32322 Federal Register / Vol. 70, No.

105 / Thursday, June 2, 2005 / Notices

issue that may affect the responsibilities notice of intent to file a development must be filed by providing the original
of a particular resource agency, they application allows an interested person and the number of copies provided by
must also serve a copy of the document to file the competing application no the Commission’s regulations to: The
on that resource agency. later than 120 days after the specified Secretary, Federal Energy Regulatory
j. Description of Project: The proposed comment date for the particular Commission, 888 First Street, NE.,
project would consist of: (1) A proposed application. A competing license Washington, DC 20426. An additional
impoundment having a surface area of application must conform with 18 CFR copy must be sent to Director, Division
10 acres and storage capacity of 50 acre- 4.30(b) and 4.36. of Hydropower Administration and
feet and normal water surface elevation n. Notice of Intent—A notice of intent Compliance, Federal Energy Regulatory
of 1670 feet msl, (2) two proposed 48- must specify the exact name, business Commission, at the above-mentioned
inch-diameter steel penstocks, 18.8- address, and telephone number of the address. A copy of any notice of intent,
mile-long and 4-mile-long, (3) a prospective applicant, and must include competing application or motion to
proposed powerhouse containing two an unequivocal statement of intent to intervene must also be served upon each
generating units having a total installed submit, if such an application may be representative of the Applicant
capacity of 7.4 MW, (5) a proposed filed, either a preliminary permit specified in the particular application.
tailrace emptying into the Salton Sea, application or a development r. Agency Comments—Federal, state,
(6) a proposed 8-mile-long, 12.5 kV application (specify which type of and local agencies are invited to file
transmission line, and (7) appurtenant application). A notice of intent must be comments on the described application.
facilities. The proposed project would served on the applicant(s) named in this A copy of the application may be
have an annual generation of 64,000 public notice. obtained by agencies directly from the
MWh. o. Proposed Scope of Studies under Applicant. If an agency does not file
k. Location of Application: A copy of Permit—A preliminary permit, if issued, comments within the time specified for
the application is available for does not authorize construction. The filing comments, it will be presumed to
inspection and reproduction at the term of the proposed preliminary permit have no comments. One copy of an
Commission in the Public Reference would be 36 months. The work agency’s comments must also be sent to
Room or may be viewed on the proposed under the preliminary permit the Applicant’s representatives.
Commission’s Web site at http:// would include economic analysis,
www.ferc.gov using the ‘‘eLibrary’’ link. preparation of preliminary engineering Linda Mitry,
Enter the docket number excluding the plans, and a study of environmental Deputy Secretary.
last three digits in the docket number impacts. Based on the results of these [FR Doc. E5–2779 Filed 6–1–05; 8:45 am]
field to access the document. For studies, the Applicant would decide BILLING CODE 6717–01–P
assistance, call toll-free 1–866–208– whether to proceed with the preparation
3676 or e-mail of a development application to
FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project. DEPARTMENT OF ENERGY
call (202) 502–8659. A copy is also p. Comments, Protests, or Motions to
available for inspection and Intervene—Anyone may submit Federal Energy Regulatory
reproduction at the address in item g comments, a protest, or a motion to Commission
above. intervene in accordance with the
l. Individuals desiring to be included requirements of Rules of Practice and Notice of Application Accepted For
on the Commission’s mailing list should Procedure, 18 CFR 385.210, .211, .214. Filing and Soliciting Comments,
so indicate by writing to the Secretary In determining the appropriate action to Protests, and Motions To Intervene
of the Commission. take, the Commission will consider all
May 25, 2005.
m. Competing Preliminary Permit— protests or other comments filed, but
Anyone desiring to file a competing only those who file a motion to Take notice that the following
application for preliminary permit for a intervene in accordance with the hydroelectric application has been filed
proposed project must submit the Commission’s Rules may become a with the Commission and is available
competing application itself, or a notice party to the proceeding. Any comments, for public inspection:
of intent to file such an application, to protests, or motions to intervene must a. Type of Application: Preliminary
the Commission on or before the be received on or before the specified Permit.
specified comment date for the comment date for the particular b. Project No.: 12584–000.
particular application (see 18 CFR 4.36). application. c. Date filed: April 19, 2005.
