You are on page 1of 6

Energy Conservation in Welding

By
Avinash Abnave
Larsen & Toubro Limited,
Heavy Engineering Division, Powai
1.0 Introduction
In the past few decades, Environmental Impact of industrial activities is one of the major concerns
in all countries. Apart from automobiles exhaust, a major cause for atmospheric pollution is
burning of coal, oil and gas in thermal power plants for generation of electricity. The hydel or
nuclear power generation is also cause for major environmental and safety concerns. So
conservation of energy in all industrial operations is an important objective for all industries. As a
responsible corporate citizen, Larsen & Toubro Limited had embarked on company-wide efforts
to conserve energy in all its operations.
Table 1. Welding related percentage of total energy costs

A recent survey in USA has brought out that about 20% of the energy consumed in heavy
engineering industries in United States is for welding related activities. ( see Table 1 ) Similar
data is not available for India, but it is expected to be marginally higher than this. Also the cost of
energy is much higher in India compared to US and overall cost savings from energy conservation
will be of higher proportion. Hence optimization of energy consumption in welding and related
operations has received focused attention. A few examples of Energy saving in welding and
related activities are discussed in this paper with special emphasis on Welding Process selection,
Welding machines, Welding consumables and Pre-heat, Post-heat & PWHT.
2.0 Energy Efficiency of Welding Processes
Until recently, among the criteria for selection of welding process has been the need for better
quality of welds to maximise the performance of welds in service or higher productivity to bring
down the cost and cycle time for making the welds. The energy efficiency of the process as one
of the criteria for process selection is now receiving greater attention. There have been many

attempts to evaluate the energy efficiency of welding processes. Most of these consider only the
energy necessary to produce the weld. They do not reflect the total energy requirements of a
welding process accurately. So to compare the energy efficiency of each process, it is necessary to
consider energy consumption in total. A recent report published by TWI takes into consideration
Primary - the energy required for the heating the material to produce a satisfactory weld.
Secondary the energy required for services and auxiliary equipment like:
 Preheat / Postheat
 Electrode Baking / Holding
 Wire feed units, Motorised slides, Fume extractors
 Job handling devices - Manipulators, Gantry, Robot
 Weld preparation Machining, Grinding
This Table-2 brings out the potential of friction stir welding as an energy efficient, environmental
friendly welding process
Table 2 - Comparison of the total energy consumption of welding processes
Process

Material
Thickness mm

MMA

MIG / MAG

GTAW

SAW

Laser

EB (in vacuum)
Friction Stir
Welding

1
12
50
1
12
50
1
12
50
1
12
50
1
12
50
1
12
50
1
12
50

Primary Energy
kJ
57
1420
17640
32
1280
--94
------1450
16200
112
120
----120
1000
--1100
3680

Secondary
Energy kJ
105
1278
13035
52
277
--40
------864
9870
454
4268
----5283
7958
--347
1495

Total Energy
KJ
163
2698
30675
84
1557
--130
------2314
26070
566
4388
----5403
8958
--1447
5175

In submerged - arc welding by replacing the single filler wire by two smaller diameter wires
sharing the same current, the increase in current density in the wires can produce about 20%
increase in deposition rate, with corresponding energy savings. In MIG welding, use of smaller
diameter wires at the same operating current, can bring in similar increase in deposition rate and
corresponding energy saving.
3.0 Welding Power Source
A major share of energy consumption in welding goes to welding machines. The technology of
welding power source is advancing day by day and the journey started with huge generators has
reached to compact, energy efficient inverters.

In SMAW welding, usual arcing time achieved in a shift of 8 hrs is about 2.5 to 3 hrs. This means
idling time is around 5 to 5.5 hrs. The rectifiers draw current during idle time also and by using energy
saving kit, this consumption is brought down significantly. When machine is not in use, this energy
saving device enable to cut off the supply after 3 minutes. All rectifiers available in the production shop
are equipped with this energy saving kit. The Inverter power sources are very compact and occupy less
shop floor space, they are also energy efficient. Inverter has an average energy efficiency of 85 percent
and good power factor. For the same output welding current they utilize about 30 - 50% less primary
current than a rectifier or generator. During idling of the machine the power drawn is about 70% less
than a rectifier.
Table-3 Sample Calculation for Energy Consumption for Rectifier & Inverter
Parameter**
Rectifier
Inverter
Capacity
400 Amps
300 Amps
Input KW (Arcing)
11.2
5.6
Input KW (Idling)
1.4
0.28
Power consumed KWH (Arcing)
Power consumed KWH (Idling)
Total KWH Consumed
Cost of running / Day (at Rs.5.29/Unit)
* 2.5 Hrs arcing is considered per 8 Hrs shift
**Arcing data taken at 200 Amps output.
Saving is Rs.107 per Inverter per Shift

