Federal Register / Vol. 70, No.

57 / Friday, March 25, 2005 / Notices 15297

ADDRESSES: Commander, U.S. Army Contracting Directorate, U.S. Army if that does not occur, the date of the
Medical Research and Materiel Community and Family Support Center EPA notice will determine the closing
Command, ATTN: Command Judge (USACFSC), (703) 681–5245. date for comments on the DEIS.
Advocate, MCMR–ZA–J, 504 Scott SUPPLEMENTARY INFORMATION: This Comments on the Draft EIS must be
Street, Fort Detrick, Frederick, MD publication applies to U.S. Army NAF submitted to the address below under
21702–5012. contracting activities. It does not apply Further Contact Information and must
FOR FURTHER INFORMATION CONTACT: For to the Army and Air Force Exchange be received no later than 5 p.m. Pacific
patent issues, Ms. Elizabeth Arwine, Service (AAFES), the U.S. Army Reserve Standard Time, Monday, May 9, 2005.
Patent Attorney, (301) 619–7808. For (USAR), the Army National Guard ADDRESSES: The Draft Environmental
licensing issues, Dr. Paul Mele, Office of (ARNG), and the Chaplain’s Fund, Plan Impact Statement/Environmental
Research & Technology Assessment, Trust, and the NAF Banking and Impact Report can be viewed online at
(301) 619–6664, both at telefax (301) Investment Fund (investment contracts http://www.slocity.org/publicworks/
619–5034. only). The public may view AR 215–4, documents.asp (Waterway Management
SUPPLEMENTARY INFORMATION: anyone Nonappropriated Fund Contracting Plan documents). Copies of the Draft
wishing to object to the grant of this Regulation is available at http:// Environmental Impact Statement/
license can file written objections along www.apd.army.mil/pdffiles/r215_4.pdf. Environmental Impact Report and
with supporting evidence, if any, within Regulatory Flexibility Act: This action appendices are also available for review
15 days from the date of this is not considered rule-making within at the following government offices and
publication. Written objections are to be the maning of the Regulatory Flexibility libraries:
filed with the Command Judge Act, 5 U.S.C. 601–612. Government Offices—City Public
Paperwork Reduction Act: The Works Department, 955 Morro Street,
Advocate, U.S. Army Medical Research
Paperwork Reduction Act, 44 U.S.C. San Luis Obispo, California.
and Materiel Command, 504 Scott
3051 et seq., does not apply because no Libraries: San Luis Obispo City/
Street, Fort Detrick, Frederick, MD
information collection or record-keeping County Library, 995 Palm Street, San
21702–5012.
requirements are imposed on Luis Obispo, CA 93401.
Brenda S. Bowen, contractors, offerors, or members of the FOR FURTHER INFORMATION CONTACT:
Army Federal Register Liaison Officer. public. Bruce Henderson, Senior Project
[FR Doc. 05–5922 Filed 3–24–05; 8:45 am] Brenda S. Bowen, Manager, U.S. Army Corps of Engineers,
BILLING CODE 3710–08–M Army Federal Register Liaison Officer. Ventura Regulatory Field Office, 2151
[FR Doc. 05–5925 Filed 3–24–05; 8:45 am] Alessandro Drive, Suite 110, Ventura,
BILLING CODE 3710–08–M
California 93001, Telephone: 805/585–
DEPARTMENT OF DEFENSE 2145, bruce.a.henderson@
usace.army.mil.
Department of the Army
DEPARTMENT OF DEFENSE SUPPLEMENTARY INFORMATION: This EIS
NAF Contracting Regulation, AR 215— was prepared as part of a joint
4 Department of the Army; Corps of document by the U.S. Army Corps of
Engineers Engineers in conjunction with the City
AGENCY: Department of the Army, DOD. of San Luis Obispo and the San Luis
ACTION: Notice; final policy. Availability of the Draft Environmental Obispo County Flood Control & Water
Impact Statement/Environmental Conservation District (Zone 9) (City/
SUMMARY: This publication was last Impact Report for the San Luis Obispo Zone 9) pursuant to corresponding
published October 10, 1990. It has been Creek Watershed Waterway responsibilities under NEPA and the
updated and revised to include best Management Plan, City and County of California Environmental Quality Act
value acquisition practices, acquisition San Luis Obispo, CA (CEQA, resulting in preparation of an
streamlining, participation in the Environmental Impact Report).
AGENCY: U.S. Army Corps of Engineers,
government/nonappropriated fund The Corps of Engineers and City/Zone
DoD.
(NAF) purchase card program, 9 prepared the Draft EIS/EIR evaluating
implementation of a NAF automated ACTION: Notice of availability.
the potential environmental impacts of
procurement system, and reassignment SUMMARY: The U.S. Army Corps of the proposed San Luis Obispo Creek
of signature authority in keeping with Engineers is issuing this notice to advise Watershed Waterway Management Plan
the Army’s recent restructuring that the public that a Draft Environmental (Program). The Program is a
resulted in the establishment of the new Impact Statement (DEIS) has been combination of policies, programs and
Installation Management Agency (IMA). prepared for the San Luis Obispo Creek plans proposed to address flooding and
The public was not and will not be Watershed Waterway Management Plan flood control along San Luis Obispo
invited to comment on AR 215–4, NAF within the City and County of San Luis Creek and its tributaries on a regional or
Contracting Regulation. Although the Obispo, California and is available for watershed-wide basis. Project planning
policy contained in this regulation review and comment. for activities and development within
affects the public as defined in Title 44,
DATES: In accordance with the National and affecting the stream corridor has
this regulation will not be codified. This
Environmental Policy Act (NEPA), we historically been managed or guided by
notice is being published for the
have filed the DEIS with the policies of various agencies with little
purpose of notifying the public as to
Environmental Protection Agency (EPA) coordinated effort at consistent
how Nonapproporiated Fund
for publication of their notice of management techniques. The Program is
Contracting activities will conduct its
availability in the Federal Register. The comprised of a Waterway Management
business.
EPA notice officially starts the 45-day Plan (WMP), Stream Maintenance and
EFFECTIVE DATE: March 11, 2005. review period for this document. It is Management Plan (SMMP), and
FOR FURTHER INFORMATION CONTACT: Ms. the goal of the Corps of Engineers to Drainage Design Manual (DDM), which
Maary Keeney, Chief, Policy Division, have the COE notice published on the represent a consolidated effort to
Nonappropriated Fund (NAF) same date as the EPA notice. However, provide a consistent management

