You are on page 1of 27

Oracle Corporation

Oracle Value Chain


Planning - Planning
Time Fence Profile
Options
Revised: 2015-05-20

For Oracle Internal and licensed customer use only.


This report is compiled from the Profile Options Database created and maintained by the
VCP Support Team and contains knowledge gathered from the Documentation, Notes,
Bugs, and other internal sources. We do not guarantee this data to be without flaw and
offer no warranty to its fitness for use.
We will update and maintain this document when possible to present the best available
information.
(c) Oracle Corporation 2010

Table of Contents
Advanced Planning and Scheduling Profile Options......................................................................3
MRP: Firm Internal Req Transferred to OE.............................................................................4
MRP: Net All Purchase Orders Prior To Requisitions.............................................................5
MRP:Calculate Excess Exceptions on Time Fence................................................................6
MRP:Create Time fence..........................................................................................................7
MRP:Firm Planned Order Time Fence....................................................................................8
MRP:Include Substitute Components.....................................................................................9
MRP:Recommend action within PTF....................................................................................10
MRP:Time Fence Warning....................................................................................................11
MSC: Apply shortage and excess tolerance to planned orders............................................12
MSC: Consume Forecast Inside Demand Time Fence.........................................................13
MSC: Firm Internal Requisition Time Fence.........................................................................14
MSC: Firm Intransit and PO in Receiving Supplies...............................................................15
MSC: Ignore PTF during CTP...............................................................................................16
MSC: MPS Auto-Firm Planned Orders.................................................................................17
MSC: PS Adjust Post Horizon Demand Qty..........................................................................18
MSO: Create Aggregate Supply for Unsatisfied Demands within Planning Time Fence......19
MSO: Firm Requisitions Within Time Fence.........................................................................21
MSO: Firm Supply Allocation Window (Backward days).......................................................22
MSO: Generate Compression Days Exception.....................................................................23
MSO: Lead Time Control......................................................................................................24
MSO: Schedule All Firm Planned Orders First......................................................................26

Advanced Planning and Scheduling Profile Options


MRP: Firm Internal Req Transferred to OE
Profile Code
Profile Option Name
Description

MRP
MRP_FIRM_OE_XFERRED_INTERNAL_REQ
Valid values are:

Yes - all internal requisitions transferred to Oracle Order


Management are treated as firm supplies by Oracle
Advanced Supply Chain Planning
No - Oracle Advanced Supply Chain Planning may generate
reschedule recommendations for these internal requisitions.

Rescheduled recommendations cannot be released to purchasing for internal


requisitions. To reschedule recommendations, cancel the internal requisition
in the source instance and create a new requisition with the new date.
Default Value - Yes
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile
12.1.1 Profile
Data Collections
Item Mass Maintenance
Advanced Supply Chain Planning
All Plan Types
Unconstrained Plan
Constrained EDD
Constrained ECC
Distribution Planning
Collaborative Planning
Inventory Optimization
Service Parts Planning
All Plan Types
Enforce Constraints Not Optimized
Enforce Constraints Optimized
Disable Constraints Not Optimized
Disable Constraints Optimized
Rapid Planning
Demand Planning
Demantra
Strategic Network Optimization
Advanced Planning Command Center
Manufacturing Operations Center
Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide


Yes
No
No
Yes
No
No
No
No
Yes
No
No
Yes
No
No
No
No
No
No
No
No
Yes
No
No
No

MRP: Net All Purchase Orders Prior To Requisitions


Profile Code
Profile Option Name
Description

MRP
MRP_FIRM_REQS_WITHIN_TF
Use this profile to specify whether or not the planning engine should net all
existing supplies prior to netting purchase requisitions.

Yes - Net purchase orders, then net purchase requisitions.


This may result in purchase requisitions with schedule dates
earlier than purchase orders being canceled or rescheduled
out.
No - Net purchase orders and purchase requisitions
together. Note: If the plan planning mode is Constrained
(Without Detailed Scheduling), the planning engine does not
use this profile option.

Default - No
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile
12.1.1 Profile
Data Collections
Item Mass Maintenance
Advanced Supply Chain Planning
All Plan Types
Unconstrained Plan
Constrained EDD
Constrained ECC
Distribution Planning
Collaborative Planning
Inventory Optimization
Service Parts Planning
Rapid Planning
Demand Planning
Demantra
Strategic Network Optimization
Advanced Planning Command Center
Manufacturing Operations Center
Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide


Yes
No
No
Yes
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No

MRP:Calculate Excess Exceptions on Time Fence


Profile Code
Profile Option Name
Description

MRP
MRP_CALC_EXCESS_EXCEPT
Indicates whether excess exceptions are calculated at the time fence or up to
the time fence

Yes: The planning engine issues exceptions only at the time


fence date.

