November 2008
- Bi -
07-1118-0020
TABLE OF CONTENTS
SECTION
1.0
2.0
3.0
4.0
PAGE
INTRODUCTION......................................................................................... 1
WATER LEVEL MONITORING DURING DRILLING ................................. 1
HYDRAULIC CONDUCTIVITY TESTING .................................................. 1
GRAPHICAL PRESENTATION OF PACKER TEST RESULTS................ 2
LIST OF TABLES
Table B1
LIST OF FIGURES
Scatter plots of Hydraulic Conductivity Test Results by location, drillhole and formation, vs.
elevation or depth below ground surface.
Golder Associates
November 2008
1.0
- B1 -
07-1118-0020
INTRODUCTION
The following text outlines the water level hydraulic and conductivity testing monitoring
performed during the geotechnical program at FDN.
2.0
3.0
Hydraulic conductivity testing in the form of packer testing was routinely performed during the
advancement of the thirteen geotechnical boreholes. Over sixty packer tests were carried out.
Interval lengths were initially shorter (30m to 45m). However, due to the relatively low
permeability of the formations, the interval length was increased in tight rock (70m intervals).
Approximately 57 tests were conducted.
Test intervals were exposed by raising the drill rods off hole bottom to expose the interval. The
packer system consisted of a two-packer arrangement, lowered using the drill rig wire line. One
packer sits immediately above the drill bit, in the rods. The lower packer sits immediately below
the drill bit, within the rock interval. The top of the test interval is considered the bottom of the
lower packer (when inflated). The bottom of the test interval is considered the bottom of hole.
Packers were inflated using compressed nitrogen gas.
Golder Associates
November 2008
- B2 -
07-1118-0020
The hydraulic conductivity test procedure typically followed the falling head procedure. Once
packers were properly seated and inflated, a hydraulic head was applied to the rock mass via a
column of water through the drill rods. A data logger device within the water column,
occasionally supplemented by a data logger device within the test interval, would record the drop
in head within the water column over time. Rising head, stepped pressure constant head, single
pressure injection, or pressure pulse tests were also carried out, at the discretion of the field
engineer, based on the in-situ character of the rock.
The test data was then reduced in the field using one or more of the following (Hvorslev 1951),
the commercial available code Aqtesolve, or the Golder-in house developed software
FLOWDIM, used to carry out second derivative analysis. Results were compared where one or
more analytical solution was used, and highlighted on Table B1.
4.0
Following Table B1 are graphical presentations of the Packer Test results, with purpose to present
the information by location, rock types exposed in the test interval and by drillhole vs. depth. The
scatter plots typically indicate that FDN rocks are low permeability (geometric mean 10-8m/s),
with highest hydraulic conductivities near-surface and decreasing hydraulic conductivity with
depth below top of bedrock.
MR/cg/co