VerDate jul<14>2003 16:11 Mar 24, 2005 Jkt 205001 PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 E:\FR\FM\25MRN1.SGM 25MRN1
15298 Federal Register / Vol. 70, No. 57 / Friday, March 25, 2005 / Notices

program for the waterway and habitat quantity and quality, an http://www.nwk.usace.army.mil/
watershed. assessment of habitat fragmentation projects/hcdsap/.
There is a history of flooding along along the stream corridors, and SUPPLEMENTARY INFORMATION:
SLO Creek, with its attendant problems mitigation measures to offset
of erosion, and water quality and unavoidable adverse impacts. 1. Background
ecological issues. However, there are Dated: March 10, 2005. The Republican River Flood of 1935
relatively few structural flood control resulted in major property damage in
Alex C. Dornstauder,
features. The City/Zone 9 identified the the Republican River Basin and the loss
need to manage flooding within the SLO Colonel, U.S. Army, District Engineer.
[FR Doc. 05–5903 Filed 3–24–05; 8:45 am] of 113 lives. The Harlan County Dam
Creek watershed because urban uses project was authorized under the Flood
have developed along the creek and its BILLING CODE 3710–92–P
Control Act of 1941, Public Law 228,
tributaries in the natural floodway. The 77th Congress, as part of the Missouri
under-city culvert and other manmade River Basin Comprehensive Plan. The
structures have reduced the capacity of DEPARTMENT OF DEFENSE
Flood Control Act of 1944 authorized
the creek to convey floodwaters. The project purposes of flood control,
Department of the Army; Corps of
Program’s objectives include (1) irrigation, fish and wildlife, and
identification and prioritization of the Engineers
recreation. The U.S. Bureau of
amount and extent of flooding, erosion, Intent To Prepare a Draft Reclamation manages Harlan County
water quality and ecological issues in Environmental Impact Statement and Dam’s 150,000 acre-feet of storage
the SLO Creek; (2) identification and Dam Safety Assurance Program allocated for irrigation. Harlan County
development of programs to address Evaluation Report for Harlan County Dam began operation in 1952 will full
these issues; (3) preparation of Lake Located in Harlan County, multipurpose pool being achieved in
guidelines for design of future Nebraska Near the Cities of Alma and 1957. Engineering analysis of Harlan
development and reconstructed Republican City, NE County Dam’s 18 tainter gates indicated
developments in the SLO Creek
operating issues if the gates were
watershed; (4) preparation of a AGENCY: Department of the Army; U.S. required to operate as designed under
programmatic environmental and Army Corps of Engineers, DoD. full water load conditions to control
permitting review process for ACTION: Notice of intent. reservoir water levels to the top of flood
implementation of Objectives 2 and 3 as
applicable; and (5) development of an control pool elevation of 1973.5 feet,
SUMMARY: The U.S. Army Corps of mean sea level (msl). The tainter gates
implementation program. It is Engineers, Kansas City District, intends
anticipated this Program will result in a are 30 feet by 40 feet made of structural
to prepare a Draft Environmental Impact steel. The design of the Harlan County
means by which the Corps and other Statement (DEIS) and Dam Safety
pertinent agencies may Dam tainter gates is similar to the
Assurance Program (DSAP) Evaluation Folsom Dam tainter gates that
comprehensively assess identified Report for Harlan County Lake. Harlan
proposed actions within jurisdictional experienced structural and mechanical
County Lake is located near the cities of failure in 1995. Harlan County Dam
