You are on page 1of 12

Bill Of Quantities

Excavation, Shoring Piles And Anchorage


Sl. #

Description

Unit

Quantity

Rate

Amount

Page 1 Of 12

Bill Of Quantities
Excavation, Shoring Piles And Anchorage
Sl. #

Description

Unit

Quantity

Rate

Amount

Total

Page 2 Of 12

Bill Of Quantities
Excavation, Shoring Piles And Anchorage
Sl. #

Description

1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
1.12
1.13
1.14
1.15
1.16
1.17

Development Works:

1.18
1.19
1.20
1.21
2
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2.12
2.13
2.14

Earthworks
Approach Road
Approach Road (3+3 Lane) including Fencing & Signage
Overhead Water Reservoir (100,000 Gallon)
Street Lights 150 Watt LED
Flood Lights 100 Watt LED
Bridge
Parking Area (Tuff Pavers Min. 7000 psl)
Retaining wall for road
Boundary Wall
Toll Both (Pre Fab u PVC)
Toll Canopy
Secondary Inspection Canopy
Cargo Immigration Canopy
Quarantine Shed
Surface Drainage Works
Solar Power System including Panels, Investers and deep cycle
batteries (Decentralized System for each block/ area)
Power Supply Network
External gas pipeline network for connection to each block
External sewerage pipeline network connecting all block with main
seweage drain
External pipeline network for water supply connecting each block to
main source (reservoir)
Buildings:
Central Administration System
Seized Goods Warehouse
Commercial Warehouse
Small Offices
Customs Laboratory
Paasenger Terminal Building
Service Area (Pray Area, Caf, Maintenance Shop)
Services
Watch Tower
Security Gates
Business Centre
Accomodation
Payment
Approach Road (2 Lane)

Unit

Quantity

M3
M2
M2
Each
Each
Each
M2
M2
M
M
Each
M2
M2
M2
M2
M2

1,300
51,552
0
2
110
135
4,460
220,600
370
4,425
12
1,464
1,130
0
1,200
220,600

Watt
M2
Job

80,000
220,600
1

Job

Job

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
Km

2,055
5,250
10,480
300
400
2,100
2,300
1,200
400
9
1,950
1,200
1,600
0.5

Total

Rate

Amount

Bill Of Quantities
Excavation, Shoring Piles And Anchorage
Sl. #
S.1
S.2
S.3
S.4
S.5
S.6
S.7
S.8
S.9
S.10
S.11
S.12
S.13
S.14
S.15
S.16
S.17
S.18
S.19
S.20
S.21
S.22
S.23
S.24
S.25
S.26
S.27
S.28
S.29
S.30
S.31
S.32
S.33
S.34
S.35
S.36
S.37
S.38
S.39
S.40
S.41
SS.1

Description
Hard Security Infrastructure and Equipment
Perimeter and Traffic Lane fencing and segregation
Concrete Coils on perimeter fencing and segregation of restricted
Hesco Bags around walls and traffic entry and exit lanes and booths
Perimeter and tasj lighting LED based Solar Lights
Standby Power arrangement
Marking Lanes to get Trafic lane segregation
Hydaulic entry and exit traffic lane barriers
Sniffer Dogs and Kennels
Preparing New Standard Operating Procedures (SOPs)
Practicing New SOPs
Emergency Operating SOPs
Terorist Event SOPs
Natural Disaster Policies, Plans and SOPs
Helipad Training and Certification
Electronic Vehicle Queuing Training and SOPs
WCO SAFE and AEO Training and SOPs
Single Window System inter-agency SOPs and Training
Telecom System, PABX and Digital two way radios
i) PABX VHF Base
ii) VHF Base Handled Radios
Intrusion Detection System
Biometric Access Control Mechanism
Emergency Alarm system
Public Address System (PA)
Hand Held Metal Detectors
Wak-through scanning gates
Smoke Detectors
Firefighting Equipment
Chemical, Biological, Radioactive and Nuclear (CBRN) vehicle
scanning equipment
Vehicle Number Plate Scanning Equipment
Hand-held explosive and narcotics Vapor Tracing Equipment
Bio-data reading and collevtion equipment
Pedestrain luggage scanning equipment
Document and currency scanning equipment
Explosive detection equipment
Vehicle and cargo backscatter and color X-Ray scanning equipment
Mobile Vehicle X-Ray Scanner
Vehicle wighing and dimension check machine
RFID readers and tags
Helipad Equipment
Electronic Vehicle Queuing Equipment
RFID Tracking Equipment Training and SOPs
Under Vehicle Scanners
Soft Security (Short Term)
Training to operate new detection equipment using vendor trainers
and manuals

Unit

Quantity

ft.
M
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

10,000.00
5,000
656
50
1
4
8
6
22
22
1
1
1
1
4
1

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

1
32
1
3
1
1
16
16
50
7

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

8
8
16
16
16
16
16
2
1
4
4
1
4
4
8

No.

