Support UDD to develop disaster risk reduction integrated physical plan/land use
map for Mymensingh urban areas along with rural (10 new unions) areas
Model development for enhancing capacities of seismic retrofitting technology
of critical infrastructures training to engineers & professionals, PWD retrofitting cell
establishment, seismic retrofitting assessments of three major buildings
Landslide hazard assessment study conducted on landslide zonation mapping for Coxs
Safer City campaign Orientation workshop for Mayors on LG-SAT and CRA/FTCRA in
cooperation with UNISDR & MAB under Safer City Campaign: Making Cities Resilient. Till now 180
Municipal Mayors of Bangladesh signed UNISDR Protocol.
1st batch completed in March with 16 participants Mayors
2nd batch is scheduled at June 01-02 with likely participants of 36
Mymensingh Municipality
MoU & FA signed with Sylhet City Corporation for re-excavation of various khal/chora
and drain; under tendering process
Construction of road side U drain, box culvert, guard wall, footpath, catch-pit and canal
re-excavation at Chittagong City Corporation work started recently (10% progress)
Re-excavation works along with construction of RCC retaining wall on both sides of
Mohesh khal in Chittagong - under tendering process
Management Committee
Ongoing training to urban registered volunteers on contingency planning, conduct
simulation drill, overseas tour program for FSCD personnel.
Expand support to FSCD for procuring equipment