You are on page 1of 13

166000 Cartagena Refinery Project

SUBCONTRACTOR DOCUMENT
COVER SHEET
Subcontractor Name: Ingeniera Especializada S.A. - IEB S.A.
Purchase Offer No.: SC-1611
Purchase Offer Title:

ITT 166000-SC-1611 Computarized Protective Relay Settings file


Documents

CB&I Document No.:


Subcontractor Document Number

Rev.

Rev. Date

SC-1611-BT-P-12

03/25/2014

Document Title: Multilin 339 Motor Protection Testing Protocol


GENERAL INSTRUCTIONS TO SUBCONTRACTORS
Listed below is the current approval status of your documents. Refer to status code listed hereunder for further information. Revisions originated
by the Subcontractor shall be identified by revision triangles with revision numbers and by revision clouds which shall be removed after each
approval cycle.
- CB&I Subcontracts representative must be advised immediately of any price or delivery change before proceeding.
- Correct and resubmit documents stamped '3' or '4' within 10 working days.
- Stamp documents "Certified" and resubmit within 10 working days for documents returned stamped '2'.
- For technical questions regarding the comments made, contact the CB&I Subcontracts Representative assigned to this P.O.

SUBCONTRACTOR DOCUMENT REVIEW


Subcontracts Representative review of Subcontract documents does not relieve Subcontractor of the responsibility for correctness under the
Purchase Offer. Permission to proceed does not constitute acceptance of design, detail and calculations, test methods or materials developed or
selected by the Subcontractor and does not relieve the Subcontractor from full compliance with the Purchase Offer or any other obligations, nor
detract from any of the Purchasers rights.

IMPORTANT
Should the Subcontractor consider that any comments made by the Purchaser change the Scope, the Subcontractor shall advise the
price and delivery implications of such changes within five working days of receipt. The Subcontractor must not incorporate such
changes without prior approval of the Purchaser of the revised price and/or delivery period. RETROSPECTIVE CLAIMS WILL NOT BE
CONSIDERED.

CBI Americas Ltd. 2008-2010. All rights reserved. Contains confidential information proprietary to CB&I, or its
affiliates, clients or suppliers and may not be used, reproduced or disclosed without CB&I's prior written permission.

DOCUMENT CODE:
SC-1611-BT-P-12
MULTILIN 339 MOTOR PROTECTION TESTING PROTOCOL
DATE: 03/25/2014
Revision 1

Pgina 2

MULTILIN 339 MOTOR PROTECTION TESTING PROTOCOL

Substation number:

Voltage Level:

18
Relay Tag Number:

4160
Relay Type:

18-11M-339-005

SR339

Switchgear Tag
Number:
18-MCC-1-01A

Cubicle Number:

Relay serial number:

Firmware Version:

Unit 1RA

BL2A12001505

1.5

1. INITIAL CHECKS
1.1 Conditions of equipment necessary for testing
1.2 Safety conditions of the working site
1.3 Verify that no current exist through secondary circuits of the CTs

2. VISUAL AND MECHANICAL INSPECTION


2.1 Operation of light-emitting diodes (Status/Target LEDs) through the activation
of the associated signal.
STATUS LEDS

CHECK

IN SERVICE
TROUBLE
LOCKOUT
START INHIBIT
TRIP
ALARM
PICKUP
MAINTENANCE
STOPPED
STARTING
RUNNING
HOT RTD

2.2 Relay case and front panel conditions


2.3 Tightness of connections
2.4 Grounded frame in accordance with relay manufacturer's instructions
2.5 Operation of front-panel display and control buttons
2.6 Relay settings in accordance to coordination study

DOCUMENT CODE:
SC-1611-BT-P-12
MULTILIN 339 MOTOR PROTECTION TESTING PROTOCOL
DATE: 03/25/2014
Revision 1

Pgina 3

3. ELECTRICAL TESTS
The following tests will be performed based on the typical wiring diagram shown below.

DOCUMENT CODE:
SC-1611-BT-P-12
MULTILIN 339 MOTOR PROTECTION TESTING PROTOCOL
DATE: 03/25/2014
Revision 1

Pgina 4

3.1 Analog current inputs measurement test (maximum error under the accuracy declared by manufacturer in the device's inputs specifications). This test will be done by
secondary injection of the currents shown in the following table, and its result will be positive if the calculated error is below the accuracy specified by the relay
manufacturer as stated in the reference manual.
Calculated Error
Injected Current (1)
Measured Current (2)
(3)={[(1)*CTR - (2)] / (1)*CTR}*100
Description
(A secondary)
(A Primary)
%
A

