You are on page 1of 2

Federal Register / Vol. 70, No.

97 / Friday, May 20, 2005 / Notices 29295

Commission, 888 First Street, NE., DEPARTMENT OF ENERGY days from the date of publication of this
Washington, DC 20426. notice in the Federal Register.
This filing is accessible on-line at Federal Energy Regulatory
Magalie R. Salas,
Commission
http://www.ferc.gov, using the Secretary.
‘‘eLibrary’’ link and is available for [FR Doc. E5–2538 Filed 5–19–05; 8:45 am]
review in the Commission’s Public [Docket No. EL05–77–000]
BILLING CODE 6717–01–P
Reference Room in Washington, DC. Florida Power Corporation, Carolina
There is an ‘‘eSubscription’’ link on the Power & Light Company; Notice of
Web site that enables subscribers to Institution of Proceeding and Refund DEPARTMENT OF ENERGY
receive e-mail notification when a Effective Date
document is added to a subscribed Federal Energy Regulatory
docket(s). For assistance with any FERC May 12, 2005. Commission
Online service, please e-mail On May 5, 2005, the Commission [Docket No. ER05–744–000]
FERCOnlineSupport@ferc.gov, or call issued an order that instituted a
(866) 208–3676 (toll free). For TTY, call proceeding in Docket No. EL05–77–000, Major Lending, LLC; Notice of
(202) 502–8659. pursuant to section 206 of the Federal Issuance of Order
Comment Date: 5 p.m. eastern time on Power Act (FPA), 16 U.S.C. § 824e, to May 12, 2005.
May 20, 2005. determine whether Florida Power Major Lending LLC (Major Lending)
Corporation and Carolina Power & Light filed an application for market-based
Magalie R. Salas, Company may continue to charge rate authority, with an accompanying
Secretary. market-based rates. Florida Power rate tariff. The proposed rate tariff
[FR Doc. E5–2549 Filed 5–19–05; 8:45 am] Corporation and Carolina Power & Light provides for the sales of capacity and
BILLING CODE 6717–01–P Company, 111 FERC ¶ 61,154 (2005). energy at market-based rates. Major
The refund effective date in Docket Lending also requested waiver of
No. EL05–77–000, established pursuant various Commission regulations. In
DEPARTMENT OF ENERGY to section 206(b) of the FPA, will be 60 particular, Major Lending requested that
days from the date of publication of this the Commission grant blanket approval
Federal Energy Regulatory notice in the Federal Register. under 18 CFR Part 34 of all future
Commission issuances of securities and assumptions
Magalie R. Salas,
of liability by Major Lending.
Secretary. On May 11, 2005, pursuant to
[Docket No. EL05–105–000]
[FR Doc. E5–2536 Filed 5–19–05; 8:45 am] delegated authority, the Director,
Entergy Services, Inc.; Notice of BILLING CODE 6717–01–P Division of Tariffs and Market
Institution of Proceeding and Refund Development—South, granted the
Effective Date request for blanket approval under Part
DEPARTMENT OF ENERGY 34. The Director’s order also stated that
May 12, 2005. the Commission would publish a
Federal Energy Regulatory
On May 5, 2005, the Commission separate notice in the Federal Register
Commission
issued an order that instituted a establishing a period of time for the
proceeding in Docket No. EL05–105– filing of protests. Accordingly, any
[Docket No. EL05–99–000] person desiring to be heard or to protest
000, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C. the blanket approval of issuances of
LG&E Energy Marketing Inc., Louisville securities or assumptions of liability by
824e, to investigate whether Entergy Gas & Electric Company, Kentucky
Services, Inc. satisfies the Commission’s Major Lending should file a motion to
Utilities Company, WKE Station Two intervene or protest with the Federal
transmission market power and affiliate Inc., Western Kentucky Energy Energy Regulatory Commission, 888
abuse or reciprocal dealing standards for Corporation; Notice of Institution of First Street, NE., Washington, DC 20426,
the grant of market-based rate authority. Proceeding and Refund Effective Date in accordance with Rules 211 and 214
Entergy Services, Inc., 111 FERC
May 12, 2005. of the Commission’s Rules of Practice
¶ 61,145 (2005). and Procedure. 18 CFR 385.211, 385.214
The refund effective date in Docket On May 5, 2005, the Commission (2004).
No. EL05–105–000, established issued an order that instituted a Notice is hereby given that the
pursuant to section 206(b) of the FPA, proceeding in Docket No. EL05–99–000, deadline for filing motions to intervene
will be 60 days from the date of pursuant to section 206 of the Federal or protest is June 10, 2005.
Power Act (FPA), 16 U.S.C. 824e, to Absent a request to be heard in
publication of this notice in the Federal
determine whether LG&E Energy opposition by the deadline above, Major
Register.
Marketing Inc., Louisville Gas & Electric Lending is authorized to issue securities
Magalie R. Salas, Company, Kentucky Utilities Company, and assume obligations or liabilities as
Secretary. WKE Station Two Inc., and Western a guarantor, indorser, surety, or
[FR Doc. E5–2535 Filed 5–19–05; 8:45 am] Kentucky Energy Corporation (LG&E otherwise in respect of any security of
Parties) may continue to charge market- another person; provided that such
BILLING CODE 6717–01–P
based rates pursuant to the provisions of issuance or assumption is for some
section 206. LG&E Energy Marketing lawful object within the corporate
Inc., et al., 111 FERC ¶ 61,153 (2005). purposes of Major Lending, compatible
The refund effective date in Docket with the public interest, and is
No. EL05–99–000, established pursuant reasonably necessary or appropriate for
to section 206(b) of the FPA, will be 60 such purposes.

