ANNEXURE - I

SECTION - I
SUMMARY FOR CIVIL WORKS - COMPOUND WALL WORKS
It. No.
A
1

Description of Items
COMPOUND WALL
COMPOUND WALL
Building Workers welfare Cess - 1%
TOTAL

Amount

10,426,550.00
104,265.50
10,530,815.50

Remarks

TCS , ADIBHATLA

Section I - Revised BOQ

TCS , HYDERABAD AT ADIBATLA


REVISED BOQ FOR COMPOUND WALL CIVIL WORKS IN SEZ AREA
SECTION-I
REVISED BOQ
It. No.

ITEM

DESCRIPTION OF ITEMS

UNIT

PREAMBLE
The description of an item shall be deemed to include all
preambles, headings, sub-headings and references to other
documents. The detailed description of work and materials,
given in the Specification are not necessarily repeated in the
Bill of Quantities.
The Preamble to the Bills of Quantities must be read with the
Drawings, Conditions of Contract and the Specification and the
tenderer shall be deemed to have examined the Drawings,
Specifications, Conditions of Contract and to have acquainted
himself with the Works to be done and the way in which they
are to be carried out. This preamble to the Bills of Quantities
shall form part of the Contract.
Tenderers are instructed to quote "rate only" for all QRO items
without fail and not to enter any amount in the amount column.
The rates quoted under QRO items is negotiable during the
evaluation of the tender and the rationalised rate only will be
considered if there is a need to operate QRO items during
execution. Any percentage of discount / rebate offered by the
tenderer during negotiation is applicable on all the quoted rates
of the tendered items including "QRO" Items.
Providing and forming all temporary roads / Pathways, cross
over, foot path, tracks, hard standings, Temporary ramp to
approach the excavated level etc. within the site and shall
provide temporary foot path outside the boundaries if required
to protect the public entering into the construction area at no
extra cost.
Providing and maintaining Field Laboratory in a satisfactory
manner till the completion of work to ensure site control on
quality of materials and the works and shall strictly comply with
provision of Indian/ International Standards at no extra cost. All
other regular tests including requisite materials shall be carried
out as directed either at approved laboratory or at site at no
extra cost.
The Tenderers are requested to inspect the site and obtain for
themselves at their own expense all necessary information and
particulars to enable them to submit the tender.
The dimensions shown in the drawings shall have to be verified
by the contractor at site before execution of the items and
necessary allowance's have to be made as per the actual
dimensions available at site.
For the items of works having Basic rate of material, price
adjustment will be made only on the actual quantity measured.
Wastage shall be to Contractors account. Basic rate indicates
landed cost at site including transportation charges, loadingunloading and all other levies and taxes as applicable.
The contractor should refer to the detailed drawings for details.
All the rates so quoted should be inclusive of all hardware. In
case of discrepancy between drawing and Bill of Quantity the
drawing supersedes, unless specifically mentioned in the BOQ.

Page 1 of 9

QUANTITY

RATE

AMOUNT

Remarks

TCS , ADIBHATLA

Section I - Revised BOQ


REVISED BOQ

It. No.

