You are on page 1of 2

Federal Register / Vol. 70, No.

91 / Thursday, May 12, 2005 / Notices 25041

DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY k. Description of Application: The


Applicants jointly and severally seek
Federal Energy Regulatory Federal Energy Regulatory Commission approval to transfer the
Commission Commission license for the De Pere Hydroelectric
Project from International Paper
Notice of Application for Transfer of Company to Thilmany, LLC.
[Project No. 7264–010–WI] License and Soliciting Comments, l. Location of Application: A copy of
Motions To Intervene, and Protests the application is available for
Fox Paper Company and N.E.W. Hydro,
Inc.; Notice of Availability of May 5, 2005. inspection and reproduction at the
Environmental Assessment Take notice that the following Commission in the Public Reference
hydroelectric application has been filed Room, located at 888 First Street, NE.,
May 5, 2005. with the Commission and is available Room 2A, Washington, DC 20426, or by
for public inspection: calling (202) 502–8371. This filing may
In accordance with the National
a. Application Type: Transfer of also be viewed on the Commission’s
Environmental Policy Act of 1969, as Web site at http://www.ferc.gov using
amended, and Federal Energy license.
b. Project No.: 4914–012. the ‘‘eLibrary’’ link. Enter the docket
Regulatory Commission’s regulations, number excluding the last three digits in
c. Date Filed: April 29, 2005.
18 CFR part 380 (Order No. 486, 52 FR d. Applicants: International Paper the docket number field to access the
47879), the Office of Energy Projects has Company (Transferor) and Thilmany, document. For assistance, call toll-free
reviewed the application for a LLC (Transferee). 1–866–208–3676 or e-mail
subsequent license for the Middle e. Name of Project: De Pere FERCOnlineSupport@ferc.gov. For TTY,
Appleton Dam Hydroelectric Project Hydroelectric. call (202) 502–8659. A copy is also
located on the Lower Fox River, in f. Location of Project: At the U.S. available for inspection and
Outagamie County, Wisconsin, and has Army Corps of Engineers’ De Pere Dam reproduction at the addresses in item h.
prepared an Environmental Assessment on the Fox River in Brown County, above.
(EA). The EA analyzes the potential Wisconsin. The project does not occupy m. Individuals desiring to be included
environmental effects of licensing the any United States lands. on the Commission’s mailing list should
project and concludes that issuing a g. Filed Pursuant to: Federal Power so indicate by writing to the Secretary
subsequent license for this project, with Act, 16 U.S.C. 791a–825r. of the Commission.
h. Applicants Contacts: John F. n. Comments, Protests, or Motions To
appropriate environmental measures,
Harrington and Glenn S. Benson, Intervene: Anyone may submit
would not constitute a major Federal
Fulbright & Jaworski L.L.P., 801 comments, a protest, or a motion to
action that would significantly affect the intervene in accordance with the
Pennsylvania Avenue, NW.,
quality of the human environment. requirements of Rules of Practice and
Washington, DC 20004, (202) 662–0200
A copy of the EA is on file with the (Transferor); William J. Madden, Jr., Procedure, 18 CFR 385.210, 385.211,
Commission and is available for public Winston & Strawn LLP, 1700 K Street, 385.214. In determining the appropriate
inspection. The EA may also be viewed NW., Washington, DC 20006 action to take, the Commission will
on the Commission’s Web site at (Transferee). consider all protests or other comments
http://www.ferc.gov using the i. FERC Contact: Regina Saizan, (202) filed, but only those who file a motion
‘‘eLibrary’’ link. Enter the docket 502–8765. to intervene in accordance with the
number excluding the last three digits in j. Deadline for filing comments and Commission’s Rules may become a
the docket number field to access the motions to intervene: May 25, 2005. party to the proceeding. Any comments,
document. For assistance, contact or All documents (original and eight protests, or motions to intervene must
FERCOnlineSupport@ferc.gov call toll- copies) should be filed with: Magalie R. be received on or before the specified
free at (866) 208–3676, or for TTY Salas, Secretary, Federal Energy comment date for the particular
Regulatory Commission, 888 First application.
contact (202) 502–8659. o. Filing and Service of Responsive
Street, NE., Washington, DC 20426.
Any comments should be filed within Comments, protests, and Documents: Any filings must bear in all
30 days from the date of this notice and interventions may be filed electronically capital letters the title ‘‘COMMENTS’’,
should be addressed to the Secretary, via the Internet in lieu of paper; see 18 ‘‘PROTEST’’, or ‘‘MOTION TO
Federal Energy Regulatory Commission, CFR 385.2001(a)(1)(iii) and the INTERVENE’’, as applicable, and the
888 First Street, NE., Room 1–A, instructions on the Commission’s Web Project Number of the particular
Washington, DC 20426. Please affix site under the ‘‘e-Filing’’ link. The application to which the filing refers.
‘‘Middle Appleton Dam Hydroelectric Commission strongly encourages Any of the above-named documents
Project No. 7264–010’’ on all comments. electronic filings. Please include the must be filed by providing the original
Comments may be filed electronically project number (P–4914) on any and eight copies to: The Secretary,
via Internet in lieu of paper. See 18 CFR comments or motions filed. Federal Energy Regulatory Commission,
385.2001(a)(1)(iii) and the instructions The Commission’s Rules of Practice 888 First Street, NE., Washington, DC
on the Commission’s Web site under the and Procedure require all intervenors 20426. A copy of any motion to
‘‘eFiling’’ link. For further information, filing a document with the Commission intervene must also be served upon each
to serve a copy of that document on representative of the Applicants
contact John Ramer at (202) 502–8969.
each person in the official service list specified in the particular application.
Magalie R. Salas, for the project. Further, if any intervenor p. Agency Comments: Federal, State,
Secretary. files comments or documents with the and local agencies are invited to file
[FR Doc. E5–2316 Filed 5–11–05; 8:45 am] Commission relating to the merits of an comments on the described application.
issue that may affect the responsibilities A copy of the application may be
BILLING CODE 6717–01–P
of a particular resource agency, they obtained by agencies directly from the
must also serve a copy of the documents Applicants. If an agency does not file
on that resource agency. comments within the time specified for

