You are on page 1of 3

Federal Register / Vol. 70, No.

50 / Wednesday, March 16, 2005 / Notices 12863

regulations thereunder. Project No. 382 DEPARTMENT OF ENERGY Comment Date: 5 p.m. eastern time on
is located on the Kern River in Kern March 23, 2005.
County, California. Federal Energy Regulatory
Commission 3. FPL Energy Seabrook, LLC
The license for Project No. 382 was
[Docket No. ER02–1838–004]
issued for a period ending February 28, [Docket No. EG05–35–000, et al.]
2005. Section 15(a)(1) of the FPA, 16 Take notice that on February 25, 2005,
U.S.C. 808(a)(1), requires the SeaWest WindPower, Inc., et al.; FPL Energy Seabrook, LLC submitted a
Commission, at the expiration of a Electric Rate and Corporate Filings request to increase prior authorization
license term, to issue from year to year to sell energy, capacity and ancillary
March 9, 2005. services at market-based rates.
an annual license to the then licensee
The following filings have been made
under the terms and conditions of the FPL Energy Seabrook LLC states that
with the Commission. The filings are
prior license until a new license is copies of the filing were served upon
listed in ascending order within each
issued, or the project is otherwise the Florida Public Service Commission.
docket classification.
disposed of as provided in section 15 or Comment Date: 5 p.m. eastern time on
any other applicable section of the FPA. 1. SeaWest WindPower, Inc. March 18, 2005.
If the project’s prior license waived the [Docket No. EG05–35–000]
applicability of section 15 of the FPA, 4. PJM Interconnection, L.L.C.
On March 4, 2005, SeaWest
then, based on section 9(b) of the [Docket No. ER04–608–003]
WindPower, Inc. (SeaWest WindPower),
Administrative Procedure Act, 5 U.S.C.
located at 1455 Frazee Road, Ninth Take notice that on February 28, 2005,
558(c), and as set forth at 18 CFR
Floor, San Diego, California, 92108, PJM Interconnection, L.L.C. (PJM)
16.21(a), if the licensee of such project filed with the Federal Energy Regulatory submitted for filing an updated status
has filed an application for a subsequent Commission an amended application for report of PJM’s stakeholder process
license, the licensee may continue to determination of exempt wholesale regarding expansion of PJM’s behind the
operate the project in accordance with generator (EWG) status pursuant to part meter generation program to include
the terms and conditions of the license 365 of the Commission’s regulations. generation associated with municipals’
after the minor or minor part license SeaWest WindPower states it will be and cooperatives’ electric distribution
expires, until the Commission acts on engaged directly and exclusively in the systems, originally filed on January 3,
its application. If the licensee of such a business of operating certain eligible 2005, in Docket No. ER04–608–002.
project has not filed an application for facilities and selling electric energy
a subsequent license, then it may be Comment Date: 5 p.m. eastern time on
exclusively at wholesale within the March 21, 2005.
required, pursuant to 18 CFR 16.21(b), meaning of section 32(a) of PUHCA.
to continue project operations until the SeaWest WindPower requests that the 5. Upper Peninsula Power Company
Commission issues someone else a Commission determine that it is an [Docket No. ER05–89–002]
license for the project or otherwise EWG as it is currently owned and after
orders disposition of the project. consummation of the sale of 100 percent Take notice that on March 2, 2005,
of the capital stock of its parent, Upper Peninsula Power Company
If the project is subject to section 15
SeaWest Holdings, Inc., to a wholly- (UPPCO) tendered for filing a
of the FPA, notice is hereby given that
owned subsidiary of the AES Supplement to market-based rate
an annual license for Project No. 382 is
Corporation, AES Western Wind, LLC. application in preparation for MISO
issued to Southern California Edison Day-2 Market Operations FILED ON
Company for a period effective March 1, SeaWest WindPower states that a
copy of the amended application has January 4, 2005 in Docket No. ER05–89–
2005 through February 28, 2006, or until 001.
the issuance of a new license for the been served on the U.S. Securities and
project or other disposition under the Exchange Commission, the California UPPCO states that copies of the filing
FPA, whichever comes first. If issuance Public Utilities Commission, the were served upon the official service
of a new license (or other disposition) Indiana Utility Regulatory Commission, list, PJM, MISO and the Michigan Public
the Oregon Public Utility Commission, Service Commission.
does not take place on or before March
1, 2006, notice is hereby given that, and the Wyoming Public Service Comment Date: 5 p.m. eastern time on
pursuant to 18 CFR 16.18(c), an annual Commission. March 14, 2005.
license under section 15(a)(1) of the Comment Date: 5 p.m. eastern time on
March 22, 2005. 6. Southwest Power Pool, Inc.
FPA is renewed automatically without
[Docket No. ER05–490–001]
further order or notice by the 2. California Independent System
Commission, unless the Commission Operator Corporation Take notice that on March 7, 2005,
orders otherwise. [Docket Nos. ER98–997–006, ER98–1309– Southwest Power Pool, Inc. (SPP)
If the project is not subject to section 005, ER02–2297–005, and ER02–2298–005] submitted for filing an amendment to an
15 of the FPA, notice is hereby given executed service agreement for Firm
Take notice that on March 2, 2005, the
that Southern California Edison Point-To-Point Transmission Service
California Independent System Operator
Company is authorized to continue with Southwestern Public Service
Corporation (ISO) submitted a filing in
operation of the Borel Project No. 382 Company (Southwestern) previously
compliance with the Commission’s
until such time as the Commission acts filed with the Commission in Docket
Order issued February 11, 2005, 110
on its application for subsequent No. ER05–490–000 on January 26, 2005.
FERC ¶ 61,122.
SPP seeks an effective date of January 1,
license. The ISO states that this filing has been
2005, for the service agreement.
served on all parties on the official
Magalie R. Salas, SPP states that Southwestern was
service lists for the above-captioned
Secretary. dockets. In addition, the ISO states that served with a copy of this filing.
[FR Doc. E5–1152 Filed 3–15–05; 8:45 am] the filing has been posted on the ISO Comment Date: 5 p.m. eastern time on
BILLING CODE 6717–01–P Home Page. March 16, 2005.

