number: 20050531–0123. 1024.
Linda Mitry, Filed Date: 5/25/2005.
Comment Date: 5 p.m. Eastern Time
Deputy Secretary. Accession Number: 20050531–0130.
on Thursday, June 16, 2005.
[FR Doc. E5–2881 Filed 6–6–05; 8:45 am] Docket Numbers: ER05–1020–000. Comment Date: 5 p.m. Eastern Time
BILLING CODE 6717–01–P Applicants: WASP Energy, LLC. on Wednesday, June 15, 2005.
Description: WASP Energy, LLC’s Docket Numbers: ER05–1025–000.
petition for acceptance of initial rate Applicants: California Independent
DEPARTMENT OF ENERGY schedule (FERC Electric Rate Schedule System Operator Corporation.
Federal Energy Regulatory 1), waivers and blanket authority under Description: California Independent
Commission ER05–1020. System Operator Corporation submits
Filed Date: 5/26/2005. Amendment No. 70 to its ISO Tariff
Notice of Filings Accession Number: 20050531–0122. under ER05–1025.
Comment Date: 5 p.m. Eastern Time Filed Date: 5/25/2005.
Wednesday, June 1, 2005. on Thursday, June 16, 2005. Accession Number: 20050531–0131.
Take notice that the Commission Docket Numbers: ER05–1021–000. Comment Date: 5 p.m. Eastern Time
received the following electric rate Applicants: Pacific Gas & Electric on Wednesday, June 15, 2005.
filings: Company. Docket Numbers: ER05–1026–000.
Docket Numbers: ER04–170–006; Description: Pacific Gas and Electric Applicants: American Electric Power
ER05–1027–000. Company submits Agreements between Services Corporation.
Applicants: MxEnergy Electric Inc. Pacific Gas and Electric Company and Description: American Electric Power
Description: MxEnergy Electric Inc the City and County of San Francisco Service Corporation on behalf of the
submits its Substitute Second Revised PUC for the interconnection of the San AEP Eastern Operating Companies
Sheet No. 3, which revises paragraph 8 Francisco Airport Electric Reliability submits a letter agreement, dated 4/28/
of its FERC Electric Rate Schedule No. Project under ER05–1021. 05, to the Amended & Restated Cost
1 and a Notice of Succession of Total Filed Date: 5/26/2005. Allocation Agreement with Buckeye
Gas & Electricity (PA) Inc.’s Rate Accession Number: 20050531–0134. Power, Inc under ER05–1026.
Schedule No. 2. Comment Date: 5 p.m. Eastern Time Filed Date: 5/26/2005.
Filed Date: 5/26/2005. on Thursday, June 16, 2005. Accession Number: 20050531–0129.
Accession Number: 20050531–0127. Docket Numbers: ER05–1022–000. Comment Date: 5 p.m. Eastern Time
Comment Date: 5 p.m. Eastern Time Applicants: ISO New England Inc. on Thursday, June 16, 2005.
on Thursday, June 16, 2005. and New England Power Pool. Docket Numbers: ER98–1150–005;
Docket Numbers: ER05–644–002. Description: ISO New England, Inc. EL05–87–001.
Applicants: PSEG Energy Resources & and New England Power Pool submits Applicants: Tucson Electric Power
Trade LLC and PSEG Fossil Fossil LLC. proposed market rule changes to modify Company.
Description: PSEG Energy Resources the existing methodology for allocating Description: Tucson Electric Power Co
& Trade LLC submits Substitute Original surplus Transmission Congestion submits the second of two filings in
Sheet No. 1, et al., to FERC Electric Revenue and to conform certain market compliance with FERC’s 4/14/05 Order,
Tariff, Original Volume 1 in compliance monitoring definitions used in Market an updated generation market power
with FERC’s Order issued 4/25/05 under Rule 1 to the terminology that has been analysis under ER98–1150 et al.
ER05–644. adopted as part of the RTO process Filed Date: 5/25/2005.
Filed Date: 5/25/2005. under ER05–1022. Accession Number: 20050531–0125.
Accession Number: 20050531–0128. Filed Date: 5/25/2005. Comment Date: 5 p.m. Eastern Time
Comment Date: 5 p.m. Eastern Time Accession Number: 20050531–0120. on Wednesday, June 15, 2005.
on Wednesday, June 15, 2005. Comment Date: 5 p.m. Eastern Time Docket Numbers: ER99–2251–003;
Docket Numbers: ER05–1018–000. on Wednesday, June 15, 2005. ER99–2252–004; ER98–2491–009; ER97–

VerDate jul<14>2003 20:54 Jun 06, 2005 Jkt 205001 PO 00000 Frm 00088 Fmt 4703 Sfmt 4703 E:\FR\FM\07JNN1.SGM 07JNN1
Federal Register / Vol. 70, No. 108 / Tuesday, June 7, 2005 / Notices 33143

