Federal Register / Vol. 70, No.

52 / Friday, March 18, 2005 / Notices 13215

For the Nuclear Regulatory Commission. encounter problems in accessing the Flange Requirements Evaluation for
Brenda Jo. Shelton, documents located in ADAMS, should Vogtle Units 1 and 2,’’ to justify
NRC Clearance Officer, Office of Information contact the PDR reference staff at 1– eliminating the reactor vessel/head
Services. 800–397–4209, 301–415–4737, or by e- flange region when determining
[FR Doc. 05–5368 Filed 3–17–05; 8:45 am] mail to pdr@nrc.gov. In addition, the pressure-temperature (P–T) limits for
BILLING CODE 7590–01–P Houston Love Memorial Library, 212 the reactor vessel.
West Burdeshaw Street, Dothan, The proposed action is in accordance
Alabama, and the Lucy Maddox with the licensee’s application dated
NUCLEAR REGULATORY Memorial Library, 11880 Columbia February 26, 2004, as supplemented on
COMMISSION Street, Blakely, Georgia, have agreed to July 8, and October 22, 2004.
make the final plant-specific The Need for the Proposed Action:
[Docket Nos. 50–348 and 50–364] Appendix G of 10 CFR part 50, contains
supplement to the GEIS available for
public inspection. requirements for P–T limits for the
Southern Nuclear Operating Company,
primary system, and requirements for
Inc (SNC), Joseph M. Farley Nuclear FOR FURTHER INFORMATION CONTACT: Mr.
metal temperature of the closure head
Power Plant, Units 1 and 2; Notice of Jack Cushing, License Renewal and
flange and vessel flange regions. The
Availability of the Final Supplement 18 Environmental Impacts Program,
P–T limits are to be determined using
to the Generic Environmental Impact Division of Regulatory Improvement
the methodology of American Society of
Statement for the License Renewal of Programs, U.S. Nuclear Regulatory
Mechanical Engineers Boiler and
Joseph M. Farley Nuclear Power Plant, Commission, Washington, DC 20555.
Pressure Vessel Code (ASME Code),
Units 1 and 2 Mr. Cushing may be contacted at 301–
Section XI, Appendix G, but the flange
415–1424 or via e-mail at JXC9@nrc.gov. temperature requirements are specified
Notice is hereby given that the U.S.
Nuclear Regulatory Commission (the Dated in Rockville, Maryland, this 9th day in 10 CFR part 50, Appendix G. This
of March, 2005. rule states that the metal temperature at
Commission) has published a final
plant-specific supplement to the For the Nuclear Regulatory Commission. the closure flange regions must exceed
Generic Environmental Impact Pao-Tsin Kuo, the material unirradiated RTNDT by at
Statement (GEIS), NUREG–1437, Program Director, License Renewal and least 120 °F for normal operation when
regarding the renewal of operating Environmental Impacts Program, Division of the pressure exceeds 20 percent of the
licenses NPF–2 and NPF–8 for an Regulatory Improvement Programs, Office of pre-service hydrostatic test pressure.
Nuclear Reactor Regulation. This requirement was originally based
additional 20 years of operation at
Joseph M. Farley Nuclear Power Plant [FR Doc. 05–5365 Filed 3–17–05; 8:45 am] on concerns about the fracture margin in
(FNP). FNP is located in Houston BILLING CODE 7590–01–P the closure flange region. During the
County, Alabama, approximately 16.5 boltup process, outside surface stresses
miles east of the City of Dothan, in this region typically reach over 70
Alabama. Possible alternatives to the NUCLEAR REGULATORY percent of the steady state stress,
proposed action (license renewal) COMMISSION without being at steady state
include no action and reasonable temperature. The margin of 120 °F and
[Docket Nos. 50–424 and 50–425]
alternative energy sources. the pressure limitation of 20 percent of
Section 9.3 of the final supplement 18 Southern Nuclear Operating Company, hydrostatic pressure were developed in
states: Vogtle Electric Generating Plant, Units the mid-1970s using the Kla fracture
1 and 2; Environmental Assessment toughness to ensure that appropriate
Based on: (1) The analysis and findings in margins would be maintained.
the GEIS (NRC 1996; 1999), (2) the and Finding of No Significant Impact
Improved knowledge of fracture
environmental report submitted by SNC The U.S. Nuclear Regulatory toughness and other issues that affect
(SNC 2003), (3) consultation with Federal,
State, Tribal, and local agencies, (4) the staff’s
Commission (NRC) is considering the integrity of the reactor vessel have
own independent review, and (5) the staff’s issuance of an exemption from Title 10 led to the recent change to allow the use
consideration of public comments, the of the Code of Federal Regulations (10 of Klc in the development of P–T curves,
recommendation of the staff is that the CFR) part 50, Appendix G, for Renewed as contained in ASME Code Case N–
Commission determine that the adverse Facility Operating License Nos. NPF–68 640, ‘‘Alternative Reference Fracture
environmental impacts of license renewal for and NPF–81, issued to Southern Toughness for Development of P–T
Farley Units 1 and 2, are not so great that Nuclear Operating Company (the Limit Curves for Section XI, Division 1.’’
preserving the option of license renewal for licensee), for operation of the Vogtle ASME Code Case, N–640 has been
energy planning decision makers would be Electric Generating Plant (Vogtle), Units approved for use without conditions by
unreasonable.
1, and 2, located in Waynesboro, the NRC staff in Regulatory Guide 1.147,
The final Supplement 18 to the GEIS Georgia. Therefore, as required by 10 ‘‘Inservice Inspection Code Case
is available for public inspection in the CFR 51.21, the NRC is issuing this Acceptability, ASME Section XI,
NRC Public Document Room (PDR) environmental assessment and finding Division 1,’’ published in June 2003.
located at One White Flint North, 11555 of no significant impact. However, P–T limit curves can still
Rockville Pike, Rockville, Maryland, produce operational constraints by
20852, between 7:30 a.m. and 4:15 p.m. Environmental Assessment limiting the operational range available
or from the Publicly Available Records Identification of the Proposed Action: to the operator during heatup and
(PARS) component of NRC’s The proposed action would exempt the cooldown of the plant, especially when
Agencywide Documents Access and licensee from the requirements of 10 considering requirements in the closure
Management System (ADAMS). ADAMS CFR part 50, Appendix G, footnote 2 to head flange and the vessel flange
is accessible from the NRC’s Web site at table 1, and allow the licensee to use the regions. Implementing the P–T curves
http://www.nrc.gov/reading-rm/ methodology in Westinghouse that use Klc material fracture toughness
adams.html (the Public Electronic Commercial Atomic Power Report without exempting the flange
Reading Room). Persons who do not (WCAP), WCAP–16142, Revision 1, requirement of 10 CFR part 50,
have access to ADAMS, or who ‘‘Reactor Vessel Closure Head/Vessel Appendix G, would place a restricted