No: The planning engine issues individual exception.

Valid values: yes/no


Default value: yes
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile
12.1.1 Profile
Data Collections
Item Mass Maintenance
Advanced Supply Chain Planning
All Plan Types
Unconstrained Plan
Constrained EDD
Constrained ECC
Distribution Planning
Collaborative Planning
Inventory Optimization
Service Parts Planning
Rapid Planning
Demand Planning
Demantra
Strategic Network Optimization
Advanced Planning Command Center
Manufacturing Operations Center
Global Order Promising

Yes
No
No
Yes
Yes
No
No
No
No
No
No
No
No
No
No
No
No
No
No

MRP:Create Time fence


Profile Code
Profile Option Name
Description

MRP
MRP_FIRM_ORDER_TF
Instructs the planning engine to create a natural time fence on firm work
orders, purchase orders, flow schedules and shipments. Valid values are:

Yes - create a natural time fence based on firm work orders,


purchase orders, flow schedules, and shipments

No - the planning engine does not create a time fence

The planning engine honors the item attribute Planning Time Fence
regardless of the value of this profile option.
Note Reference(s)

399888.1
422361.1

Bug Reference(s)
Document References(s)

Dependent Profiles
11.5.10 Profile
12.1.1 Profile
Data Collections
Item Mass Maintenance
Advanced Supply Chain Planning
All Plan Types
Unconstrained Plan
Constrained EDD
Constrained ECC
Distribution Planning
Collaborative Planning
Inventory Optimization
Service Parts Planning
Rapid Planning
Demand Planning
Demantra
Strategic Network Optimization
Advanced Planning Command Center
Manufacturing Operations Center
Global Order Promising

-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
Yes
No
No
Yes
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No

MRP:Firm Planned Order Time Fence


Profile Code
Profile Option Name
Description

MRP
MRP_FIRM_PO_TF
Instructs the planning engine to create a natural time fence for an item at the
completion date of the latest firm planned order. Valid values are:

Yes - firm planned orders create a natural time fence.

No - planning engine does not create a time fence at a firm


planned order

If the overwrite option in the plan is set to overwrite all, then all firm planned
orders are deleted
Note Reference(s)

Bug Reference(s)
Document References(s)

Dependent Profiles
11.5.10 Profile
12.1.1 Profile
Data Collections
Item Mass Maintenance
Advanced Supply Chain Planning
All Plan Types
Unconstrained Plan
Constrained EDD
Constrained ECC
Distribution Planning
Collaborative Planning
Inventory Optimization
Service Parts Planning
Rapid Planning
Demand Planning
Demantra
Strategic Network Optimization
Advanced Planning Command Center
Manufacturing Operations Center
Global Order Promising

3642086
2553205
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
Yes
No
No
Yes
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No

MRP:Include Substitute Components


Profile Code
Profile Option Name
Description

MRP
MRP_ATP_SUB_COMP
Indicates whether to include substitute components in the Oracle Global
Order Promising calculation.
Users can update at the site level.
This setting is only applicable when ATP is based on Planning output.

Note Reference(s)

Bug Reference(s)
Document References(s)

Dependent Profiles
11.5.10 Profile
12.1.1 Profile
Data Collections
Item Mass Maintenance
Advanced Supply Chain Planning
Distribution Planning
Collaborative Planning
Inventory Optimization
Service Parts Planning
Rapid Planning
Demand Planning
Demantra
Strategic Network Optimization
Advanced Planning Command Center
Manufacturing Operations Center
Global Order Promising

3162334
1555350
-1
-1
Oracle Global Order Promising Implementation and User's Guide
Yes
No
No
No
No
No
No
No
No
No
No
No
No
No
Yes

MRP:Recommend action within PTF


Profile Code
Profile Option Name
Description

MRP
MRP_REC_ACTION_IN_PTF
Affects exceptions and recommendations. It instructs the planning engine, in
unconstrained plans, to generate recommendations for scheduled receipts
earlier than Planning Time Fence Date.
This profile is not used for MSO (constrained planning), looks at planning
time fence control.

