24556 Federal Register / Vol. 70, No.

89 / Tuesday, May 10, 2005 / Notices

confidential version and a non- channels landward of Spectacle Island the Mystic River Channel upstream of
confidential summary. is needed to remove shoals and restore the Moran Terminal, from the current
the navigation channels to their ¥35 foot depths to ¥40 feet will also
D. Michael Hutchinson,
authorized depths. Ships are currently be examined, as will deepening the
Acting Chairman, Committee for the experiencing tidal delays and potential Chelsea River Channel from the current
Implementation of Textile Agreements.
damage from grounding. Material ¥38 foot depth ¥40 feet.
[FR Doc. 05–9325 Filed 5–9–05; 8:45 am] dredged from the federal channels will Maintenance dredging of the federal
BILLING CODE 3510–DS either be disposed at the Massachusetts Main Ship channel seaward of Spectacle
Bay Disposal Site (if the material is Island, the President Roads anchorage
suitable for ocean disposal) or, if the area, and the Broad Sound North
DEPARTMENT OF DEFENSE material is not suitable for ocean Channel is scheduled to be completed
disposal, in confined aquatic disposal by May 2005. Material dredged from
Department of the Army (CAD) cell(s). Major navigation channel these channels was determined to be
improvements (depending) were made suitable for ocean water disposal and
Availability of Non-Exclusive,
in 1999 through 2001 in the Reserved was disposal at the U.S. Environmental
Exclusive License or Partially
Channel, the Mystic River, Inner Protection Agency designated dredged
Exclusive Licensing of U.S. Patent
Confluence and the Chelsa River. A material Massachusetts Bay Disposal
Concerning Electrospun Fibers and an
final EIS was prepared for this previous Site.
Apparatus Therefor Alternatives: The no action alternative
navigation improvement project in June
AGENCY: Department of the Army, DoD. of 1995 in which the use of CAD cells will be investigated. Material unsuitable
ACTION: Notice. in the Mystic River, Inner Confluence, for ocean disposal would most likely be
and Chelsea River were investigated. disposed within confined aquatic
SUMMARY: In accordance with 37 CFR CAD cells not used during the disposal (CAD) cells within the federal
part 404.6, announcement is made of construction of the previous navigation navigation channels above the Ted
the availability for licensing of U.S. improvement project will be Williams Tunnel. The draft and final
Patent No. US 6,860,156 B1 entitled investigated for acceptability during the EIS for the previous Boston Harbor
‘‘Electrospun Fibers and an Apparatus preparation of this SEIS. navigation improvement project
Therefor’’ issued June 22, 2004. This ADDRESSES: If you wish to be placed on investigated other alternative disposal
patent has been assigned to the United the mailing list for this project, or have sites for the disposal of dredged
States Government as represented by the questions about the proposed action and material. Material suitable for ocean
Secretary of the Navy. the DSEIS, please contact Ms. Catherine disposal would likely be disposed at the
FOR FURTHER INFORMATION CONTACT: Mr. Rogers, Ecologist, U.S. Army Corps of Massachusetts Bay Disposal Site. A draft
Robert Rosenkrans at U.S. Army Soldier Engineers, New England District, SEIS is expected to be completed by
Systems Center, Kansas Street, Natick, Evaluation Branch, 696 Virginia Road, October 2005.
MA 01760, Phone: (508) 233–4928 or E- Concord, MA 01742. Dated: April 25, 2005.
mail: FOR FURTHER INFORMATION CONTACT: Ms. Thomas L. Koning,
Robert.Rosenkrans@nantick.army.mil. Catherine Rogers, (978) 318–8231. Colonel, Corps of Engineers, New England
SUPPLEMENTARY INFORMATION: Any SUPPLEMENTARY INFORMATION: The U.S. District.
licenses granted shall comply with 35 Army Corps of Engineers is authorized [FR Doc. 05–9316 Filed 5–9–05; 8:45 am]
U.S.C. 209 and 37 CFR part 404. by the various Rivers and Harbor Acts BILLING CODE 3710–24–M
and Water Resources Development Acts
Brenda S. Bowen, to conduct maintenance dredging of the
Army Federal Register Liaison Officer. federal navigation channels and DEPARTMENT OF DEFENSE
[FR Doc. 05–9311 Filed 5–9–05; 8:45 am] anchorage areas in Boston Harbor.
BILLING CODE 3710–08–M In addition to maintenance dredging Department of the Navy
of the inner harbor, a feasibility study is
currently underway to investigate Notice of Availability of Government-
DEPARTMENT OF DEFENSE deepening of the main shipping Owned Inventions; Available for
channels in the port of Boston seaward Licensing
Department of the Army; Corps of of the Ted Williams Tunnel to a depth AGENCY: Department of the Navy, DoD.
Engineers greater than the currently authorized ACTION: Notice.
depths. This feasibility study, which
Intent to Prepare a Draft Supplemental SUMMARY: The inventions listed below
will also include the preparation of a
Environmental Impact Statement for are assigned to the United States
Supplemental EIS to the 1995 Record of
the Boston Harbor Inner Harbor Government, as represented by the
Decision for the navigation
Maintenance Dredging Project Secretary of the Navy and are available
improvement project, will examine the
AGENCY: Department of the Army, U.S. engineering feasibility, economic for licensing by the Department of the
Army Corps of Engineers, DOD. justification, social and cultural Navy. U.S. Patent No. 6,879,011 entitled
ACTION: Notice of intent. resource impacts, and environmental ‘‘Magnetically Shielded Circuit Board’’
acceptability of the proposed channel and U.S. Patent Application No. 11/
SUMMARY: The U.S. Army Corps of deepening. The existing ¥40 foot 108,150 entitled ‘‘Method for Field
Engineers, New England District is MLLW main harbor entrance channel Calibrating an Ion Spectrometer’’.
preparing a Supplemental from Broad Sound, through President ADDRESSES: Requests for copies of the
Environmental Impact Statement (SEIS) Roads, and up to the Marine Terminal inventions cited should be directed to
to maintenance dredge the federal just seaward of the Ted Williams the Naval Surface Warfare Center, Crane
navigation channels landward of Tunnel will be examined for depths up Div., Code 054, Bldg 1, 300 HWY 361,
Spectacle Island in Boston Harbor, MA. to ¥50 feet MLLW, as will the Reserved Crane, IN 47522–5001 and must include
Maintenance dredging of the navigation Channel. Deepening of a small area of the patent number.

VerDate jul<14>2003 17:09 May 09, 2005 Jkt 205001 PO 00000 Frm 00059 Fmt 4703 Sfmt 4703 E:\FR\FM\10MYN1.SGM 10MYN1