705–014; ER02–2080–003; ER02–2546– service, please email Applicants state that a copy of the
004; ER99–3248–006; ER99–1213–004 FERCOnlineSupport@ferc.gov. or call application was served upon the
and ER01–1526–004. (866) 208–3676 (toll free). For TTY, call California Public Utilities Commission.
Applicants: Consolidated Edison (202) 502–8659. Comment Date: 5 p.m. June 14, 2005.
Company of New York, Inc., et al.
Linda Mitry, 2. EME Homer City Generation L.P.,
Description: ConEdison Companies
Deputy Secretary. Metropolitan Life Insurance Company,
submits amendments to their market-
[FR Doc. E5–2882 Filed 6–6–05; 8:45 am] General Electric Capital Corporation
based rate tariff, in accordance with
FERC’s May 5, 2005 Order under ER99– BILLING CODE 6717–01–P [Docket No. EC05–87–000]
2251 et al. Take notice that on May 24, 2005,
Filed Date: 5/25/2005. EME Homer City Generation L.P., (EME
Accession Number: 20050527–0023. DEPARTMENT OF ENERGY Homer City) Metropolitan Life
Comment Date: 5 p.m. Eastern Time Insurance Company (MetLife) and
on Wednesday, June 15, 2005. Federal Energy Regulatory
General Electric Capital Corporation
Commission
Any person desiring to intervene or to (GECG) filed with the Commission an
protest in any of the above proceedings application pursuant to section 203 of
must file in accordance with Rules 211 [Docket No. EC05–86–000, et al.] the Federal Power Act for authorization
and 214 of the Commission’s Rules of of an indirect disposition of
La Paloma Generating Company, LLC, jurisdictional facilities whereby
Practice and Procedure (18 CFR 385.211
et al.; Electric Rate and Corporate interests in a passive, non-power-selling
and 385.214) on or before 5 p.m. Eastern
Filings lessor of the Homer City generating
time on the specified comment date. It
is not necessary to separately intervene May 31, 2005. station in Pennsylvania will be
again in a subdocket related to a transferred by GECG or an affiliate to
The following filings have been made MetLife or an affiliate.
compliance filing if you have previously
with the Commission. The filings are Comment Date: 5 p.m. June 14, 2005.
intervened in the same docket. Protests
listed in ascending order within each
will be considered by the Commission 3. PJM Interconnection L.L.C.
docket classification.
in determining the appropriate action to
be taken, but will not serve to make 1. La Paloma Generating Company, [Docket Nos. ER04–742–005 and EL04–105–
protestants parties to the proceeding. LLC; La Paloma Holding Company, 003]
Anyone filing a motion to intervene or LLC; and La Paloma Acquisition Co, Take notice that on May 24, 2005,
protest must serve a copy of that LLC PJM Interconnection, L.L.C. (PJM)
document on the Applicant. In reference submitted revisions to the PJM Open
[Docket No. EC05–86–000]
to filings initiating a new proceeding, Access Transmission Tariff (PJM Tariff)
interventions or protests submitted on Take notice that on May 24, 2005, La and the Amended and Restated
or before the comment deadline need Paloma Generating Company, LLC Operating Agreement of PJM
not be served on persons other and the (Genco), La Paloma Holding Company, Interconnection, L.L.C. (Operating
Applicant. LLC (La Paloma Holding), and La Agreement) in compliance with the
The Commission encourages Paloma Acquisition Co, LLC (La Paloma Commission’s May 9, 2005 order in
electronic submission of protests and Acquisition Co) (collectively, Docket Nos. EL04–742–004 and ER04–
interventions in lieu of paper, using the Applicants) submitted an application 105–002, 111 FERC ¶ 61,187 (May 9
FERC Online links at http:// pursuant to section 203 of the Federal Order), concerning the allocation of
www.ferc.gov. To facilitate electronic Power Act for authorization of a auction revenue rights and financial
service, persons with Internet access disposition of jurisdictional facilities, transmission rights. PJM states that the
who will eFile a document and/or be whereby La Paloma Holding proposes to submitted revisions reflect an effective
listed as a contact for an intervenor transfer to La Paloma Acquisition Co date of March 8, 2005, consistent with
must create and validate an one-hundred percent of the membership the effective date previously established
eRegistration account using the interests in Genco, which owns and in this proceeding.
eRegistration link. Select the eFiling operates an approximately 1,022 MW PJM states that copies of this filing
link to log on and submit the combined cycle generating facility in were served upon all persons on the
intervention or protests. the California Independent System service list in these dockets, as well as
Persons unable to file electronically Operator (CAISO) market, and certain all PJM members, and each state electric
should submit an original and 14 copies related rights and assets. Genco states utility regulatory commission in the
of the intervention or protest to the that the sale of the membership interests PJM region. PJM also states that the
Federal Energy Regulatory Commission, in Genco from La Paloma Holding to La requested waiver of the Commission’s
888 First St. NE., Washington, DC Paloma Acquisition Co will constitute posting requirements to permit
20426. the indirect disposition of certain electronic service on the PJM members
The filings in the above proceedings jurisdictional facilities and assets held and state commissions.
are accessible in the Commission’s by Genco, including a market-based rate Comment Date: 5 p.m. on June 14,
eLibrary system by clicking on the wholesale power sales tariff on file with 2005.
appropriate link in the above list. They the Commission, certain 4. Black Hills Power, Inc.
are also available for review in the interconnection facilities associated
Commission’s Public Reference Room in with the generating facility, and related [Docket No. ER05–924–001]
Washington, DC. There is an FPA jurisdictional accounts, books and Take notice that on May 24, 2005,
eSubscription link on the Web site that records. Genco also states that the Black Hills Power, Inc. (Black Hills
enables subscribers to receive email Applicants seek expedited review of the Power), submitted an amendment to its
notification when a document is added application and request confidential April 29, 2005 filing in ER05–924–000.
to a subscribed dockets(s). For treatment of certain documents Comment Date: 5 p.m. on June 14,
assistance with any FERC Online submitted therewith. 2005.

VerDate jul<14>2003 20:54 Jun 06, 2005 Jkt 205001 PO 00000 Frm 00089 Fmt 4703 Sfmt 4703 E:\FR\FM\07JNN1.SGM 07JNN1

You might also like