Submission of a timely notice of intent Comments, protests and interventions d. Applicant: Loyalhanna
allows an interested person to file the may be filed electronically via the Hydroelectric Company LLC.
competing preliminary permit Internet in lieu of paper; See 18 CFR e. Name and Location of Project: The
application no later than 30 days after 385.2001(a)(1)(iii) and the instructions proposed Loyalhanna Hydroelectric
the specified comment date for the on the Commission’s web site under ‘‘e- Project would be located at the existing
particular application. A competing filing’’ link. The Commission strongly U.S. Corps of Engineers’ Loyalhanna
preliminary permit application must encourages electronic filing. Dam located on Loyalhanna Creek, near
conform with 18 CFR 4.30(b) and 4.36. q. Filing and Service of Responsive the Town of Saltsburg, Westmoreland
Competing Development Documents—Any filings must bear in County, Pennsylvania. The proposed
Application—Any qualified all capital letters the title project would utilize federal lands.
development applicant desiring to file a ‘‘COMMENTS’’, ‘‘NOTICE OF INTENT f. Filed Pursuant to: Federal Power
competing development application TO FILE COMPETING APPLICATION’’, Act, 16 U.S.C. 791(a)—825(r).
must submit to the Commission, on or ‘‘COMPETING APPLICATION’’, g. Applicant contact: Mr. Clifford
before a specified comment date for the ‘‘PROTEST’’, or ‘‘MOTION TO Phillips, Advanced Hydro Solutions
particular application, either a INTERVENE’’, as applicable, and the LLC, 150 North Miller Road, Suite 450
competing development application or a Project Number of the particular C, Fairlawn, OH 44333, (330) 869–8451.
notice of intent to file such an application to which the filing refers. h. FERC Contact: Tom Papsidero,
application. Submission of a timely Any of the above-named documents (202) 502–6002.

VerDate jul<14>2003 16:54 Jun 01, 2005 Jkt 205001 PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 E:\FR\FM\02JNN1.SGM 02JNN1
Federal Register / Vol. 70, No. 105 / Thursday, June 2, 2005 / Notices 32323

i. Deadline for filing comments, m. Competing Preliminary Permit— intervene in accordance with the
protests, and motions to intervene: 60 Anyone desiring to file a competing requirements of Rules of Practice and
days from the issuance date of this application for preliminary permit for a Procedure, 18 CFR 385.210, .211, .214.
notice. proposed project must submit the In determining the appropriate action to
All documents (original and eight competing application itself, or a notice take, the Commission will consider all
copies) should be filed with Magalie R. of intent to file such an application, to protests or other comments filed, but
Salas, Secretary, Federal Energy the Commission on or before the only those who file a motion to
Regulatory Commission, 888 First specified comment date for the intervene in accordance with the
Street, NE., Washington, DC 20426. particular application (see 18 CFR 4.36). Commission’s Rules may become a
Comments, protests and interventions Submission of a timely notice of intent party to the proceeding. Any comments,
may be filed electronically via the allows an interested person to file the protests, or motions to intervene must
Internet in lieu of paper; see 18 CFR competing preliminary permit be received on or before the specified
385.2001(a)(1)(iii) and the instructions application no later than 30 days after comment date for the particular
on the Commission’s web site under the the specified comment date for the application.