ITEM

DESCRIPTION OF ITEMS
The work shall be carried out as per drawings, specifications,
the description of the items in the schedule and / or engineers
instructions.
All pre-fabrication works wherever possible shall be carried
outside the client's premises, only assembling and finishing
work will be allowed within the Site.
Items of work provided in this schedule but not covered in the
specifications shall be executed strictly as per instructions of
the engineer.
Unless otherwise mentioned in the contract, the tenderer shall
quote for the finished items and shall provide for the complete
cost towards labour, materials, plant and machinery,
operational costs, levies, taxes, transport, repairs, rectification,
maintenance
till
handing
over,
revenue
expenses,
contingencies, overheads, profits and all incidental items not
specifically mentioned but reasonably implied and necessary to
complete the works according to the contract.
The quantities of the various items mentioned in the schedule
of items are approximate and may vary up to any extent or be
deleted altogether. The quoted rates of each item shall remain
firm as long as the variation in the total value of the works
executed under this contract including extra items, if any,
remain within + 25% of the tendered value of the works. The
contractor, in his own interest, should get an indication of the
probable extent of the work to be executed under any particular
item in this schedule, before undertaking any preliminary and
enabling work or purchasing bought out components related to
the work.
Rates shall be quoted both in figures and in words in clear
legible writing. No overwriting is allowed. All scoring and
cancellations should be countersigned by the tenderer. In case
of illegibility, the interpretation of the engineer shall be final. All
entries shall be in English language.
The Engineer-in-charge's decision shall be final and binding on
the contractor regarding clarifications of items in this schedule
with respect to the other sections of the Contract.
It may be noted that the total work or any part / parts of the
same may be awarded as mentioned in this schedule of items.
The rates quoted shall be inclusive of all mock-ups, associated
samples prior to any mass production or procurement as per
complete satisfaction of the Client and Architect. Inclusive of
dismantling, demolishing and carting the material and making
good of the surface.
Any debris generated out of the said work may please be
cleared on priority basis from the Site. The contractor to allow
for work to be executed on the upper Floors, temporary
storage of material on the Ground Floor, for hoisting material
to the upper floors, for bringing debris and waste down, for coordinating and scheduling movement of material with facilities
available on site. The disposal of debris will be the sole
responsibility of the Contractor.
Any fault that occurs during the time of production, shifting or
installation of finished materials should be replaced with good
one as per the instruction from Engineer-in-charge.
Basic Prices for Cement OPC 53 Grade - 210 Rs/ Bag ( SEZ)
& Reinforcement steel ( Fe 500) - 40,000 Rs/MT
The abbreviations used in the Specification and Bill of
Quantities shall be read as follows :
IS :- Indian Standard
A.S.T.M :- American Society for Testing and Materials
EIC-Engineer in Charge
Page 2 of 9

UNIT

QUANTITY

RATE

AMOUNT

Remarks

TCS , ADIBHATLA

Section I - Revised BOQ


REVISED BOQ

It. No.

1.00
1.01

ITEM

DESCRIPTION OF ITEMS
MM or mm :- Millimetre /s
CM and cm :- Centimetre /s
RM (rm) / RMT (rmt) :- Running metre /s
KG (kg) :- Kilogram /s
Tonne/t/MT :- Metric ton/s (1000 Kilogram's)
Dia. :- Diameter
Sqm :- Square metre
Cum:- Cubic metre
No.:- Number/s
Qty.:- Quantity
L.S :- Lump sum.
QRO:- Quote rate only.
Drg. No. :- Drawing number
PCC:- Plain Cement Concrete
RCC:- Reinforced cement concrete
HSD:- High Yield strength Deformed bars.
MS:- Mild Steel
CRS:- Corrosion resistance steel.
CTD:- Cold Twisted Deformed steel.
TMT :- Thermo Mechanically Treated Bars
IRC: - Indian Road Congress
COMPOUND WALL
Excavation
Rate to include Clearing and Grubbing of the fill area including,
curing and removal of shrubs, plants and stumps, disposal of
rubbish / excavated stuff to contractor's own disposal ground.
The rate for excavation should include carting away the debris,
pieces of rock , earth etc. to the dumping ground for all lifts and
leads (Inside the CMC/TCS premises as per the instruction or
outside the site premises with the permission of local authority)
The rate should also include dewatering the all excavation area
filled by the rain water or any other external source and pools of
water in the building area by using diesel driven pumps or other
devices, including disposing of the water to a safe distance as
directed.
PCC, outer dimension of foundation shall be considered for the
mass
and
local
excavation
measurement
for
payment/certification.
The rate for excavation shall include for shoring the sides or
trenches with approved timber/steel accessories wherever
necessary to prevent the sides from falling including bailing or
pumping out of water (naturally occurring water met with while
excavating the pits, ) if found necessary. If there are any
shrubs, bushes, trees etc., are to be removed, roots of the
trees should be removed for minimum depth 50. All these
materials should be neatly stacked at site and to be handed
over to the clients.
Individual boulders which may be encountered in the
excavations and which can be removed by crow bars/bucket of
poclain excavator from the parent-matrix shall be removed and
shall form part of this item and no separate payment will be
made.
Contour level to be taken jointly before starting any excavation/
filling at every 3 / 5 mt grids.
Should contractor excavate to a greater depth or width than
shown on the drawing or instructed by PMC/Client, the
contractor shall at his own expense fill in such greater depth or
width of excavation with PCC. bedding as described for
foundation by structural consultant.
Page 3 of 9

UNIT

QUANTITY

RATE

AMOUNT

Remarks

TCS , ADIBHATLA

Section I - Revised BOQ


REVISED BOQ

It. No.