waters of the United States that Alma and Republican City, Nebraska,
encompass standard maintenance and engineering studies resulted in the
immediately north of the Nebraska- adoption in 2003 of a 5-year Interim
replacement or improvement of existing Kansas border. The dam provides
flood structures, or repair of banks, Operating Plan for Harlan County Dam
irrigation water supply to areas on both with top of flood control pool elevation
channels, and stream habitats, and sides of the state line and flood control
could include identified stream bank being lowered to 1960.5 msl. At this
for the Republican River Basin between lower elevation only 17.5 feet of water
repair projects provided they are Harlan County, Nebraska and Milford
consistent with the Program. Other would be on the gates prior to releasing
Lake located in east central Kansas near of floodwater as compared to
capital improvement projects for flood Junction City, in Clay and Geary
management not part of the City/Zone 9 approximately 30 feet of water if the
counties. The DEIS study will analyze gates were completely operating as
Annual Work Plan would be subject to the economic, environmental, and social
further review by the Corps and the designed. The maximum height on the
impacts that may occur as a result of the gates to date is 12.5 feet. The Interim
local agency prior to implementation.
various alternatives solutions being Operating Plan has resulted in the
Currently, the Corps asserts
discretionary authority over bank considered in the DSAP Report for reduction of the flood control storage
stabilization measures within the SLO Harlan County Lake, The DSAP Report capacity of the reservoir by
Creek and its tributaries. This was based will analyze both structural and non- approximately 50 percent from 500,000
on a determination that proposals to structural solutions for Harlan County acre feet to 227,000 acre feet. To date,
channelize or otherwise substantially Dam’s current tainter gate operational this lower storage capacity has had no
impact the Creek and its tributaries, issues, the dam’s overall hydrologic effect on the dam’s operation for flood
such as by armoring the banks, would adequacy, spillway stability and the control, irrigation, recreation, or fish
result in greater than minimal interdependence of all these factors on and wildlife use. The Interim Operating
cumulative impacts. In 1996, the Corps the performance of the dam. Plan’s top of flood control pool of
requested that a comprehensive plan for FOR FURTHER INFORMATION CONTACT: Eric 1960.5 msl elevation is 4.8 feet higher
the watershed be developed, the S. Lynn, Project Manager, Plan than the Dam’s highest historic pool
purpose and focus of which to ensure Formulation Section, ATTN: CENWK– elevation. Engineering analysis
that aquatic resource impacts are PM–PF, U.S. Army Engineer District, indicates that if corrective action is not
avoided and minimized to the Kansas City, 601 East 12th Street, taken the gate mechanisms will
maximum extent practicable. The Corps Kansas City, Missouri 64106–2896, probably continue to corrode and
suggested that the plan include an Phone 816–983–3258 or e-mail to: deteriorate requiring potentially more
analysis of alternatives that meet the Eric.S.Lynn@usace.army.mil. Additional stringent operating restrictions at some
overall project purpose of anticipated information is also available on the point in the future. There are
flood control needs, an assessment of Harlan County Dam Project Web site substantive economic, social,

VerDate jul<14>2003 16:11 Mar 24, 2005 Jkt 205001 PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 E:\FR\FM\25MRN1.SGM 25MRN1