You are on page 1of 2

Federal Register / Vol. 70, No.

52 / Friday, March 18, 2005 / Notices 13189

m. This filing is available for review the project number of the application to of Building, City of Marysville, Yuba
and reproduction at the Commission in which the filing responds; (3) furnish County, CA, Wait Period Ends: April
the Public Reference Room, Room 2A, the name, address, and telephone 18, 2005, Contact: Gary Price (530)
888 First Street, NE., Washington, DC number of the person protesting or 749–3904.
20426. The filing may also be viewed on intervening; and (4) otherwise comply EIS No. 050101, Final EIS, AFS, AZ,
the Web at http://www.ferc.gov using with the requirements of 18 CFR Arizona Snowbowl Facilities
the ‘‘eLibrary’’ link. Enter the docket 385.2001 through 385.2005. All Improvements, Proposal to Provide a
number, here P–12574, in the docket comments, recommendations, terms and Consistent/Reliable Operating Season,
number field to access the document. conditions or prescriptions must set Coconino National Forest, Coconino
For assistance, call toll-free 1–866–208– forth their evidentiary basis and County, AZ, Wait Period Ends: April
3676 or e-mail otherwise comply with the requirements 18, 2005, Contact: Ken Jacobs (928)
FERCOnlineSupport@ferc.gov. For TTY, of 18 CFR 4.34(b). Agencies may obtain 774–1147.
call (202) 502–8659. A copy is also copies of the application directly from EIS No. 050102, Final EIS, COE, OH,
available for review and reproduction at the applicant. Any of these documents Mill Creek, Ohio Flood Damage
the address in item h. above. must be filed by providing the original Reduction Project, To Reduce
n. Development Application—Any and eight copies to: The Secretary, Damages to Communities, Hamilton
qualified applicant desiring to file a Federal Energy Regulatory Commission, County, OH, Wait Period Ends: April
competing application must submit to 888 First Street, NE., Washington, DC 18, 2005, Contact: Barry Schueler
the Commission, on or before the 20426. An additional copy must be sent (502) 315–6780.
specified deadline date for the to Director, Division of Hydropower EIS No. 050103, Draft EIS, HUD, CA,
particular application, a competing Administration and Compliance, Office Stillwater Business Park,
development application, or a notice of of Energy Projects, Federal Energy Development of Business Park,
intent to file such an application. Regulatory Commission, at the above Annexation AN 1–01, Shastec
Submission of a timely notice of intent address. A copy of any protest or motion Redevelopment Project Area, Airport
allows an interested person to file the to intervene must be served upon each Land Use Plan Amendment Pre-Zone,
competing development application no representative of the applicant specified General Plan Amendment GPA–2–01,
later than 120 days after the specified in the particular application. A copy of Funding and U.S. Army COE 404
deadline date for the particular all other filings in reference to this Permit, City of Redding, Shasta
application. Applications for application must be accompanied by County, CA, Comment Period Ends:
preliminary permits will not be proof of service on all persons listed in May 2, 2005, Contact: Nathan
accepted in response to this notice. the service list prepared by the Cherpeski (530) 225–4519.
o. Notice of Intent—A notice of intent EIS No. 050104, Draft EIS, AFS, CA,
Commission in this proceeding, in
must specify the exact name, business Golden Gate National Recreation Area
accordance with 18 CFR 4.34(b) and
address, and telephone number of the (GGNRA) Fire Management Plan,
385.2010.
prospective applicant, and must include Implementation, Muir Woods
an unequivocal statement of intent to Magalie R. Salas, National Monument, Fort Point
submit, if such an application may be Secretary. National Historic Site, San Mateo, San
filed, either a preliminary permit [FR Doc. E5–1178 Filed 3–17–05; 8:45 am] Francisco and Marin Counties, CA,
application or a development BILLING CODE 6717–01–P Comment Period Ends: May 17, 2005,
application (specify which type of Contact: Alex Naar (415) 331–6374.
application). A notice of intent must be EIS No. 050105, Draft EIS, AFS, WI,
served on the applicant(s) named in this PROGRAMMTIC EIS—Huron-
ENVIRONMENTAL PROTECTION
public notice. Manistee National Forests, Proposed
p. Protests or Motions to Intervene— AGENCY
Land and Resource Management Plan,
Anyone may submit a protest or a [ER–FRL–6661–5] Implementation, Several Counties,
motion to intervene in accordance with WI, Comment Period Ends: May 2,
the requirements of Rules of Practice Environmental Impact Statements; 2005, Contact: Jeff Pullen (231) 775–
and Procedure, 18 CFR 385.210, Notice of Availability Responsible 2421.
385.211, and 385.214. In determining EIS No. 050106, Final EIS, AFS, MT,
Agency: Office of Federal Activities,
the appropriate action to take, the Sheep Creek Salvage Project, Moving
General Information (202) 564–7167 or
Commission will consider all protests Current Resource Conditions and
http://www.epa.gov/compliance/nepa.
filed, but only those who file a motion Trends Toward Desired Future
to intervene in accordance with the Weekly receipt of Environmental Impact Conditions, Beaverhead-Deerlodge
Commission’s Rules may become a Statements National Forest, Beaverhead County,
party to the proceeding. Any protests or Filed March 8, 2005 Through March 11, MT, Wait Period Ends: April 19, 2005,
motions to intervene must be received 2005 Contact: Jeffrey L. Trejo (406) 832–
on or before the specified deadline date Pursuant to 40 CFR 1506.9. 3178.
for the particular application. EIS No. 050099, Draft EIS, AFS, OR, Big EIS No. 050107, Draft EIS, AFS, IL,
q. All filings must (1) bear in all Butte Springs Timber Sales, To Shawnee National Forest Proposed
capital letters the title ‘‘PROTEST’’, Implementation Management Land and Resource Management Plan
‘‘MOTION TO INTERVENE’’, ‘‘NOTICE Direction, Roque River-Siskiyou Revision, Implementation, Alexander,
OF INTENT TO FILE COMPETING National Forest, Butte Falls Ranger Gallatin, Hardin, Jackson, Johnson,
APPLICATION,’’ ‘‘COMPETING District, Cascade Zone, Jackson Massac, Pope, Union and Williamson
APPLICATION,’’ ‘‘COMMENTS,’’ County, OR, Comment Period Ends: Counties, IL, Comment Period Ends:
‘‘REPLY COMMENTS,’’ May 2, 2005, Contact: Joel T. King June 16, 2005, Contact: Stephen Hupe
‘‘RECOMMENDATIONS,’’ ‘‘TERMS (541) 560–3400. (618) 253–7114.
AND CONDITIONS,’’ or EIS No. 050100, Final EIS, HUD, CA, EIS No. 050108, Final EIS, FTA, UT,
‘‘PRESCRIPTIONS;’’ (2) set forth in the Marysville Hotel Demolition Project, Weber County to Salt Lake City
heading the name of the applicant and Proposed Acquisition and Demolition Commuter Rail Project, Proposes a