n:\active\2007\1118\07-1118-0020 aurelian-ecuador\phase 2200 conveyor and ramp investigation\reports\appendices\appendix b\01- 0711180020appb_draft.doc
Golder Associates
Golder
Name
Aurelian
Name
***Extrapolated
Value
Inclination
at Collar
Comment
on Test
Test #
G-07-1
G-07-2
G-07-3
G-07-4
G-07-5
GP-07-1
CP-07-148
CP-07-146
CP-07-156
CP-07-153
CP-07-159
CP-07-169
75
70
65
60
60
75
GP-07-2
CP-07-165
65
GP-07-3
CP-07-164
60
GM-07-01
CP-07-162
56
GM-07-03
CP-07-170
CP-07-176
54
50
GM-07-05
CP-07-177
CP-07-183
61
55
(mbgs)
(mbgs)
Tester
From
To
From
To
FC
69.40
125.00
67.04
120.74
Test Type
Test Date
mbgs
Open Hole
Interval
Slug
Pulse
Step Test
Constant
Rate
HOLLIN SANDSTONE
11.88
N/M
--
--
--
12-Aug-07
Hvorslev
Thiem /
Dupuit
Aqtesolve
FlowDim
1.4E-07
1.0E-07
9.0E-09
--
Comments
FC
117.36
196.47
113.36
189.78
FRUTA - ANDESITE
5.48
5.48
--
--
--
13-Aug-07
9.1E-09
6.5E-09
2.1E-08
--
FC
167.16
323.16
161.46
312.15
FRUTA - ANDESITE
--
--
--
15-Aug-07
2.5E-07
2.5E-08
4.0E-07
--
Step Test
FC
320.00
380.00
309.10
367.05
N/M
19.86
--
--
--
16-Aug-07
3.3E-07
2.5E-07
3.2E-07
Pulse Test
ML/MZ
419.00
479.00
404.72
462.68
MISHUALLI - ANDESITE
--
--
--
19-Aug-07
--
--
--
-6.3E-11
Pulse Test
ML/MZ
479.00
585.00
462.68
565.07
MISHUALLI - ANDESITE
--
--
--
22-Aug-07
--
--
--
7.5E-10
199.00
585.00
192.22
565.07
--
--
26-Aug-07
--
1.2E-09
155.78
238.46
146.39
224.08
FRUTA - ANDESITE
--
--
31-Jul-07
4.7E-07
--
--
Abandoned test
GB/LB
225.00
325.00
211.43
305.40
FRUTA - ANDESITE
--
--
--
-3.4E-07
--
--
--
ML/MZ
GB/LB
--
3-Aug-07
GB/LB
233.90
325.46
219.79
305.83
FRUTA - ANDESITE
58.36
75.71
--
--
3-Aug-07
4.7E-08
7.6E-08
--
--
Pumping Test
GB/LB
334.00
394.20
219.78
301.42
313.86
370.43
FRUTA - ANDESITE
34.00
39.34
--
--
3-Aug-07
4.3E-07
1.3E-07
2.6E-08
--
FC
233.88
320.76
--
--
4
5
--
--
--
5-Aug-07
1.0E-09
2.9E-09
--
--
FC
433.81
500.20
407.65
470.03
73.76
N/M
FRUTA - ANDESITE
SUAREZ - Conglo (5m Andesite at top)
75.58
N/M
--
--
--
8-Aug-07
2.0E-08
5.5E-08
--
--
PFR
133.70
208.50
121.17
188.97
75.80
--
--
--
10-Sep-07
4.5E-08
--
--
--
PFR
203.60
280.50
184.52
254.22
72.70
--
--
--
11-Sep-07
6.1E-09
--
--
--
PFR
275.20
368.80
249.42
334.25
108.70
--
--
--
13-Sep-07
9.1E-09
--
--
--
MZ/ML
77.00
160.00
69.79
145.01
SUAREZ
61.73
--
--
--
31-Aug-07
--
--
--
PFR/CH
157.70
211.70
136.57
183.34
SUAREZ
--
--
--
1-Sep-07
6.0E-08
--
--
--
--
xx
PFR/CH
206.40
250.70
178.75
217.11
SUAREZ
--
--
--
3-Sep-07
--
--
--
--
xx
1A
PFR/LB
94.80
109.70
82.10
95.00
80.80
--
--
--
17-Sep-07
1.6E-07
--
--
--
1B
PFR/LB
81.60
201.40
70.67
174.42
--
63.20
--
--
--
19-Sep-07
4.5E-08
--
--
--
PFR/LB
108.60
201.40
94.05
174.42
FRUTA (Andesite)
--
62.70
--
--
--
19-Sep-07
1.1E-07
--
--
--
PFR/CH
191.80
256.70
166.10
222.31
55.40
55.30
--
--
--
20-Sep-07
8.8E-10
--
--
--
N/M
56.90
81.69
61.88
ML/MZ
40.21
75.10
38.84
72.54
SUAREZ
16.71
41.28*
--
--
--
13./14.10.2007
2.2E-07
--
--
--
ML/MZ
40.21
75.10
38.84
72.54
SUAREZ
12.87
--
--
--
14-Oct-08
6.1E-07
--
--
--
ML/MZ
29.21
75.10
28.21
72.54
SUAREZ
11.00
15.39*
--
--
--
14./15.10.2009
1.2E-07
--
--
--
ML/MZ
38.36
76.15
34.77
69.02
HOLLIN - SUAREZ
23.78
--
--
--
5-Oct-07
7.5E-07
--
--
--
ML/MZ
77.96
100.75
70.66
91.31
SUAREZ
28.47
--
--