VerDate jul<14>2003 16:45 Mar 15, 2005 Jkt 205001 PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 E:\FR\FM\16MRN1.SGM 16MRN1
12864 Federal Register / Vol. 70, No. 50 / Wednesday, March 16, 2005 / Notices

7. New England Power Company 10. Midwest Independent Transmission (VEC) tendered for filing its second
[Docket No. ER05–530–001]
System Operator, Inc. annual formula rate update to its open
[Docket No. ER05–667–000]
access transmission tariff (OATT), FERC
Take notice that on March 2, 2005,
Electric Tariff, Original Volume No. 1
New England Power Company (NEP) Take notice that on March 2, 2005, the
and First Revised Rate Schedule FERC
tendered for filing an amendment to its Midwest Independent Transmission
Nos. 4 and 6. VEC states that the OATT
January 31, 2005, filing in Docket No. System Operator, Inc. (Midwest ISO)
charges produced by the formula rates
ER05–530–000. NEP states that the submitted an unexecuted Large
are applicable to the new VEC-specific
amendment consists of Substitute Generator Interconnection Agreement
Local Service Schedule of the ISO New
Service Agreements for Network among Montana-Dakota Utilities Co.,
England Tariff, FERC Electric Tariff No.
Integration Transmission Service under Dakota Wind Harvest, LLC and the
3, as well as the subsequent Local
NEP’s FERC Electric Tariff, Second Midwest ISO.
Service Schedule that may be filed with
Revised Volume No. 9. NEP reiterates its Midwest ISO states that a copy of this
the Commission in the future.
request for an effective data of January filing was served on the parties to this
VEC states that a copy of this filing is
1, 2005. Interconnection Agreement.
Comment Date: 5 p.m. eastern time on being served on each of the customers
NEP states that copies of this filing
March 23, 2005. under the OATT and Rate Schedule
have been served on Dominion Energy
FERC Nos. 4 and 6, the Vermont Public
and regulators in the States of 11. New England Power Company Service Board and the Vermont
Massachusetts and Rhode Island.
Comment Date: 5 p.m. eastern time on [Docket No. ER05–668–000] Department of Public Service.
March 23, 2005. Comment Date: 5 p.m. eastern time on
Take notice that on March 2, 2005,
March 23, 2005.
New England Power Company (NEP)
8. Public Service Company of New
submitted for filing an Interconnection 14. FirstEnergy Service Company
Mexico
Agreement between NEP and Bear
[Docket No. ER05–671–000]
[Docket No. ER05–664–000] Swamp Power Co. LLC (Bear Swamp
Take notice that on March 2, 2005, the Power) designated as a service Take notice that on March 2, 2005,
Public Service Company of New Mexico agreement under ISO New England FirstEnergy Service Company
(PNM) submitted for filing an interim Inc.’s transmission, markets and (FirstEnergy) Tendered for filing a
invoicing agreement with respect to services tariff, ISO New England Inc., Notice of Cancellation of a Generator
invoicing for coal deliveries from San FERC Electric Tariff No. 3. NEP states Interconnection and Operating
Juan Coal Company among PNM, that the Agreement concerns the Agreement between FirstEnergy Nuclear
Tucson Electric Power Company (TEP), interconnection of the Bear Swamp Operating Company and American
and the other owners of interests in the Project, a hydro-electric generating unit, Transmission Systems, Incorporated
San Juan Generating Station covering to NEP’s transmission system. (ATSI), designated as Service
