You are on page 1of 1

Federal Register / Vol. 70, No.

42 / Friday, March 4, 2005 / Notices 10687

maintain the records until the prohibits employers from overloading schedules are used to calculate the base
underground-construction project is floors in areas used to store material and period wages and benefits payable
complete; they must also make the equipment in multi-story units that are under the Unemployment
records available to OSHA compliance under construction, thereby preventing Compensation for Ex-servicemembers
officers on request. the floors from collapsing and seriously (UCX) Program.
Maintaining records of air-quality injuring employees. The revised schedule reflects
tests allow employers to document Agency: Occupational Safety and increases in military pay and
atmospheric hazards, and to ascertain Health Administration. allowances which are effective as of
the effectiveness of controls (especially Type of Review: Extension of January 2, 2005.
ventilation) and implement additional currently approved collection.
controls if necessary. Title: Cranes and Derricks Standards Accordingly, the following new
Accordingly, these requirements for Construction: Posting Weight and Schedule of Remuneration, issued
prevent serious injury and death to Load Capacity of Personnel Platforms. pursuant to 20 CFR 614.12(c), applies to
employees who work on underground- OMB Number: 1218–0151. UCX ‘‘first claims’’ filed beginning with
construction projects. In addition, these Frequency: On occasion. the first day of the first week which
records provide an efficient means for Type of Response: Third party begins on or after January 2, 2005.
employees to evaluate the accuracy and disclosure.
effectiveness of an employer’s exposure- Affected Public: Business or other for- Monthly
Pay grade
profit; not-for-profit institutions; Federal wage rate
reduction program, and for OSHA
compliance officers to determine that government; and State, local, or tribal
(1) Commissioned Officers
employers performed the required tests government.
and implemented appropriate controls. Number of Respondents: 2,750. 0–10 ........................................ $15,794.44
Agency: Occupational Safety and Number of Annual Responses: 2,750. 0–9 .......................................... 15,505.47
Health Administration. Estimated Time per Response: 5 0–8 .......................................... 14,332.05
Type of Review: Extension of minutes. 0–7 .......................................... 13,029.68
currently approved collection. Total Burden Hours: 229. 0–6 .......................................... 11,110.25
Title: Construction Standards on Total Annualized capital/startup 0–5 .......................................... 9,350.01
Posting Emergency Telephone Numbers costs: $0. 0–4 .......................................... 7,980.46
and Floor Load Limits. Total Annual Costs (operating/ 0–3 .......................................... 6,243.46
OMB Number: 1218–0093. maintaining systems or purchasing 0–2 .......................................... 4,978.80
Frequency: On occasion. services): $0. 0–1 .......................................... 3,793.06
Type of Response: Third party Description: Paragraph (g)(4)(ii)(I) of
the Cranes and Derricks Standard for (2) Commissioned Officers With Over 4
disclosure.
Construction (Sec. 1926.550) requires Years Active Duty As An Enlisted Member
Affected Public: Business or other for- or Warrant Officer
profit; not-for-profit institutions; Federal employers to post conspicuously with a
government; and State, local, or tribal plate or other permanent marking the 0–3E ....................................... 7,261.85
government. weight and rated load capacity or 0–2E ....................................... 5,954.09
Number of Respondents: 74,325. maximum intended loads of each 0–1E ....................................... 5,070.74
Number of Annual Responses: 74,325. platform used to raise and lower
Estimated Time per Response: 2 employees to a worksite using a crane (3) Warrant Officers
minutes for posting an emergency or derrick. This requirement helps
telephone number and 15 minutes for employers to avoid exceeding the lifting W–5 ........................................ 8,241.70
posting floor load limits. capacity of such platforms and the W–4 ........................................ 7,290.50
Total Burden Hours: 8,901. cranes or derrick being used to lift the W–3 ........................................ 6,237.04
Total Annualized capital/startup W–2 ........................................ 5,348.60
platforms. Therefore, this requirement
costs: $0. W–1 ........................................ 4,486.11
can prevent the platform, crane, or
Total Annual Costs (operating/ derrick from collapsing and causing (4) Enlisted Personnel
maintaining systems or purchasing serious injury or death to employees on
services): $0. or below the platform. E–9 ......................................... 6,979.58
Description: Two Construction E–8 ......................................... 5,876.55
standards, ‘‘Medical Services and First Ira L. Mills,
E–7 ......................................... 5,176.04
Aid’’ (Sec. 1926.50), and ‘‘General Departmental Clearance Officer. E–6 ......................................... 4,475.77
Requirements for Storage’’ (Sec. [FR Doc. 05–4211 Filed 3–3–05; 8:45 am] E–5 ......................................... 3,704.19
1926.250), contain posting provisions. BILLING CODE 4510–26–P E–4 ......................................... 3,071.39
Paragraph (f) of Sec. 1926.50 requires E–3 ......................................... 2,751.65
employers to post emergency telephone E–2 ......................................... 2,618.25
numbers for physicians, hospitals, or DEPARTMENT OF LABOR E–1 ......................................... 2,388.62
ambulances at the worksite if the 911
emergency telephone services is not Employment and Training The publication of this new Schedule
available; in the event an employee has Administration of Remuneration does not revoke or
a serious injury at the worksite, this Revised Schedule of Remuneration for change the period of time for any prior
posting requirement expedites the UCX Program schedule that was in effect.
emergency medical treatment of the Signed at Washington, DC, on February 28,
employee. Paragraph (a)(2) of Sec. Under Section 8521(a)(2) of Title 5 of 2005.
1926.250 specifies that employers must the United States Code, the Secretary of
Emily Stover DeRocco,
post the maximum safe load limits of Labor is required to issue a Schedule of
floors located in storage areas inside Remuneration specifying the pay and Assistant Secretary of Labor.
buildings or other structures, unless the allowances for each pay grade of [FR Doc. E5–896 Filed 3–3–05; 8:45 am]
floors are on grade. This provision members of the military services. The BILLING CODE 4510–30–P

VerDate jul<14>2003 19:07 Mar 03, 2005 Jkt 205001 PO 00000 Frm 00097 Fmt 4703 Sfmt 4703 E:\FR\FM\04MRN1.SGM 04MRN1

You might also like