VerDate jul<14>2003 16:14 Mar 17, 2005 Jkt 205001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\18MRN1.SGM 18MRN1
13190 Federal Register / Vol. 70, No. 52 / Friday, March 18, 2005 / Notices

Commuter Rail Transit Service with ENVIRONMENTAL PROTECTION Summary: No formal comment letter
Nine Stations between Salt Lake City AGENCY was sent to the preparing agency.
and Peasant View, Funding, Weber, ERP No. F–FHW–C40158–NY,
[ER–FRL–6661–6]
Davis and Salt Lake Counties, UT, Slingerlands Bypass Extension (NYS
Wait Period Ends: April 18, 2005, Environmental Impact Statements and Route 85) (P.I.N. 1125.19) Route 140
Contact: Don Cover (720) 963–3332. Regulations; Availability of EPA (Cherry Avenue Extension) to the
Comments Albany City Line, Reconstruction Town
EIS No. 050109, Draft Supplement,
of Bethlehem, Albany County, NY.
NOA, PR, VI, Amendment to the Availability of EPA comments Summary: EPA continues to have
Fishery Management Plans (FMPs), prepared pursuant to the Environmental environmental concerns with the
Amendment 2 for the Spiny Lobster Review Process (ERP), under section preferred alternative regarding the
Fishery; Amendment 1 for the Queen 309 of the Clean Air Act and section adequacy of mitigation for impacts to
Conch Resources; Amendment 3 for 102(2)(c) of the National Environmental forested wetlands.
the Reef Fish Fishery; Amendment 2 Policy Act as amended. Requests for ERP No. F–FHW–F40419–MN, MN–
Corals and Reef Associated copies of EPA comments can be directed 371 North Improvement Project,
Invertebrates, U.S. Caribbean to to the Office of Federal Activities at Reconstruction from the intersection of
Address Required Provisions (202) 564–7146. An explanation of the Crow Wing County Road 18 in Nisswa
MSFCMA, Puerto Rico and the U.S. ratings assigned to draft environmental to the Intersection of Cass County Road
Virgin Island, Comment Period Ends: impact statements (EISs) was published 42 in Pine River, Funding, NPDES
May 2, 2005, Contact: Dr. Roy in the Federal Register dated April 2, Permit, and U.S. Army COE Section 404
Crabtree (727) 824–5301. 2004 (69 FR 17403). Permit Issuance, Crow Wing and Cass
Draft EISs Counties, MN.
Amended Notices
Summary: EPA has no objection to the
ERP No. D–AFS–G65097–NM Rating action as proposed since previous
EIS No. 050018, Draft EIS, FAA, IL, LO, Tajique Watershed Restoration
O’Hare Modernization Program, comments were adequately addressed.
Project, Proposes Fuel Reduction and Wetland mitigation issues will be
Proposes Major Development, Chicago Restore Forest Health, Cibola National
O’Hare International Airport, Airport pursued as part of the CWA Section 404
Forest, Torraine County, NM. permit review.
Layout Plan (ALP), Federal Funding, Summary: EPA expressed lack of
U.S. Army COE Section 404 Permit, ERP No. F–NIH–G84000–TX,
objections to the preferred alternative.
Galveston National Laboratory for
City of Chicago, IL, Comment Period ERP No. D–NPS–G02014–TX Rating
Biodefense and Emerging Infectious
Ends: April 6, 2005, Contact: Michael EC2, Big Thicket National Preserve Oil
Diseases Research Facility at the
W. MacMullen (847) 294–8339. and Gas Management Plan,
University of Texas Medical Branch,
Revision of FR Notice Published on Implementation, Hardin, Jefferson,
Construction, Partial Funding, Grant,