ITEM

DESCRIPTION OF ITEMS
Tree cutting and disposing (if any) to be done as per site
engineer's (in charge) instructions.
Carrying out excavation in the specified type of soil, inclusive of
de-watering to keep the area clear from water ponding at all
times, to the required depth and profile as shown on drawings.
Rate includes removal of old buildings, foundations, plinth
beams, floor concrete, trenches, sewers, pipelines, column
stubs, any other retaining structure etc. with or without
reinforcement and other embedment and carting away the
debris. No separate payment will be made on account of
breaking, removing and carting away of such existing structures
within the excavation area.

UNIT

QUANTITY

Cum
Cum

2,660.00

RATE

AMOUNT

The
excavated
material,
as
directed
by
Project
Manager/Engineer-in-charge, shall be retained at the locations
within the site or disposed off outside the plot boundary in the
approved dump yard of Local Municipal Authority or any other
place . The rate of excavation includes cost of all necessary
licences, Royalty charges and permissions for the disposing
the unsuitable earth from appropriate authorities. No additional
lead or lift shall be claimed either for inside or outside dumping
of the excavated material
Contractor shall take all necessary steps to ensure that the
temporary soil retention system (touching piles, diaphragm wall
or any other shoring system) is not damaged or disturbed
during the excavation activity. In case any damages occurred,
the Contractor shall make good such damages during the
progress of the work at his own cost.
The final approved founding strata shall be left absolutely clean
by removing loose, slushy soil, murrum and weathered rocks
with necessary tools & tackles, cleaning the surface by wire
brush and carting away the debris, dewatering to keep site dry
at all times till laying and curing of PCC etc. are all complete to
the approval of PM/Engineer-in-Charge.
The rates of excavation are inclusive of providing and
maintaining in good condition, barricading all along excavated
pits with minimum 75 mm dia bullies of 2 m height with signs of
danger on it.
Excavation in all kinds of soils, soft or hard murrum, soft rock,
hard rock, loose or stiff clay in foundations, trenches, rafts,
column pits, pile caps up to depth mentioned below the ground
level including providing strutting and shoring, dressing to
excavated sides as required, excavation.
For measurement of depth of excavation, the average slope of
the particular building should be calculated and the average
level should be considered at "0.00" level i.e. the average
ground level. All below depths shall be measured from this level
A
B
C

Soft soil and Murrum


Soft rock, moderately weathered or disintegrated rock,
loose boulders
Hard rock (requiring controlled blasting). The rate shall
include obtaining required permissions from relevant
authorities.
Hard rock (requiring chiselling by pneumatic breaker). The
rate shall include obtaining required permissions from relevant
authorities.

Page 4 of 9

150
500

Cum

800

Cum

3,000

399,000.00

Remarks

TCS , ADIBHATLA

Section I - Revised BOQ


REVISED BOQ

DESCRIPTION OF ITEMS
1.02 Back filling Backfilling the trenches for compound wall by treated
excavated earth & backfilling as given in drawing treatment
process.
1) REMOVE EXCAVATED SOIL 2) MIX WITH
LIME BY 4% - 5% BY WEIGHT 3) ALL MIX SMALL QUANTITY
OF RUBBLE SOME IN SIZE APPOX 5-10% 4) REFILL THE
SOIL IN LAYERS 5) COMPACTION TO HIGH DEGREE IS
NOT REQUIRED
1.02a Back filling Same as above but by earth brought from outside
1.03 Rubble
Providing and laying rubble packing 230mm thick using
Soling
hard stone rubble, handset one on edge, consolidating the
same with power roller 8 to 10 tonnes wherever possible, or
ramming with heavy wooden rammers, watering, filling,
interstices with hand broken stone spalls and binding the top
with hard murrum / stone dust at least 0.5 Cum. per 10 Sqm.
preliminary rolling / ramming of sub-grade watering, rolling and
ramming etc. complete as directed by PMC.

It. No.