VerDate jul<14>2003 19:04 May 11, 2005 Jkt 205001 PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 E:\FR\FM\12MYN1.SGM 12MYN1
25042 Federal Register / Vol. 70, No. 91 / Thursday, May 12, 2005 / Notices

filing comments, it will be presumed to k. Deadline for filing comments or comments must also be sent to the
have no comments. One copy of an motions: June 6, 2005. Applicant’s representatives.
agency’s comments must also be sent to l. Locations of the application: A copy Magalie R. Salas,
the Applicants’ representatives. of the application is available for Secretary.
Magalie R. Salas, inspection and reproduction at the [FR Doc. E5–2334 Filed 5–11–05; 8:45 am]
Secretary. Commission’s Public Reference Room,
BILLING CODE 6717–01–P
[FR Doc. E5–2315 Filed 5–11–05; 8:45 am]
located at 888 First Street, NE., Room
2A, Washington, DC 20426 or may be
BILLING CODE 6717–01–P
viewed on the Commission’s Web site at DEPARTMENT OF ENERGY
http://www.ferc.gov using the
DEPARTMENT OF ENERGY ‘‘eLibrary’’ link. Enter the docket Federal Energy Regulatory
number excluding the last three digits in Commission
Federal Energy Regulatory the docket number field to access the
Commission document. For assistance, call toll-free Notice of Application Accepted for
1–866–208–3676 or e-mail Filing and Soliciting Comments,
Notice of Application Accepted for FERCOnlineSupport@ferc.gov. For TTY, Protests, and Motions To Intervene
Filing and Soliciting Comments, call (202) 502–8659. A copy is also
Motions To Intervene, and Protests May 6, 2005.
available for inspection and
reproduction at the address in item ‘‘h’’ Take notice that the following
May 4, 2005.
above. hydroelectric application has been filed
Take notice that the following with the Commission and is available
hydroelectric application has been filed m. Filing and Service of Responsive for public inspection:
with the Commission and is available Documents: Any filings must bear in all a. Type of Application: Preliminary
for public inspection: capital letters the title ‘‘COMMENTS’’, permit.
a. Type of Application: New water ‘‘RECOMMENDATIONS FOR TERMS b. Project No.: 12571–000.
withdrawal from licensed project AND CONDITIONS’’, ‘‘PROTEST’’, or c. Date Filed: January 24, 2005.
waters. ‘‘MOTION TO INTERVENE’’, as d. Applicant: NatEl America
b. Project No.: 2232–487. applicable, and the project number (P– Hydropower Company.
c. Date Filed: April 6, 2005. 2232–457) to which the filing refers. All e. Name and Location of Project: The
d. Applicant: Duke Power Company. documents (original and eight copies) proposed Mississippi River L&D No. 25
e. Name of Project: Catawba-Wateree. should be filed with: The Secretary, Hydroelectric Project would be located
f. Location: The Catawba-Wateree Federal Energy Regulatory Commission, in Lincoln County in Missouri and
Project is located in Alexander, Burke, 888 First Street, NE., Washington, DC Calhoun County in Illinois and would
Caldwell, Catawba, Gaston, Iredell, 20426. A copy of any motion to use the U.S. Army Corps of Engineers
Lincoln, McDowell and Mecklenburg intervene must also be served upon each Lock and Dam No. 25.
Counties, North Carolina and Chester, representative of the Applicant f. Filed Pursuant to: Federal Power
Fairfield, Kershaw, Lancaster, and York specified in the particular application. Act, 16 U.S.C. 791(a)–825(r).