VerDate jul<14>2003 20:07 May 19, 2005 Jkt 205001 PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 E:\FR\FM\20MYN1.SGM 20MYN1
29296 Federal Register / Vol. 70, No. 97 / Friday, May 20, 2005 / Notices

The Commission reserves the right to On May 9, 2005, the Commission copy of that document on the Applicant.
require a further showing that neither issued another notice to establish a Anyone filing an intervention or protest
public nor private interests will be common comment due date for further on or before the intervention or protest
adversely affected by continued filings that had been submitted that date need not serve motions to intervene
approval of Major Lending’s issuances relate to the March 31, 2005 filing by the or protests on persons other than the
of securities or assumptions of liability. Midwest ISO Applicants. Applicant.
Copies of the full text of the Director’s Subsequently, Midwest ISO
Applicants’ anticipated filing to The Commission encourages
Order are available from the
Commission’s Public Reference Room, incorporate lost revenue information electronic submission of protests and
888 First Street, NE., Washington, DC that was submitted by the PJM interventions in lieu of paper using the
20426. The Order may also be viewed transmission owners, was submitted on ‘‘eFiling’’ link at http://www.ferc.gov.
on the Commission’s Web site at May 4, 2005, as amended on May 5, Persons unable to file electronically
http://www.ferc.gov, using the eLibrary 2005. A notice for this filing was issued should submit an original and 14 copies
link. Enter the docket number excluding on May 12, 2005, with a comment due of the protest or intervention to the
the last three digits in the docket date of May 26, 2005. Federal Energy Regulatory Commission,
number filed to access the document. Accordingly, in order to ensure 888 First Street, NE., Washington, DC
Comments, protests, and interventions consistent comment deadlines on these 20426.
may be filed electronically via the related filings, notice is hereby given This filing is accessible on-line at
internet in lieu of paper. See, 18 CFR that the due date for comments on the http://www.ferc.gov, using the
385.2001(a)(1)(iii) and the instructions filings submitted in the above captioned ‘‘eLibrary’’ link and is available for
on the Commission’s Web site under the dockets is extended to and including review in the Commission’s Public
‘‘e-Filing’’ link. The Commission May 26, 2005. Reference Room in Washington, DC.
strongly encourages electronic filings. Magalie R. Salas, There is an ‘‘eSubscription’’ link on the
Magalie R. Salas, Secretary. web site that enables subscribers to
Secretary. [FR Doc. E5–2545 Filed 5–19–05; 8:45 am] receive e-mail notification when a
[FR Doc. E5–2540 Filed 5–19–05; 8:45 am] BILLING CODE 6717–01–P document is added to a subscribed
BILLING CODE 6717–01–P docket(s). For assistance with any FERC
Online service, please e-mail
DEPARTMENT OF ENERGY FERCOnlineSupport@ferc.gov, or call
DEPARTMENT OF ENERGY (866) 208–3676 (toll free). For TTY, call
Federal Energy Regulatory (202) 502–8659.
Federal Energy Regulatory Commission
Commission Intervention and Comment Date: 5
[Docket No. RP05–339–000] p.m. eastern time on May 19, 2005.
[Docket Nos. ER05–6–017, –018, –019, –020,
–021, –022; EL04–135–019, –020, –021,
North Baja Pipeline, LLC; Notice of Magalie R. Salas,
–022, –023, –024; EL02–111–037, –038, Limited Case-Specific Waiver Secretary.
–039, –040, –041, –042; EL03–212–033, May 13, 2005. [FR Doc. E5–2552 Filed 5–19–05; 8:45 am]
–034, –035, –036, –037, –038]
Take notice that on May 10, 2005, BILLING CODE 6717–01–P