Note Reference(s)

Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile
12.1.1 Profile
Data Collections
Item Mass Maintenance
Advanced Supply Chain Planning
All Plan Types
Unconstrained Plan
Constrained EDD
Constrained ECC
Distribution Planning
Collaborative Planning
Inventory Optimization
Service Parts Planning
Rapid Planning
Demand Planning
Demantra
Strategic Network Optimization
Advanced Planning Command Center
Manufacturing Operations Center
Global Order Promising

2980511
-1
-1
Yes
No
No
Yes
No
Yes
No
No
No
No
No
No
No
No
No
No
No
No
No

MRP:Time Fence Warning


Profile Code
Profile Option Name
Description
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile
12.1.1 Profile
Data Collections
Item Mass Maintenance
Advanced Supply Chain Planning
Distribution Planning
Collaborative Planning
Inventory Optimization
Service Parts Planning
Rapid Planning
Demand Planning
Demantra
Strategic Network Optimization
Advanced Planning Command Center
Manufacturing Operations Center
Global Order Promising

MRP
MRP_MPS_TIME_FENCE_WARNING
Not used in Oracle Advanced Planning.

Yes
No
No
No
No
No
No
No
No
No
No
No
No
No
No

MSC: Apply shortage and excess tolerance to


planned orders
Profile Code
Profile Option Name
Description

MSC
MSC_APPLY_TOL_PLAN_ORD
Introduced in ASCP Egnine/UI rollup #33
Valid values are:

Yes - The shortage tolerance and excess percentages are


applied to all supplies including planned orders. This is the
default value.
No - The shortage tolerance and excess percentages are
applied only to firm existing supplies (such as Onhand, WIP).

Introduced in ASCP Engine/UI rollup #33.

Default Value - Yes


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile
12.1.1 Profile
Data Collections
Item Mass Maintenance
Advanced Supply Chain Planning
All Plan Types
Unconstrained Plan
Constrained EDD
Constrained ECC
Distribution Planning
Collaborative Planning
Inventory Optimization
Service Parts Planning
Rapid Planning
Demand Planning
Demantra
Strategic Network Optimization
Advanced Planning Command Center
Manufacturing Operations Center
Global Order Promising

7461501
-1
Yes
No
No
Yes
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No

MSC: Consume Forecast Inside Demand Time


Fence
Profile Code
Profile Option Name
Description

MSC
MSC_CONSUME_FORECAST_DTF
Valid values are:

No - demand time fence control is implemented prior to


forecast consumption. Forecast entries in the demand time
fence are dropped as demand statements and not used for
consumption.
Yes - forecast consumption occurs prior to enforcing demand
time fence control. The forecast entries within the demand
time fence are used for consumption but not as demand.
After consumption, demand quantity for all the forecast
entries within the demand time fence is zero.

If you are using forecast spreading:

Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile
12.1.1 Profile
Data Collections
Item Mass Maintenance
Advanced Supply Chain Planning
All Plan Types
Unconstrained Plan
Constrained EDD
Constrained ECC
Distribution Planning
Collaborative Planning
Inventory Optimization
Service Parts Planning
Rapid Planning
Demand Planning
Demantra
Strategic Network Optimization
Advanced Planning Command Center
Manufacturing Operations Center
Global Order Promising

565926.1

-1
Yes
No
No
Yes
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No

For a periodic forecast entry that falls in weekly planning


buckets within the demand time fence, the forecast
spreading process spreads the entries into daily entries.
If the daily entry is within the demand time fence, the process
ignores the value that you set and uses the value Yes in
processing.
If the daily entry is outside the demand time fence, the
process ignores this profile option and consumes against the
entry.

MSC: Firm Internal Requisition Time Fence


Profile Code
Profile Option Name
Description

MSC
MSC_FIRM_PURCH_REQ_TF
This profile option creates a natural time fence for an item if a firm internal
requisition exists. The natural time fence is the date of the latest firm internal
requisition. Valid values are:

Yes: Use this to create a natural time fence for a firm internal
requisition.
No: Use this if you do not want to create a natural time fence
for a firm internal requisition.

Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile
12.1.1 Profile
Data Collections
Item Mass Maintenance
Advanced Supply Chain Planning
All Plan Types
Unconstrained Plan
Constrained EDD
Constrained ECC
Distribution Planning
Collaborative Planning
Inventory Optimization
Service Parts Planning
Rapid Planning
Demand Planning
Demantra
Strategic Network Optimization
Advanced Planning Command Center
Manufacturing Operations Center
Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide


Yes
No
No
Yes
Yes
No
No
No
Yes
No
No
No
No
No
No
No
No
No
No

MSC: Firm Intransit and PO in Receiving Supplies


Profile Code
Profile Option Name
Description

MSC
MSC_FIRM_INTRANSIT_PO_IN_RECEIVING
This profile option applies to unconstrained plans only and instructs the
planning engine whether it should consider intransit and purchase order in
receiving supplies as firm or it should issue reschedule recommendations for
them. Valid values are:

Yes - the planning engine considers intransit and purchase


order in receiving supplies as firm.

No - the planning engine generates reschedule


recommendations for these types of supplies. Use this
setting if you expedite shipments that are en route from a
supplier to a receiving organization or if you want to expedite
the movement of materials in receiving to the shop floor. For
example, you might offload a package from a ship at a port
and then fly the package to the receiving organization.

These recommendations are informational only and cannot be released from


the Planner Workbench.
This is a user level profile option.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile
12.1.1 Profile
Data Collections
Item Mass Maintenance
Advanced Supply Chain Planning
All Plan Types
Unconstrained Plan
Constrained EDD
Constrained ECC
Distribution Planning
Collaborative Planning
Inventory Optimization
Service Parts Planning
Rapid Planning
Demand Planning
Demantra
Strategic Network Optimization
Advanced Planning Command Center
Manufacturing Operations Center
Global Order Promising

4593891
-1
Yes
No
No
Yes
No
Yes
No
No
No
No
No
No
No
No
No
No
No
No
No

MSC: Ignore PTF during CTP


Profile Code
Profile Option Name
Description

MSC
MSC_CTP_IGNORE_PTF
Valid values are:
* Yes - set the Planning Time Fence to sysdate. So Planning Time Fence
is not considered while doing ATP.
* No
Default Value - No
Introduced to help customers who are running UNconstrained plan and using
ATP based on Planning output.
For GOP, for make order, the start date will respect Planning Time Fence .
For transfer order, the ship date will respect Planning Time Fence.
For buy order, the dock date will respect Planning Time Fence.
This it is consistent with the constrained plan, and it is by design.
However, for an unconstrained plan, due date will respect Planning Time
Fence.
So if GOP is done on a unconstrained plan, this could lead to confusion.

Note Reference(s)

Bug Reference(s)

Document References(s)

Dependent Profiles
11.5.10 Profile
12.1.1 Profile
Data Collections
Item Mass Maintenance
Advanced Supply Chain Planning
All Plan Types
Unconstrained Plan
Constrained EDD
Constrained ECC
Distribution Planning
Collaborative Planning
Inventory Optimization
Service Parts Planning
Rapid Planning
Demand Planning
Demantra
Strategic Network Optimization
Advanced Planning Command Center
Manufacturing Operations Center
Global Order Promising

Available in 11.5.10 Front port bug 6241549 on top of VCP 12.1.3.8 was done Jan 2014 via Patch
18150049 but requires DEV Approval to apply.
464095.1

6113215
6241549
624154
-1
-1
-1
-1
Yes
No
No
Yes
No
No
No
No
No
No
No
No
No
No
No
No
No
No
Yes

MSC: MPS Auto-Firm Planned Orders


Profile Code
Profile Option Name
Description

MSC
MSC_MPS_AUTO_FIRM_PO
This profile option specifies how the planning engine deals with master
production schedule firm planned orders. You can use this profile option to
specify whether or not the planning engine should treat all planned orders in
the master production schedule as firm:
Valid values are:

Yes - When running batch replan using an MPS plan, all


planned orders are treated as firm without regard to planning
time fence

No - When running batch replan, only planned orders inside


the PTF are firm.

If an MPS is a demand schedule for another plan,


this has no impact as planned orders from the MPS
are always treated as firm.

Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile
12.1.1 Profile
Data Collections
Item Mass Maintenance
Advanced Supply Chain Planning
All Plan Types
Unconstrained Plan
Constrained EDD
Constrained ECC
Distribution Planning
Collaborative Planning
Inventory Optimization
Service Parts Planning
Rapid Planning
Demand Planning
Demantra
Strategic Network Optimization
Advanced Planning Command Center
Manufacturing Operations Center
Global Order Promising

This profile option applies only to master production schedule plans. You can
set it at the site and user levels.
259322.1

-1
Yes
No
No
Yes
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No

MSC: PS Adjust Post Horizon Demand Qty


Profile Code
Profile Option Name
Description

MSC
MSC_SCP_PS_ADJUST_POST_HORIZON_DEM_QTY

MSC: PS Adjust Post Horizon Demand Qty


This profile allows PS solver to "net-out" demands
that are not fulfilled until after the end of the
scheduling horizon.
When profile "MSC: PS Adjust Post Horizon
Demand Qty" to yes,
then PS uses the Work Orders that are on end of
horizon to meet demand.