the period from January 1, 2005, NEP states that copies of this filing Agreement No. 290 under ATSI’s FERC
through December 31, 2005. PNM states have been served on Bear Swamp Electric Tariff, Second Revised Volume
that the interim invoicing agreement is Power, ISO New England, Inc. and No. 1. ATSI requests an effective date of
an appendix to the San Juan Project regulators in the Commonwealth of January 1, 2005.
participating agreement (PPA), and Massachusetts. FirstEnergy states that a copy of the
effectively modifies the PPA for that Comment Date: 5 p.m. eastern time on filing was served upon the parties to the
same period. March 23, 2005. Service Agreement No. 290.
On February 8, 2005, Tucson Electric Comment Date: 5 p.m. eastern time on
12. New England Power Company March 23, 2005.
Power Company filed a certificate of
concurrence in connection with the [Docket No. ER05–669–000] 15. PacifiCorp
2005 interim invoicing agreement for Take notice that on March 2, 2005,
New England Power Company (NEP) [Docket No. ER05–674–000]
the San Juan Generating Station. PNM
requests an effective date of January 1, submitted for filing an interconnection Take notice that on March 2, 2005,
2005. agreement between NEP and Bear PacifiCorp tendered for filing the
PNM states that copies of the filing Swamp Power Co. LLC (Bear Swamp February 18, 2005, Joint Operating
have been sent to the New Mexico Power) under ISO New England Inc.’s Agreement between PacifiCorp and
Public Regulation Commission, the New transmission, markets and services Utah Associated Municipal Power
Mexico Attorney General, TEP and each tariff, ISO New England Inc., FERC Systems (UAMPS).
of the owners of interest in the San Juan Electric Tariff No. 3. NEP states that the PacifiCorp states that copies of this
Generating Station. Agreement concerns the interconnection filing were supplied to the Public Utility
Comment Date: 5 p.m. eastern time on of the Fife Brook Development, a hydro- Commission of Oregon, the Washington
March 23, 2005. electric generating unit, to NEP’s Utilities and Transportation
transmission system. Commission, and UAMPS.
9. Barrick Goldstrike Mines Inc. Comment Date: 5 p.m. eastern time on
NEP states that copies of this filing
[Docket No. ER05–665–000] have been served on Bear Swamp March 23, 2005.
Take notice that on March 2, 2005, Power, ISO New England, Inc. and 16. Black Hills Power, Inc.
Barrick Goldstrike Mines Inc. submitted regulators in the Commonwealth of
an application, pursuant to section 205 Massachusetts. [Docket No. RT01–50–001]
of the Federal Power Act, for an order Comment Date: 5 p.m. eastern time on Take notice that on March 1, 2005,
accepting its proposed market-based March 23, 2005. Black Hills Power, Inc., pursuant to the
rate tariff and granting certain blanket Commission’s letter order issued
13. Vermont Electric Cooperative, Inc.
authorizations and waivers of the February 8, 2005, submitted a report on
Commission’s regulations. [Docket No. ER05–670–000] its recent and current efforts with
Comment Date: 5 p.m. eastern time on Take notice that on March 2, 2005, the respect to regional transmission
March 23, 2005. Vermont Electric Cooperative, Inc. organizations.

VerDate jul<14>2003 16:45 Mar 15, 2005 Jkt 205001 PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 E:\FR\FM\16MRN1.SGM 16MRN1
Federal Register / Vol. 70, No. 50 / Wednesday, March 16, 2005 / Notices 12865

