You are on page 1of 2

21992

Notices Federal Register


Vol. 70, No. 81

Thursday, April 28, 2005

This section of the FEDERAL REGISTER DEPARTMENT OF AGRICULTURE in the event of a wildfire by reducing
contains documents other than rules or the fire hazard along the Main Boulder
proposed rules that are applicable to the Forest Service Road, and to reduce fuel loadings by
public. Notices of hearings and investigations, breaking up the vertical and horizontal
committee meetings, agency decisions and Main Boulder Fuels Reduction Project, fuel composition in the corridor,
rulings, delegations of authority, filing of Big Timber Ranger District, Gallatin
petitions and applications and agency
wherever possible.
National Forest, Park and Sweet Grass
statements of organization and functions are Counties, MT Proposed Action
examples of documents appearing in this
section. AGENCY: Forest Service, USDA. Stand density reduction, utilizing
ground based harvest equipment, would
ACTION:Notice of intent to prepare a
occur on approximately 1060 acres on
Supplemental Environmental Impact
DEPARTMENT OF AGRICULTURE slopes up to 35%. Approximately 1040
Statement.
acres on slopes >35% would be treated
Foreign Agricultural Service SUMMARY: The USDA, Forest Service is with other specialized methods or hand-
releasing a Supplemental treatments. A minimum of 15 to 20% of
Reestablishment of the Edward R. Environmental Impact Statement (SEIS) each unit would be left untreated to
Madigan United States Agricultural to further address the environmental provide diversity across the landscape.
Export Excellence Award Board of effects that the Main Boulder Fuels In addition to reducing surface fuel
Evaluators Reduction Project would have on the loading by commercial thinning and
northern goshawk. This is a hazardous salvage, small diameter fuel reduction,
AGENCY: Foreign Agricultural Service, fuels reduction project consisting of understory and/or pile burning would
USDA. approximately 2500 acres of overstory occur. Conifers would be slashed and
ACTION: Notice to reestablish board of and understory canopy thinning, prescribed burning would occur on
evaluators. prescribed burning, and aspen approximately 400 acres of meadow-
stimulation. type habitats. Aspen clones would have
conifers removed within a 100 foot
SUMMARY: Notice is hereby given that DATES: The Supplemental Draft radius to encourage aspen regeneration.
the Secretary of Agriculture intends to Environmental Impact Statement is A maximum of 7.4 miles of temporary
reestablish the Edward R. Madigan expected May of 2005 and the road may be constructed to access the
United States Agricultural Export Supplemental Final Environmental areas proposed for mechanical fuels
Excellence Award Board of Evaluators. Impact Statement and Record of treatment. No permanent roads would
The Secretary of Agriculture has Decision are expected August of 2005. be constructed.
determined that the Board is necessary ADDRESSES: Written correspondence
and in the public interest. should be sent to Bill Avey, District Alternatives
Ranger, Big Timber Ranger District, P.O. Alternatives that were considered in
FOR FURTHER INFORMATION CONTACT:
Box 1130, Big Timber, MT 59011–1130. detailed study include the No Action
Marketing Operations Staff, Foreign Copies of the Main Boulder Fuels
Agricultural Service, USDA, Room Alternative and the Proposed Action
Reduction SEIS will be available at the Alternative. Seven other alternatives
4932, 1400 Independence Ave., SW., Big Timber Ranger District Office, 225 were considered, but did not merit
Washington, DC 20250–10442, Big Timber Loop Road, Big Timber, MT detailed analysis or further
telephone: (202) 720–4327, fax: (202) and the Bozeman Ranger District Office, consideration in the process.
720–9361, E-mail: 3710 Fallon Street, Bozeman, MT.
mosdamin@fas.usda.gov. Electronic copies will also available on Responsible Official
the Internet at http://www.fs.fed.us/r1/ Rebecca Heath, Forest Supervisor,
SUPPLEMENTARY INFORMATION: The gallatin in the Projects and Plans area.
purpose of the Edward R. Madigan Gallatin National Forest, P.O. Box 130,
FOR FURTHER INFORMATION CONTACT: Bill 10 East Babcock, Bozeman, MT 59011.
United States Agricultural Export
Avey, District Ranger or Brent Foster, ID
Excellence Award Board of Evaluators is Nature of Decision To Be Made
Team Leader, Big Timber Ranger
to advise the Secretary of Agriculture on District at (406) 932–5155 or Barbara The scope of actions in the decision
the selection of recipients for the Ping, Co-ID Team Leader, Bozeman are limited to stand density reduction
Edward R. Madigan United States Ranger District at (406) 522–2558 (see and the reduction of downed fuel
Agricultural Export Excellence Award. ADDRESSES above). loadings on National Forest Land
Dated: April 15, 2005. SUPPLEMENTARY INFORMATION: including the thinning of large diameter
A. Ellen Terpstra, conifers, removal of insect or disease
Purpose and Need for Action damaged/killed conifers, cutting of
Administrator, Foreign Agricultural Service.
The purpose and need of the project small diameter conifers, slashing of
[FR Doc. 05–8480 Filed 4–27–05; 8:45 am]
is to provide for public and firefighter conifers encroaching into meadow or
BILLING CODE 3410–10–P
safety by minimizing the probability aspen stands, prescribed burning of
and effects of future fire starts in the meadow areas, underburning of some
wildland/urban interface of the Main treated stands, piling and removal or
Boulder River Corridor, to extend the burning of downed woody materials
potential time available for evacuation resulting from treatment actions.