28
7.7
35.7
189

14
1.54
15.5
82

4.0 Welding Consumables


The welding electrodes are required to be stored in temperature and humidity controlled stores.
We have a hot room for storage of welding consumables with a capacity for 20000 Kg. Hot room
is equipped with four de-humidifier to control the temperature and humidity. Power consumption
for the hot room per year is about rupees one lakh. Further the electrodes are baked in a oven at
temperature ranging from 150 oC to 400 oC depending on the type of electrode and they are held
in holding ovens at 100 oC till they are issued. By changing over to procurement of low hydrogen
electrodes in vacuum-sealed packets, the need for hot room storage capacity is reduced and
baking and holding ovens utilization is considerably brought down. This has brought about
considerable savings in power consumption.
Table 4 -Procurement of electrodes in Vacuum-Sealed packets:
2005

2006

2007 (Planned)

1,500 kg

16,500 kg

35,000 kg

Table 5 -Typical data for Power savings by use of Vacuum Sealed Packets:
Power
Rating
Saving Rs
Power Consumed for
Consumption/day
Baking Oven
4.5 KW
40 units
343
Holding Oven
2.0 KW
25 units
Backing considered as 300C for 2 hrs followed by holding

5.0 Pre-heating, Post-Heating & PWHT:


Fabrication of high wall thickness pressure vessels demand high preheats to be maintained
throughout the welding operations followed by post heating before the weld can be cooled to
room temperature. The preheating and post heating are often done by gas burners using LPG. The
LPG fuel was replaced by Piped Natural Gas, which is about 15% cheaper and safer to handle.
Further several initiatives were taken to control the consumption of Fuel gas.
-

Burner efficiency improvement to save gas


Providing Insulation / hoods to retain heat at the joint
Infrared sensor to monitor preheat temperature and PID control to regulate fuel consumption.

5.1 Burner efficiency improvement to save gas

Low velocity candle type burner


(Rs 75/Hr)

ST.80 Spot burner


(Rs. 90/Hr )

5.2 Providing Insulation / hoods to retain heat at the joint


Typical savings on one job.
Number of seams welded -14
Welding cycle time 5-6 days
Total gas cost without hood, without insulation per seam
Savings in gas cost due to application of hood and insulation per seam
Total saving in gas consumption in one job
Cost of hood and Insulation :
Net Savings:

Hood to retain heat at the joint

Dished End and Nozzle


covered with Insulation

Rs. 88,000
Rs. 20,000
Rs 2,80,000
Rs. 65,000
Rs. 2,15,000

Forged nozzle Pre-heating

5.3 Infrared sensor to monitor preheat temperature and PID control

The control of preheat temperature is monitored by an infrared sensor device ahead of the point
of welding. The PID controller regulates the gas supply to the burners depending on the
temperature. A temperature recorder on the PID controller record the preheat temperature and is
available as a quality record.

PID controller with gas inlet


connections

Infra red sensor measure


preheat temperature

Infra red sensor

6.0 Post weld Heat treatment


Maximum use of PNG is in furnaces for PWHT. All furnaces were changed from refractory
lining to Ceramic Fibre lining several years back. Recently an energy audit of PWHT furnaces
was carried out with the help of Indian Institute of Technology, Bombay and some suggestions for
improvement of burner arrangement and operation of burners with optimum air-fuel ratio for low
fuel consumption are implemented.
7.0 Conclusion
As a result of many planned initiatives across all areas of operation, including the above
initiatives in welding and related areas, L&T could achieve considerable reduction in Electricity
and Gas consumption over the years.
Electrical

(Rs. in Lakhs)

300 274.55
250

250.13

PNG

210.97

200
150

117.25

117.1

100

64.5

50
0
2002-03

2003-04

2004-05

In recognition of the above institutionalized systems and procedures for efficient utilization and
conservation of energy, the Heavy Engineering Division of L&T was awarded the First Prize
in General category in National Energy Conservation Awards-2005, conferred by the Ministry of
Power.

You might also like