You are on page 1of 4

MUHAMMAD JAVID IQBAL

(CIVIL ENGINEER)

PERSONAL INFORMATION

Fathers Name : Iqbal Hussain


D.O.B : 30-3-1991
Nationality: Pakistani
Address: House no.6, street no.2, W-block Government colony,
Okara.
Contact Number: +92-332-7434943
Email: javidiqbal475@gmail.com

OBJECTIVE
To secure a position in an organization that would fully employ my personal
skills, my experience as well as my academic training in a rewarding
career that affords professional and personal growth.
EDUCATION AND QUALIFICATIONS

Bachelor of Science in Civil Engineering (2010-2014)


The University of Lahore.

Intermediate (2008-2010)
Punjab College main G.T road, Okara.

Matric (2006-2008)
Al-sadiq Best Way High School 2-4/L Okara.

FINAL YEAR PROJECT


CONSTRUCTION SITE SAFETY
For this project, 23 different construction sites were visited during different
span of time. During this project I collected data about:
How many companies were conducting their operations according to
the safety standards and whether the manpower present on the site is
provided with safety equipment?
How many companies are ISO-14000 certified.

OTHER PROJECTS
During the graduation span, I was involved directly in the following projects.

Visited different Solid Waste Management site in Lahore and prepared


a comprehensive report on it.
Visited head New Khanki barrage and prepared a comprehensive
report.
Visited Pakistan Metrological Department and studied on how they
gather their data.
Visited Ring road project in Lahore and had a detailed discussion with
site engineers.

PROFESSIONAL EXPERIENCE

SPARCO CONSTRUCTION COMPANY


AUGUST 2015)

(FEBRUARY 2015-

Site Engineer
I am working as a site engineer and my responsibilities are
following.

Preparation of bund walls.


Shift the water from canal to other side.
Make sure the availability of material before working start.
Make sure the availability of manpower on site.
Lean the bed of canal.
Ensuring that the structures are constructed of a good quality with the

specification and good working practice.


Giving clear directions to workers as to what needs to be done to avoid repetitive

mistakes by the workers.


Deal with the consultant and talk them about the progress of work on site.
Removal of bund walls.
Keep record of material present on site specially steel

Project:

Improvement of LOWER BARI DOAB CANAL IMPROVEMENT


PROJECT (LBDCIP) SAHIWAL

IKAN ENGINEERING SERVICES PVT LTD


JANUARY 2015)
Site Engineer

(AUGUST 2014-

I was working as a site engineer and my responsibilities are


following.

Handle the problems regarding any type of issue on the site.


Deal with the labor and assign them their works.
Manage the material and order the material for coming two days which
is required on the site.
Make sure the availability of manpower and machinery on the site so
that our works could not stop in any condition.
Assure that the work on site is according to approved drawings.
Preparation of guide wall to mark that on which point we have to make
drill bores for the purpose of pilings.
Checking the sounding and make it sure that it is according to
specifications.
Checking that the steel cage is according to drawing or not and making
sure the cage lowering.
Filling of bores with cage and then with concrete.
In preparation of deck slab make sure the availability of concrete.
Excavation from the deck slabs to the required level and expose the
secent piles.
Make sure the cleaning of secent piles so that soil could remove from
the top surface of piles.
For all stretches in underpass make sure the availability mesh
reinforcement and placement of these meshes reinforcement on piles.
Order the material for shot Crete and checking that shot Crete is not
extending from their required level.
Make sure the plaster on the surface of the shot Crete.
Make sure the curing on the plaster.
Preparation of rigid pavement under the deck slab.
Fixing of barriers.
Fixing of tiles on the surface on wall of underpass for finishing.
Fixing of curb stones according to drawing.

Projects:
Construction and Improvement of Maulana Shaukat Ali road to
Multan Road via Kareem Market.

Scope of work includes:

The total length of the road will be 3.4-km. Two underpasses will be
constructed on this road, first at Lahore Canal Crossing and second at
Wahdat Road Crossing. Out of the total length, the length of new road within
the Punjab University premises is about 1.8-km, whereas rest of the road,
which is already passing through Allama Iqbal Town and connecting with
Multan Road, will be reconstructed and renovated.

COMPUTER SKILLS

Microsoft word
Microsoft excel
Microsoft powerpoint
Ms-project
Autocad