VerDate jul<14>2003 16:00 Apr 27, 2005 Jkt 205001 PO 00000 Frm 00001 Fmt 4703 Sfmt 4703 E:\FR\FM\28APN1.SGM 28APN1
Federal Register / Vol. 70, No. 81 / Thursday, April 28, 2005 / Notices 21993

Scoping Process environmental review of the proposal so SUMMARY: The USDA, Forest Service,
Collaboration with the public has that it is meaningful and alerts an Los Padres National Forest, published a
been an important part of the project. agency to the reviewer’s position and Notice of Intent to conduct an analysis
The proposal was developed with input contentions. Vermont Yankee Nuclear and prepare an Environmental Impact
from adjacent private landowners,the Power Corp. v. NRDC, 435 U.S. 519, 553 Statement (EIS) for oil and gas leasing
local watershed association, and (1978). Also, environmental objections in the Federal Register on September
numerous state, county, and local that could be raised at the draft 15, 1995 (Volume 60, Number 179,
officals and groups. More than 20 environmental impact statement stage pages 47929–47930). A revised notice of
meetings have been held providing but that are not raised until after Intent is being issued because of the
information and updates pertaining to completion of the final environmental delay in filing the Final EIS. The
the project. Numerous field trips to the impact statement may be waived or original Notice of Intent of September
project area have been conducted dismissed by the courts. City of Angoon 15, 1995 stated that the Final EIS was
involving various individuals, agencies v. Hodel, 803 F.2d 1016, 1022 (9th Cir. scheduled to be completed by April of
and organizations. In December 2002, a 1986) and Wisconsin Heritages, Inc. v. 1997. The estimated date for completing
formal scoping letter was sent to Harris, 490 F. Supp. 1334, 1338 (E.D. the Final EIS is now June of 2005.
interested parties. The DEIS was Wis. 1980). Because of these court DATES: Scoping was conducted as
released for public comment in July of rulings, it is very important that those described in the September 15, 1995
2004 followed by a 45 day review and interested in this proposed action Notice of Intent. Scoping comments
comment period. In January of 2005 the participate by the close of the 45 day submitted during scoping for the
FEIS and ROD were released and a 45 comment period so that substantive proposed action are part of the project
day appeal filing period began. Three comments and objections are made record and were considered in the Draft
appeals were received and subsequently available to the Forest Service at a time EIS. The Draft EIS was distributed in
the decision was reversed to update and when it can meaningfully consider them December of 2001. Agency,
clarify the analysis to better address the and respond to them in the final organization, and public comment to the
impacts to northern goshawk. environmental impact statement. Draft EIS was accepted until April 19,
Preliminary Issues To assist the Forest Service in 2002. These comments are being
identifying and considering issues and considered during the completion of the
Key issues that were identified concerns on the proposed action, Final EIS. The final environmental
include the possible negative comments on the Supplemental Draft impact statement is expected in June of
environmental effects to water quality, Environmental Impact Statement should 2005.
fisheries, scenery, wildlife, recreation, be as specific as possible. It is also FOR FURTHER INFORMATION CONTACT: Al
and air quality. Key issues also included helpful if comments refer to specific Hess, Oil and Gas Resource Specialist,