ITEM

1.04 PCC 1:3:6 Providing and laying plain cement concrete 1:3:6 using
coarse graded aggregate of 20 mm and down size for levelling
course including laying layers of specified thickness as
directed including form work wherever necessary and well
compacted etc. all complete, as directed.
BY USING WEIGH BATCHERS
OR
1.05 PCC 1:3:6 DO AS 1.04 ABOVE BUT BY USING RMC
1.06 RCC Raft Providing and constructing RCC Raft as per design as
Wall
instructed by Project Manager / drawings in proportion 1:2:4,
inclusive of shuttering, etc. all complete to the satisfaction of
EIC.
BY USING WEIGH BATCHERS
OR
1.07 RCC Raft DO AS 1.06 ABOVE BUT BY USING RMC
Wall
1.08 RCC
Providing and constructing RCC columns as per design as
Columns
instructed by Project Manager / drawings in proportion 1:2:4,
inclusive of shuttering, etc. all complete to the satisfaction of
EIC.
BY USING WEIGH BATCHERS
OR
1.09 RCC
DO AS 1.08 ABOVE BUT BY USING RMC( BASIC PRICE IS
Columns
RS. 3,800/- PER CU.M)
1.10 Solid Block Providing and constructing Solid Concrete Block masonry
Masonry
in proper line and level at all levels in cement mortar 1:6 using
standard size of Blocks as 400 x 200mm of thickness as given
below, with minimum compressive strength of each block not
less than 3.5 N/Sq.mm including all scaffolding, staging, curing,
all lifts, raking of joints, all labour, hire and fuel charges for all
tools and plants employed etc. complete and as directed. Rate
shall include providing Concrete Binders in proportion 1:2:4,
75mm thick reinforced with 2 nos. of 8 mm dia Fe 500 bars with
8mm dia Fe 500 tie link bars at 300 mm c/c, RCC binders to be
at every 1 metre interval from floor level. The rate to be
inclusive of cost of reinforcement and formwork, cover blocks
for reinforcement and all other incidental charges etc., all
complete and as directed. The rate to also include closing the
gap between the masonry and RCC beam / slab finished to
required slope as directed by the Engineer-in-charge. Note:The width of the joints not to exceed 10mm.

200mm thick unfinished block in cement mortar 1:6 and


without RCC binders
Page 5 of 9

UNIT

Cum

QUANTITY
600

RATE
260

AMOUNT
156,000.00

Cum
Cum

145

1,500
1,040

150,800.00

Cum

65

5,750

373,750.00

Cum
Cum

170

7,250
6,000

1,020,000.00

Cum

7,500

Cum

6,500

Cum

7,500

Cum

6,000

Remarks

TCS , ADIBHATLA

Section I - Revised BOQ


REVISED BOQ

ITEM

DESCRIPTION OF ITEMS
Providing and constructing Coursed Rubble Masonry both
side dressed Random Rubble (undulation in dressing is max.
2") stone masonry for walls/ retaining wall in CM 1:4 using
granite/ trap stones, course height not less than 150mm high,
edges of stones hammer dressed, through bond stones every
1.5 m to 2.0m intervals, joints between stones packed with
spalls and cement mortar, exposed joints of stone masonry
neatly racked, including scaffolding tools and plant, curing, etc.
complete. The masonry shall be so constructed such that the
percentage of cement mortar shall not be more than 30% of the
total volume of masonry. The stones shall be so hammer
dresses such that the joints between the stones in finished
masonry work shall not be more than 25mm.

UNIT

QUANTITY

A
B
1.12 Random
Rubble
Masonry

Below Ground
Above Ground
Providing and constructing Un-Coarsed Random Rubble
Stone Masonry for walls/ retaining wall in CM 1:4 using
granite/ trap stones, course height not less than 150mm high,
edges of stones hammer dressed, through bond stones every
1.5m to 2.0m intervals, joints between stones packed with
spalls and cement mortar, exposed joints of stone masonry
neatly racked, including weep holes of 100 mm dia. A.C. Pipes
if required, Making smooth finish to cut-outs shown in drawing,
required scaffolding tools and plant, curing, etc. complete. The
masonry shall be so constructed such that the percentage of
cement mortar shall not be more than 30% of the total volume
of masonry. The stones shall be so hammer dresses such that
the joints between the stones in finished masonry work shall
not be more than 25mm.

Cum
Cum

290

A
B
1.13 External
Single coat
Plaster

Below Ground
Above Ground
Providing and applying 15mm thick External Plaster in one
coats for external surfaces of masonry, RCC. pergola, Chajja
etc. in cement mortar 1:4 with the addition of water proofing
compound and 100% virgin polypropylene fibres of approved
make and finishing rough to take on cladding. The rate should
also be inclusive of all scaffolding for single as well as
double/multiple height areas, surface preparation, curing both
the coats, sills, pattas, grooves, providing GI chicken mesh as
mentioned in the notes above to a width of 150mm at the
junctions of masonry and concrete works including tying in
position by using suitable nails / clamps / screws and as
directed etc. complete at all levels.