Note Reference(s)
1386168.1
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile
12.1.1 Profile
Data Collections
Item Mass Maintenance
Advanced Supply Chain Planning
All Plan Types
Unconstrained Plan
Constrained EDD
Constrained ECC
Distribution Planning
Collaborative Planning
Inventory Optimization
Service Parts Planning
Rapid Planning
Demand Planning
Demantra
Strategic Network Optimization
Advanced Planning Command Center
Manufacturing Operations Center
Global Order Promising

12939774
-1
-1
No
No
No
Yes
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No

MSO: Create Aggregate Supply for Unsatisfied


Demands within Planning Time Fence
Profile Code
Profile Option Name
Description

MSO
MSO_AGG_SUP_FOR_DMD_IN_PTF

Introduced in ASCP Engine/UI rollup #33 for


11.5.10
Front ported to R12 in CU5 patch 7270650
Fixed in VCP Cum patch 12.1.3.1 and above
The Memory Based Planner (MBP) used to create
supplies for unsatisfied demands inside PTF on
respective dates after considering the FDS. Later
on those supplies were moved to PTF date,
resulting in more than one supply on PTF date.
This would be wrong for some set up. So, we made
the code changes to create single supply for
unsatisfied demands in PTF.
This is now controlled by this profile.

Yes, then one supply is created for unsatisfied demands on


the PTF date if all of the following conditions are satisfied:

Plan is not constrained with


Decision Rules
Plan is not optimized.

No, more than one supply may be created for unsatisfied


demands on the PTF date. (Default if NULL)

Available in 12.1.3.1 and upwards


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile
12.1.1 Profile
Data Collections
Item Mass Maintenance
Advanced Supply Chain Planning
All Plan Types
Unconstrained Plan
Constrained EDD
Constrained ECC
Distribution Planning
Collaborative Planning
Inventory Optimization

7294117
-1
Yes
No
No
Yes
No
Yes
No
No
No
No
No

Service Parts Planning


Rapid Planning
Demand Planning
Demantra
Strategic Network Optimization
Advanced Planning Command Center
Manufacturing Operations Center
Global Order Promising

No
No
No
No
No
No
No
No

MSO: Firm Requisitions Within Time Fence


Profile Code
Profile Option Name
Description

MSO
MSO_FIRM_REQ_WITHIN_PTF
Indicates whether or not the planning engine should firm those requisitions
that are within the time fence. The valid values are:

Yes: Firms requisitions that are within the time fence.

Note Reference(s)

The planning engine does not reschedule or cancel recommendations even if


there are conditions for reschedules and cancellations.
The planning engine uses the start date of the receiving organization as the
reference for internal requisitions. Default : No
555016.1
1079681.1
1068297.1
365112.1

Bug Reference(s)
Document References(s)

Dependent Profiles
11.5.10 Profile
12.1.1 Profile
Data Collections
Item Mass Maintenance
Advanced Supply Chain Planning
All Plan Types
Unconstrained Plan
Constrained EDD
Constrained ECC
Distribution Planning
Collaborative Planning
Inventory Optimization
Service Parts Planning
All Plan Types
Enforce Constraints Not Optimized
Enforce Constraints Optimized
Disable Constraints Not Optimized
Disable Constraints Optimized
Rapid Planning
Demand Planning
Demantra
Strategic Network Optimization
Advanced Planning Command Center
Manufacturing Operations Center
Global Order Promising

No: The planning engine does not reschedule the non-firm


purchase requisitions that have dock dates within the
Planning Time Fence.