A1

20% of Rated
Current

30

50% of Rated
Current

2,5

2,5

100% of Rated
Current

Sequence
Current Test

2,5

B2

C3

75
150.1
30<358

75<118

150.1<238

OBSERVATIONS:

3.2 Analog voltage inputs measurement test (maximum error under the accuracy declared by manufacturer in the device's inputs specifications). This test will be done by
secondary injection of the currents shown in the following table, and its result will be positive if the calculated error is below the accuracy specified by the relay
manufacturer as stated in the reference manual.
Description

Injected Voltage (1)

For the sequence current test this will be the positive sequence current value
For the sequence current test this will be the negative sequence current value
3
For the sequence current test this will be the zero sequence current value
2

Measured Voltage (2)

Calculated Error
(3)={[(1)*VTR - (2)] / (1)*VTR}*100

DOCUMENT CODE:
SC-1611-BT-P-12
MULTILIN 339 MOTOR PROTECTION TESTING PROTOCOL
DATE: 03/25/2014
Revision 1

Pgina 5

(V secondary)

(V Primary)

A-B

B-C

C-A

A-B

20% of Rated
Voltage

24

840

50% of Rated
Voltage

60

100% of Rated
Voltage

120

Voltage
Sequence Test

24

60

120

OBSERVATIONS:
La fase C no se encuentra conectada.

3.3 Self-test alarms inactive in the relay (front panel status LEDs or display)

4
5
6

For the sequence voltage test this will be the positive sequence voltage value
For the sequence voltage test this will be the negative sequence voltage value
For the sequence voltage test this will be the zero sequence voltage value

B-C

%
C-A

A-B

B-C

C-A

DOCUMENT CODE:
SC-1611-BT-P-12
MULTILIN 339 MOTOR PROTECTION TESTING PROTOCOL
DATE: 03/25/2014
Revision 1

Pgina 6

3.4 Functional operation test of every function set in the coordination study. Attached to this protocol the summarized settings of the relay being tested are shown.

27

49

66

38

50

TCS

46

50G

47

51LR

IMPORTANT NOTE: Every protection function will be tested using the test set, and the detailed results will appear in the test report, as an attachment to this protocol

OBSERVATIONS:

3.5 Operation of all digital inputs available in the relay (digital input signal recognized by the relay).

C1 52a

C5 INPUT5

C9 INPUT9

C2 52b

C6 INPUT6

C10 INPUT10

C3 INPUT3

C7 INPUT7

C4 INPUT4

C8 INPUT8

DOCUMENT CODE:
SC-1611-BT-P-12
MULTILIN 339 MOTOR PROTECTION TESTING PROTOCOL
Pgina 7

DATE: 03/25/2014
Revision 1

This test will be done by applying 125 Vdc from the auxiliary DC output of the test set to the specific input pair of terminals. For example, for testing C5 input, the positive polarity of
the DC signal must be applied to the C5 terminal and the negative polarity to C11 (Common reference terminal for the whole set of digital inputs). The change of state in the digital
input being tested must be verified through the Actual Values menu in the EnerVista SR3 Setup software after establishing connection with the relay being tested, as it is shown in
the next capture.

DOCUMENT CODE:
SC-1611-BT-P-12
MULTILIN 339 MOTOR PROTECTION TESTING PROTOCOL
DATE: 03/25/2014
Revision 1

Pgina 8

3.6 Operation of all output contacts available in the relay (closing or opening of the output contacts from the activation of any logic programmed in the
relay).

A2-B3-A3

A8-B9-A9

B4-A4-B5

B10-A10-B11

A5-B6-A6

A11-B12-A11

B7-A7-B8
This test will be done through the activation of an auxiliary logic programmed just for the purpose of testing the output contacts. Such logic will be programmed as a bypass signal,
which means that by the activation of a contact input (using the same method explained before) the contact output being tested is activated. A graphic explanation for programming
this logic is given below:

3.7 Adequate operation of the logic functions programmed in the relay, if applicable, by activating the input elements of such logics, according to the logic scheme implemented
and using the wiring diagrams as a guide.

