Federal Register / Vol. 70, No.

25 / Tuesday, February 8, 2005 / Notices 6647

or documents with the Commission persons listed on the service list All documents (original and eight
relating to the merits of an issue that prepared by the Commission in this copies) should be filed with: Magalie R.
may affect the responsibilities of a proceeding, in accordance with 18 CFR Salas, Secretary, Federal Energy
particular resource agency, they must 4.34(b), and 385.2010. Regulatory Commission, 888 First
also serve a copy of the document on You may also register online at Street, NE., Washington, DC 20426.
that resource agency. http://www.ferc.gov/esubscribenow.htm The Commission’s Rules of Practice
Comments and recommendations may to be notified via e-mail of new filings require all intervenors filing documents
be filed electronically via the Internet in and issuances related to this or other with the Commission to serve a copy of
lieu of paper. The Commission strongly pending projects. For assistance, contact that document on each person on the
encourages electronic filings. See CFR FERC Online Support. official service list for the project.
385.2001 (a)(1)(iii) and the instructions n. Procedures Schedule: The Further, if an intervenor files comments
on the Commission’s Web site (http:// Commission staff proposes to issue an or documents with the Commission
www.ferc.gov) under the ‘‘eFiling’’ link. Environmental Assessment (EA) rather relating to the merits of an issue that
k. This application has been accepted, than issuing a draft and final EA. Staff may affect the responsibilities of a
and is ready for environmental analysis intends to allow at least 30 days for particular resource agency, they must
at this time. entities to comment on the EA, and will also serve a copy of the document on
l. The Bar Mills Hydroelectric Project take into consideration all comments that resource agency.
consists of the following existing received on the EA before final action is Scoping comments may be filed
facilities: (1) A 400-foot-long by 25-foot- taken on the license application. The electronically via the Internet in lieu of
high dam with 6.75-foot-high application will be processed according paper. The Commission strongly
flashboards, a 90- to 200-foot-wide by to the following schedule, but revisions encourages electronic filings. See 18
725-foot-long power canal; (2) a 5.3- to the schedule may be made as CFR 385.2001(a)(1)(iii) and the
mile-long impoundment, which has a appropriate: instructions on the Commission’s Web
surface area of 263 acres at the normal Issue Notice of Availability of EA: site (http://www.ferc.gov) under the ‘‘e-
full pond elevation of 148.5 feet above May 15, 2005. Filing’’ link.
mean sea level; (3) a powerhouse Ready for Commission Decision on k. This application is not ready for
containing two generating units with the Application: June 30, 2005. environmental analysis at this time.
total installed generating capacity of 4.5 l. The project is located on the Saco
megawatts (MW); and (4), appurtenant Magalie R. Salas, River in the towns of Buxton and Hollis,
facilities. The dam and existing project Secretary. York County, Maine. The project lies
facilities are owned by FPL Energy [FR Doc. E5–503 Filed 2–7–05; 8:45 am] about 19 river miles upstream from the
Maine Hydro LLC. BILLING CODE 6717–01–P river mouth at Camp Ellis, Maine. The
m. A copy of the application is Bar Mills Project consists of two