8709703
-1
-1
-1
-1
-1
Yes
No
No
Yes
Yes
No
No
No
No
No
No
Yes
No
No
No
No
No
No
No
No
No
No
No
No

MSO: Firm Supply Allocation Window (Backward


days)
Profile Code
Profile Option Name
Description

MSO
MSO_FIRM_SUPPLY_ALLOC_WIN
The allocation of firm supplies to demands is based on demand priorities
within the Firm Supply Allocation window. Set this window using system
level profile options. This window is derived dynamically for each demand; it
starts with the demand due date and goes backwards to the window size.
This is stated as the number of calendar days including non-workdays. Valid
values are:

Integer > 0

Default Value - 1
Note Reference(s)

Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile
12.1.1 Profile
Data Collections
Item Mass Maintenance
Advanced Supply Chain Planning
All Plan Types
Unconstrained Plan
Constrained EDD
Constrained ECC
Distribution Planning
Collaborative Planning
Inventory Optimization
Service Parts Planning
Rapid Planning
Demand Planning
Demantra
Strategic Network Optimization
Advanced Planning Command Center
Manufacturing Operations Center
Global Order Promising

4688250
-1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Yes
No
No
Yes
No
No
Yes
Yes
No
No
No
No
No
No
No
No
No
No
No

MSO: Generate Compression Days Exception


Profile Code
Profile Option Name
Description

MSO
MSO_GENERATE_COMPRESSION_EXCEPTION
Use this profile option to control issuance of exception message Orders with
compression days. Valid values are:

Yes - Issue the exception message


No - Do not issue the exception message

The planning engine issues exception message Orders with insufficient leadtime when it schedules orders for less time than their assembly's lead-time.
If the reason for that scheduling is that the planning engine would schedule
the order in the past, it also issues exception message Orders with
compression days.
To avoid seeing both these exceptions for the same order, select No for this
profile option.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile
12.1.1 Profile
Data Collections
Item Mass Maintenance
Advanced Supply Chain Planning
All Plan Types
Unconstrained Plan
Constrained EDD
Constrained ECC
Distribution Planning
Collaborative Planning
Inventory Optimization
Service Parts Planning
Rapid Planning
Demand Planning
Demantra
Strategic Network Optimization
Advanced Planning Command Center
Manufacturing Operations Center
Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide


Yes
No
No
Yes
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No

MSO: Lead Time Control


Profile Code
Profile Option Name
Description

MSO
MSO_LEAD_TIME_CONTROL

Violate Minimum Processing Times to Meet


Demand Due Date: The planning engine meets
the demand due date even if it compresses
operations and supplies beyond their minimum
durations (from item lead-times and routing
usages).
-- This setting can violate the Planning Time Fence
settings for an item.
-- It can also violate a Natural Time Fence created
by using profile MRP: Create Time Fence = Yes
Do Not Violate Minimum Processing Times: The
planning engine respects the minimum durations of
operations and supplies (from item lead-times and
routing usages) even if it satisfies demands late.
Default Value: Violate minimum Processing Times
to Meet Demand Due Date
This, sometimes, used with plan option - Enforce
Purchasing Lead-times Constraint and can change
planning engine behavior.
In 11.5.10, this profile is only for EDD - Enforce
Demand Due Dates plan
In 12.0.4 and above, this profile works for BOTH
EDD and ECC - Enforce Capacity Constraints
plans.

Note Reference(s)

Bug Reference(s)
Document References(s)

Dependent Profiles
11.5.10 Profile
12.1.1 Profile
Data Collections
Item Mass Maintenance
Advanced Supply Chain Planning

399888.1
850591.1
443357.1

-1
-1
-1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Yes
No
No
Yes

All Plan Types


Unconstrained Plan
Constrained EDD
Constrained ECC
Distribution Planning
Collaborative Planning
Inventory Optimization
Service Parts Planning
Rapid Planning
Demand Planning
Demantra
Strategic Network Optimization
Advanced Planning Command Center
Manufacturing Operations Center
Global Order Promising

No
No
Yes
Yes
No
No
No
No
No
No
No
No
No
No
No

MSO: Schedule All Firm Planned Orders First


Profile Code
Profile Option Name
Description

MSO
MSO_SCHEDULE_FIRM_PLANNED_ORDERS_FIRST
Determines if Firm Planned Orders are to be scheduled first before other
supplies. This can work in tandem with other Firm profiles to create a Natural
Time fence.
Valid values: Yes/No
Default value: No

Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile
12.1.1 Profile
Data Collections
Item Mass Maintenance
Advanced Supply Chain Planning
All Plan Types
Unconstrained Plan
Constrained EDD
Constrained ECC
Distribution Planning
Collaborative Planning
Inventory Optimization
Service Parts Planning
Rapid Planning
Demand Planning
Demantra
Strategic Network Optimization
Advanced Planning Command Center
Manufacturing Operations Center
Global Order Promising

No
No
No
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
No
No
No
No
No
No

You might also like