Rate

SS.2
SS.3
SS.4
SS.5
SS.6
SS.1
SS.2
SS.3
SS.4

Preparing New Standard Operating Procedures (SOPs)


Practicing New SOPs
Emergency Operating SOPs
Terorist Event SOPs
Natural Disaster Policies, Plans and SOPs
Soft Security (Long Term)
RFID Tracking Equipment Training and SOPs
Helipad Training and Certification
Electronic Vehicle Queuing Training and SOPs
WCO SAFE and AEO Training and SOPs

No.
No.
No.
No.
No.

22
22
1
1
2

No.
No.
No.
No.

4
1
1
1

Total

Amount

Bill Of Quantities
Excavation, Shoring Piles And Anchorage
Sl. #

Description

T.1 Data / LAN Cabling Cat-6 Category


T.1.A Data / LAN Cabling Cat-6 Category
T.2 ICT Equipment integration, configuration and commision
T.3 Input/Output Panel for 10kVA (Main Building)
T.4 Input/Output Panel for 6kVA (ICT Rack)
T.5 Input/Output Panel for 6kVA (Other Buildings)
T.5.A Input/Output Panel for 6kVA (Small Buildings)
T.6 User End Power Outlet Box (1*Flat Pin, 1*Round Pin)
T.7 User end UPS Output Power Cabling
T.8 UPSs Electrical Input Cabling/Ducting
T.9 Earthing
T.10 Earthing for Gensets
T.11 Gensets Cabling (2*95mm - 4 Core)
T.12 Access Control Device
T.13 Campus Fiber Optic Cabling 10 G Standard. Installation
T.14 Campus Fiber Optic Cabling 10 G Standard. Cabling
T.15 Input/Output Panel with Cabling / Earthing for 20kVA UPSs
T.16 Input/Output Panel for 10kVA UPSs
T.17 Input/Output Panel for 6kVA UPSs
T.18 Input/Output Panel for 3kVA UPSs
T.19 Access Control Device
T.20 WeBOC Enhancements for SWS (Complete Module)
T.21 Inventory Management System
T.22 Laptop Computer
T.23 Desktop Computers
T.24 Tablets/ PDAs
T.25 Application Server
T.26 Printers
T.27 Desktop Scanners
T.28 Wi-Fi Outdoor
T.29 Wi-Fi Indoor
T.29.A Data Racks (Branded)
T.30 Racks PDUs
T.31 24 Port 1G Layer 2 Devices Aggregation Ethernet Switch
T.32 24 Port 1G Layer 2 User Access Ethernet Switch
T.33 24 Port 1G Layer 2 User Access Ethernet Switch
T.34 UTM Firewall;
T.35 Anti-Virus for Users
T.36 Anti-Virus for Server
T.37 E-Queue Management System
T.38 IP PBX (30 users)
T.39 Environment Monitoring System
T.40 IP Based Surveillance System (CCTV)
T.41 UPSs 6KVA with ExtBattery Backup
T.42 UPSs 10 KVA with Ext Battery Backup
T.43 UPSs 6KVA with ExtBattery Backup
T.43.A UPSs 3 kVA with Ext Battery Backup
T.44 ICT Equipment integration, configuration and commision
T.45 Gensets - 100KVA
T.46 Layer 3 Core Switch
T.47 Layer 2 Ethernet Switch 48 Ports

Unit

Quantity

Per Node
Per R/Foot
No.
No.
No.
No.
No.
No.
Per Node
Per Meter
Per Pit
Per Pit
Per Meter
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

60
120
1
1
1
4
4
60
60
10
2
4
50
1
1
1
1
4
14
2
20
1
1
5
50
5
1
10
10
4
10
1
2
1
3
4
1
50
1
1
1
1
1
1
1
4
4
1
2
2
3

Rate

T.48 Layer 2 Ethernet Switch 24 Ports


T.49 UTM Firewall
T.50 2 * 20 kVA UPS (N+1) with Ext Backup and Parallel Main. Bypass
T.51 10 kVA UPS
T.52 6 kVA UPS
T.53 3 kVA UPS
T.54 IP PBX (150 users)
T.55 Environment Monitoring System
T.56 IP Based Surveillance System (CCTV) with Control Room
T.57 Network / Device Monitoring System with LCD Display (NMS)
T.58 Procurement or Development of ICT Software
T.58.A Trade Faciitation

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
LS

18
1
1
4
14
2
1
2
1
1
1
1

Total

Amount

You might also like