available for review at the Commission generating units with an installed
in the Public Reference Room or may be DEPARTMENT OF ENERGY capacity of 4.5 megawatts (MW), a
viewed on the Commission’s Web site at hydraulic capacity of 3,120 cubic feet
http://www.ferc.gov using the ‘‘elibrary Federal Energy Regulatory per second (cfs), and generates about
link’’. Enter the docket number Commission 18,850 megawatt-hours (MWh) of energy
excluding the last three digits in the [Project No. 2194–020] annually. The project operates
docket number field to access the essentially in a cycling mode with
document. For assistance, contact FERC FPL Energy Maine Hydro LLC; Notice moderate fluctuations of the
Online Support at Soliciting Scoping Comments impoundment up to 2 feet of the normal
FERCOnlineSupport@ferc.gov or toll- full pond elevation. The project does
February 1, 2005.
free at 1–866–208–3676, or for TTY, not occupy any federal lands.
(202) 502–8659. A copy is also available Take notice that the following m. A copy of the application is
for inspection and reproduction at the hydroelectric application has been filed available for review at the Commission
address in item h. above. with the Commission and is available in the Public Reference Room or may be
All filings must: (1) Bear in all capital for public inspection. viewed on the Commission’s Web site at
letters the title ‘‘COMMENTS’’, ‘‘REPLY a. Type of Application: New major
http://www.ferc.gov using the
COMMENTS’’, license.
‘‘eLibrary’’ link. Enter the docket
‘‘RECOMMENDATIONS’’, ‘‘TERMS b. Project No.: P–2194–020.
c. Date Filed: June 30, 2003. number excluding the last three digits in
AND CONDITIONS’’, or d. Applicant: FPL Energy Maine the docket number field to access the
‘‘PRESCRIPTIONS’’; (2) set forth in the Hydro LLC. document. For assistance, contact FERC
heading the name of the applicant and e. Name of Project: Bar Mills Online Support at
the project number of the application to Hydroelectric Project. FERCOnlineSupport@ferc.gov or toll-
which the filing responds; (3) furnish f. Location: On the Saco River in the free at 1–866–208–3676, or for TTY,
the name, address, and telephone towns of Buxton and Hollis, York (202) 502–8659. A copy is also available
number of the person submitting the County, Maine. The project does not for inspection and reproduction at the
filing; and (4) otherwise comply with affect any Federal lands. address in item h above.
the requirements of 18 CFR 385.2001 g. Filed Pursuant to: Federal Power n. You may also register online at
through 385.2005. All comments, Act, 16 U.S.C. 791 (a)—825(r). http://www.ferc.gov.esubscribenow.htm
recommendations, terms and h. Applicant Contact: Frank Dunlap, to be notified via email of new filings
conditions, or prescriptions must set FPL Energy Maine Hydro LLC, 160 and issuances related to this or other
forth their evidentiary basis and Capitol Street, Augusta, ME 04330, (207) pending projects. For assistance, contact
otherwise comply with the requirements 623–8417. FERC Online Support.
of 18 CFR 4.34(b). Agencies may obtain i. FERC Contact: Jack Hannula, (202) o. Scoping Process. The Commission
copies of the application directly from 502–8917, john.hannula@ferc.gov. staff intends to prepare an
the applicant. Each filing must be j. Deadline for Filing Scoping Environmental Assessment (EA) for the
accompanied by proof of service on all Comments: March 4, 2005. Bar Mills Hydroelectric Project in