DOCUMENT CODE:
SC-1611-BT-P-12
MULTILIN 339 MOTOR PROTECTION TESTING PROTOCOL
DATE: 03/25/2014
Revision 1

Pgina 9

3.8 All the records, statistics, counters and events reset upon completion of testing

SUBCONTRACTOR SIGNATURE

EPC CONTRACTOR SIGNATURE

DOCUMENT CODE:
SC-1611-BT-P-12
MULTILIN 339 MOTOR PROTECTION TESTING PROTOCOL
DATE: 03/25/2014
Revision 1

Pgina 10

4. FUNCTIONAL TESTS
4.1 Operation of all active digital inputs (digital input signal recognized by the relay)

Binary Input ID

Signal Assignment Description

DNP Point
(if applicable)

Operation Check

C Card INPUT 1
C Card INPUT 2
C Card INPUT 3
C Card INPUT 4
C Card INPUT 5
C Card INPUT 6
C Card INPUT 7
C Card INPUT 8
C Card INPUT 9
C Card INPUT 10
IMPORTANT NOTE: This test will have attached the wiring diagrams detailing the signals wired to the input contacts of the relay.

OBSERVATIONS:

DOCUMENT CODE:
SC-1611-BT-P-12
MULTILIN 339 MOTOR PROTECTION TESTING PROTOCOL
DATE: 03/25/2014
Revision 1

Pgina 11

4.2 Operation of the programmed output contacts. Test every output by operating the controlled device (circuit breaker, auxiliary relay or alarm)

Binary Input ID

Signal Assignment Description/Controlled Device

Operation Check

OUTPUT 1
OUTPUT 2
OUTPUT 3
OUTPUT 4
OUTPUT 5
OUTPUT 6
OUTPUT 7
IMPORTANT NOTE: This test will be done by secondary injection of a trip condition or by activating each logic element programmed to the active output contacts

OBSERVATIONS:

DOCUMENT CODE:
SC-1611-BT-P-12
MULTILIN 339 MOTOR PROTECTION TESTING PROTOCOL
DATE: 03/25/2014
Revision 1

Pgina 12

4.3 Perform transfer and/or received DTT specifying the devices interacting
DTT Signal ID/Description

DTT Source Device

DTT Destination Device

Transmission Check

Reception Check

IMPORTANT NOTE: This test will be done by secondary injection of a trip condition in the source device and checking the receiving of this signal in the destination device.
OBSERVATIONS:

4.4 Verify the correct processing of at least 25% of the signals configured in the DNP points tested. The following is the suggested 25% of the signals to be tested. For a
detailed and complete list of the DNP signals assigned to this specific relay, see the checklist attached at the end of this document.

Type (AI, DI, DO,


ACCUM)

DNP
Object

Variation

DNP Index

Modbus
Register

XX-11M-339-016_MCC Alarm

D.I

42215

XX-11M-339-016_PCS ON

D.I

42215

XX-11M-339-016_PCS OFF

D.I

43878

Short Point Name Description

Operation
Check

DOCUMENT CODE:
SC-1611-BT-P-12
MULTILIN 339 MOTOR PROTECTION TESTING PROTOCOL
DATE: 03/25/2014
Revision 1

Pgina 13

Type (AI, DI, DO,


ACCUM)

DNP
Object

Variation

DNP Index

Modbus
Register

XX-11M-339-016_MCC Run

D.I

43879

XX-11M-339-016_MCC Stop

D.I

43880

XX-11M-339-016_MCC Fault/Trip

D.I

43881

XX-11M-339-016_SIS Command

D.I

43882

XX-11M-339-016_CB Open

D.I

30328

XX-11M-339-016_CB Closed

D.I

30330

XX-11M-339-016_Trip (86)

D.I

30332

XX-11M-339-016_Phase A Curr

A.I

30

30328

XX-11M-339-016_ Phase B Curr

A.I

30

30330

XX-11M-339-016_Phase C Curr

A.I

30

30332

XX-11M-339-016_Neutral Curr

A.I

30

30326

Short Point Name Description

Operation
Check

4.5 All the records, statistics, counters and events reset upon completion of testing

SUBCONTRACTOR SIGNATURE

EPC CONTRACTOR SIGNATURE