Midwest Independent Transmission North Baja Pipeline, LLC (NBP), Sempra


System Operator, Inc.; Midwest Energy LNG Marketing Corp. (Sempra
Marketing) and Termoelectrica de DEPARTMENT OF ENERGY
Independent Transmission System
Operator, Inc. and PJM Mexicali, S. de R.L. de C.V. (TDM)
tendered for filing a joint petition for Federal Energy Regulatory
Interconnection, LLC, et al.; Midwest
limited case-specific waiver. Commission
Independent Transmission System
Operator, Inc. and PJM NBP, TDM and Sempra Marketing are
Interconnection, LLC, et al.; Ameren requesting a limited case-specific waiver [Docket No. EL05–95–000]
Services Company, et al.; Notice of the Commission’s capacity release
Establishing Common Comment Date regulations in order to allow an PacificCorp and PPM Energy, Inc.;
assignment of TDM’s firm capacity and Notice of Institution of Proceeding and
May 13, 2005. its negotiated rate contract to Sempra Refund Effective Date
On April 19, 2005, the Commission Marketing.
issued a Notice of Extension of Time Any person desiring to intervene or to May 12, 2005.
establishing a common due date to file protest this filing must file in On May 9, 2005, the Commission
comments on the March 31, 2005, filing accordance with Rules 211 and 214 of issued an order that instituted a
by the Midwest Independent the Commission’s Rules of Practice and proceeding in Docket No. EL05–95–000,
Transmission System Operator, Inc. Procedure (18 CFR 385.211 and pursuant to section 206 of the Federal
(Midwest ISO) and the Midwest ISO 385.214). Protests will be considered by Power Act (FPA), 16 U.S.C. 824e, to
Transmission Owners (collectively, the Commission in determining the determine whether PacifiCorp and PPM
Midwest ISO Applicants). The comment appropriate action to be taken, but will Energy, Inc. may continue to charge
due date was extended to coincide with not serve to make protestants parties to market-based rates in the PacifiCorp
the comment date established for an the proceeding. Any person wishing to East and Idaho control areas. PacifiCorp
anticipated filing that was to be become a party must file a notice of and PPM Energy, Inc. 111 FERC
submitted by Midwest ISO Applicants intervention or motion to intervene, as
¶ 61,205 (2005).
to incorporate lost revenue information appropriate. Such notices, motions, or
that was to be filed by the PJM protests must be filed on or before the The refund effective date in Docket
Interconnection, L.L.C. (PJM) date as indicted below. Anyone filing an No. EL05–95–000, established pursuant
transmission owners. intervention or protest must serve a to section 206(b) of the FPA, will be 60

VerDate jul<14>2003 20:07 May 19, 2005 Jkt 205001 PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 E:\FR\FM\20MYN1.SGM 20MYN1

You might also like