‘‘e-Filing’’ link. The Commission particular application. A competing Comments, protests and interventions
strongly encourages electronic filings. preliminary permit application must may be filed electronically via the
Please include the project number (P– conform with 18 CFR 4.30(b) and 4.36. Internet in lieu of paper; See 18 CFR
12584–000) on any comments or m. Competing Development 385.2001 (a)(1)(iii) and the instructions
motions filed. Application—Any qualified on the Commission’s web site under ‘‘e-
The Commission’s Rules of Practice development applicant desiring to file a filing’’ link. The Commission strongly
and Procedure require all intervenors competing development application encourages electronic filing.
filing documents with the Commission must submit to the Commission, on or
to serve a copy of that document on before a specified comment date for the q. Filing and Service of Responsive
each person in the official service list particular application, either a Documents—Any filings must bear in
for the project. Further, if an intervenor competing development application or a all capital letters the title
files comments or documents with the notice of intent to file such an ‘‘COMMENTS’’, ‘‘NOTICE OF INTENT
Commission relating to the merits of an application. Submission of a timely TO FILE COMPETING APPLICATION’’,
issue that may affect the responsibilities notice of intent to file a development ‘‘COMPETING APPLICATION’’,
of a particular resource agency, they application allows an interested person ‘‘PROTEST’’, or ‘‘MOTION TO
must also serve a copy of the document to file the competing application no INTERVENE’’, as applicable, and the
on that resource agency. later than 120 days after the specified Project Number of the particular
j. Description of Project: The proposed comment date for the particular application to which the filing refers.
project would utilize the existing U.S. application. A competing license Any of the above-named documents
Army Corps of Engineers’ Loyalhanna application must conform with 18 CFR must be filed by providing the original
Dam and would consist of: (1) A new 4.30(b) and 4.36. and the number of copies provided by
200-foot-long, 10-foot-diameter n. Notice of Intent—A notice of intent the Commission’s regulations to: The
penstock; (2) a new 50-foot-long, 30- must specify the exact name, business Secretary, Federal Energy Regulatory
foot-wide, 20-foot-high powerhouse address, and telephone number of the Commission, 888 First Street, NE,
containing one or two generating units prospective applicant, and must include Washington, DC 20426. An additional
for a total installed capacity of 2.0–MW; an unequivocal statement of intent to copy must be sent to Director, Division
(3) a new exhaust apron; (4) a new submit, if such an application may be of Hydropower Administration and
3,960-foot-long, 14.7–kV transmission filed, either a preliminary permit Compliance, Federal Energy Regulatory
line; and (5) appurtenant facilities. application or a development Commission, at the above-mentioned
k. Location of Applications: A copy of application (specify which type of address. A copy of any notice of intent,
the application is available for application). A notice of intent must be competing application or motion to
inspection and reproduction at the served on the applicant(s) named in this intervene must also be served upon each
Commission in the Public Reference public notice. representative of the Applicant
Room or may be viewed on the o. Proposed Scope of Studies under specified in the particular application.
Commission’s Web site at http:// Permit—A preliminary permit, if issued, r. Agency Comments—Federal, state,
www.ferc.gov using the ‘‘eLibrary’’ link. does not authorize construction. The and local agencies are invited to file
Enter the docket number excluding the term of the proposed preliminary permit comments on the described application.
last three digits in the docket number would be 36 months. The work A copy of the application may be
field to access the document. For proposed under the preliminary permit obtained by agencies directly from the
assistance, call toll-free 1–866–208– would include economic analysis, Applicant. If an agency does not file
3676 or e-mail preparation of preliminary engineering comments within the time specified for
FERCOnlineSupport@ferc.gov. For TTY, plans, and a study of environmental filing comments, it will be presumed to
call (202) 502–8659. A copy is also impacts. Based on the results of these have no comments. One copy of an
available for inspection and studies, the Applicant would decide agency’s comments must also be sent to
reproduction at the address in item g whether to proceed with the preparation the Applicant’s representatives.
above. of a development application to
l. Individuals desiring to be included construct and operate the project. Linda Mitry,
on the Commission’s mailing list should p. Comments, Protests, or Motions to Deputy Secretary.
so indicate by writing to the Secretary Intervene—Anyone may submit [FR Doc. E5–2780 Filed 6–1–05; 8:45 am]
of the Commission. comments, a protest, or a motion to BILLING CODE 6717–01–P