You are on page 1of 2

17994 Federal Register / Vol. 70, No.

67 / Friday, April 8, 2005 / Notices

ENVIRONMENTAL PROTECTION Involving Removal of Trees, Improvements, Section of


AGENCY Prescribed Burning, Stem Injection of Independent Utility #7 , a 40-Mile
Selected Trees, Control Invasive Plant Portion of the I–70 Corridor from just
[ER–FRL–6662–3]
Species, Northeastern Research West of Route 19 (milepost 174) to
Environmental Impact Statements and Station, Parson, Tucker County, WV. Lake St. Louis Boulevard (milepost
Regulations; Availability of EPA Summary: EPA expressed 214) Montgomery, Warren, St. Charles
Comments environmental concerns regarding Counties, MO.
impacts to water quality and riparian Summary: While EPA has no
Availability of EPA comments resources and requested more specific objection to the proposed action, it did
prepared pursuant to the Environmental information on herbicide treatments, request clarification on wetlands issues.
Review Process (ERP), under section especially related to overstory trees to Rating LO.
309 of the Clean Air Act and section control invasive plants. The Final EIS
102(2)(c) of the National Environmental should address stream monitoring to Final EISs
Policy Act as amended. Requests for assess potential impacts that may result EIS No. 20050017, ERP No. F–NOA–
copies of EPA comments can be directed from the proposed actions as well as A91070–00, Atlantic Herring Fishery
to the Office of Federal Activities at how the public and wildlife will be Management Plan, Minimizing
202–564–7167. protected from prescribed fire Impacts on Essential Fish Habitat of
An explanation of the ratings assigned treatments. Rating EC2. Any Species, Gulf of Maine—Georges
to draft environmental impact EIS No. 20050047, ERP No. D–BIA– Bank, ME, NH, MA, CT and RI.
statements (EISs) was published in the C60005–NY, Stockbridge-Munsee Summary: EPA expressed a lack of
Federal Register dated April 1, 2005 (70 Casino Project, Proposes To Address objections to the DEIS due to the overall
FR 16815). the Tribe’s Economic Development, benefits of the proposed action. Based
Draft EISs Bands of Mohican Indians of on our review of the FEIS, we found that
Wisconsin (the Tribe), NPDES Permit our issues were addressed.
EIS No. 20040583, ERP No. D–BLM– and U.S. Army COE Section 404
J65433–WY, Rawlins Field Office EIS No. 20050027, ERP No. F–BLM–
Permit, Town of Thompson, Sullivan L65462–AK, Northeast National
Planning Area Resource Management County, NY.
Plan, Addresses the Comprehensive Petroleum Reserve Alaska Amended
Summary: EPA expressed concerns Integrated Activity Plan, To Amend
Analysis of Alternatives for the regarding indirect and cumulative
Planning and Management of Public 1998 Northeast Petroleum Reserve, To
impacts on new water and sewer lines, Consider Opening Portions of the
Land and Resource Administered by traffic and air quality of the five casinos
(BLM), Albany, Carbon, Laramie, and BLM-Administrated Lands, North
expected to be built in Sullivan County Slope Borough, AK.
Sweetwater Counties, WY. and the casino’s solid waste disposal.
Summary: EPA expressed Summary: EPA expressed
EPA requested that these issues be
environmental concerns regarding environmental objections given that the
evaluated in the Final EIS along with a
potential impacts to ecosystem selected alternative is likely to have
detailed wetlands mitigation and
processes, air quality, water quality, and more adverse impacts to surface
monitoring plan. Rating EC2.
wildlife habitat. EPA requests that the resources and subsistence communities.
EIS No. 20050074, ERP No. D–NAS– EPA recommends that BLM phase in
Final EIS disclose water quality impacts
E12007–FL, New Horizons Mission to leases in new, environmentally sensitive
to aquatic resources more clearly and
Pluto, Continued Preparations and areas only after experimental mitigation
quantitatively, specifically in grazing
Implementation to Explore Pluto and measures are proven effective for areas
allotments needing preservation of
Potentially the Recently Discovered currently available for leasing.
riparian habitat and water quality.
Kuiper Belt, Cape Canaveral Air Force EIS No. 20050045, ERP No. F–AFS–
Rating EC2.
Station, FL. K65307–AZ, Coconino, Kaibab, and
EIS No. 20050026, ERP No. D–BIA–
Summary: EPA has no objections Prescott National Forest, Integrated
F60007–WI, Beloit Casino Project, To
regarding this launch. Rating LO. Treatment of Noxious and Invasive
Expand the Tribal Governmental
Revenue Base, St. Croix Chippewa EIS No. 20050043, ERP No. DS–FHW– Weeds, Implementation, Coconino,
Indians of Wisconsin and Bad River J40166–UT, US 6 Highway Project, Mojave, and Yavapai Counties, AZ.
Band of the Lake Superior Tribe of Improvements from Interstate 15 (I– Summary: The Final EIS addressed
Chippewa Indians, Rock County, WI. 15) in Spanish Fork to Interstate (I– EPA’s concerns about impacts to
70) near Green River, New drinking water from herbicide
Summary: EPA expressed concerns
Information, Funding, Right-of-Way applications with the addition of
regarding the construction and
Permit and US Army COE Section 404 mitigation measures.
operation of the proposed casino project
Permit, Utah, Wasatch, Carbon, and EIS No. 20050057, ERP No. F–AFS–
and cumulative noise and air impacts
Emery Counties, UT. J65303–MT, Bridger Bowl Ski Area,
from the proposed I–90 highway
reconfiguration. EPA requested that Summary: EPA expressed concerns Permit Renewal and Master
these issues be evaluated in the Final due to impaired waters in the project Development Plan Update,
EIS along with mitigation for noise and area. Rating EC1. Implementation, Special Use Permit
light pollution from increased night EIS No. 20050002, ERP No. DS–NPS– and COE Section 404 Permit, Gallatin
time traffic, and evaluation of the use of L65264–WA, Elwha River Ecosystem National Forest, in the City of
native vegetation in landscaping for Restoration Implementation Project, Bozeman, MT.
energy and water conservation. Rating Update Information, Olympic Summary: EPA continues to express
EC2. Peninsula, Challam County, WA. environmental concerns regarding
EIS No. 20050032, ERP No. D–AFS– Summary: EPA has no objections to impacts to wildlife habitat.
D65049–WV, Fernow Experimental the proposed action. Rating LO. EIS No. 20050065, ERP No. F–AFS–
Forest, To Continue Long-Term EIS No. 20050007, ERP No. D2–FHW– J65389–MT, North Belts Travel Plan
Research and Initiate New Research, H40397–MO, Interstate 70 Corridor and the Dry Range Project, Provision