--
6-Oct-07
--
--
--
CH
38.50
71.70
29.49
54.93
SUAREZ
--
--
--
29-Sep-07
1.1E-06
1.3E-06
--
--
--
CH
70.20
103.20
53.78
79.06
SUAREZ
--
--
--
1-Oct-07
--
--
--
--
PFR/CH
47.10
109.40
39.05
90.70
SUAREZ
2.90
10.30
--
--
--
24-Sep-07
1.5E-09
--
--
--
CH
108.30
186.00
89.78
154.20
SUAREZ/SINTER
4.10
6.20
--
--
--
26-Sep-07
5.9E-09
--
--
---
CH
276.80
336.80
229.48
279.22
MISAHUALLI
4.20
--
--
--
--
1-Oct-07
--
--
--
CH
353.30
413.20
292.90
342.56
MISAHUALLI
36.80
--
--
--
--
3-Oct-07
--
--
--
--
PFR/CH
275.50
445.20
228.40
369.09
MISAHUALLI
55.30
66.70
--
--
--
4-Oct-07
4.6E-07
--
--
--
ML/MZ
443.46
514.20
367.65
426.29
MISAHUALLI
55.99
55.60
--
--
6-Oct-07
ML/MZ
21.30
100.50
17.23
81.31
0.88
1.00
--
--
16-Oct-07
2.2E-09
9.3E-07
-6.7E-07
-5.1E-07
--
Injection Test
--
--
1
2
Pump Test
ML/MZ
21.30
100.50
17.23
81.31
0.88
1.00
--
--
--
16-Oct-07
2.2E-07
8.4E-07
2.6E-04
--
--
Packer
Inflation
Pressure
(psi)
x not shown
Injection Test
ML
84.21
175.50
68.13
141.98
0.68
-0.58
--
--
--
18-Oct-07
9.7E-07
6.8E-07
9.4E-07
--
Injection Test
ML
173.71
250.12
140.53
202.35
SUAREZ/MISAHUALLI
Artesian
-0.63
--
--
--
21-Oct-07
5.2E-08
3.7E-08
4.2E-08
-4.9E-07
-4.1E-07
-2.3E-06
-8.4E-08
-2.2E-09
--
2.6E-07
--
720
--
--
--
950
Pulse Test
MZ
266.71
319.50
215.77
258.48
Artesian
-1.45
--
--
23-Oct-07
Injection Test
ML/KG
317.31
346.10
256.71
280.00
Artesian
-5.51
--
--
--
--
27-Oct-07
7A
GY/KG
382.50
441.30
309.45
357.02
MISAHUALLI
Artesian
-5.89
--
--
--
2-Nov-07
GY
461.50
568.30
373.36
459.76
MISAHUALLI
Artesian
-1.40
--
--
--
15-Nov-07
7.7E-07
GY
565.15
631.15
457.22
510.61
MISAHUALLI
-1.34
-1.73
--
--
--
18-Nov-07
3.9E-08
--
--
--
950
10
GY/PFR
626.70
709.50
507.01
574.00
MISAHUALLI
-3.74
-2.98
--
--
--
20-Nov-07
1.3E-07
--
--
950
Injection Test
GY/KG
104.36
163.15
79.94
124.98
SUAREZ (Conglomerate)
48.77
44.84
--
--
--
5-Nov-07
1.7E-06
-1.3E-06
345
GY/KG/PR
184.00
225.10
140.95
172.44
44.21**
44.21**
--
--
--
8-Nov-07
--
--
-4.7E-07
8.80E-07
--
500
GY/KG
191.00
270.80
146.31
207.44
44.21
44.21
--
--
--
9-Nov-07
--
--
5.4E-09
--
550
GY
267.40
353.20
204.84
270.57
41.25***
41.25***
--
--
--
20-Nov-07
550
GY
349.70
432.50
267.89
331.31
MISAHUALLI
39.65
39.88
--
--
23-Nov-07
-5.0E-07
--
Injection Test
-6.8E-07
2.4E-08
--
--
--
650
1.2E-07
8.4E-08
-1.8E-07
---
x not shown
725
8.3E-07
-5.0E-07
--
x not shown
550
Injection Test
GY
429.00
511.80
328.63
392.06
MISAHUALLI
35.19
35.39
--
--
--
25-Nov-07
GY
429.00
511.80
328.63
392.06
MISAHUALLI
35.19
35.39
--
--
--
25-Nov-07
Injection Test
GY
165.20
500.00
144.49
437.31
MISAHUALLI
Artesian
--
--
--
GY
165.20
500.00
144.49
437.31
MISAHUALLI
Artesian
--
--
--
PFR/LB
71.30
145.20
54.62
111.23
SUAREZ/FDN
52.70
52.70
--
--
--
PFR/LB
131.30
145.20
100.58
111.23
52.70
52.20
--
--
LB
143.70
190.20
110.08
145.70
50.80
50.50
--
--
--
--
--
--
6
GM-07-04
True Depth
Interval
GM-07-02
Downhole Depth
Interval
1.1E-07
-15.14
725
--
29-Nov-07
-4.5E-07
-5.9E-08
--
--
--
550
500
--
29-Nov-07
1.6E-06
--
--
--
500
--
30-Nov-07
1.1E-07
--
--
--
500
--
--
--
--
--
--
--
--
25-Nov-07
--
Where more than one test analysis method was carried out, the shaded result was selected for graphical presentation, based on engineering judgement.