Cum
Cum
Sqm

675
80

5,000
5,250
160

3,375,000.00
420,000.00

1.14 Pointing

Providing and carrying out Pointing in Cement Mortar 1:3 of


joints of rubble or block masonry works including racking out
joints 5mm deep, cleaning, pressing cement mortar finishing
and curing including cost of materials, labour, scaffolding for all
leads and lifts etc. complete as per the direction of Engineer-incharge
Sunk type.
Providing and cladding on walls machine cut and machine
pre-polished Granite slab 19mm thick of size as per drawings
set on backing coat of cement mortar 1:3 not exceeding 19mm
thick, including pointing with matching cement paste with
pigmented additives to match the shade of the slab. The rate
should also be inclusive of applying temporary supports to the
cladded stone as directed by the Architect at site. Cost to be
inclusive of hand buffing/cleaning on surface etc complete as
per directions. Cost of Granite Rs.1900/Sqm.

Sqm
Sqm

4140

50
3,500

207,000.00

It. No.

1.11 Coursed
Rubble
Masonry

A
1.15 Granite
Cladding

Page 6 of 9

RATE

5,150
5,400

AMOUNT

1,566,000.00

Remarks

TCS , ADIBHATLA

Section I - Revised BOQ


REVISED BOQ

It. No.

ITEM

1.16 Solar
Fencing

UNIT
DESCRIPTION OF ITEMS
Supply, Erecting and Commissioning of Renewable Energy Rmt
Devices & Spares of Security Power (Solar) Fence System.
Includes: Control Panel with Alarm facility, Solar PV Module
with stand, Battery, Neon Tester, Lightening diverter Kit, Double
Insulated Cables, Housing Box, External Horn, IG HT Wire, Anticlimb Insulators, CP Strain Insulators, Permanent Wire
Tightners, Warning Sign Boards, Joint Clamps, Super Earth
Kits, Kiwitah Posts(Galvanized) Corner Assemblies, Support
sections etc.
Height 1 Mtr
No. of Strings 10 Nos (please also refer ADDENDUM for
scope & Technicalities, Fence specifications & Common
features = Annexure 1) - 8 zone panel
Refer Annexure 1

QUANTITY

RATE
1,750

A
1.17 Additional
Cost

12 zone panel AS PER MENTIONED ABOVE


Quote for Extra Fence Sections Materials which includes
FOR 8 ZONE PANEL
Supply and Installation of Termination Assemblies, Permanent
Wire Tightners, CP Strain Insulators, SS Strain Insulators,
Jumpers, Loops, Joint Clamps etc.

Rmt
Nos

2,250
50,000

A
1.18 PCC
Binder

12 zone panel AS PER MENTIONED ABOVE


Providing and constructing PCC Binders as per design as
instructed by Project Manager / drawings in proportion 1:2:4,
inclusive of shuttering, etc. all complete to the satisfaction of
EIC.
BY USING WEIGH BATCHERS
OR
DO AS 1.18 ABOVE BUT USING RMC

Nos
Cum

80,000
6,000

Cum

8,000

Supplying and fixing Manually Operated Sliding Gate of size


7000mm x 1750mm. made up in MS frameworks as per design
and detailed drawings including all accessories and bottom
angle, roller tracks with heavy duty roller at bottom of gates and
all fabricated and fixed as shown in the drawing, including
buffing, painting 3 coats with approved shade synthetic enamel
paint over a coat of Zinc chromate primer etc. complete and all
as directed. Rate shall include for fixing in position, alignment,
grouting the MS support for sliding panels using cement
concrete 1:2:4 and finishing the surface neat and smooth etc.
as per drawing and specification complete as directed.