VerDate jul<14>2003 19:00 Apr 07, 2005 Jkt 205001 PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 E:\FR\FM\08APN1.SGM 08APN1
Federal Register / Vol. 70, No. 67 / Friday, April 8, 2005 / Notices 17995

of Motorized and Non-motorized Channel in Order to Enhance of Federal Register notice published
Recreation, Helena National Forest, Commercial Navigation on the on March 18, 2005: Correction to the
Broadwater, Lewis and Clark, and McCellan Kerr Arkansas River State from WI to MI.
Meagher Counties, MT. Navigation System (MKARNS), EIS No. 050136, Draft EIS, AFS, CO, Dry
Summary: EPA continues to have Several Counties, AR and Several Fork Federal Coal Lease-by-
environmental concerns regarding Counties, OK, Comment Period Ends: Application (COC–67232), Leasing
erosion, habitat damage and adverse May 24, 2005, Contact: Renee Wright Additional Federal Coal Lands for
impacts to wildlife security from (501) 324–6139. Underground Coal Resource, Special-
motorized uses as well as the need for EIS No. 050140, Final EIS, FHW, NV, Use-Permits and US Army COE
an effective monitoring and adaptive Boulder City/US 93 Corridor Section 404 Permit, Grand Mesa,
management program for travel Transportation Improvements, Study Uncompahgre and Gunnison National
management. Limits are between a western Forests, Gunnison County, CO,
boundary on US 95 in the City of Comment Period Ends: May 16, 2005,
EIS No. 20050070, ERP No. F–FHW–
Henderson and an eastern boundary Contact: Liane Mattson (970) 874–
G40177–LA, Kansas Lane Connector
on US 93 west of downtown Boulder 6697. Revision of Federal Register
Project, Construction between U.S. 90
City, NPDES and US Army COE notice published on April 1, 2005:
(Desiard Street) and U.S. 165 and the
Section 404 Permits Issuance and Correction to Telephone Number.
Forsythe Avenue Extension, US Army
Right-of Way Grant, Clark County, NV
COE Section 10 and 404 Permits Dated: April 5, 2005.
Wait Period Ends: May 9, 2005,
Issuance, City of Monroe, Quachita Ken Mittelholtz,
Contact: Ted P. Bendure (775) 687–
Parish, LA. Environmental Protection Specialist, Office
5322.
Summary: EPA has no objections to EIS No. 050141, Draft EIS, USA, FL, of Federal Activities.
the proposed project. Eglin Air Force Base and Hurlburt [FR Doc. 05–7041 Filed 4–7–05; 8:45 am]
EIS No. 20050009, ERP No. FS–NOA– Field Military Family Housing, BILLING CODE 6560–50–P
A91063–00, Monkfish Fishery Demolition, Construction, Renovation
Management Plan (FMP) Amendment and Leasing (DCR&L) Program,
2, Implementation, Proposes Okaloosa County, FL, Comment ENVIRONMENTAL PROTECTION
Measures to Address a Wide Range of Period Ends: May 23, 2005, Contact: AGENCY
Management Issues, New England and Julia Cantrell (210) 536–3515. [OPPT–2005–0012; FRL–7708–9]
Mid-Atlantic. EIS No. 050142, Draft EIS, NOA, CA,
Summary: EPA has no objection to the Programmatic—Montrose Settlements Endocrine Disruptor Methods
proposed action. Restoration Program (MSRP) Draft Validation Advisory Committee
EIS No. 20050040, ERP No. FS–AFS– Restoration Plan, To Restore Injured (EDMVAC); Notice of Public Meeting
J02027–UT, Table Top Exploraory Oil Natural Resources, Channel Islands,
Southern California Bight including AGENCY: Environmental Protection