07-1118-0020
1600
1500
1400
G-07-1
G-07-3
G-07-5
GP-07-2
GM-07-01
GM-07-03
GM-07-05
G-07-2
G-07-4
GP-07-1
GP-07-3
GM-07-02
GM-07-04
Depth (m bgs)
1300
1200
1100
1000
900
800
1.0E-09
1.0E-08
1.0E-07
Transmissivity (m2/s)
1.0E-06
1.0E-05
1600
1500
1400
G-07-1
G-07-3
G-07-5
GP-07-2
GM-07-01
GM-07-03
GM-07-05
G-07-2
G-07-4
GP-07-1
GP-07-3
GM-07-02
GM-07-04
Depth (m bgs)
1300
1200
1100
1000
900
800
1.0E-11
1.0E-10
1.0E-09
1.0E-08
Hydraulic Conductivity (m/s)
1.0E-07
1.0E-06
1.0E-05
1600
CP-07-169
CP-07-164
CP-07-165
1500
1400
Depth (m bgs)
1300
1200
1100
1000
900
800
1.0E-11
1.0E-10
1.0E-09
1.0E-08
Hydraulic Conductivity (m/s)
1.0E-07
1.0E-06
1.0E-05
1600
1500
CP-07-148
CP-07-156
CP-07-159
CP-07-146
CP-07-153
1400
Depth (m bgs)
1300
1200
1100
1000
900
800
1.0E-11
1.0E-10
1.0E-09
1.0E-08
Hydraulic Conductivity (m/s)
1.0E-07
1.0E-06
1.0E-05
1600
1500
CP-07-162
CP-07-176
CP-07-183
CP-07-170
CP-07-177
1400
Depth (m bgs)
1300
1200
1100
1000
900
800
1.00E-11
1.00E-10
1.00E-09
1.00E-08
Hydraulic Conductivity (m/s)
1.00E-07
1.00E-06
1.00E-05
1600
1500
Elevation (m asl)
1400
Suarez - Conglomerate
Hollin - Sandstone
Fruta - Andesite
Fruta - Suarez - Contact
Misahualli - Andesite
Suarez - Misahualli - West Fault
Fruta - Suarez - Misahualli
Hollin - Suarez
Suarez - FDN - Contact
1300
1200
1100
1000
900
800
1.00E-11
1.00E-10
1.00E-09
1.00E-08
Hydraulic Conductivity (m/s)
1.00E-07
1.00E-06
1.00E-05
100
Elevation (m asl)
200
Suarez - Conglomerate
Hollin - Sandstone
Fruta - Andesite
Fruta - Suarez - Contact
Misahualli - Andesite
Suarez - Misahualli - West Fault
Fruta - Suarez - Misahualli
Hollin - Suarez
Suarez - FDN - Contact
300
400
500
600
1.00E-11
700
1.00E-10
1.00E-09
1.00E-08
1.00E-07
1.00E-06
1.00E-05
1600
Hollin - Sandstone
1500
Hollin - Suarez
Elevation (m asl)
1400
1300
1200
1100
1000
900
800
1.00E-11
1.00E-10
1.00E-09
1.00E-08
Hydraulic Conductivity (m/s)
1.00E-07
1.00E-06
1.00E-05
1600
Suarez - Conglomerate
Fruta - Suarez - Contact
1500
Elevation (m asl)
1400
Hollin - Suarez
Suarez - FDN
1300
1200
1100
1000
900
800
1.00E-11
1.00E-10
1.00E-09
1.00E-08
Hydraulic Conductivity (m/s)
1.00E-07
1.00E-06
1.00E-05
1600
Fruta - Andesite
1500
Elevation (m asl)
1400
1300
1200
1100
1000
900
800
1.00E-11
1.00E-10
1.00E-09
1.00E-08
Hydraulic Conductivity (m/s)
1.00E-07
1.00E-06
1.00E-05
1600
Misahualli - Andesite
1500
Elevation (m asl)
1400
1300
1200
1100
1000
900
800
1.00E-11
1.00E-10
1.00E-09
1.00E-08
Hydraulic Conductivity (m/s)
1.00E-07
1.00E-06
1.00E-05
1600
1500
Suarez - Conglomerate
Hollin - Suarez
Elevation (m asl)
1400
1300
1200
1100
1000
900
800
1.00E-11
1.00E-10
1.00E-09
1.00E-08
Hydraulic Conductivity (m/s)
1.00E-07
1.00E-06
1.00E-05
1500
Hollin - Sandstone
Fruta - Andesite
Misahualli - Andesite
Elevation (m asl)
1400