Counties, South Carolina. This project Comments, protests, and interventions g. Applicant Contact: Mr. Daniel J.
does not occupy any federal lands. may be filed electronically via the Schneider, NatEl America, 3298 FM
g. Filed Pursuant to: Federal Power internet in lieu of paper. See 18 CFR 407, Justin, TX 76247, (817) 488–7436.
Act, 16 U.S.C. 791a–825r. 385.2001(a)(1)(iii) and the instructions h. FERC Contact: Tom Papsidero,
h. Applicant Contact: Mr. Joe Hall, on the Commission’s Web site under the (202) 502–6002.
Lake Management Representative, Duke ‘‘e-Filing’’ link. The Commission i. Deadline for Filing Comments,
Power, Division of Duke Energy Corp., strongly encourages e-filings. Protests, and Motions to Intervene: 60
P.O. Box 1006, Charlotte, North Carolina days from the issuance date of this
28201–1006, (704) 382–8576. Anyone may submit responses in notice.
i. FERC Contact: Any questions accordance with the requirements of All documents (original and eight
regarding this notice should be Rules of Practice and Procedure, 18 CFR copies) should be filed with Magalie R.
addressed to Blake Condo at (202) 502– 385.210, .211, .214. In determining the Salas, Secretary, Federal Energy
8914. appropriate action to take, the Regulatory Commission, 888 First
j. Description of Request: Duke Power Commission will consider all protests or Street, NE., Washington, DC 20426.
proposes to grant a new water withdraw other comments filed, but only those Comments, protests and interventions
easement to the Town of Mooresville, who file a motion to intervene in may be filed electronically via the
North Carolina for project property accordance with the Commission’s Internet in lieu of paper; see 18 CFR
within Lake Norman. The easement will Rules may become a party to the 385.2001(a)(1)(iii) and the instructions
provide for the placement of new intake proceeding. Any responses must be on the Commission’s Web site under the
screens and new water intake pipes, received on or before the specified ‘‘e-Filing’’ link. The Commission
allowing the Town of Mooresville to comment date for the particular strongly encourages electronic filings.
withdraw water using a new raw water application. Please include the project number (P–
intake pump station. The proposed n. Agency Comments: Federal, State, 12571–000) on any comments or
water intake and pump station would be and local agencies are invited to file motions filed.
located adjacent to the existing raw comments on the described The Commission’s Rules of Practice
water intake and existing pump station. applications. A copy of the applications and Procedure require all intervenors
Mooresville has requested that the new may be obtained by agencies directly filing documents with the Commission
facility have an initial capacity of 12 from the Applicant. If an agency does to serve a copy of that document on
million gallons per day (MGD). The not file comments within the time each person in the official service list
water intake and pump facility will be specified for filing comments, that for the project. Further, if an intervenor
located in Iredell County, North agency will be presumed to have no files comments or documents with the
Carolina. comments. One copy of an agency’s Commission relating to the merits of an

VerDate jul<14>2003 19:04 May 11, 2005 Jkt 205001 PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 E:\FR\FM\12MYN1.SGM 12MYN1

You might also like