Comment Date: 5 p.m. eastern time on DEPARTMENT OF ENERGY other things, limits PacifiCorp’s
March 22, 2005. commitment to fund decommissioning
Federal Energy Regulatory to $17,150,000 (1999 dollars), of which
17. First Electric Cooperative Commission a maximum of $2,000,000 would be for
Corporation permitting and mitigation costs.
[Docket No. RT01–59–001]
Notice of Settlement Agreement Anticipating that permitting and
Modification and Solicitation of mitigation costs will exceed $2,000,000,
Take notice that on March 1, 2005, Comments PacifiCorp signed a memorandum of
First Electric Cooperative Corporation, agreement with the parties that modifies
March 10, 2005.
pursuant to the Commission’s letter the 1999 settlement agreement to: (1)
order issued February 8, 2005, Please take notice that the following
settlement agreement modification has Delay the commencement of
submitted a report on its recent and decommissioning to October 1, 2008; (2)
been filed with the Commission and is
current efforts with respect to regional increase PacifiCorp’s commitment to
available for public inspection. The
transmission organizations. fund decommissioning to $20,450,000
filing includes a request to amend an
Comment Date: 5 p.m. eastern time on associated decommissioning application (1999 dollars); and (3) increase the
March 22, 2005. to reflect the settlement agreement maximum amount of permitting and
modification. mitigation costs to $5,300,000 (1999
Standard Paragraph dollars). By this notice, we are
a. Type of Application: Modification
of Settlement Agreement. providing an opportunity to submit
Any person desiring to intervene or to comments concerning the modified
protest this filing must file in b. Project No.: P–2342–011.
c. Date filed: February 28, 2005. provisions of the settlement agreement.
accordance with Rules 211 and 214 of k. A copy of the memorandum of
the Commission’s Rules of Practice and d. Applicant: PacifiCorp.
e. Name of Project: Condit agreement modifying the settlement
Procedure (18 CFR 385.211 and agreement is available for review at the
Hydroelectric Project.
385.214). Protests will be considered by Commission in the Public Reference
f. Location: On the White Salmon
the Commission in determining the Room or may be viewed on the
River in Klickitat and Skamania
appropriate action to be taken, but will Counties, Washington. Commission’s Web site at http://
not serve to make protestants parties to g. Applicant Contact: Jeff Lovinger, www.ferc.gov using the ‘‘eLibrary’’ link.
the proceeding. Any person wishing to 825 NE. Multnomah, Suite 1500, Enter the docket number excluding the
become a party must file a notice of Portland, Oregon 97232; (503) 230– last three digits in the docket number
intervention or motion to intervene, as 7120. field to access the document. For
appropriate. Such notices, motions, or h. FERC Contact: Nicholas Jayjack, assistance, contact FERC Online
protests must be filed on or before the (202) 502–6073; Support at
comment date. Anyone filing a motion Nicholas.Jayjack@ferc.gov. FERCOnlineSupport@ferc.gov or toll-
to intervene or protest must serve a copy i. Deadline for filing comments: free at 1–866–208–3676, or for TTY,
of that document on the Applicant and March 21, 2005. Reply comments due (202) 502–8659. A copy is also available
all parties to this proceeding. March 31, 2005. for inspection and reproduction at the
All documents (original and eight address in item h above.
The Commission encourages You may also register online at
electronic submission of protests and copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy http://www.ferc.gov/docs-filing/
interventions in lieu of paper using the esubscription.asp to be notified via e-
Regulatory Commission, 888 First
‘‘eFiling’’ link at http://www.ferc.gov. mail of new filings and issuances
Street, NE., Washington, DC 20426.
Persons unable to file electronically related to this or other pending projects.
The Commission’s Rules of Practice
should submit an original and 14 copies For assistance, contact FERC Online
require all intervenors filing documents
of the protest or intervention to the with the Commission to serve a copy of Support.
Federal Energy Regulatory Commission, that document on each person on the Magalie R. Salas,
888 First Street, NE., Washington, DC official service list for the project. Secretary.
20426. Further, if an intervenor files comments [FR Doc. E5–1151 Filed 3–15–05; 8:45 am]
This filing is accessible on-line at or documents with the Commission
BILLING CODE 6717–01–P
http://www.ferc.gov, using the relating to the merits of an issue that
‘‘eLibrary’’ link and is available for may affect the responsibilities of a
review in the Commission’s Public particular resource agency, they must DEPARTMENT OF ENERGY
Reference Room in Washington, DC. also serve a copy of the document on
There is an ‘‘eSubscription’’ link on the that resource agency. Federal Energy Regulatory
Web site that enables subscribers to Comments may be filed electronically Commission
receive e-mail notification when a via the Internet in lieu of paper. The
[Docket No. RM05–7–000 and AD04–13–000]
document is added to a subscribed Commission strongly encourages
docket(s). For assistance with any FERC electronic filings. See 18 CFR Potential New Wholesale Transmission
Online service, please e-mail 385.2001(a)(1)(iii) and the instructions Services; Assessing the State of Wind
on the Commission’s Web site (http:// Energy in Wholesale Electricity
FERCOnlineSupport@ferc.gov, or call
www.ferc.gov) under the ‘‘e-Filing’’ link. Markets; Notice of Final Agenda for
(866) 208–3676 (toll free). For TTY, call
j. On October 29, 1999, PacifiCorp Technical Workshop
(202) 502–8659. filed a settlement agreement, signed by
Linda Mitry, 23 Federal and State agencies and non- March 10, 2005.
Deputy Secretary. governmental organizations, to As announced in the Notice of
[FR Doc. E5–1136 Filed 3–15–05; 8:45 am]
decommission the Condit Hydroelectric Technical Workshop issued on February
Project commencing October 1, 2006. 1, 2005, and March 2, 2005, the staffs of
BILLING CODE 6717–01–P
The 1999 settlement agreement, among Bonneville Power Administration (BPA)

VerDate jul<14>2003 16:45 Mar 15, 2005 Jkt 205001 PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 E:\FR\FM\16MRN1.SGM 16MRN1

You might also like