1300
1200
1100
1000
900
800
1.00E-11
1.00E-10
1.00E-09
1.00E-08
Hydraulic Conductivity (m/s)
1.00E-07
1.00E-06
1.00E-05
1500
Suarez - Conglomerate
Fruta - Suarez - Contact
Misahualli - Andesite
Suarez - Misahualli - West Fault
Suarez - FDN - Contact
Elevation (m asl)
1400
1300
1200
1100
1000
900
800
1.00E-11
1.00E-10
1.00E-09
1.00E-08
Hydraulic Conductivity (m/s)
1.00E-07
1.00E-06
1.00E-05
1600
Suarez - Conglomerate
1500
Elevation (m asl)
1400
1300
1200
1100
1000
900
800
1.00E-11
1.00E-10
1.00E-09
1.00E-08
Hydraulic Conductivity (m/s)
1.00E-07
1.00E-06
1.00E-05
1600
Suarez - Conglomerate
Hollin - Suarez
1500
Elevation (m asl)
1400
1300
1200
1100
1000
900
800
1.00E-11
1.00E-10
1.00E-09
1.00E-08
Hydraulic Conductivity (m/s)
1.00E-07
1.00E-06
1.00E-05
1600
Suarez - Conglomerate
1500
Elevation (m asl)
1400
1300
1200
1100
1000
900
800
1.00E-11
1.00E-10
1.00E-09
1.00E-08
Hydraulic Conductivity (m/s)
1.00E-07
1.00E-06
1.00E-05
1600
Hollin - Sandstone
Fruta - Andesite
1500
Misahualli - Andesite
Fruta - Suarez - Misahualli
Elevation (m asl)
1400
1300
1200
1100
1000
900
800
1.00E-11
1.00E-10
1.00E-09
1.00E-08
Hydraulic Conductivity (m/s)
1.00E-07
1.00E-06
1.00E-05
1600
Suarez - Conglomerate
Fruta - Andesite
1500
Elevation (m asl)
1400
1300
1200
1100
1000
900
800
1.00E-11
1.00E-10
1.00E-09
1.00E-08
Hydraulic Conductivity (m/s)
1.00E-07
1.00E-06
1.00E-05
1600
Suarez - Conglomerate
1500
Hollin - Suarez
Elevation (m asl)
1400
1300
1200
1100
1000
900
800
1.00E-11
1.00E-10
1.00E-09
1.00E-08
Hydraulic Conductivity (m/s)
1.00E-07
1.00E-06
1.00E-05
1600
Suarez - Conglomerate
1500
Elevation (m asl)
1400
1300
1200
1100
1000
900
800
1.00E-11
1.00E-10
1.00E-09
1.00E-08
Hydraulic Conductivity (m/s)
1.00E-07
1.00E-06
1.00E-05
1600
Suarez - Conglomerate
1500
Fruta - Andesite
Elevation (m asl)
1400
1300
1200
1100
1000
900
800
1.00E-11
1.00E-10
1.00E-09
1.00E-08
Hydraulic Conductivity (m/s)
1.00E-07
1.00E-06
1.00E-05
1600
Suarez - Conglomerate
1500
Misahualli - Andesite
Elevation (m asl)
1400
1300
1200
1100
1000
900
800
1.00E-11
1.00E-10
1.00E-09
1.00E-08
Hydraulic Conductivity (m/s)
1.00E-07
1.00E-06
1.00E-05
1600
Suarez - Conglomerate
1500
Elevation (m asl)
1400
1300
1200
1100
1000
900
800
1.00E-11
1.00E-10
1.00E-09
1.00E-08
Hydraulic Conductivity (m/s)
1.00E-07
1.00E-06
1.00E-05
1600
Suarez - Conglomerate
1500
Misahualli - Andesite
Suarez - Misahualli - West Fault
Elevation (m asl)
1400
1300
1200
1100
1000
900
800
1.00E-11
1.00E-10
1.00E-09
1.00E-08
Hydraulic Conductivity (m/s)
1.00E-07
1.00E-06
1.00E-05
1600
Misahualli - Andesite
1500
Elevation (m asl)
1400
1300
1200
1100
1000
900
800
1.00E-11
1.00E-10
1.00E-09
1.00E-08
Hydraulic Conductivity (m/s)
1.00E-07
1.00E-06
1.00E-05
1600
Suarez - Conglomerate
1500
Elevation (m asl)
1400