1/28/05: CEQ Comment Period Orange, Liberty, Tyler, Jasper and Polk
Galveston, TX.
Ending 03/23/2005 has been Extended Counties, TX.
Summary: EPA expressed Summary: No formal comment letter
to 04/06/2005. was sent to the preparing agency.
environmental concerns with impacts to
EIS No. 050063, Final EIS, AFS, UT, jurisdictional wetlands and requests ERP No. F–NRC–E09809–SC,
Monticello and Blanding Municipal additional information on the Savannah River Site Construction and
Watershed Improvement Projects, delineation of these wetlands be Operation of a Mixed Oxide (MOX) Fuel
Implementation, Manti-La Sal incorporated in the Final EIS. Fabrication Facility, NUREG–1767,
National Forest, Monticello Ranger Aiken, Barnwell and Allendale
District, San Juan County, UT, Wait Final EISs Counties, SC.
Period Ends: March 21, 2005, Contact: ERP No. F–AFS–J65402–WY, Tongue Summary: EPA continues to have
Greg T. Montgomery (435) 636–3348. Allotment Management Plan, Proposal environmental concerns about the
Revision of FR Notice Published on to Continue Livestock Grazing on All or project regarding the hazardous and
2/18/2005: Correction to Contact Portions of the 22 Allotment, Bighorn radioactive wastes associated with the
Person Name and Telephone Number. National Forest, Tongue and Medicine exhaust that will be generated during
Wheel/Paintrock Ranger Districts, operation of the proposed facility.
EIS No. 050068, Draft EIS, AFS, AK, OK, However, EPA acknowledges that NRC
Johnson, Sheridan and Bighorn
Ouachita National Forest, Proposed Counties, WY. will address related air emissions issues
Revised Land and Resource Summary: EPA continued to express during the Clean Air Act permitting
Management Plan, Implementation, concerns with potential adverse impacts process.
several counties, AR and LeFlore and to water quality and riparian zones from ERP No. F–SFW–L64050–00, Caspian
McCurtain Counties, OK, Comment livestock grazing and recreation. EPA’s Tern (sterna caspia) Management to
Period Ends: May 26, 2005, Contact: request for additional evaluation, Reduce Predation of Juvenile Salmonids
Bill Pell (501) 321–5320. Revision of disclosure, and mitigation in the Final in the Columbia River Estuary, To
FR Notice Published on 2/25/2005: EIS and recommendation to eliminate Comply with the 2002 Settlement
CEQ Comment Period Ending on grazing impacts near important aquatic Agreement, Endangered Species Act
4/11/2005 has been Extended to resources were not addressed. (ESA), Columbia River, WA, OR, ID and
5/26/2005. ERP No. F–AFS–L65405–AK, CA.
Dated: March 15, 2005.
Shoreline Outfitter/Guide Plan, Summary: EPA’s concerns associated
Commercial Permits Issuance for with tern consumption of ESA-listed
Robert W. Hargrove, Shoreline-Based Activities on National Salmonids, alternative nesting sites and
Director, NEPA Compliance Division, Office Forest System Lands, Admiralty Island water quality impacts were addressed in
of Federal Activities. National Monument, Hoonah, Sitka and the Final EIS. However, EPA continued
[FR Doc. 05–5417 Filed 3–17–05; 8:45 am] Juneau Ranger Districts, Tongass to express concerns over whether the
BILLING CODE 6560–50–P National Forest, AK. proposed relocation of terns to newly

VerDate jul<14>2003 16:14 Mar 17, 2005 Jkt 205001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\18MRN1.SGM 18MRN1

You might also like