and Gas Wells, New Information from Agency (EPA).
the Approval 1994 Final EIS, Baja California Pacific Islands, Orange
County, CA, Comment Period Ends: ACTION: Notice.
Wasatch-Cache National Forest,
Evanston Ranger District, Summit May 23, 2005, Contact: William T.
SUMMARY: There will be a meeting of the
County, UT. Hogarth (301) 713–1622.
EIS No. 050143, Draft EIS, FHW, LA, Endocrine Disruptor Methods
Summary: No formal comment letter Validation Advisory Committe
AR, I–69 Corridor—Section of
was sent to the preparing agency. (EDMVAC) on April 26–28, 2005, in
Independent Utility (SIU) No. 14,
Dated: April 5, 2005. Construction from Junction I–20 near Washington, DC. This meeting, as with
Ken Mittelholtz, Haughton, LA to US 82 near EI all EDMVAC meetings, is open to the
Environmental Protection Specialist, Office Dorado, AR, Bossier, Claiborne and public. Seating is on a first-come basis.
of Federal Activities. Webster Parishes, LA and Columbia The purpose of the meeting is to receive
[FR Doc. 05–7040 Filed 4–7–05; 8:45 am] and Union Counties, AR, Comment advice and input from the EDMVAC on:
Period Ends: May 30, 2005, Contact: Steroidogenesis, Uterotrophic, Fish
BILLING CODE 6560–50–P
William Farr (225) 757–7615. Screen Studies, and Amphibian
EIS No. 050144, Draft EIS, FHW, IN, Metamorphosis Assays.
ENVIRONMENTAL PROTECTION US–31 Kokomo Corridor Project, DATES: The meeting will be held on
AGENCY Transportation Improvement between Wednesday, April 26, 2005, from 12:30
IN–26 and US 35 Northern Junction, p.m. to 5:30 p.m.; Thursday, April 27,
[ER–FRL–6662–2] 2005, from 8:30 a.m. to 5:30 p.m.; and
City of Kokomo and Center Township,
Environmental Impact Statements; Howard and Tipton Counties, IN, Friday, April 28, 2005, from 8 a.m. to
Notice of Availability Comment Period Ends: May 23, 2005, 12:15 p.m., eastern standard time.
Contact: Matt Fuller (317) 226–5234. Request to participate in the meeting
Responsible Agency: Office of Federal This document is available on the must be received by EPA on or before
Activities, General Information (202) Internet at: http:// April 21, 2005. To ensure proper receipt
564–7167 or http://www.epa.gov/ www.us31kokomo.com. by EPA, it is imperative that you
compliance/nepa/. identify docket identification (ID)
Amended Notices number OPPT–2005–0012 in the subject
Weekly receipt of Environmental Impact
Statements EIS No. 050105, Draft EIS, AFS, MI, line on the first page of your request.
Filed March 28, 2005, through April 1, Huron-Manistee National Forests, Individuals requiring special
2005 Proposed Land and Resource accommodations at the meeting,
Pursuant to 40 CFR 1506.9. Management Plan, Implementation, including wheelchair access, should
EIS No. 050139, Draft EIS, COE, AR, OK, Several Counties, MI, Comment contact the person listed under FOR
Arkansas River Navigation Study, To Period Ends: June 16, 2005, Contact: FURTHER INFORMATION CONTACT at least 5
Maintain and Improve the Navigation Jeff Pullen (231) 775–2421. Revision business days prior to the meeting.

VerDate jul<14>2003 19:00 Apr 07, 2005 Jkt 205001 PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 E:\FR\FM\08APN1.SGM 08APN1

You might also like