the threat of fuel accumulation and the pages or chapters of the Draft Statement. Los Padres National Forest, 1190 E. Ojai
potential for increasing the risk of Comments may also address the Ave., Ojai, CA 93023, (805) 646–4348,
noxious weed spread. adequacy of the Supplemental Draft ext. 311. E-mail: ahess@fs.fed.us
Comment Requested Environmental Impact Statement or the SUPPLEMENTARY INFORMATION:
The Draft Supplemental EIS is merits of the alternatives formulated
and discussed in the statement. Purpose and Need for Action
expected to be filed with the
Environmental Protection Agency (EPA) Reviewers may wish to refer to the There is a need for identification of
and available for public review in May Council on Environmental Quality Los Padres National Forest lands were
2005. At that time EPA will publish a Regulations for implementing the oil and gas exploration, development,
Notice of Availability (NOA) of the Draft procedural provisions of the National and production would be appropriate.
Supplemental EIS in the Federal Environmental Policy Act at 40 CFR There is a need to respond to the Bureau
Register. The comment period on the 1503.3 in addressing these points. of Land Management on outstanding
Draft Supplemental EIS will be 45 days Comments received, including the requests (applications) for leasing. There
from the publication date of the NOA. names and addresses of those who is a need for information concerning the
A Supplemental Final Environmental comment, will be considered part of the potential environmental impacts of
Impact Statement and new Record of public record on this proposal and will existing leases.
Decision will then be prepared. be available for public inspection.
Proposed Action
Early Notice of the Importance of Dated: April 21, 2005.
The Forest Supervisor proposes to
Public Participation in Subsequent Rebecca Heath,
make additional areas of Los Padres
Environmental Review Forest Supervisor. National Forest lands available for oil
A Supplemental Draft Environmental [FR Doc. 05–8483 Filed 4–27–05; 8:45 am] and gas exploration, development, and
Impact Statement will be prepared for BILLING CODE 3410–11–P production by selecting among
comment. The comment period on the alternative leasing scenarios. These
Supplemental Draft Environmental scenarios vary in the amount of area
Impact Statement will be 45 days from DEPARTMENT OF AGRICULTURE available for leasing as well as the
the date the Environmental Protection conditions (stipulations) under which
Forest Service
Agency publishes the notice of the lands would be leased. The Forest
availability in the Federal Register. Los Padres National Forest; California; Supervisor will also determine what
The Forest Service believes, it is Oil and Gas Leasing Analysis specific lands will be offered for leasing.
important to give reviewers notice of The various leasing scenarios are
several court rulings related to public AGENCY: Forest Service, USDA. described in detail in Section 2.4.2 of
participation in the environmental the Draft EIS. The proposal will amend
ACTION: Revised notice of intent to
review process. First, reviewers of draft the Los Padres National Forest Land and
prepare an environmental impact
environmental impact statements must Resource Management Plan in
statement.
structure their participation in the accordance with regulations for oil and

VerDate jul<14>2003 16:00 Apr 27, 2005 Jkt 205001 PO 00000 Frm 00002 Fmt 4703 Sfmt 4703 E:\FR\FM\28APN1.SGM 28APN1

You might also like