Nos

150,000

Providing and constructing Concrete Coping as per design


as instructed by Project Manager / drawings in proportion 1:2:4,
inclusive of shuttering, binding, wires, steel etc. all complete to
the satisfaction of EIC.
BY USING WEIGH BATCHERS
OR
DO AS 1.21 ABOVE BUT USING RMC

Cum

7,000

Cum

13,000

1.19 PCC
Binder
1.20 Sliding
Gates

1.21 Concrete
Coping

1.22 Concrete
Coping

Page 7 of 9

AMOUNT

Remarks

TCS , ADIBHATLA

Section I - Revised BOQ


REVISED BOQ

DESCRIPTION OF ITEMS
1.23 Steel
Providing and fixing steel reinforcement for RCC including
reinforcem material, fabricating as per IS-2502, transporting, storing, deent
coiling, straightening, cutting, bending, spirally hooping and
placing in position at all levels, including all labour, equipments,
supplies, incidentals, sampling and testing as prescribed in IS
codes including all charges thereon for requisite tests,
supervision and binding with 18 gauge approved quality GI
Annealed binding wire. The measurement shall be as per IS
1200 Part- and unit weight shall be derived as mentioned in IS
1786. The rolling margin shall be on Contractors own cost. The
rate shall include cost of cover blocks, binding wire, chairs,
spacers and pins to be provided as per specifications and will
not be measured separately for payment. Quantity of steel as
per drawing and with authorized overlaps only shall be
measured and paid for.

It. No.

ITEM

UNIT

MT

QUANTITY
12

RATE
57,000

AMOUNT
684,000.00

Acre

75

3,000

225,000.00

550,000

550,000.00

The quoted rate will include welding of reinforcement with low


hydrogen low heat welding electrodes for the welding length
mentioned in the drawings in place of conventional laps, if the
consultants have recommended the same, for which no extra
shall be claimed. Replacing conventional laps with welding
splices will be entirely at consultants discretion and will have to
be borne by the Contractor. Such unclaimed welding will also
include welding of reinforcement to already fixed insert plates,
structural steel members etc. Shear connectors prepared from
the reinforcing steel welded to structural steel members shall
be measured in the reinforcement item.
The rate also includes protecting the reinforcing bars in their
virgin form or in the fabricated form, or when placed and tied up
position or as dowels left for future continuation of work or at
construction joint against corrosion due to exposure to
weather if left exposed and un-encased for more than three
weeks from the date of delivery to the site. Cement wash shall
be given to such bars if they are likely to be exposed for more
that three weeks and less than twelve weeks. Process of
application of cement slurry shall be repeated after every
twelve weeks if the exposure period is stretched.

1.24 Site
contour

1.25 Liasoning

High yield strength deformed bars conforming to IS:1786


with Fy = 500N/sq.mm
Providing detailed layout plan of area in scale 1:500
including carrying out contour survey and detailed Engineering
plane table Survey measurement of the
plot and structures, trees, over head line and under ground
service amenities within the area, and giving details of the
structures, such as total area, type of building and distance
from all corners taking trial pit 0.5 x 0.5 x 2.00 m. 2 Nos. per
Acre and . The plan shall be traced on 75 micron polyester film
and shall be submitted along with three Ammonia Prints and
AutoCAD drawings of the same. The contour levels shall be
marked at 0.5 Metre intervals. Cost to include Survey of the
existing boundary RPs and levels etc. complete. Details as
per the attached sheet. (Annexure 2)

Liasoning with the statutory body and confirmation on the Lumps


boundary and acreage and collection of record from city survey um
/D.I.L.R. authorities and authentification. Detailed description of
the works attached. (Annexure 3)

Page 8 of 9

Remarks

TCS , ADIBHATLA

Section I - Revised BOQ


REVISED BOQ

It. No.

ITEM

1.26 Security
Cabin

UNIT
DESCRIPTION OF ITEMS
Supply, Installation of a Portable cabin as per the details Lumps
given for the Portable Cabin in the attached sheet & a panel um
room for Solar fencing equipments. The container sizes as per
the details. ( 1no 40 ft & 1 no 20 ft). The contractor to provide
detailed drg of the Portable cabin and submit the same to
the Architect for approval. Only after approval from the
Architect the Contractor can start the work on the Portable
Cabin. (Annexure 4)

QUANTITY
1

RATE
1,300,000

1.27 Transplantation
of tress

Transplantation of trees as identified by Engineer-incharge, as per the procedure specified to the location
specified. The vendor shall be responsible for maintaining the
transplanted tree for a period of 6 months or as suggested by
the consultant.

Nos

1,500.00

1.28 Planting
new trees

Planting new trees of height 1500mm (5 feet). Species of the


trees to be as per the Architect/Specs ( Refer Plant List
Attachement)
GRAND TOTAL

Nos

550.00

Page 9 of 9

AMOUNT
1,300,000.00

10,426,550.00

Remarks