1300
1200
1100
1000
900
800
1.00E-11
1.00E-10
1.00E-09
1.00E-08
Hydraulic Conductivity (m/s)
1.00E-07
1.00E-06
1.00E-05
APPENDIX B2
Hydraulic Conductivity Test Results
Ramp and Shaft-Conveyor Investigation
October 2008
- Bi -
07-1118-0020
TABLE OF CONTENTS
SECTION
1.0
2.0
3.0
4.0
PAGE
INTRODUCTION......................................................................................... 1
WATER LEVEL MONITORING DURING DRILLING ................................. 1
HYDRAULIC CONDUCTIVITY TESTING .................................................. 1
GRAPHICAL PRESENTATION OF PACKER TEST RESULTS................ 2
LIST OF TABLES
Table B2
LIST OF FIGURES
Scatter plots of Hydraulic Conductivity Test Results by location, drillhole and formation, vs.
elevation or depth below ground surface.
Golder Associates
August 2008
1.0
- B1 -
07-1118-0020
INTRODUCTION
The following text outlines the water level hydraulic and conductivity testing monitoring
performed during the geotechnical program for the ramp and conveyor at FDN carried out in
March and April 2008.
2.0
3.0
Hydraulic conductivity testing in the form of packer testing was routinely performed, once Golder
personnel arrived on-site, during the advancement of the two geotechnical boreholes. Eight
packer tests were carried out as part of the conveyor and ramp geotechnical investigation. Interval
lengths were initially shorter (30m to 50m). However, due to the relatively low permeability of
the formations, the interval length was increased in tight rock (60m to 80m intervals).
Test intervals were exposed by raising the drill rods off hole bottom to expose the interval. The
packer system consisted of a two-packer arrangement, lowered using the drill rig wire line. One
packer sits immediately above the drill bit, in the rods. The lower packer sits immediately below
the drill bit, within the rock interval. The top of the test interval is considered the bottom of the
lower packer (when inflated). The bottom of the test interval is considered the bottom of hole.
Packers were inflated using compressed nitrogen gas.
The hydraulic conductivity test procedure typically followed the falling head procedure. Once
packers were properly seated and inflated, a hydraulic head was applied to the rock mass via a
column of water through the drill rods. A data logger device within the water column,
occasionally supplemented by a data logger device within the test interval, would record the drop
in head within the water column over time. Rising head, stepped pressure constant head, single
Golder Associates
August 2008
- B2 -
07-1118-0020
pressure injection, or pressure pulse tests were also carried out, at the discretion of the field
engineer, based on the in-situ character of the rock.