VerDate jul<14>2003 18:12 Feb 07, 2005 Jkt 205001 PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 E:\FR\FM\08FEN1.SGM 08FEN1
6648 Federal Register / Vol. 70, No. 25 / Tuesday, February 8, 2005 / Notices

accordance with the National paper. The Commission strongly scoping through issuing this scoping
Environmental Policy Act. The EA will encourages electronic filings. See 18 document.
consider both site-specific and CFR 385.2001(a)(1)(iii) and the Copies of the scoping document
cumulative environmental impacts and instructions on the Commission’s Web outlining the subject areas to be
reasonable alternatives to the proposed site (http://www.ferc.gov) under the addressed in the EA were distributed to
action. ‘‘Filing’’ link.
the parties on the Commission’s mailing
Commission staff does not propose to k. The existing Macomb Project
list. Copies of the scoping document are
conduct any on-site scoping meetings at consists of: (1) A 106-foot-long, 32-foot-
this time. Instead, we will solicit available for review at the Commission
high concrete gravity overflow-type dam
comments, recommendations, having a spillway crest elevation of or may be viewed on the Commission’s
information, and alternatives in the 570.7 feet above mean sea level; (2) a 38- Web site at http://www.ferc.gov, using
Scoping Document (SD). foot-long, 25-foot-high intake structure the ‘‘eLibrary’’ link. Enter the docket
Copies of the SD outlining the subject along each bank; (3) a 6-foot-diameter, number excluding the last three digits in
areas to be addressed in the EA were 60-foot-long, riveted-steel, gated waste the docket number field to access the
distributed to the parties on the tube along each bank; (4) a 14-acre document. For assistance, contact FERC
Commission’s mailing list. Copies of the reservoir with a net storage capacity of Online Support at
SD may be viewed on the Web at 14 acre-feet at the spillway crest FERCOnlineSupport@ferc.gov or toll-
http://www.ferc.gov using the elevation; (5) a 6.5-foot-diameter, 60- free at (806) 208–3676, or for TTY,
‘‘eLibrary’’ link. Enter the docket foot-long, riveted-steel, concrete- contact (202) 502–8659.
number excluding the last three digits in encased, gated pipeline along the left As part of scoping, the staff will: (1)
the docket number field to access the (south) bank; (6) a powerhouse Summarize the environmental issues
document. For assistance, call 1–866– containing one 1,000-kilowatt tentatively identified for analysis in the
208–3676 or for TTY, (202) 502–8659. horizontal Francis turbine; (7) a 370- EA; (2) solicit from comments all
Magalie R. Salas,
foot-long, 34.5-kilovolt transmission available information, especially
line; and (8) appurtenant facilities. The quantifiable data, on the resources at
Secretary.
applicant estimates that the total
[FR Doc. E5–504 Filed 2–7–05; 8:45 am] issue; (3) encourage statements from
average annual generation would be
BILLING CODE 6717–01–P experts and the public on issues that
5,660 megawatthours.
should be analyzed in the EA, including
l. A copy of the application is on file
with the Commission and is available viewpoints in opposition to, or in
DEPARTMENT OF ENERGY support of, the staff’s preliminary views;
for public inspection. This filing may
also be viewed on the Web at http:// (4) determine the resource issues to be
Federal Energy Regulatory addressed in the EA; and (5) identify
Commission www.ferc.gov using the ‘‘eLibrary’’
link—select ‘‘Docket #’’ and follow the those issues that require a detailed
[Project No. 7321–018] instructions. For assistance, please analysis, as well as those issues that do
contact FERC Online Support at not require a detailed analysis.
Erie Boulevard Hydropower, L.P.; FERCOnlineSupport@ferc.gov or toll Consequently, interested entities are
Notice of Scoping and Soliciting free at (866) 208–3676, or for TTY, requested to file with the Commission
Scoping Comments contact (202) 502–8659. A copy is also any data and information concerning
February 1, 2005. available for inspection and environmental resources and land uses
a. Type of Application: Subsequent reproduction at the address in item h in the project area and the subject
license. above. project’s impacts to the aforementioned.
b. Project No.: 7321–018. You may also register online at http:/ n. The revised schedule for processing
c. Date Filed: November 26, 2004. /www.ferc.gov/docs-filing/ the Macomb Project license application
d. Applicant: Erie Boulevard esubscription.asp to be notified via is:
Hydropower, L.P. email of new filings and issuances
e. Name of Project: Macomb Project. related to this or other pending projects. Major milestone Target date
f. Location: On the Salmon River in For assistance, contact FERC Online
Franklin County, New York. This Support. Notice of application is ready April 2005.
project does not occupy federal lands. m. Scoping Process. Scoping is for environmental analysis.
g. Filed Pursuant to: Federal Power intended to advise all parties regarding Notice of the availability of October 2005.
Act, 16 U.S.C. 791 (a)–825(r). the proposed scope of the the EA.
h. Applicant Contact: Mr. Jerry L. environmental analysis and to seek Ready for Commission’s de- November
Sabattis, Erie Boulevard Hydropower, additional information pertinent to this cision on the application. 2005.
L.P., 225 Greenfield Parkway, Suite 201, analysis. The Commission staff intends
Liverpool, NY 13088, (315) 413–2787. to prepare an environmental assessment Magalie R. Salas,
i. FERC Contact: John Smith, (EA) on the project in accordance with Secretary.
telephone (202) 502–8972, e-mail the National Environmental Policy Act. [FR Doc. E5–505 Filed 2–7–05; 8:45 am]
john.smith@ferc.gov. The EA will consider both site-specific
BILLING CODE 6717–01–P
j. Deadline for Filing Scoping and cumulative environmental impacts
Comments: March 2, 2005. and reasonable alternatives to the
All documents (original and eight proposed action.
copies) should be filed with: Magalie R. At this time, the Commission staff
Salas, Secretary, Federal Energy does not propose to conduct any formal
Regulatory Commission, 888 First public or agency meetings or an on-site
Street, NE., Washington, DC 20426. visit. Instead we will solicit comments,
Scoping comments may be filed recommendations, information, and
electronically via the Internet in lieu of alternatives by conducting paper

VerDate jul<14>2003 18:12 Feb 07, 2005 Jkt 205001 PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 E:\FR\FM\08FEN1.SGM 08FEN1

You might also like