The test data was then reduced in the field using the Hvorslev 1951 method, and the results are
presented on Table B2.
4.0
Following Table B2 are graphical presentations of the Packer Test results, with purpose to present
the information by location, rock types exposed in the test interval and by drillhole vs. depth. The
scatter plots typically indicate that Batholith and shaft alignment rocks are low permeability
(geometric mean 10-8m/s), with highest hydraulic conductivities near-surface and decreasing
hydraulic conductivity with depth below top of bedrock.
MR/cg/co
n:\active\2007\1118\07-1118-0020 aurelian-ecuador\phase 2200 conveyor and ramp investigation\reports\appendices\appendix b\02- 0711180020appb2_draft.doc
Golder Associates
Golder
Name
**Assumed
Value
Aurelian
Name
***Extrapolated
Value
Inclination
at Collar
Test #
1
GS-08-01
GBC-08-01
CP-08-222
CP-08-228
76.5
58.8
Comment
on Test
Downhole Depth
Interval
Tester
KG/AH
True Depth
Interval
(mbgs)
(mbgs)
From
To
From
To
212.00
281.80
206.14
274.01
Test Type
Test Date
mbgs
Open Hole
Interval
Slug
Pulse
Step Test
Constant
Rate
Conglomerate (Suarez)
21.16*
15.04***
--
--
--
28-Mar-08
Hvorslev
Thiem /
Dupuit
Aqtesolve
FlowDim
5.1E-08
--
--
--
KG/AH
271.70
321.50
264.19
312.62
Andesite (Mihuahalli)
18.78***
15.66
--
--
--
29-Mar-08
1.0E-08
--
--
--
KG/AH
321.05
403.85
312.18
392.69
Andesite (Mihuahalli)
8.59***
6.6E+00
--
--
--
30-Apr-08
6.0E-09
--
--
--
KG/AH
212.00
513.65
206.14
499.46
Andesite (Mihuahalli)
11.14
N/A
--
--
--
1-Apr-08
4.9E-09
--
--
236.25
550.25
229.72
535.05
Andesite (Mihuahalli)
20.80
26.40***
--
--
2-Apr-08
5.1E-09
---
32.20
67.15
27.54
57.44
Laterite/Saprock/Corestones
33.37***
25.73***
--
--
8-Apr-08
7.3E-08
--
--
KG
63.85
140.65
54.62
120.31
Batholith
33.67
30.51*
--
---
---
--
--
KG/AH
KG
--
11-Apr-08
--
--
--
CP/CH
141.55
200.35
121.08
171.37
Batholith
34.82
30.04
--
--
--
19-Apr-08
7.8E-09
7.6E-08
--
--
--
CP/CH
279.05
352.85
199.52
283.81
Batholith
0.08
1.83
--
--
279.05
353.85
252.91
320.70
Batholith
3.75
4.07
---
--
CP/CH
---
--
---
19-Apr-08
21-Apr-08
4.0E-07
--
--
--
CP/CH
225.05
353.85
203.96
320.70
Batholith
6.68
6.72
--
--
--
21-Apr-08
1.3E-07
--
--
--
March 2008
Table B2 PACKER TEST RESULTS MAIN TABLE 14.12.07.xls
Comments
Packer
Inflation
Pressure
(psi)
07-1118-0020
1600
GS-08-01
1500
GBC-08-01
1400
Depth (m bgs)
1300
1200
1100
1000
900
800
1.0E-07
1.0E-06
1.0E-05
Transmissivity (m2/s)
1.0E-04
1600
GS-08-01
1500
GBC-08-01
1400
Depth (m bgs)
1300
1200
1100
1000
900
800
1.0E-10
1.0E-09
1.0E-08
Hydraulic Conductivity (m/s)
1.0E-07
1.0E-06
1600
GS-08-01 or CP08-222
1500
Ground Surface
Saprolite and weathered rock
1400
Fruta Andesite - no data, drilling carried out before Golder team on-site
1300
Suarez Conglomerate
1200
1100
1000
Mishahuahalli Andesite
900
800
1.0E-11
1.0E-10
1.0E-09
1.0E-08
Hydraulic Conductivity (m/s)
1.0E-07
1.0E-06
1.0E-05